The invention relates to the field of shield construction, in particular to a shield tunnel influence area boulder detection and intelligent construction method which comprises the steps that S1, a horizontal
drill hole is drilled along the design axis of a shield tunnel, geological
radar detection is adopted in the horizontal
drill hole, and first detection data are obtained; s2, based on the first detection data, preliminarily identifying a boulder abnormal area in front of the tunnel; s3, for the boulder abnormal area, vertical
drill holes are formed, cross-hole CT detection is carried out, and second detection data are obtained; s4, fusing the first detection data and the second detection data, and constructing a three-dimensional geologic model; and S5, based on the three-dimensional geologic model, performing
inference analysis through the
knowledge graph, and generating an adjustment suggestion of the shield construction parameters. The geological
radar and the cross-hole CT are combined to maximize the detection effect under limited cost, and through data fusion, construction of a three-dimensional geological model, reasoning analysis of a
knowledge graph and generation of adjustment suggestions of construction parameters, intelligentization of construction control is realized, and safety is improved.