Novel high-temperature water heating network fixing frame
By using working steel pipes to connect the insulation layer protection pipe in the high-temperature hydrothermal mesh fixing frame, and combining the design of the waterproof ring fixing ring and outer jacket sealing steel pipe, the problem of the existing fixing frame affecting the pipeline insulation is solved, achieving efficient insulation and sealing effects.
Patent Information
- Application Number
- CN202421740449.7
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-07-22
- Publication Date
- 2025-05-02
- Estimated Expiration
- 2034-07-22
AI Technical Summary
The existing high-temperature hydrothermal mesh fixtures will affect the installation of the pipeline insulation layer during installation, resulting in heat loss.
A new high-temperature hydrothermal mesh fixing frame is designed, using working steel pipes to connect the insulation layer protection tube, and sealing the steel pipe with a waterproof ring and a jacket sealing steel pipe on the setting of the fixing bracket clamp and stiffener plate to ensure the sealing and insulation effect of the fixing frame.
Through this design, it is achieved to maintain efficient insulation when fixing the pipe, while ensuring the suitability and sealing of the fixing frame and avoiding heat loss.
Smart Images

Figure CN222824434U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of water heating network, in particular to a novel high-temperature water heating network fixing frame. Background Art
[0002] High temperature water heating network is a system that transports high temperature water to achieve heating, cooling or other industrial purposes. It usually consists of a central heating station, a pipeline network and a user end. In the pipeline network, a fixing frame is needed to fix the pipeline.
[0003] When the existing high-temperature water heating network fixing frame is actually used, the pipes for hot water transmission need to be wrapped with an insulation layer for insulation to prevent heat loss of the hot water in the pipes. Installing the fixing frame outside the pipes will inevitably affect the installation of the pipe insulation layer.
[0004] Therefore, it is necessary to invent a new type of high-temperature water heating network fixing frame to solve the above problems. Utility Model Content
[0005] The purpose of the utility model is to provide a novel high-temperature water heating network fixing frame to solve the problem of installing the high-temperature hot water network pipeline fixing frame proposed in the above background technology.
[0006] To achieve the above-mentioned purpose, the utility model provides the following technical solutions: a new type of high-temperature water heating network fixing frame, including a working steel pipe, the outer surface of the working steel pipe is sleeved with an insulation layer protection pipe, both sides of the working steel pipe are fixedly installed with fixed bracket clamps, one end of the outer surface of the two fixed bracket clamps is sleeved with stiffening ribs, the inner end of the insulation layer protection pipe is fixedly installed with a waterproof ring fixing ring, one side of the waterproof ring fixing ring is provided with a sealing filler, and the other side of the sealing filler is provided with a sealing waterproof paste, the interior of the insulation layer protection pipe is provided with a polyurethane insulation layer, the outer surface of the insulation layer protection pipe is sleeved with a heat shrink sleeve, and one end of the heat shrink sleeve is fixedly connected to an outer sealing steel pipe.
[0007] Preferably, there are two thermal insulation layer protection tubes, and the inner sides of the two thermal insulation layer protection tubes are both sleeved on the surface of the working steel pipe.
[0008] Preferably, one end of the stiffening rib plate is fitted and fixed on the surface of the working steel pipe, and a sealing and waterproof paste is provided inside the stiffening rib plate.
[0009] Preferably, the bottom surface of the polyurethane insulation layer is wrapped and adhered to the outer surface of the working steel pipe.
[0010] Preferably, one side of the sealing filler and the sealing waterproof paste are filled on the inner wall of the outer sleeve sealing steel pipe, and the other side of the sealing filler and the sealing waterproof paste are filled and adhered to the outer surface of one side of the insulation layer protection pipe.
[0011] Preferably, one side of the outer surface of the fixed bracket clip is fixedly connected to an external concrete block.
[0012] Technical effects and advantages of the utility model:
[0013] By setting the fixed bracket clamp plate and the stiffening rib plate, when installing the bracket on the hot water network pipe, waterproof ring fixing rings are set on the insulation layer protection pipes at both ends of the bracket fixing place of the working steel pipe, and then the outer sleeve sealing steel pipe is sleeved on the bracket fixing place, and the connecting ends of the waterproof ring fixing ring and the outer sleeve sealing steel pipe are first filled with sealing filler, and then sealed and bonded with water-repellent sealing paste to ensure the sealing inside the outer sleeve sealing steel pipe, and then the fixed bracket clamp plates fixed at both ends of the working steel pipe and penetrating and fixed at both ends of the outer sleeve sealing steel pipe are fixed to the external concrete structure, thereby fixing the hot water network pipe on the one hand, and ensuring the insulation effect of the outer surface of the hot water network pipe on the other hand, thereby improving the applicability of the fixing frame. BRIEF DESCRIPTION OF THE DRAWINGS
[0014] In order to more clearly illustrate the technical solutions of the embodiments of the utility model, the drawings required for use in the embodiments will be briefly introduced below. It should be understood that the following drawings only show certain embodiments of the utility model and therefore should not be regarded as limiting the scope. For ordinary technicians in this field, other relevant drawings can be obtained based on these drawings without paying creative work.
[0015] Figure 1 This is a schematic diagram of the planar structure of a new type of high-temperature water heating network fixing frame of the utility model.
