Anchor sealing template connecting structure and anchor sealing template

By using the first connecting rib to the anchor sealing template connection structure to fix the connection structure, the second connecting rib and the end sealing template can be detachably connected through locking parts, the cumbersome problem of the connection process of the end sealing template in the prior art is solved, and the construction process is simplified and time-saving and labor-saving effects are achieved.

CN222874868UActive Publication Date: 2025-05-16CHINA RAILWAY 19TH BUREAU GRP EAST CHINA ENG CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202421546904.X
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-07-02
Publication Date
2025-05-16
Estimated Expiration
2034-07-02

AI Technical Summary

Technical Problem

In the prior art, the connection process of the end-sealing template is cumbersome, labor-intensive, and the template is bulky and difficult to reinforce. Auxiliary measures such as rivets and expansion screws are often required.

Method used

An anchor sealing template connection structure is adopted, including a first connecting rib, a second connecting rib and a locking member, which is fixedly connected to the anchor pad and the mesh through the first connecting rib. The second connecting rib and the end sealing template are removably connected through the locking member, simplifying the connection process.

Benefits of technology

On the premise of ensuring construction quality, the construction process is greatly simplified, the construction process saves time and effort, and avoids the use of bulky connecting components and auxiliary reinforcement measures.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222874868U_ABST
    Figure CN222874868U_ABST
Patent Text Reader

Abstract

The utility model relates to the technical field of engineering construction, and provides a sealing anchor template connecting structure and a sealing anchor template, the connecting structure comprises a first connecting rib, a second connecting rib and a locking piece; one end of the first connecting rib is fixedly connected with the anchor backing plate in the anchor recess, and the other opposite end is used for connecting the mesh in the anchor recess; one end of the second connecting rib is detachably connected with the end, away from the anchor bearing plate, of the first connecting rib in the axial direction, and the other opposite end of the second connecting rib is detachably connected with the end sealing formwork through a locking piece and used for locking the end sealing formwork to the anchor recess. According to the arrangement, the second connecting ribs in butt joint with the first connecting ribs are used for providing a connecting foundation for the end sealing formworks, heavy connecting components such as full-length back ribs or U-shaped clamps do not need to be used, and components such as rivets and expansion screws do not need to be used for assisting in reinforcing either, so that connection of the end sealing formworks is simpler and more convenient, and the connecting process is more time-saving and labor-saving.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of engineering construction, in particular to a sealing anchor template connection structure and a sealing anchor template. Background Art

[0002] In the prefabrication construction of prestressed projects such as large railway box girders, the main function of the beam end anchor concrete is to protect the anchors and steel strands after tensioning, to ensure the stability and durability of the anchor points, and to keep the beam ends flat, thereby ensuring the performance and life of the box girder.

[0003] At present, the commonly used anchor sealing method is the formwork support method, that is, after the anchor hole is processed, the steel mesh is installed, and then the end sealing formwork is installed and fixed outside the anchor hole, and then concrete is filled in the anchor hole. After the concrete is solidified, the end sealing formwork is removed to achieve the sealing of the anchor hole.

[0004] In the related art, the end-sealing formwork is generally reinforced through the corners of the beam ends by means of methods such as horizontal full-length back ribs or vertical U-shaped clamps.

[0005] However, when using the above method, the formwork is bulky and difficult to reinforce, and sometimes some auxiliary measures such as rivets and expansion screws have to be taken, which is a cumbersome and labor-intensive process. Utility Model Content

[0006] The utility model provides a sealing and anchoring template connection structure to solve the defects of the prior art that the sealing template connection process is complicated and labor-intensive, and can greatly simplify the construction process while ensuring the construction quality, thus saving time and labor in the construction process.

[0007] The utility model provides a sealing and anchoring template connection structure, comprising: a first connecting rib, a second connecting rib and a locking piece;

[0008] One end of the first connecting rib is fixedly connected to the anchor plate in the anchor hole, and the other end opposite thereto is used to connect to the mesh in the anchor hole;

[0009] One end of the second connecting rib is detachably connected to an end of the first connecting rib away from the anchor plate along the axial direction, and the other opposite end is detachably connected to the end sealing template via a locking member for locking the end sealing template to the anchor hole.

[0010] According to a sealing anchor template connection structure provided by the utility model, the locking member includes a first threaded portion and a first nut;

[0011] The first threaded portion is connected to an end of the second connecting rib away from the first connecting rib; the first nut is used for threaded connection with the first threaded portion passing through the end-sealing template.

[0012] According to a sealing and anchoring template connection structure provided by the utility model, the first connecting rib and the second connecting rib are detachably connected via a connecting piece.

