Quick plugging structure for road grouting hole

By using the sealing structure of the isolation film and waterproof foam filling material, the problem that the existing technology cannot effectively seal the road grouting holes is solved, and rapid and effective sealing is achieved, ensuring the quality of grouting construction.

CN222862040UActive Publication Date: 2025-05-13江苏智仝建设科技有限公司
View PDF 1 Cites 0 Cited by

Patent Information

Application Number
CN202421835820.8
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-07-31
Publication Date
2025-05-13
Estimated Expiration
2034-07-31

AI Technical Summary

Technical Problem

The prior art cannot effectively seal the road grouting holes, causing rainwater or debris to enter, affecting the quality of grouting construction.

Method used

A quick sealing structure including an isolation film and a waterproof foam filling material is adopted. The isolation film is embedded in the grouting hole, and the waterproof foam filling material allows the isolation film to fit the hole wall and achieve rapid sealing.

Benefits of technology

It achieves rapid and effective sealing of road grouting holes, making construction more convenient, prevents rainwater from entering, and is easy to clean after sealing, without affecting the quality of grouting construction.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222862040U_ABST
    Figure CN222862040U_ABST
Patent Text Reader

Abstract

The utility model discloses a quick plugging structure for road grouting holes in the field of road engineering construction, which comprises a road layer, the road layer is an asphalt surface layer of a road, a plurality of grouting holes are arranged on the road layer, an isolating membrane is arranged corresponding to each grouting hole, the middle part of the isolating membrane is embedded into the corresponding grouting hole, and the grouting holes are communicated with the isolating membrane. The peripheral edge of the isolating membrane is located on the road layer on the periphery of the corresponding grouting hole, a waterproof foaming filling material is arranged in the isolating membrane embedded in the grouting hole, and the periphery of the waterproof foaming filling material extrudes the isolating membrane so that the isolating membrane can be attached to the hole wall of the corresponding grouting hole. The road grouting hole plugging device can rapidly and effectively plug the road grouting hole, construction is more convenient, rainwater or sundries can be prevented from entering the road grouting hole, and grouting construction quality is guaranteed.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model belongs to the field of road engineering construction, and particularly relates to a blocking structure for a non-excavation grouting hole in a road. Background Art

[0002] After a period of use, roads will develop cracks, subsidence, slurry, mud pumping and other road diseases, which need to be repaired. At present, non-excavation grouting reinforcement technology is usually used to repair roads. During the repair, several grouting holes are first drilled on the road surface, and then specific materials are injected into the grouting holes to fill the gaps, strengthen the roadbed, and improve the bearing capacity of the road surface. Drilling grouting holes on the road surface requires a certain construction period. The construction team often injects specific materials into the grouting holes on the second or even third working day. At this time, the grouting holes need to be blocked to prevent rainwater or debris from entering the grouting holes, so as to avoid affecting the road environment and the quality and effect of grouting construction.

[0003] In the prior art, there is a waterproof plugging structure for a through-wall screw, and its patent application number is: 202022322470.3; application date: 2020.10.19; its structure includes a concrete wall and a through-wall screw, the end of the through-wall screw is cut flat with the wall surface of the concrete wall, the end of the through-wall screw is cut deeply into the concrete wall and forms a hole on the wall surface of the concrete wall outside the screw head of the through-wall screw, and the screw head is evenly coated with an anti-rust paint layer. This structure can waterproof and plug the screw of the wall, but its disadvantage is that it cannot be used to plug the road grouting hole, which will cause rainwater or debris to enter the road grouting hole, affecting the quality of the grouting construction. Utility Model Content

[0004] The utility model aims to provide a road grouting hole rapid plugging structure, which can quickly and effectively plug the road grouting hole, making the construction more convenient, preventing rainwater or debris from entering the road grouting hole, and ensuring the quality of grouting construction.

[0005] The purpose of the utility model is achieved as follows: a road grouting hole rapid plugging structure, including a road layer, a plurality of grouting holes are opened on the road layer, and an isolation membrane is arranged corresponding to each of the grouting holes, the middle part of the isolation membrane is embedded in the corresponding grouting hole, the peripheral edge of the isolation membrane is located on the road layer at the periphery of the corresponding grouting hole, and a waterproof foam filling material is arranged in the isolation membrane embedded in the grouting hole, and the periphery of the waterproof foam filling material squeezes the isolation membrane so that the isolation membrane fits on the hole wall of the corresponding grouting hole.

[0006] The utility model is used to quickly and effectively block the grouting holes of roads. When in use, the isolation membrane is first embedded in the grouting hole, and the outer periphery of the isolation membrane is fixed on the road layer at the outer periphery of the grouting hole. Then the waterproof foam filling material is injected into the grouting hole. The waterproof foam filling material makes the isolation membrane fit on the hole wall of the corresponding grouting hole, completing the rapid blocking of the grouting hole. When the grouting hole needs to be grouted, the isolation membrane and the waterproof foam filling material are taken out of the grouting hole, and the removal is also very convenient. Compared with the prior art, the beneficial effects of the utility model are: it can quickly and effectively block the grouting holes of roads, and the construction is more convenient; it can prevent rainwater from entering the grouting holes; it is convenient to clean after blocking the holes, does not affect the quality of grouting construction, and avoids pollution of roads and the environment.

