Insulation platform for operation in photovoltaic field area
By designing an insulating platform in the photovoltaic field and using pipe piles and support rods to form a three-dimensional triangular structure, the problem of maintenance personnel insufficient height in the confluent box and deep silt or water on both feet is solved, and a safe maintenance platform is achieved, providing maintenance personnel with a stable working environment.
Patent Information
- Application Number
- CN202421797482.3
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-07-29
- Publication Date
- 2025-04-29
- Estimated Expiration
- 2034-07-29
AI Technical Summary
In the confluent box position in the photovoltaic field, due to insufficient height, the maintenance personnel are easily forced to sink into silt or water, and there is a risk of falling and electric shock.
A photovoltaic field operation insulation platform is designed, by fixing the upper and lower symmetrical fixing rings on the pipe piles, and using support rods to form a three-dimensional triangular structure to support the insulation platform, providing a stable maintenance platform.
The insulated platform enables maintenance personnel to stand safely on the platform for maintenance, avoiding the risk of deep silt or water on their feet and reducing the possibility of falling and electric shock.
Smart Images

Figure CN222810415U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of photovoltaic field construction, in particular to an insulating platform for photovoltaic field operations. Background Art
[0002] The terrain of photovoltaic fields is mostly saline-alkali land, and there is a lot of water in low-lying areas in summer, especially at the junction box, where the water is deep and the bottom is mostly mud. During daily maintenance, when maintenance personnel deal with defects in the junction box, there is a problem that the maintenance personnel are not tall enough and their feet are forced to sink deep into the mud or water to deal with the defects, and there is also a risk of falling and electric shock. Utility Model Content
[0003] The purpose of the utility model is to provide an insulating platform for photovoltaic field operations in view of the above-mentioned deficiencies, which can provide workers with a platform for standing and maintenance, avoid the problem that maintenance personnel are not tall enough and their feet are forced to sink deep into mud or water to handle defects, and can also reduce the risk of falling and electric shock.
[0004] In order to achieve the above purpose, the utility model adopts the following technical solutions:
[0005] An insulating platform for photovoltaic field operations includes a pipe pile fixed on the ground, characterized in that an upper fixing ring and a lower fixing ring are symmetrically fixed on the pipe pile, one side of the upper fixing ring is provided with an insulating platform, one side of the upper fixing ring is provided with a support rod 1 and a support rod 2 connected to the insulating platform, the lower fixing ring is provided with a support rod 3 connected to the bottom of the insulating platform, and the support rods 1, 2, 3 and the pipe pile are combined to form a three-dimensional triangle.
[0006] Furthermore, the upper fixing ring includes an upper left half hoop and an upper right half hoop, and the ends of the upper left half hoop and the upper right half hoop are respectively provided with upper connecting plates, and the two opposite upper connecting plates are tightened by bolt 1; the lower fixing ring includes a lower left half hoop and a lower right half hoop, and the ends of the lower left half hoop and the lower right half hoop are respectively provided with lower connecting plates, and the two opposite lower connecting plates are tightened by bolt 2.
[0007] Furthermore, the support rod one and the support rod two are respectively fixed on the upper left half hoop, and the support rod three is fixed on the lower left half hoop.
[0008] Furthermore, the ends of the support rod one and the end of the support rod two are respectively arranged close to the two upper connecting plates on the upper left half hoop; and the support rod three is arranged close to the middle part of the lower left half hoop.
[0009] Furthermore, the support rod one, the support rod two and the support rod three each include an outer tube body, one end of which is slidably connected to an inner tube body inside the outer tube body, and a plurality of mounting holes are provided on the outer tube body along the length direction of the outer tube body, and a connecting hole is provided on the inner tube body opposite to the mounting hole, and the mounting hole and the connecting hole are tightened by bolt three.