[0013] According to a sealing anchor template connection structure provided by the utility model, the connecting piece includes a second threaded portion and a second nut;

[0014] The second threaded portion is connected to one of the first connection rib and the second connection rib, the second nut is connected to the other, and the second nut is threadedly connected to the second threaded portion.

[0015] According to an anchor template connection structure provided by the utility model, the second nut is fixedly connected to an end of the first connecting rib away from the anchor plate, and the second threaded portion is arranged at the end of the second connecting rib.

[0016] According to an anchor template connection structure provided by the utility model, a threaded hole is arranged on the anchor pad, a third threaded portion is arranged on one end of the first connecting rib away from the second connecting rib, and the third threaded portion is threadedly connected to the threaded hole.

[0017] According to an anchor template connection structure provided by the utility model, a hook end is provided at one end of the first connecting rib away from the anchor pad, and the hook end is used to hook the mesh.

[0018] According to an anchoring template connection structure provided by the utility model, the first threaded portion and / or the second threaded portion are integrally formed with the second connecting rib.

[0019] According to a sealing and anchoring template connection structure provided by the utility model, the third threaded portion and / or the second nut are integrally formed with the first connecting rib.

[0020] The utility model also provides an anchor sealing template, comprising an anchor pad, a mesh and an end sealing template; the anchor pad is arranged at the bottom of the anchor hole, and the mesh is arranged inside; and it also includes an anchor sealing template connection structure described in any one of the above items for connecting the anchor pad, the mesh and the end sealing template.

[0021] The sealing and anchoring template connection structure and the sealing and anchoring template provided by the utility model, when the sealing template is connected, the first connecting rib is first used to connect the mesh and the anchor pad to realize the connection and fixation of the mesh in the anchor hole, on this basis, the end of the second connecting rib is butted with the first connecting rib, and the second connecting rib can provide a connection basis for the sealing template, and after the sealing template is buckled on the anchor hole, the sealing template and the second connecting rib are connected by the locking piece, so that the sealing template is locked on the anchor hole, and the connection and fixation of the sealing template on the anchor hole is realized, and then the anchor hole is filled with concrete, and the concrete is ready to be mixed. After the concrete solidifies, the locking piece is removed to disassemble the end formwork, and then the second connecting rib is pulled axially to separate the second connecting rib from the first connecting rib, and the second connecting rib is pulled out of the solidified concrete, and finally the hole is sealed. Compared with the related art, the second connecting rib connected to the first connecting rib is used to provide a connection basis for the end formwork, without the need to use bulky connecting components such as full-length back ribs or U-shaped clips, and without the need to use rivets, expansion screws and other components for auxiliary reinforcement, making the connection of the end formwork simpler and more convenient, and the connection process is more time-saving and labor-saving. BRIEF DESCRIPTION OF THE DRAWINGS

[0022] In order to more clearly illustrate the technical solutions in the present invention or the prior art, a brief introduction will be given below to the drawings required for use in the embodiments or the description of the prior art. Obviously, the drawings described below are some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying any creative work.

[0023] Figure 1 It is a structural schematic diagram of the sealing and anchoring template connection structure provided by an embodiment of the utility model.

[0024] Figure 2 It is a structural schematic diagram of the first connecting rib provided by the utility model.

[0025] Figure 3 It is a structural schematic diagram of the second connecting rib provided by the utility model.

[0026] Reference numerals:

[0027] 10. First connecting rib; 100. Third threaded portion; 101. Hook end; 11. Second connecting rib; 12. Locking piece; 120. First threaded portion; 121. First nut; 13. Connecting piece; 130. Second threaded portion; 131. Second nut; 20. Anchor hole; 21. Anchor pad; 210. Threaded hole; 22. End-sealing template. DETAILED DESCRIPTION

[0028] In order to make the purpose, technical solution and advantages of the utility model clearer, the technical solution of the utility model will be described clearly and completely in conjunction with the drawings in the utility model. Obviously, the described embodiments are part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments in the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.

[0029] In order to facilitate the understanding of the anchoring template connection structure and the anchoring template provided by the utility model, its application background is first introduced. In the prestressed construction of the box girder, the main purpose of the anchoring at the beam end is to protect the anchor and steel strands after tensioning to ensure the performance and life of the box girder. The traditional anchoring method is the template support method, that is, after the anchor hole is processed, the steel bar with a hook at the end is used to connect the anchor plate and the mesh to achieve the connection and installation of the mesh, and then the end-sealing template is fixed outside the anchor hole, and then concrete is poured. After solidification, the end-sealing template is removed to achieve the sealing of the anchor hole.

