Green building construction wastewater recycling device
By using inclined filter plates and conveying chain drive scraper systems in the wastewater recycling device for construction construction, the problem of existing equipment affecting the filter effect due to impurities blockage is solved, and the filter plate replacement process is simplified by driving the screw to rotate by driving the motor, achieving efficient filtration and convenient maintenance.
Patent Information
- Application Number
- CN202421457310.1
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-06-25
- Publication Date
- 2025-04-29
- Estimated Expiration
- 2034-06-25
AI Technical Summary
The existing construction sewage filtration equipment is prone to affect the filtration effect due to impurities during use, and it is cumbersome and inconvenient to replace the filter element or filter mesh.
A green building construction wastewater recycling device is designed, using an inclined filter plate and a scraper system driven by the conveying chain. The conveying chain drives the scraper to move, clean up impurities on the filter plate, avoid blockage, and drive the screw to rotate through the drive motor to facilitate the replacement of the filter plate.
It effectively avoids clogging of the filter plate, improves the filtration effect, simplifies the filter plate replacement process, and improves the convenience of the equipment.
Smart Images

Figure CN222804794U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of wastewater recycling devices, in particular to a green building construction wastewater recycling device. Background Art
[0002] Construction wastewater refers to wastewater containing silt, suspended matter, and other pollutants generated during the construction process. In order to save water resources, construction wastewater needs to be treated and recycled.
[0003] When the existing construction wastewater is recycled, it needs to be transported to the filtering equipment for filtration to filter out the silt, suspended matter and impurities in the wastewater. However, when the existing filtering equipment is used, the sewage is transported to the filter element or filter screen for filtration. Since the filter element or filter screen cannot be cleaned while filtering, the impurities in the sewage will clog the filter element or filter screen, affecting the filtration. When the filter screen or filter element is damaged and needs to be replaced, the staff needs to open the filtering equipment and then remove the filter element or filter screen in the filtering equipment for replacement. Since the internal space of the filtering equipment is small, it is troublesome to remove the filter element or filter screen and inconvenient to replace it. To this end, we propose a green building construction wastewater recycling device. Utility Model Content
[0004] The purpose of the utility model is to solve the above-mentioned shortcomings in the prior art and to propose a green building construction wastewater recycling device.
[0005] In order to achieve the above-mentioned purpose, the utility model adopts the following technical scheme: a green building construction wastewater recycling device is designed, including a box body, a base is installed at the bottom of the box body, and a plurality of legs are vertically installed at the bottom edge of the base;
[0006] A water inlet pipe is installed at one end of the top of the box, two filter plates are stacked inside the box, there is a gap between the two filter plates, and both filter plates are inclined, and a circulation pipe is installed at one end of the bottom of the box;
[0007] Two pairs of strip mounting plates are installed inside the box, each pair of strip mounting plates is located above the corresponding filter plate, and a pair of connecting shafts are installed between each pair of strip mounting plates, and conveying chains are provided at both ends of each pair of connecting shafts, and the conveying chains are meshed with sprockets installed at both ends of each pair of connecting shafts. The end of one connecting shaft in each pair of connecting shafts is connected to a first driving motor, and the first driving motor is fixed to the side wall of the box;
[0008] Several scrapers are installed between two adjacent conveyor chains. The bottom of the scraper is in clearance with the top of the corresponding filter plate. Two slag discharge grooves are set on one side of the box. The slag discharge grooves are located above the corresponding filter plates, and one end of the scraper extends out of the slag discharge groove.
[0009] Two pairs of strip connecting plates are provided on both sides of the box body, one side of each strip connecting plate is slidably connected to the guide rail on the side wall of the box body through a slider, and both ends of the filter plate are fixed on the corresponding strip connecting plates;
[0010] A connecting block is vertically installed at one end of the bottom of each strip connecting plate, and two pairs of screw rods are rotatably connected on both sides of the interior of the box body, each screw rod passes through the corresponding connecting block and is threadedly matched with the corresponding connecting block, and one end of each screw rod is connected to a second drive motor, which is fixed on the side wall of the box body;
[0011] Two through slots are arranged on one side of the box body close to the second driving motor, and the strip-shaped connecting plate and the filter plate are aligned with the corresponding through slots.
