Pipeline pressure testing device for fire-fighting facility engineering construction
By designing the buffer ring and buffer spring structure in the fire-fighting pipe pressure test device, the problem of large vibration in the existing device during pressure testing is solved, and the stability and convenience of the pressure test pump are improved.
Patent Information
- Application Number
- CN202421554191.1
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-07-03
- Publication Date
- 2025-05-02
- Estimated Expiration
- 2034-07-03
AI Technical Summary
The existing fire-fighting pipeline pressure testing device vibrates greatly when conducting pipeline pressure testing and requires manual pressing of the pressure test pump, which is not convenient for the use of the pressure test pump.
A pipeline pressure testing device for fire protection facilities construction is designed, including a water storage shell, an electric pressure test pump body, a buffer ring, a support pad plate, a buffer spring and other structures. Through the coordination of the buffer ring and a buffer spring, the vibration of the pressure test pump is buffered to maintain the stability of the pressure test pump.
It effectively reduces the vibration of the pressure test pump, improves the convenience of the pressure test pump, facilitates the stability of the pressure test pump, and can easily remove the buffer structure for inspection when needed.
Smart Images

Figure CN222825362U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of pressure testing, in particular to a pipeline pressure testing device for fire protection facility engineering construction. Background Art
[0002] Firefighting equipment refers to fixed facilities such as automatic fire alarm systems, indoor fire hydrants, and outdoor fire hydrants in buildings. Engineering construction is a special accounting subject for construction and installation companies to collect and account for engineering costs. It is an activity of new construction, expansion, and reconstruction of construction projects based on the requirements of construction project design documents. During the construction process, corresponding temporary firefighting equipment must be set up on site, and firefighting pipes are pipes used to transmit firefighting water. Firefighting pipes must be able to withstand a certain water pressure.
[0003] Announcement No.: CN214539009U discloses a fire protection pipe pressure testing device. The fire protection pipe pressure testing device described in the utility model can be easily installed, has an adjustment function, is suitable for fire protection pipes of different sizes, can improve the sealing performance, and make the pressure test data of the pipe more accurate. However, the above patent does not provide a structure for buffering and positioning the pressure test pump type pressure testing device. When the pressure test of the pipe is performed, the vibration generated is relatively large, and the pressure test pump needs to be manually pressed, which is inconvenient to use the pressure test pump. Utility Model Content
[0004] The utility model aims to provide a pipeline pressure testing device for fire protection facility engineering construction to solve the problems raised in the above-mentioned background technology.
[0005] To achieve the above-mentioned purpose, the utility model provides the following technical solutions: a pipeline pressure testing device for fire protection facility engineering construction, comprising a water storage shell, a mounting top plate is fixedly welded on one side of the top of the water storage shell, an electric pressure test pump body is installed on the top of the mounting top plate, a buffer ring is sleeved on the outer side of the electric pressure test pump body, support pads are fixedly welded on both sides of the top of the buffer ring, four second buffer partitions are fixedly connected to the top of each support pad, a connecting shaft is fixedly provided between every two adjacent second buffer partitions, an L-shaped vertical plate is fixedly connected to one side of the water storage shell, a limiting slide groove is provided at the center of the front side of the L-shaped vertical plate, the limiting slide groove is connected to the limiting top plate through the inside, four buffer connecting plates are fixedly welded on the bottom end of the limiting top plate, one end of each buffer connecting plate is fixedly connected to the mounting ring, and every two positions The mounting collars facing each other are connected with connecting cross bars, and the mounting collars facing each other are connected with buffer springs. The bottom end of each mounting collar is hinged with a buffer connecting rod through two first buffer partitions, and each buffer connecting rod is hinged with the connecting shaft facing each other. The purpose of this arrangement is to connect the water guide hose to the flange of the fire-fighting pipe to be tested, and then the fire-fighting pipe can be filled through the electric pressure test pump body to test the water pressure of the pipe. When the electric pressure test pump body vibrates, the support pad can be pushed up through the buffer ring. Since the positioning pad limits the limit top plate and the support pad moves up, the two mounting collars can be pushed close to each other through the buffer connecting rod, thereby squeezing the buffer spring to contract. The deformation force of the buffer spring can buffer the impact force transmitted to the electric pressure test pump body through the buffer ring, so as to maintain the stability of the electric pressure test pump body.
[0006] Preferably, each of the buffer springs is sleeved on the outer side of the connecting cross bar.
