Novel steel door and window mounting structure
By setting plug-in connectors on the frames and frames of steel doors and windows, the problem of cumbersome and easy damage of steel doors and windows is solved, and a fast and simple installation process is achieved, which improves installation efficiency and avoids pollution and damage.
Patent Information
- Application Number
- CN202421845716.7
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-01
- Publication Date
- 2025-05-09
- Estimated Expiration
- 2034-08-01
AI Technical Summary
During the installation process, steel doors and windows are not as convenient and fast as doors and windows made of aluminum alloys and other materials, which can easily cause damage to glass parts and require professionals to install them. The installation process is cumbersome and easy to cause pollution and damage.
A new type of steel door and window installation structure is designed, and the installation process is simplified by providing a first connection at the frame connection of the door and window and a second connection at the attached frame.
It realizes rapid installation of doors and windows at one time, solves the problem of step-by-step installation and cross-operation of conventional structures, simplifies the installation process, improves installation efficiency, and avoids pollution and damage.
Smart Images

Figure CN222848058U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the field of door and window installation, in particular to a novel steel door and window installation structure. Background Art
[0002] For a long time, steel doors and windows have certain advantages over doors and windows made of other materials in terms of structural stability and durability, but they are not as convenient and quick to install as doors and windows made of materials such as aluminum alloy. Generally, the materials used for doors and windows need to be transported to the installation site and assembled on site, which can easily cause damage to glass and other parts. On the other hand, it also requires professional personnel to install, and the installation process is cumbersome. At the same time, on-site construction is prone to secondary pollution and bumps and scratches. Utility Model Content
[0003] The purpose of the utility model is to address the defects existing in the above-mentioned technology and provide a new type of steel door and window installation structure, in which a first connecting member is connected to the frame of the door and window, and a second connecting member is provided on the auxiliary frame. The installation of the entire door and window can be completed by plugging the first connecting member and the second connecting member, and the installation process is simple and efficient.
[0004] The purpose of the utility model is achieved by comprising:
[0005] A door or a window, wherein a frame is provided around the door or the window;
[0006] An auxiliary frame, the auxiliary frame is fixedly arranged and used to connect the door or window, and a gap is provided between the auxiliary frame and the frame body of the door or window;
[0007] A first connecting member, wherein the first connecting member is connected to the frame;
[0008] A second connecting member, the second connecting member is fixedly connected to the auxiliary frame;
[0009] The first connecting member is plugged into the second connecting member.
[0010] In the above structure, the first connecting member includes a connecting portion and a hanging tongue, the hanging tongue includes an inclined portion and a flat portion, the inclined portion is connected between the flat portion and the connecting portion, so that a gap is formed between the flat portion and the connecting portion;
[0011] The second connecting member is provided with a hanging groove, and the planar portion is inserted into the hanging groove.
[0012] In the above structure, a long hole is respectively provided on both sides of the connecting portion, and the first connecting member is connected to the frame body through screws at the long hole.
[0013] In the above structure, the first connecting member can slide along the length direction of the long hole and be limited by screws.
[0014] In the above structure, a through hole is respectively provided on both sides of the second connecting member, and the second connecting member is fixedly connected to the auxiliary frame by screws at the through holes.
[0015] The beneficial effects of the utility model are as follows: a first connecting piece is connected to the frame of the door and window, and a second connecting piece is provided on the auxiliary frame. The installation of the entire door and window can be completed by plugging the first connecting piece and the second connecting piece. The door and window can be installed at one time, with high speed and short cycle, which solves the problem that the conventional structure of doors and windows needs to be installed in steps, which is crossed with other construction work on the construction site, and coordination is required, resulting in a long installation cycle. The installation process is simple and efficient, which solves the problem that some materials and accessories of the conventional structure need to be assembled on site, and the skills, on-site working conditions and equipment of the on-site installers cannot guarantee the product quality, and it avoids the on-site installation and other construction cross-operations, which may cause pollution of doors and windows, scratches and other problems. BRIEF DESCRIPTION OF THE DRAWINGS
[0016] Figure 1 This is a schematic diagram of the installation structure of the utility model steel door and window;
[0017] Figure 2 This is a schematic diagram of the first connecting member structure of the utility model Figure 1 ;
[0018] Figure 3 This is a schematic diagram of the first connecting member structure of the utility model Figure 2 ;
[0019] Figure 4 This is a schematic diagram of the structure before the first connecting member and the second connecting member of the utility model are connected Figure 1 ;
[0020] Figure 5 This is a schematic diagram of the structure before the first connecting member and the second connecting member of the utility model are connected Figure 2 ;
[0021] Figure 6 This is a schematic diagram of the structure after the first connecting member and the second connecting member of the utility model are connected Figure 1 ;
[0022] Figure 7 This is a schematic diagram of the structure after the first connecting member and the second connecting member of the utility model are connected Figure 2 . DETAILED DESCRIPTION
[0023] The present application provides a novel steel door and window installation structure, in which a first connecting piece is connected to the door and window frame, and a second connecting piece is provided on the auxiliary frame. The installation of the entire door and window can be completed by plugging the first connecting piece and the second connecting piece. The door and window can be installed at one time, with high speed and short cycle. The installation process is simple and efficient, which solves the problem that some materials and accessories of the conventional structure need to be assembled on site, which is cross-operated with other construction on site, requires coordination, etc., has a long installation cycle, and the skills of the on-site installers, on-site working conditions, and equipment cannot guarantee product quality. In addition, it avoids the cross-operation of on-site installation and other construction, which causes problems such as pollution of doors and windows, scratches, etc.