[0012] Preferably, a first guide plate is provided between the two filter plates, the first guide plate is inclined, the first guide plate is fixed on the side wall of the box, and there is a distance between one end of the first guide plate and the side wall of the box.
[0013] Preferably, a support plate is provided between each conveyor chain, the bottom of the support plate is gap-matched with the inner bottom surface of the conveyor chain, and one side of the support plate is fixed on the strip mounting plate.
[0014] Preferably, two guide plates are installed on one side of the inner wall of the box close to the slag discharge trough, the top of each guide plate is flush with the bottom of the corresponding slag discharge trough, the bottom of the guide plate and the top of the filter plate are matched with the gap, and the top of the guide plate is an arc structure, and the top curvature of the guide plate matches the moving trajectory of the scraper.
[0015] Preferably, a second guide plate is installed at the bottom of the box body, the top of the second guide plate is inclined, and the top of the circulation pipeline is flush with the lower end of the top of the second guide plate.
[0016] Preferably, a sealing cover is provided inside the through groove, the sealing cover is sealingly matched with the inner wall of the through groove, and the sealing cover is fixed to the side wall of the box body by a lock.
[0017] Preferably, a control cabinet is installed on one side of the box body, and a controller inside the control cabinet is connected to the first drive motor and the second drive motor respectively through wires.
[0018] The design scheme proposed by the utility model has the following beneficial effects during application:
[0019] 1. The first driving motor can drive the conveyor chain to move, and then control the scraper to move along the top of the filter plate to scrape off the impurities filtered by the filter plate, avoid clogging of the filter plate, and improve the filtering effect.
[0020] 2. Through the second driving motor, the filter plate can be moved out of the box from the through slot under the action of the screw rod, which is convenient for replacing the filter plate. BRIEF DESCRIPTION OF THE DRAWINGS
[0021] Figure 1 It is a schematic diagram of the internal structure of the utility model;
[0022] Figure 2 It is a schematic diagram of the structure of the utility model;
[0023] Figure 3 It is a side cross-sectional view of the filter plate and conveyor chain structure of the utility model;
[0024] Figure 4 This is a schematic diagram of the conveyor chain and scraper structure of the utility model;
[0025] Figure 5 It is a schematic diagram of the structure of the filter plate and the strip connecting plate of the utility model.
[0026] In the figure: 1. base; 2. box body; 3. screw rod; 4. strip mounting plate; 5. filter plate; 6. conveyor chain; 7. water inlet pipe; 8. scraper; 9. first drive motor; 10. first guide plate; 11. second guide plate; 12. support leg; 13. circulation pipeline; 14. second drive motor; 15. sealing cover; 16. support plate; 17. slag discharge trough; 18. connecting shaft; 19. guide plate; 20. connecting block; 21. strip connecting plate; 22. through groove. DETAILED DESCRIPTION
[0027] The technical solutions in the embodiments of the present invention will be described clearly and completely below in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, rather than all of the embodiments.
[0028] Reference Figure 1-Figure 5 A green building construction wastewater recycling device includes a box body 2, a control cabinet 23 is installed on one side of the box body 2, and a controller is arranged inside the control cabinet 23. The controller is a control mainboard or a host.
[0029] A base 1 is installed at the bottom of the box body 2, and a plurality of legs 12 are vertically installed on the bottom edge of the base 1. The base 1 can be supported by the legs 12, so that the box body 2 can remain stable when in use.