[0007] Preferably, a positioning pad is inserted between the tops of the inner walls of the limiting slide groove, and the positioning pad is in contact with the limiting top plate.
[0008] Preferably, the top end of the positioning cushion block passes through the limiting sliding groove and is fixedly connected with a positioning partition.
[0009] Preferably, the positioning partition plate is threadedly connected to the L-shaped vertical plate via two positioning bolts.
[0010] Preferably, the output end flange of the electric pressure test pump body is connected with a water-conducting hose.
[0011] Technical effects and advantages of the utility model:
[0012] (1) When the device is used, the water guide hose can be connected to the flange of the fire-fighting pipe to be tested, and then the fire-fighting pipe can be filled through the electric pressure test pump body to test the water pressure of the pipe. When the electric pressure test pump body vibrates, the support pad can be pushed up by the buffer ring. Since the positioning pad limits the limit top plate, and when the support pad moves up, the two mounting rings can be pushed close by the buffer connecting rod, thereby squeezing the buffer spring to contract. The deformation force of the buffer spring is used to buffer the impact force transmitted from the electric pressure test pump body through the buffer ring, so as to maintain the stability of the electric pressure test pump body.
[0013] (2) When it is necessary to remove a series of buffer structures to inspect the electric pressure test pump body, the positioning bolts can be removed to move the positioning pads upward, making it easier to move the limit top plate and the structure between the buffer ring upward and remove the electric pressure test pump body, so that the electric pressure test pump body can be directly inspected. BRIEF DESCRIPTION OF THE DRAWINGS
[0014] Figure 1 It is a schematic diagram of the overall structure of the utility model;
[0015] Figure 2 It is a schematic diagram of the connection structure between two mounting rings of the utility model;
[0016] Figure 3 It is a schematic diagram of the connection structure between the positioning pad and the positioning partition of the utility model.
[0017] In the figure: 1. Water storage casing; 2. Mounting top plate; 3. Electric pressure test pump body; 4. L-shaped vertical plate; 5. Limiting slide groove; 6. Water guide hose; 7. Buffer ring; 8. Buffer connecting plate; 9. Mounting ring; 10. Connecting cross bar; 11. Buffer spring; 12. First buffer partition; 13. Second buffer partition; 14. Buffer connecting rod; 15. Positioning pad; 16. Positioning partition; 17. Positioning bolt; 18. Support pad; 19. Limiting top plate. DETAILED DESCRIPTION
[0018] The following will be combined with the drawings in the embodiments of the utility model to clearly and completely describe the technical solutions in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments in the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.
[0019] The utility model provides Figure 1-3A pipeline pressure testing device for fire protection facility engineering construction shown in the figure comprises a water storage shell 1, a mounting top plate 2 is fixedly welded on one side of the top of the water storage shell 1, an electric pressure test pump body 3 is installed on the top of the mounting top plate 2, a buffer ring 7 is sleeved on the outer side of the electric pressure test pump body 3, support pads 18 are fixedly welded on both sides of the top of the buffer ring 7, four second buffer partitions 13 are fixedly connected to the top of each support pad 18, a connecting shaft is fixedly provided between every two adjacent second buffer partitions 13, an L-shaped vertical plate 4 is fixedly connected to one side of the water storage shell 1, and the L-shaped vertical plate A limited slide groove 5 is provided at the center of the front face, and a limited top plate 19 is inserted and connected inside the limited slide groove 5. Four buffer connecting plates 8 are welded to the bottom end of the limited top plate 19, and one end of each buffer connecting plate 8 is fixedly connected to a mounting collar 9, and a connecting cross bar 10 is inserted and connected between every two mounting collars 9 facing each other, and a buffer spring 11 is connected between every two mounting collars 9 facing each other, and a buffer connecting rod 14 is hinged to the bottom end of each mounting collar 9 through two first buffer partitions 12, and each buffer connecting rod 14 is hinged to the connecting shaft facing each other;
[0020] like Figure 1-2 A pipeline pressure testing device for fire protection facility construction is shown, in which each buffer spring 11 is sleeved on the outside of the connecting cross bar 10, and a positioning pad 15 is inserted between the top of the inner wall of the limiting slide groove 5. The positioning pad 15 is in contact with the limiting top plate 19, and the top of the positioning pad 15 passes through the limiting slide groove 5 and is fixedly connected with a positioning partition 16.
