Spatial positioning tool device for bridge steel structure decorative arch
By designing a bridge steel structure decorative arch space positioning tooling device containing docking blocks and welded plates, the operation difficulty and spatial position guarantee problems of inter-section preassembly and installation of blocks in the decorative arch space construction of bridge steel structures are solved, and the effects of time saving, cost reduction and quality improvement are achieved.
Patent Information
- Application Number
- CN202421922361.7
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-09
- Publication Date
- 2025-05-13
- Estimated Expiration
- 2034-08-09
AI Technical Summary
During the construction of bridge steel structure decorative arch space, the pre-assembly and installation of inter-section blocks has problems such as difficult operation, difficulty in guaranteeing space location, delayed construction period, high labor costs and poor installation quality.
A bridge steel structure decorative arch space positioning tooling device is designed, which consists of a first part and a second part, each welded with assembly blocks. The assembly block includes a butt block and a welding plate, and the alignment and connection are achieved through butt bolts and fixing holes.
The device greatly saves construction time, facilitates lifting and direct alignment, reduces labor costs, improves installation quality, and ensures the accuracy of the spatial position of the inter-section blocks.
Smart Images

Figure CN222857802U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the field of mechanical processing, in particular to a spatial positioning tooling device for a decorative arch of a bridge steel structure. Background Art
[0002] Bridge steel structure is a kind of heavy steel structure in my country. It refers to the main load-bearing and force-bearing parts of the upper part of the bridge made of steel. It is widely used in the construction of bridges for large-scale transportation projects such as municipal construction, water bridges, highways, high-speed railways, and cross-sea bridges. Steel structure has the advantages of light weight, high strength, strong tensile and compressive properties, so it is widely used in bridge construction in my country. The overall performance of steel structure bridges is closely related to their overall design.
[0003] In the Butterfly Bridge project of a cultural park construction project, when the blocks between the segments of the upper structure of the Butterfly Bridge were pre-assembled and installed at the construction site, combined with the characteristics of the bridge steel structure decoration structure and the actual situation on site, during the installation process, a cradle needed to be set up between the segments. The operation was difficult and the spatial position was difficult to ensure, resulting in serious delays in the construction period, long time consumption, high labor costs and poor installation quality.
[0004] On May 9, 2024, a search was conducted in the Chinese Patent Publication Database with "bridge and positioning and bolts and plates and assembly" as the abstract keywords, and several documents were found, namely: CN108570925A-Separated intelligent spherical force measuring support system device and assembly method; CN108202205A-A method for processing refined bolt holes in steel structures in a bridge anchoring system; CN201678943U-Keyed comb-tooth expansion joint device; CN219410983U-A bridge pile foundation protection device; CN213328673U-A bridge guardrail base shaping combined template; CN203514190 U-Bridge expansion device positioning tool; CN103526694A-Bridge expansion device positioning tool; CN205474857U-A bridge chord assembly frame; CN101073839A-Cable-stayed bridge ear plate pin hinge connection structure manufacturing method; CN219862387U-A bridge square column plain concrete pouring template; CN22359504U-Movable and detachable support device for assembling the outward-inclined beam section of the steel structure bridge web; CN206038008U-A bridge span measurement positioning frame; CN215657597U-A frame for improving the assembly accuracy of the prefabricated pier column steel cage; CN217028381 U-A kind of assembled maintenance equipment for road and bridge engineering; CN204199180U-A kind of integral embedded mold for bridge support bolts; CN113481887A-A kind of reinforcement structure based on applying prestress to the bridge deck of highway bridge; CN105290724A-A kind of bridge lower chord manufacturing process; CN204112328U-A kind of steel casing positioning guide frame in the sea; CN208563106U-A kind of railway bridge walking board installation structure; CN114164759A-A kind of bridge anchor structure manufacturing method; CN214831916U-A kind of anti-collision guardrail for road and bridge that is easy to assemble; CN216405148U-A kind of bridge maintenance workbench that is easy to disassemble and assemble; CN219532073U-A kind of bridge survey Measurement equipment; CN204940126U-bridge pad stone anchor hole position controller; CN218405475U-a bridge pile foundation construction casing; CN215949143U-a noise reduction protection fence for highway bridge engineering; CN217053028U-a split-frame bridge safety protection device; CN217203605U-a split upper bearing plate suitable for bridge bearings; CN214170142U-a removable safety guardrail for green construction of bridges; CN213531379U-a cantilever tooling membrane frame; CN216615464U-adjustable transfer attachment frame; CN103510636A-assembled twin viscous energy dissipation device; CN213296085U-a Bailey bridge installation auxiliary tool;CN219061161 U-A safety protection device for construction; CN214005363U-Assembled steel-concrete composite beam bridge; CN215281912U-A prefabricated steel bar rack for bridge construction. ;
[0005] After reading the above documents, it is found that none of them can solve the defects of the prior art: 1. There are too many components to be assembled on site, and it takes a lot of time just to align them on site; 2. It is impossible to quickly achieve alignment of a stable structure. Utility Model Content
[0006] Purpose of the utility model: to provide a better spatial positioning tooling device for decorative arches of bridge steel structures. The specific purpose can be seen in the multiple substantial technical effects of the specific implementation part.