[0024] The following is a further description of this implementation case in conjunction with the accompanying drawings:
[0025] Depend on Figure 1 — Figure 7 It can be seen that the present application includes a door or window, and the door or window is provided with a frame 1 around it; an auxiliary frame 2 is provided, and the auxiliary frame 2 is fixedly arranged and used to connect the door or window. Generally, the auxiliary frame 2 is installed in a window opening or door opening reserved in advance in a building, and is fixedly connected to the building. A gap is provided between the auxiliary frame 2 and the frame 1 of the door or window. Generally, an installation gap is left on one side between the auxiliary frame 2 and the frame 1 of the door or window. A first connecting member 3 is also provided, and the first connecting member 3 is connected to the frame 1; a second connecting member 4 is provided, and the second connecting member 4 is fixedly connected to the auxiliary frame 2, and the first connecting member 3 and the second connecting member 4 are plugged.
[0026] In this embodiment, the second connecting member 4 is first connected to the auxiliary frame 2, and the first connecting member 3 is connected to the frame 1 of the door or window. During installation, the first connecting member 3 can be directly hung on the second connecting member 4. Since there is generally a certain gap between the auxiliary frame 2 and the frame 1 of the door or window, that is, there is an operating space, the installation structure is simple and efficient to operate, and the installation structure is stable and reliable.
[0027] Based on the above embodiment, preferably, the first connecting member 3 includes a connecting portion 310 and a hanging tongue 320, the hanging tongue 320 includes an inclined portion 321 and a flat portion 322, the inclined portion 321 is connected between the flat portion 322 and the connecting portion 310, so that a gap is formed between the flat portion 322 and the connecting portion 310, and the gap is the insertion gap. The second connecting member 4 is provided with a hanging groove 410, and the flat portion 322 is inserted into the hanging groove 410.
[0028] In this embodiment, the first connecting member 3 and the second connecting member 4 have simple structures and are convenient to connect. They can be processed by stamping and have low manufacturing cost.
[0029] Based on the above implementation, preferably, a long hole 311 is respectively provided on both sides of the connection portion 310 , and the first connection member 3 is connected to the frame body 1 through screws 5 at the long hole 311 .
[0030] This embodiment further provides a connection method between the first connecting member 3 and the frame 1. An elongated hole 311 is respectively arranged on both sides of the connecting portion 310 of the first connecting member 3. In this embodiment, two screws are arranged in each elongated hole 311, and the two screws respectively form the upper limit and the lower limit of the first connecting member.
[0031] The first connecting member 3 can slide along the length direction of the long hole 311. Figure 4 , Figure 5 As shown, before installation, the lower part of the long hole 311 of the first connecting member 3 abuts against the screw 5 below. During installation, the screw 5 is slightly loosened so that the first connecting member 3 can slide along the long hole 311 under the drive of external force. The first connecting member 3 is knocked from top to bottom with a tool to slide downward until it moves to the position shown in FIG. Figure 6 , Figure 7 In the position shown, the upper part of the long hole 311 abuts against the upper screw 5, the hanging tongue 320 is inserted into the hanging groove 410 of the second connecting member, and all the first connecting members 3 and the second connecting members 4 are plugged in sequence to complete the installation. Generally, the first connecting members 3 are arranged around the frame 1 of the door or window, and the second connecting members 4 are arranged around the auxiliary frame 2 at positions corresponding to the first connecting members.
[0032] In this embodiment, a through hole is respectively provided on both sides of the second connecting member 4 , and the second connecting member 4 is fixedly connected to the auxiliary frame 2 by screws 5 at the through holes.
[0033] In the description of the present invention, it should be noted that the terms "center", "upper", "lower", "left", "right", "vertical", "horizontal", "inner", "outer", etc., indicating the orientation or positional relationship, are based on the orientation or positional relationship shown in the drawings, and are only for the convenience of describing the present invention and simplifying the description, rather than indicating or implying that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood as limiting the present invention. In addition, the terms "first", "second", and "third" are used for descriptive purposes only, and cannot be understood as indicating or implying relative importance.
[0034] In the description of the present invention, it should be noted that, unless otherwise clearly specified and limited, the terms "installation", "connection" and "connection" should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection, or it can be indirectly connected through an intermediate medium, or it can be the internal communication of two components. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.
Claims
1. A new type of steel door and window installation structure, characterized in that: include: A door or a window, wherein a frame is provided around the door or the window; An auxiliary frame, the auxiliary frame is fixedly arranged and used to connect the door or window, and a gap is provided between the auxiliary frame and the frame body of the door or window; A first connecting member, wherein the first connecting member is connected to the frame; A second connecting member, the second connecting member is fixedly connected to the auxiliary frame; The first connecting member is plugged into the second connecting member.
2. A new type of steel door and window installation structure according to claim 1, characterized in that: The first connecting member includes a connecting portion and a hanging tongue, the hanging tongue includes an inclined portion and a flat portion, the inclined portion is connected between the flat portion and the connecting portion, so that a gap is formed between the flat portion and the connecting portion; The second connecting member is provided with a hanging groove; The plane portion is inserted into the hanging groove.
3. A new type of steel door and window installation structure according to claim 2, characterized in that: A long hole is respectively provided on both sides of the connection part, and the first connection member is connected to the frame body through screws at the long hole.
4. A new type of steel door and window installation structure according to claim 3, characterized in that: The first connecting member can slide along the length direction of the long hole and be limited by screws.
5. The novel steel door and window installation structure according to claim 2 is characterized in that: The second connecting member is provided with a through hole on both sides respectively, and is fixedly connected to the auxiliary frame by screws at the through holes.