[0021] like Figure 1-3 A pipeline pressure testing device for fire protection facility construction is shown, in which the positioning partition 16 and the L-shaped vertical plate 4 are threadedly connected by two positioning bolts 17, and the output end flange of the electric pressure test pump body 3 is connected to the water guide hose 6. When a series of buffer structures need to be removed to inspect the electric pressure test pump body 3, the positioning bolts 17 can be removed to move the positioning pad 15 upward, which is convenient for moving up and removing the structure between the limit top plate 19 and the buffer ring 7, so that the electric pressure test pump body 3 can be directly inspected.
[0022] Working principle of the utility model: when the device is used, the water guide hose 6 can be connected to the fire-fighting pipe flange to be tested, and then the fire-fighting pipe can be filled through the electric pressure test pump body 3, so as to test the water pressure of the pipe. When the electric pressure test pump body 3 vibrates, the support pad 18 can be pushed upward by the buffer ring 7. Since the positioning pad 15 limits the limit top plate 19, and when the support pad 18 moves upward, the two mounting rings 9 can be pushed close by the buffer connecting rod 14, thereby squeezing the buffer spring 11 to contract, and the impact force transmitted from the electric pressure test pump body 3 through the buffer ring 7 is buffered by the deformation force of the buffer spring 11, so as to maintain the stability of the electric pressure test pump body 3, and when a series of buffer structures need to be removed to overhaul the electric pressure test pump body 3, the positioning bolt 17 can be removed to move the positioning pad 15 upward, so as to facilitate the upward removal of the structure between the limit top plate 19 and the buffer ring 7, so that the electric pressure test pump body 3 can be directly overhauled.
[0023] The contents not described in detail in this specification belong to the prior art known to the professional and technical personnel in this field. The specific embodiments described in this article are only used to illustrate the spirit of the utility model. The technicians in the technical field of the utility model can make various modifications or supplements to the specific embodiments described or replace them in a similar way, but they will not deviate from the spirit of the utility model or exceed the scope defined by the attached claims.
Claims
1. A pipe pressure testing device for fire protection facility construction, comprising a water storage jacket (1), characterized in that: A mounting top plate (2) is fixedly welded to one side of the top of the water storage casing (1), an electric pressure test pump body (3) is installed on the top of the mounting top plate (2), a buffer ring (7) is sleeved on the outer side of the electric pressure test pump body (3), support pads (18) are fixedly welded to both sides of the top of the buffer ring (7), four second buffer baffles (13) are fixedly connected to the top of each support pad (18), a connecting shaft is fixedly provided between every two adjacent second buffer baffles (13), an L-shaped vertical plate (4) is fixedly connected to one side of the water storage casing (1), a limited position sliding groove is provided at the center of the front of the L-shaped vertical plate (4), and a plurality of second buffer baffles (13) are fixedly provided between the two adjacent second buffer baffles (13). A groove (5) is provided, the interior of the limiting sliding groove (5) is connected with a limiting top plate (19) through insertion, the bottom end of the limiting top plate (19) is fixed with four welded four buffer connecting plates (8), one end of each buffer connecting plate (8) is fixedly connected with a mounting ring (9), a connecting cross bar (10) is connected through insertion between each two mounting rings (9) facing each other, a buffer spring (11) is connected between each two mounting rings (9) facing each other, the bottom end of each mounting ring (9) is hinged with a buffer connecting rod (14) through two first buffer partitions (12), and each buffer connecting rod (14) is hinged with a connecting shaft facing the position.
2. A pipe pressure testing device for fire protection facility construction according to claim 1, characterized in that: Each buffer spring (11) is sleeved on the outside of the connecting cross bar (10).
3. A pipe pressure testing device for fire protection facility construction according to claim 1, characterized in that: A positioning pad (15) is inserted between the tops of the inner walls of the limiting sliding groove (5), and the positioning pad (15) is in contact with the limiting top plate (19).
4. A pipe pressure testing device for fire protection facility construction according to claim 3, characterized in that: The top end of the positioning pad (15) passes through the limiting sliding groove (5) and is fixedly connected to a positioning partition plate (16).
5. A pipe pressure testing device for fire protection facility construction according to claim 4, characterized in that: The positioning partition plate (16) and the L-shaped vertical plate (4) are threadedly connected via two positioning bolts (17).
6. A pipe pressure testing device for fire protection facility construction according to claim 1, characterized in that: The output end flange of the electric pressure test pump body (3) is connected to a water guide hose (6).
Citation Information
Patent Citations
Fire-fighting pipeline pressure testing device
CN214539009U