[0007] In order to achieve the above purpose, the utility model adopts the following technical solutions:
[0008] A spatial positioning tooling device for a decorative arch of a bridge steel structure, characterized in that:
[0009] The tooling device comprises a first part 1 and a second part 2, each of the first part 1 and the second part 2 having an assembly block 3;
[0010] The two assembly blocks 3 can be docked with each other; the assembly block 3 includes a docking block 31;
[0011] The docking block 31 includes a fixing hole 34 through which the docking bolt 33 can pass.
[0012] A further technical solution of the present invention is that a welding plate 32 is welded below the assembly block 3 .
[0013] A further technical solution of the present invention is that the two docking blocks 31 can be docked.
[0014] A further technical solution of the present invention is that the docking block 31 includes a plurality of fixing holes 34 .
[0015] A further technical solution of the present invention is that the fixing hole 34 is a threaded hole.
[0016] A further technical solution of the present invention is that the butt bolts 33 are pre-assembled in the fixing holes.
[0017] The utility model adopting the above technical solution has the following beneficial effects compared with the prior art: it saves time creatively, firstly, it is convenient for lifting, and secondly, it is directly aligned. BRIEF DESCRIPTION OF THE DRAWINGS
[0018] In order to further illustrate the utility model, the following is further described in conjunction with the accompanying drawings:
[0019] Figure 1 An assembly diagram of the utility model;
[0020] Figure 2 A structural diagram of the first part of the utility model;
[0021] Figure 3 A structural diagram of the second part of the utility model;
[0022] Figure 4 A structural diagram of the utility model assembly block;
[0023] Among them: 1. first part; 2. second part; 3. assembly block; 31. docking block; 32. welding plate; 33. docking bolt; 34. fixing hole. DETAILED DESCRIPTION
[0024] The present invention is further explained below in conjunction with the accompanying drawings and specific embodiments. It should be understood that the following specific embodiments are only used to illustrate the present invention and are not used to limit the scope of the present invention. In the description of the present invention, it should be noted that the orientation or position relationship indicated by the terms "center", "upper", "lower", "left", "right", "vertical", "horizontal", "inner", "outer", "top", "bottom", etc. is based on the orientation or position relationship shown in the accompanying drawings, which is only for the convenience of describing the present invention and simplifying the description, rather than indicating or implying that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood as a limitation on the present invention. In addition, unless otherwise clearly specified and limited, the terms "installed", "connected", and "connected" should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be directly connected, or indirectly connected through an intermediate medium, or it can be a connection between the two elements. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.
[0025] It should be noted that, in this article, relational terms such as first and second, etc. are only used to distinguish one entity or operation from another entity or operation, and do not necessarily require or imply any such actual relationship or order between these entities or operations. Moreover, the terms "include", "comprise" or any other variants thereof are intended to cover non-exclusive inclusion, so that a process, method, article or device including a series of elements includes not only those elements, but also other elements not explicitly listed, or also includes elements inherent to such process, method, article or device.
[0026] This patent provides a variety of parallel solutions. The different expressions are improved solutions or parallel solutions based on the basic solution. Each solution has its own unique characteristics. In addition, the technical features involved in the different embodiments of the utility model described below can be combined with each other as long as they do not conflict with each other. The fixing method not described in the text can be any fixing method such as thread fixing, bolt fixing or glue bonding.
[0027] Embodiment 1: In combination with all the accompanying drawings; a bridge steel structure decorative arch space positioning tooling device, characterized in that,
[0028] The tooling device comprises a first part 1 and a second part 2, each of the first part 1 and the second part 2 having an assembly block 3;
[0029] The two assembly blocks 3 can be docked with each other; the assembly block 3 includes a docking block 31;
[0030] The docking block 31 includes a fixing hole 34 through which the docking bolt 33 can pass.