[0007] As a further improvement of the utility model, the waterproof foaming filling material is polyurethane foam.

[0008] As a further improvement of the utility model, a plurality of connecting belts are arranged at intervals on the outer edge of the isolation membrane, and fixed support blocks are arranged at the ends of the connecting belts, the connecting belts are laid on the surface of the road layer, and the fixed support blocks are placed on the surface of the road layer. The fixed support blocks are supported on the surface of the road layer to prevent the isolation membrane from falling into the hole.

[0009] As a further improvement of the utility model, two connecting belts are provided at intervals along the outer edge of the isolation membrane, and the angle between the two connecting belts along the circumference of the isolation membrane is 180°. The fixed support blocks of the two connecting belts are respectively provided with a clamping block and a clamping groove. When the isolation membrane and the waterproof foam filling material need to be taken out, the clamping blocks and the clamping grooves of the two fixed support blocks are clamped together, and then the isolation membrane is taken out from the grouting hole.

[0010] In order to better wrap the waterproof foam filling material and facilitate the removal of the isolation membrane and the waterproof foam filling material from the grouting hole, four connecting belts are arranged at equal intervals along the outer edge of the isolation membrane, and the four connecting belts are arranged opposite to each other in pairs. The fixed support blocks of the two connecting belts opposite to each other on the left and right are respectively provided with a card block and a card slot, and the fixed support blocks of the two connecting belts opposite to each other on the front and back are respectively provided with a card block and a card slot. The lengths of the two connecting belts opposite to each other on the left and right are equal, and the lengths of the two connecting belts opposite to each other on the front and back are equal, and the lengths of the two connecting belts opposite to each other on the left and right are less than the lengths of the two connecting belts opposite to each other on the front and back. The card blocks and card slots of the fixed support blocks of the two connecting belts opposite to each other on the front and back are engaged, and the card blocks and card slots of the fixed support blocks of the two connecting belts opposite to each other on the left and right are engaged.

[0011] As a further improvement of the present invention, the isolation membrane is made of polyethylene, is in a bag shape, and includes an outer membrane and an inner membrane. The double-layer membrane structure improves the strength of the isolation membrane. BRIEF DESCRIPTION OF THE DRAWINGS

[0012] Figure 1 It is a structural schematic diagram of the utility model.

[0013] Figure 2 This is an enlarged view of the grouting holes in the road layer.

[0014] Figure 3 Schematic diagram of the structure of the isolation membrane.

[0015] Figure 4 Another structural schematic diagram of the isolation membrane.

[0016] Among them, 1 is a road layer, 2 is a grouting hole, 3 is an isolation membrane, 3a is an outer membrane, 3b is an inner membrane, 4 is a waterproof foam filling material, 5 is a connecting belt, 6 is a fixed support block, 7 is a card block, and 8 is a card slot. DETAILED DESCRIPTION Example 1

[0017] like Figure 1-3 As shown, a road grouting hole rapid plugging structure includes a road layer 1, the road layer 1 is an asphalt surface layer of the road, a plurality of grouting holes 2 are opened on the road layer 1, and an isolation membrane 3 is arranged corresponding to each grouting hole 2, the middle part of the isolation membrane 3 is embedded in the corresponding grouting hole 2, the peripheral edge of the isolation membrane 3 is located on the road layer 1 at the periphery of the corresponding grouting hole 2, and the isolation membrane 3 embedded in the grouting hole 2 is provided with a waterproof foam filling material 4, and the waterproof foam filling material 4 is polyurethane foam; the periphery of the waterproof foam filling material 4 squeezes the isolation membrane 3 so that the isolation membrane 3 fits on the hole wall of the corresponding grouting hole 2.

[0018] A plurality of connecting belts 5 are arranged at intervals along the circumference of the outer edge of the isolation membrane 3. A fixed support block 6 is arranged at the end of the connecting belt 5. The connecting belt 5 is laid on the surface of the road layer 1, and the fixed support block 6 is placed on the surface of the road layer 1. The fixed support block 6 is supported on the surface of the road layer 1 to prevent the isolation membrane 3 from falling into the hole. Two connecting belts 5 are arranged at intervals along the circumference of the outer edge of the isolation membrane 3. The angle between the two connecting belts 5 along the circumference of the isolation membrane 3 is 180°. The fixed support blocks 6 of the two connecting belts 5 are respectively provided with a clamping block 7 and a clamping groove 8. When the isolation membrane 3 and the waterproof foam filling material 4 need to be taken out, the clamping blocks 7 and the clamping groove 8 of the two fixed support blocks 6 are clamped together, and then the isolation membrane 3 is taken out from the grouting hole 2.