[0010] The beneficial effects of the utility model are:
[0011] In actual applications, by fixing the upper fixing ring and the lower fixing ring on the pipe pile, a three-dimensional triangular supporting insulating platform is formed by the support rods one, two, three and the pipe pile, so that maintenance personnel can stand on the insulating platform for maintenance. The utility model can provide the staff with a standing maintenance platform, avoiding the problem that the maintenance personnel are not tall enough and their feet are forced to sink deep into the mud or water to deal with defects, and can also reduce the risk of falling and electric shock. BRIEF DESCRIPTION OF THE DRAWINGS
[0012] Figure 1 It is a schematic diagram of the overall structure of the utility model;
[0013] Figure 2 It is a top view of the utility model;
[0014] Figure 3 It is the front view of the utility model;
[0015] Figure numerals: pipe pile 1; upper fixing ring 2; upper left half hoop 21; upper right half hoop 22; upper connecting plate 23; bolt one 24; lower fixing ring 3; lower left half hoop 31; lower right half hoop 32; lower connecting plate 33; bolt two 34; insulating platform 4; support rod one 5; outer tube body 501; mounting hole 5011; inner tube body 502; connecting hole 5021; support rod two 6; support rod three 7. DETAILED DESCRIPTION
[0016] like Figure 1 , Figure 2 and Figure 3 As shown, an insulating platform for photovoltaic field operations includes a pipe pile 1 fixed on the ground, characterized in that an upper fixing ring 2 and a lower fixing ring 3 are symmetrically fixed on the pipe pile 1, an insulating platform 4 is arranged on one side of the upper fixing ring 2, a support rod 1 5 and a support rod 2 6 connected to the insulating platform 4 are arranged on one side of the upper fixing ring 2, a support rod 3 7 connected to the bottom of the insulating platform 4 is arranged on the lower fixing ring 3, and the support rod 1 5, the support rod 2 6, the support rod 3 7 and the pipe pile 1 together form a three-dimensional triangle.
[0017] When in use, by fixing the upper fixing ring 2 and the lower fixing ring 3 on the pipe pile 1, a three-dimensional triangular supporting insulating platform 4 is formed by the support rod 1 5, the support rod 2 6, the support rod 3 7 and the pipe pile 1, so that maintenance personnel can stand on the insulating platform 4 for maintenance. The utility model can provide a platform for standing maintenance for the staff, avoiding the problem that the maintenance personnel are not tall enough and their feet are forced to sink deep into the mud or water to deal with defects, and can also reduce the risk of falling and electric shock.
[0018] like Figure 1 , Figure 2 and Figure 3 As shown, the upper fixing ring 2 includes an upper left half hoop 21 and an upper right half hoop 22, and the ends of the upper left half hoop 21 and the upper right half hoop 22 are respectively provided with upper connecting plates 23, and the two opposite upper connecting plates 23 are tightened by bolts 24; the lower fixing ring 3 includes a lower left half hoop 31 and a lower right half hoop 32, and the ends of the lower left half hoop 31 and the lower right half hoop 32 are respectively provided with lower connecting plates 33, and the two opposite lower connecting plates 33 are tightened by bolts 2 34; in this embodiment, the upper fixing ring 2 is fixed to the pipe pile 1 by tightening the two opposite upper connecting plates 23 by bolts 1 24; the lower fixing ring 3 is fixed to the pipe pile 1 by tightening the two opposite lower connecting plates 33 by bolts 2 34.
[0019] like Figure 1 , Figure 2 and Figure 3 As shown, the support rod 1 5 and the support rod 2 6 are respectively fixed on the upper left half hoop 21, and the support rod 3 7 is fixed on the lower left half hoop 31; in this embodiment, when the support rod 1 5 and the support rod 2 6 are respectively fixed on the upper left half hoop 21 and the support rod 3 7 is fixed on the lower left half hoop 31, the support rod 1 5, the support rod 2 6, the support rod 3 7 and the pipe pile 1 form a more three-dimensional triangle, and the supporting effect is better.