[0031] The substantial technical effect and implementation process of the technical solution here, i.e. the basic function, are as follows: In order to solve the problem of on-site positioning space of the upper structure of the Butterfly Bridge, the following solution is proposed: According to the characteristics of the decorative structure of the bridge steel structure, the assembly process is added after the processing in the factory is completed; after the assembly is qualified, two places are set at the top plate and the bottom plate of the block connection of each side segment of the upper structure, a total of 4 connecting matching parts, each set of matching parts is equipped with two sets of M20x80 high-strength bolts and a set of φ40 steel pins, which are fixed and used during on-site assembly; during assembly on the construction site, the steel pins are installed in the holes according to the connection plates already set in the factory to complete the positioning, and at the same time, the connection plates and steel pins can bear the force between the segment blocks during lifting. This method can greatly improve work efficiency, take less time, and requires a team of three to complete it with the cooperation of a car crane, reducing labor costs, and the installation position is controllable and of good quality. It ensures the spatial position of the blocks between the segments during pre-assembly at the construction site, and improves the overall quality of the bridge body.
[0032] The innovative design saves time. First, it is convenient for lifting and second, it allows for direct alignment.
[0033] Innovatively, each of the above effects exists independently, and a set of structures can be used to combine the above results.
[0034] Embodiment 2: As a further improved solution or parallel solution or optional independent solution, a welding plate 32 is welded under the assembly block 3. The substantial technical effect and implementation process of the technical solution here, i.e., the basic function, are as follows: the welding plate 32 facilitates the overall rapid welding.
[0035] Embodiment 3: As a further improved solution or parallel solution or optional independent solution, two docking blocks 31 can be docked. The substantial technical effect and implementation process of the technical solution here, namely the basic function, are as follows: it is more convenient to realize the alignment splicing.
[0036] Embodiment 4: As a further improved solution or parallel solution or optional independent solution, the docking block 31 includes a plurality of fixing holes 34. The substantial technical effect and implementation process of the technical solution here, namely the basic function, are as follows: used to ensure the alignment is accurate.
[0037] Embodiment 5: As a further improved solution or parallel solution or optional independent solution, the fixing hole 34 is a threaded hole. The substantial technical effect and implementation process of the technical solution here, namely the basic function, are as follows: the threaded installation is fast and safe.
[0038] Embodiment 6: As a further improved solution or parallel solution or optional independent solution, the butt bolt 33 is preassembled in the fixing hole. The substantial technical effect and implementation process of the technical solution here, i.e., the basic function, are as follows: preassemble in advance and tighten directly after alignment in the later stage.
[0039] It should be noted that the multiple solutions provided by this patent include the basic solution itself, which are independent of each other and do not restrict each other, but they can also be combined with each other without conflict to achieve multiple effects together.
[0040] The above shows and describes the basic principle, main features and advantages of the utility model. Those skilled in the art should understand that the utility model is not limited by the above embodiments, and the above embodiments and descriptions are only for explaining the principle of the utility model. Without departing from the spirit and scope of the utility model, the utility model may have various changes and improvements, and these changes and improvements fall within the scope of the protection required.
Claims
1. A spatial positioning tooling device for a decorative arch of a bridge steel structure, characterized in that: The tooling device comprises a first part (1) and a second part (2), wherein each welding machine of the first part (1) and the second part (2) has an assembly block (3); The two assembly blocks (3) can be docked with each other; the assembly block (3) comprises a docking block (31); The docking block (31) comprises a fixing hole (34), and the docking bolt (33) can pass through the fixing hole (34).
2. A bridge steel structure decorative arch spatial positioning tooling device as claimed in claim 1, characterized in that: A welding plate (32) is welded below the assembly block (3).
3. A bridge steel structure decorative arch spatial positioning tooling device as claimed in claim 1, characterized in that: The two docking blocks (31) can be docked.
4. A bridge steel structure decorative arch spatial positioning tooling device as claimed in claim 1, characterized in that: The docking block (31) comprises a plurality of fixing holes (34).
5. The spatial positioning tooling device for decorative arch of a bridge steel structure as claimed in claim 1, characterized in that: The fixing hole (34) is a threaded hole.
6. A bridge steel structure decorative arch spatial positioning tooling device as claimed in claim 1, characterized in that: The butt bolts (33) are preassembled in the fixing holes.
Citation Information
Patent Citations
Method for manufacturing ear-plate pin hinged-connection structure of stayed-cable bridge
CN101073839A
Assembled viscous double-sub-energy-dissipation device
CN103510636A
Positioning tool of bridge retractable device
CN103526694A
Manufacturing process for lower chords of bridge
CN105290724A
Machining method for steel structure finished bolt holes in bridge anchoring system
CN108202205A