[0019] The material of the isolation film 3 is polyethylene, and the isolation film 3 is in a bag shape, and the isolation film 3 includes an outer film 3a and an inner film 3b. The double-layer film structure improves the strength of the isolation film 3.

[0020] The utility model is used to quickly and effectively block the road grouting hole 2. When in use, the isolation membrane 3 is first embedded in the grouting hole 2, and the outer periphery of the isolation membrane 3 is fixed on the road layer 1 around the grouting hole 2, and then the waterproof foam filling material 4 is injected into the grouting hole 2. The waterproof foam filling material 4 makes the isolation membrane 3 fit on the hole wall of the corresponding grouting hole 2, completing the rapid blocking of the grouting hole 2; when the grouting hole 2 needs to be grouted, the isolation membrane 3 is taken out of the grouting hole 2 together with the waterproof foam filling material 4, and the removal is also very convenient. The advantages of the utility model are: it can quickly and effectively block the road grouting hole 2, and the construction is more convenient; it can prevent rainwater from entering the grouting hole 2; it is easy to clean after blocking the hole, does not affect the grouting construction quality, and avoids pollution of the road and the environment. Example 2

[0021] like Figure 4 , which is different from the embodiment 1, in order to better wrap the waterproof foam filling material 4 and facilitate the removal of the isolation membrane 3 and the waterproof foam filling material 4 from the grouting hole 2, four connecting belts 5 are arranged at equal intervals along the outer edge of the isolation membrane 3, and the four connecting belts 5 are arranged opposite to each other in pairs. The fixed support blocks 6 of the two connecting belts 5 opposite to each other on the left and right are respectively provided with a clamping block 7 and a clamping groove 8, and the fixed support blocks 6 of the two connecting belts 5 opposite to each other on the front and back are respectively provided with a clamping block 7 and a clamping groove 8. The lengths of the two connecting belts 5 opposite to each other on the left and right are equal, and the lengths of the two connecting belts 5 opposite to each other on the front and back are equal, and the lengths of the two connecting belts 5 opposite to each other on the left and right are less than the lengths of the two connecting belts 5 opposite to each other on the front and back. The clamping block 7 and the clamping groove 8 of the fixed support blocks 6 of the two connecting belts 5 opposite to each other on the front and back are engaged, and the clamping block 7 and the clamping groove 8 of the fixed support blocks 6 of the two connecting belts 5 opposite to each other on the left and right are engaged.

[0022] The present utility model is not limited to the above-mentioned embodiments. On the basis of the technical solution disclosed in the present utility model, technicians in this field can make some substitutions and deformations to some technical features therein according to the disclosed technical content without creative labor, and these substitutions and deformations are all within the protection scope of the present utility model.

Claims

1. A road grouting hole rapid plugging structure, comprising a road layer, on which a plurality of grouting holes are opened, characterized in that: An isolation membrane is arranged corresponding to each of the grouting holes, the middle part of the isolation membrane is embedded in the corresponding grouting hole, the outer peripheral edge of the isolation membrane is located on the road layer around the corresponding grouting hole, and the isolation membrane embedded in the grouting hole is provided with a waterproof foam filling material, and the outer periphery of the waterproof foam filling material squeezes the isolation membrane so that the isolation membrane fits on the hole wall of the corresponding grouting hole.

2. A road grouting hole rapid plugging structure according to claim 1, characterized in that: The waterproof foam filling material is polyurethane foam.

3. A road grouting hole rapid plugging structure according to claim 1 or 2, characterized in that: A plurality of connection belts are arranged at intervals at the outer edge of the isolation membrane, and fixed support blocks are arranged at the ends of the connection belts. The connection belts are laid on the surface of the road layer, and the fixed support blocks are placed on the surface of the road layer.

4. A road grouting hole rapid plugging structure according to claim 3, characterized in that: Two connecting belts are arranged at intervals along the circumferential direction of the outer edge of the isolation membrane, and the included angle of the two connecting belts along the circumferential direction of the isolation membrane is 180°. The fixed support blocks of the two connecting belts are respectively provided with a clamping block and a clamping groove.

5. A road grouting hole rapid plugging structure according to claim 3, characterized in that: Four connecting belts are arranged at equal intervals along the circumferential direction of the outer edge of the isolation membrane, and the four connecting belts are arranged opposite to each other in pairs. The fixed support blocks of the two connecting belts opposite to each other on the left and right are respectively provided with a card block and a card groove, and the fixed support blocks of the two connecting belts opposite to each other front and back are respectively provided with a card block and a card groove, the lengths of the two connecting belts opposite to each other on the left and right are equal, the lengths of the two connecting belts opposite to each other front and back are equal, and the lengths of the two connecting belts opposite to each other on the left and right are less than the lengths of the two connecting belts opposite to each other front and back.

6. A road grouting hole rapid plugging structure according to claim 1 or 2, characterized in that: The isolation film is made of polyethylene and is in a bag shape. The isolation film includes an outer film and an inner film.