[0020] like Figure 1 , Figure 2 and Figure 3 As shown, the end of the support rod 1 5 and the end of the support rod 2 6 are respectively arranged close to the two upper connecting pieces 23 on the upper left half hoop 21; the support rod 3 7 is arranged close to the middle of the lower left half hoop 31; in this embodiment, when the end of the support rod 1 5 and the end of the support rod 2 6 are respectively arranged close to the two upper connecting pieces 23 on the upper left half hoop 21, an isosceles triangle is formed between the support rod 1 5, the support rod 2 6 and the upper fixing ring 2, and when the support rod 3 7 is arranged close to the middle of the lower left half hoop 31, the supporting force of the insulating platform 4 is more reasonable.
[0021] like Figure 1 , Figure 2 and Figure 3As shown, the support rod 1 5, the support rod 2 6 and the support rod 3 7 all include an outer tube body 501, one end of which is slidably connected to an inner tube body 502 inside the outer tube body 501, and a plurality of mounting holes 5011 are provided on the outer tube body 501 along the length direction of the outer tube body 501, and a connecting hole 5021 is provided on the inner tube body 502 opposite to the mounting hole 5011, and the mounting hole 5011 and the connecting hole 5021 are tightened by bolt 3; in this embodiment, by adjusting the mounting hole 5011 and the connecting hole 5021 tightened by bolt 3, the length of the support rod 1 5, the support rod 2 6 and the support rods are adjusted, so that the insulating platform 4 is suitable for the maintenance of the junction box at a higher position.
[0022] The specific embodiments described herein are merely examples of the spirit of the present invention. Those skilled in the art may make various modifications or additions to the specific embodiments described or replace them in similar ways, but they will not deviate from the scope defined by the spirit of the present invention.
Claims
1. An insulating platform for photovoltaic field operations, comprising a pipe pile (1) fixed on the ground, characterized in that: An upper fixing ring (2) and a lower fixing ring (3) are symmetrically fixed on the pipe pile (1); an insulating platform (4) is arranged on one side of the upper fixing ring (2); a support rod 1 (5) and a support rod 2 (6) connected to the insulating platform (4) are arranged on one side of the upper fixing ring (2); a support rod 3 (7) connected to the bottom of the insulating platform (4) is arranged on the lower fixing ring (3); and the support rod 1 (5), the support rod 2 (6), the support rod 3 (7) and the pipe pile (1) are surrounded to form a three-dimensional triangle.
2. The insulating platform for photovoltaic field operations according to claim 1, characterized in that: The upper fixing ring (2) comprises an upper left half hoop (21) and an upper right half hoop (22), the ends of the upper left half hoop (21) and the upper right half hoop (22) are respectively provided with upper connecting plates (23), and the two upper connecting plates (23) facing each other are tightened by bolt 1 (24); the lower fixing ring (3) comprises a lower left half hoop (31) and a lower right half hoop (32), the ends of the lower left half hoop (31) and the lower right half hoop (32) are respectively provided with lower connecting plates (33), and the two lower connecting plates (33) facing each other are tightened by bolt 2 (34).
3. The insulating platform for photovoltaic field operations according to claim 2, characterized in that: The support rod one (5) and the support rod two (6) are respectively fixed on the upper left half hoop (21), and the support rod three (7) is fixed on the lower left half hoop (31).
4. The insulating platform for photovoltaic field operations according to claim 3, characterized in that: The ends of the support rod one (5) and the ends of the support rod two (6) are respectively arranged close to the two upper connecting pieces (23) on the upper left half hoop (21); and the support rod three (7) is arranged close to the middle of the lower left half hoop (31).
5. The insulating platform for photovoltaic field operations according to claim 1, characterized in that: The support rod one (5), the support rod two (6) and the support rod three (7) all comprise an outer tube body (501), one end of which is slidably connected to an inner tube body (502) inside the outer tube body (501), a plurality of mounting holes (5011) are arranged on the outer tube body (501) along the length direction of the outer tube body (501), and a connecting hole (5021) is arranged on the inner tube body (502) opposite to the mounting hole (5011), and the mounting hole (5011) and the connecting hole (5021) are tightened by bolt three.