[0030] like Figure 1As shown, a water inlet pipe 7 is installed at one end of the top of the box 2, two filter plates 5 are stacked inside the box 2, there is a gap between the two filter plates 5, and the two filter plates 5 are inclined, and a circulation pipe 13 is installed at one end of the bottom of the box 2. In actual use, the water inlet pipe 7 transports sewage to the inside of the box 2. When the sewage passes through the two filter plates 5, impurities in the sewage are filtered out by the two filter plates 5, and pure water passes through the filter plates 5 and flows to the bottom of the box 2, and is finally discharged through the circulation pipe 13, which is convenient for recycling.
[0031] It should be noted that the pore size of the filter plate 5 located above is larger than that of the filter plate 5 located below. The filter plate 5 located above can filter out large particles of impurities in the sewage, and small particles of impurities will pass through the filter plate 5 above and flow along with the sewage to the filter plate 5 below. The small particles of impurities can be filtered out by the filter plate 5 below, and the filtration is sufficient.
[0032] It should be noted that if Figure 1 As shown, a first guide plate 10 is provided between the two filter plates 5. The first guide plate 10 is inclined and fixed on the side wall of the box body 2. There is a gap between one end of the first guide plate 10 and the side wall of the box body 2. After the sewage passes through the upper filter plate 5, part of the sewage will fall on the first guide plate 10 and flow along the first guide plate 10 to the top of the next filter plate 5. This can increase the filtration area of the lower filter plate 5 and improve the use effect.
[0033] like Figure 1 , Figure 3 and Figure 4 As shown, two pairs of strip mounting plates 4 are installed inside the box body 2, each pair of strip mounting plates 4 is located above the corresponding filter plate 5, and a pair of connecting shafts 18 are installed between each pair of strip mounting plates 4, and conveying chains 6 are provided at both ends of each pair of connecting shafts 18, and the conveying chain 6 is meshed with sprockets installed at both ends of each pair of connecting shafts 18. The end of one connecting shaft 18 in each pair of connecting shafts 18 is connected to a first driving motor 9, and the first driving motor 9 is fixed on the side wall of the box body 2. The first driving motor 9 is connected to the controller through a wire. In actual use, the connecting shaft 18 can be driven to rotate by the first driving motor 9, and then the conveying chain 6 can be driven to move.
[0034] like Figure 4 As shown, a plurality of scrapers 8 are installed between two adjacent conveyor chains 6, and the bottom ends of the scrapers 8 are gap-matched with the tops of the corresponding filter plates 5. Two slag discharge grooves 17 are provided on one side of the housing 2, and the slag discharge grooves 17 are both located above the corresponding filter plates 5, and one end of the scraper 8 extends out of the slag discharge groove 17. In actual use, the conveyor chain 6 drives the scraper 8 to move along the tops of the filter plates 5, and the impurities filtered out of the tops of the filter plates 5 are discharged from the housing 2 through the slag discharge grooves 17, so as to prevent the filter plates 5 from being clogged by stains.
[0035] like Figure 5 As shown, two pairs of strip connecting plates 21 are provided on both sides of the inside of the box body 2, one side of each strip connecting plate 21 is slidably connected to the guide rail on the side wall of the box body 2 through a slider, and both ends of the filter plate 5 are fixed to the corresponding strip connecting plates 21, and the filter plate 5 is fixed to the strip connecting plates 21 by bolts or locks, so that it is firmly fixed and convenient for disassembly and replacement.
[0036] like Figure 5 As shown, a connecting block 20 is vertically installed at one end of the bottom of each strip connecting plate 21, and two pairs of screw rods 3 are rotatably connected on both sides of the interior of the box body 2. Each screw rod 3 passes through the corresponding connecting block 20 and is threadedly matched with the corresponding connecting block 20. One end of each screw rod 3 is connected to a second drive motor 14, which is fixed on the side wall of the box body 2. The second drive motor 14 is connected to the controller through a wire. Two through grooves 22 are provided on one side of the box body 2 close to the second drive motor 14. The strip connecting plate 21 and the filter plate 5 are aligned with the corresponding through grooves 22. When the filter plate 5 needs to be replaced, the second drive motor 14 can drive the screw rod 3 to rotate, so that the strip connecting plate 21 and the filter plate 5 pass through the through groove 22 and move out of the box body 2, which is convenient for replacement.