[0016] In the figure: 1. Working steel pipe; 2. Insulation layer protection pipe; 3. Fixed bracket plate; 4. Stiffening rib plate; 5. Waterproof ring fixing ring; 6. Sealing filler; 7. Sealing waterproof paste; 8. Polyurethane insulation layer; 9. Heat shrink sleeve; 10. Outer sealing steel pipe. DETAILED DESCRIPTION
[0017] In order to make the purpose, technical scheme and advantages of the embodiments of the utility model clearer, the technical scheme in the embodiments of the utility model will be clearly and completely described below in conjunction with the drawings in the embodiments of the utility model. Therefore, the following detailed description of the embodiments of the utility model provided in the drawings is not intended to limit the scope of the utility model claimed for protection, but merely represents the selected embodiments of the utility model. Based on the embodiments in the utility model, all other embodiments obtained by ordinary technicians in this field without making creative work are within the scope of protection of the utility model.
[0018] The utility model provides Figure 1A new type of high-temperature water heating network fixing frame shown in the figure includes a working steel pipe 1, the outer surface of the working steel pipe 1 is sleeved with an insulation layer protection pipe 2, both sides of the working steel pipe 1 are fixedly installed with fixed bracket clamps 3, one end of the outer surface of the two fixed bracket clamps 3 is sleeved with a stiffening rib plate 4, the inner end of the insulation layer protection pipe 2 is fixedly installed with a waterproof ring fixing ring 5, one side of the waterproof ring fixing ring 5 is provided with a sealing filler 6, and the other side of the sealing filler 6 is provided with a sealing waterproof paste 7, the interior of the insulation layer protection pipe 2 is provided with a polyurethane insulation layer 8, the outer surface of the insulation layer protection pipe 2 is sleeved with a heat shrink sleeve 9, and one end of the heat shrink sleeve 9 is fixedly connected to an outer sealing steel pipe 10.
[0019] There are two thermal insulation layer protection tubes 2 , and the inner sides of the two thermal insulation layer protection tubes 2 are both sleeved on the surface of the working steel pipe 1 .
[0020] One end of the stiffening rib plate 4 is fixedly attached to the surface of the working steel pipe 1 , and a sealing and waterproof paste 7 is provided inside the stiffening rib plate 4 .
[0021] The bottom surface of the polyurethane insulation layer 8 is wrapped and adhered to the outer surface of the working steel pipe 1 .
[0022] One side of the sealing filler 6 and the sealing waterproof paste 7 are filled on the inner wall of the outer sleeve sealing steel pipe 10, and the other side of the sealing filler 6 and the sealing waterproof paste 7 are filled and adhered to the outer surface of one side of the insulation layer protection pipe 2.
[0023] One side of the outer surface of the fixed bracket clamping plate 3 is fixedly connected to the external concrete block.
[0024] Working principle: When installing the bracket on the hot water network pipeline, a waterproof ring fixing ring 5 is set on the insulation layer protection tube 2 at both ends of the bracket fixing place of the working steel pipe 1, and then the outer sleeve sealing steel pipe 10 is sleeved on the bracket fixing place, and the connecting end of the waterproof ring fixing ring 5 and the outer sleeve sealing steel pipe 10 is first filled with sealing filler 6, and then sealed and bonded with sealing waterproof paste 7 to ensure the sealing inside of the outer sleeve sealing steel pipe 10, and then the fixed bracket clamp 3 fixed at both ends of the working steel pipe 1 and penetrating and fixed at both ends of the outer sleeve sealing steel pipe 10 is fixed to the external concrete structure.
[0025] The above are only preferred embodiments of the present invention and are not intended to limit the present invention. For those skilled in the art, the present invention may be subject to various modifications and variations. Any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the present invention shall be included in the protection scope of the present invention.
Claims
1. A novel high-temperature water heating network fixing frame, comprising a working steel pipe (1), characterized in that: The outer surface of the working steel pipe (1) is sleeved with an insulation layer protection pipe (2), and fixed bracket clamps (3) are fixedly installed on both sides of the working steel pipe (1). One end of the outer surface of the two fixed bracket clamps (3) is sleeved with a stiffening rib plate (4). The inner end of the insulation layer protection pipe (2) is fixedly installed with a waterproof ring fixing ring (5), one side of the waterproof ring fixing ring (5) is provided with a sealing filler (6), and the other side of the sealing filler (6) is provided with a sealing waterproof paste (7). The interior of the insulation layer protection pipe (2) is provided with a polyurethane insulation layer (8), and the outer surface of the insulation layer protection pipe (2) is sleeved with a heat shrink sleeve (9), and one end of the heat shrink sleeve (9) is fixedly connected to an outer sealing steel pipe (10).
2. According to claim 1, a new type of high temperature water heating network fixing frame is characterized in that: There are two thermal insulation layer protection tubes (2), and the inner sides of the two thermal insulation layer protection tubes (2) are both sleeved on the surface of the working steel pipe (1).
3. According to claim 1, a new type of high temperature water heating network fixing frame is characterized in that: One end of the stiffening rib plate (4) is fixedly attached to the surface of the working steel pipe (1), and a sealing waterproof paste (7) is provided inside the stiffening rib plate (4).
4. According to claim 1, a new type of high temperature water heating network fixing frame is characterized in that: The bottom surface of the polyurethane thermal insulation layer (8) is wrapped and adhered to the outer surface of the working steel pipe (1).
5. According to claim 1, the novel high-temperature water heating network fixing frame is characterized in that: One side of the sealing filler (6) and the sealing waterproof paste (7) are filled on the inner wall of the outer sleeve sealing steel pipe (10), and the other side of the sealing filler (6) and the sealing waterproof paste (7) are filled and adhered to the outer surface of one side of the insulation layer protection pipe (2).
6. The novel high-temperature water heating network fixing frame according to claim 1 is characterized in that: One side of the outer surface of the fixed bracket clamp (3) is fixedly connected to an external concrete block.