[0037] It should be noted that if Figure 2 As shown, a sealing cover 15 is provided inside the through groove 22, and the sealing cover 15 is sealed with the inner wall of the through groove 22, and the sealing cover 15 is fixed to the side wall of the box body 2 by a lock. Under the action of the sealing cover 15, the through groove 22 can be sealed, so that when the sewage is filtered, the sewage will not leak out from the through groove 22.
[0038] Specifically, when the utility model is in use, the staff transports the sewage into the box body 2 along the water inlet pipe 7, and the sewage will fall on the upper filter plate 5 under the action of gravity. The large particles of impurities in the sewage can be filtered out through the upper filter plate 5, and the small particles of impurities and water will pass through the upper filter plate 5 and flow to the lower filter plate 5, filtering out the small particles of impurities in the water, and the filtered water is transported to the water storage tank along the circulation pipe 13 for recycling. While filtering, the first drive motor 9 is controlled by the controller to work, and the first drive motor 9 drives the conveying chain 6 to move, so that the scraper 8 will move along the top of the filter plate 5, and the impurities filtered out from the top of the filter plate 5 are discharged from the slag discharge groove 17 to prevent the filter plate 5 from being blocked. When the filter plate 5 is damaged and needs to be replaced, the staff controls the second drive motor 14 to work through the controller, and the second drive motor 14 drives the screw rod 3 to rotate, and the strip connecting plate 21 and the filter plate 5 are removed from the through groove 22 for replacement, which is convenient for replacement.
[0039] Furthermore, Figure 3 and Figure 4As shown, a support plate 16 is provided between each conveyor chain 6, the bottom of the support plate 16 is matched with the inner bottom surface clearance of the conveyor chain 6, and one side of the support plate 16 is fixed on the strip mounting plate 4. The conveyor chain 6 can be supported by the support plate 16, which increases the stability of the conveyor chain 6, and the scraper 8 will not shake when scraping stains on the filter plate 5.
[0040] Furthermore, Figure 3 As shown, two guide plates 19 are installed on one side of the inner wall of the box body 2 close to the slag discharge groove 17, and the top of each guide plate 19 is flush with the bottom of the corresponding slag discharge groove 17, the bottom of the guide plate 19 is gap-matched with the top of the filter plate 5, and the top of the guide plate 19 is an arc-shaped structure, and the top curvature of the guide plate 19 matches the moving trajectory of the scraper 8. When the scraper 8 scrapes impurities on the filter plate 5, the impurities will be discharged from the slag discharge groove 17 under the action of the guide plate 19, so that the impurities will not remain on the filter plate 5.
[0041] Furthermore, Figure 1 As shown, a second guide plate 11 is installed at the bottom of the box body 2, and the top of the second guide plate 11 is inclined. The top of the circulation pipe 13 is flush with the lower end of the top of the second guide plate 11, so that the filtered water flowing to the bottom of the box body 2 will flow along the second guide plate 11 into the circulation pipe 13, and will be transported to the water storage tank along the circulation pipe 13 for recycling.
[0042] The above description is only a preferred specific implementation manner of the present invention, but the protection scope of the present invention is not limited thereto. Any technician familiar with the technical field can make equivalent replacements or changes within the technical scope disclosed by the present invention according to the technical scheme and the utility model concept of the present invention, which should be covered by the protection scope of the present invention.
Claims
1. A green building construction wastewater recycling device, comprising a housing (2), characterized in that: A base (1) is installed at the bottom of the box body (2), and a plurality of legs (12) are vertically installed at the bottom edge of the base (1); A water inlet pipe (7) is installed at one end of the top of the box body (2), two filter plates (5) are stacked inside the box body (2), there is a gap between the two filter plates (5), and the two filter plates (5) are both inclined, and a circulation pipe (13) is installed at one end of the bottom of the box body (2); Two pairs of strip-shaped mounting plates (4) are installed inside the box body (2), each pair of strip-shaped mounting plates (4) is located above the corresponding filter plate (5), and a pair of connecting shafts (18) are installed between each pair of strip-shaped mounting plates (4), and conveying chains (6) are provided at both ends of each pair of connecting shafts (18), and the conveying chains (6) are meshed with sprockets installed at both ends of each pair of connecting shafts (18), and the end of one connecting shaft (18) in each pair of connecting shafts (18) is connected to a first driving motor (9), and the first driving motor (9) is fixed on the side wall of the box body (2); A plurality of scrapers (8) are installed between two adjacent conveyor chains (6), the bottom ends of the scrapers (8) are clearance-matched with the tops of the corresponding filter plates (5), two slag discharge grooves (17) are provided on one side of the box body (2), the slag discharge grooves (17) are both located above the corresponding filter plates (5), and one end of the scraper (8) extends out of the slag discharge groove (17); Two pairs of strip connecting plates (21) are provided on both sides of the box body (2), one side of each strip connecting plate (21) is slidably connected to a guide rail on the side wall of the box body (2) through a slider, and both ends of the filter plate (5) are fixed on the corresponding strip connecting plates (21); A connecting block (20) is vertically mounted at one end of the bottom of each strip-shaped connecting plate (21); two pairs of screw rods (3) are rotatably connected to both sides of the interior of the box body (2); each screw rod (3) passes through a corresponding connecting block (20) and is threadedly engaged with the corresponding connecting block (20); one end of each screw rod (3) is connected to a second drive motor (14); and the second drive motor (14) is fixed to a side wall of the box body (2); Two through slots (22) are provided on one side of the box body (2) close to the second drive motor (14), and the strip-shaped connecting plate (21) and the filter plate (5) are aligned with the corresponding through slots (22).
2. A green building construction wastewater recycling device according to claim 1, characterized in that: A first guide plate (10) is provided between the two filter plates (5). The first guide plate (10) is arranged obliquely. The first guide plate (10) is fixed on the side wall of the box body (2), and there is a distance between one end of the first guide plate (10) and the side wall of the box body (2).
3. A green building construction wastewater recycling device according to claim 1, characterized in that: A support plate (16) is provided between each conveying chain (6), the bottom of the support plate (16) is clearance-matched with the inner bottom surface of the conveying chain (6), and one side of the support plate (16) is fixed on the strip-shaped mounting plate (4).
4. The green building construction wastewater recycling device according to claim 1 is characterized by: Two guide plates (19) are installed on one side of the inner wall of the box body (2) close to the slag discharge groove (17), the top of each guide plate (19) is flush with the bottom of the corresponding slag discharge groove (17), the bottom of the guide plate (19) is gap-matched with the top of the filter plate (5), and the top of the guide plate (19) is an arc-shaped structure, and the top curvature of the guide plate (19) matches the moving trajectory of the scraper (8).
5. The green building construction wastewater recycling device according to claim 1 is characterized by: A second guide plate (11) is installed at the bottom of the box body (2), the top of the second guide plate (11) is inclined, and the top of the circulation pipe (13) is flush with the lower end of the top of the second guide plate (11).
6. A green building construction wastewater recycling device according to claim 1, characterized in that: A sealing cover (15) is provided inside the through groove (22), the sealing cover (15) is in sealing cooperation with the inner wall of the through groove (22), and the sealing cover (15) is fixed to the side wall of the box body (2) by means of a lock.
7. The green building construction wastewater recycling device according to claim 1 is characterized by: A control cabinet (23) is installed on one side of the box body (2), and a controller inside the control cabinet (23) is connected to the first drive motor (9) and the second drive motor (14) respectively through wires.