[0030] In the related art, the end-sealing formwork is generally reinforced through the corners of the beam ends by means of methods such as horizontal full-length back ribs or vertical U-shaped clamps.

[0031] However, when using the above method, the formwork is bulky and difficult to reinforce, and sometimes some auxiliary measures such as rivets and expansion screws have to be taken, which is a cumbersome and labor-intensive process.

[0032] Based on the above, the utility model provides a sealing and anchoring template connection structure and a sealing and anchoring template, which can greatly simplify the construction process while ensuring the construction quality, saving time and labor in the construction process.

[0033] Combine the following Figure 1-Figure 3 The utility model describes a sealing and anchoring template connection structure and a sealing and anchoring template.

[0034] Reference Figure 1 A sealing anchor template connection structure includes a first connecting rib 10, a second connecting rib 11 and a locking piece 12; wherein, one end of the first connecting rib 10 is fixedly connected to the anchor pad 21 in the anchor hole 20, and the other end opposite thereto is used to connect the mesh in the anchor hole 20; one end of the second connecting rib 11 is detachably connected to the end of the first connecting rib 10 away from the anchor pad 21 along the axial direction, and the other end opposite thereto is detachably connected to the sealing template 22 through the locking piece 12, which is used to lock the sealing template 22 on the anchor hole 20.

[0035] In a specific application scenario, when connecting the end formwork 22, the first connecting rib 10 is first used to connect the mesh and the anchor plate 21 to achieve the connection and fixation of the mesh in the anchor hole 20. On this basis, the end of the second connecting rib 11 is docked with the first connecting rib 10, and the second connecting rib 11 can provide a connection basis for the end formwork 22. After the end formwork 22 is buckled outside the anchor hole 20, the end formwork 22 and the second connecting rib 11 are connected by the locking member 12, so that the end formwork 22 is locked on the anchor hole 20 to achieve the connection and fixation of the end formwork 22 on the anchor hole 20. Subsequently, concrete is filled in the anchor hole 20. After the concrete is cured, the locking member 12 is removed to disassemble the end formwork 22, and then the second connecting rib 11 is pulled axially to separate the second connecting rib 11 from the first connecting rib 10, and the second connecting rib 11 is pulled out of the cured concrete, and finally the hole is sealed.

[0036] Compared with the related art, on the basis of the original structure, the second connecting rib 11 connected with the first connecting rib 10 is used to provide a connection basis for the end template 22. There is no need to use bulky connecting components such as full-length back ribs or U-shaped clips, nor is there any need to use rivets, expansion screws and other components for auxiliary reinforcement, which makes the connection of the end template 22 simpler and more convenient, and the connection process is more time-saving and labor-saving.

[0037] It should be pointed out that the anchor plate 21 is a steel plate or cast iron plate required for anchoring the prestressed tendons during prestressing construction. During prestressing, under the action of the prestressed tendons and anchors, the anchor plate 21 is pressed and fixed to the bottom wall of the anchor hole 20. In the embodiment of the utility model, the anchor plate 21 is used to provide a connection basis for the end capping formwork 22, without involving changes in the structure or principle of the anchor plate 21 itself. Its specific structure and working principle can refer to the prior art, and will not be repeated in the embodiment of the utility model.

[0038] According to different requirements and application scenarios, locking members 12 of different structures or types may be selected to connect the end-capping template 22 .

[0039] In a specific embodiment of the present invention, referring to Figures 1 to 3 The locking member 12 includes a first threaded portion 120 and a first nut 121; wherein the first threaded portion 120 is connected to an end of the second connecting rib 11 away from the first connecting rib 10, and the first nut 121 is used for threaded connection with the first threaded portion 120 passing through the end sealing template 22.

[0040] In actual application, after the second connecting rib 11 is connected to the first connecting rib 10, the end template 22 is buckled on the anchor hole 20, the first threaded portion 120 passes through the end template 22, and then the first nut 121 is tightened. Under the action of the first nut 121, the end template 22 is locked on the anchor hole 20; when disassembling the end template 22, the first nut 121 is unscrewed to remove the end template 22. In this way, the convenience of installing and removing the end template 22 can be improved.

[0041] Specifically, there are a variety of optional connection methods between the first threaded portion 120 and the second connecting rib 11. For example, the two can be welded and fixed, or can be integrally formed. The specific selection can be flexibly made according to actual needs and application scenarios.

[0042] Of course, the locking member 12 includes but is not limited to the structures or forms listed above. Other structures or forms of locking members 12 are also applicable as long as they can lock the end-sealing template 22 on the anchor hole 20.

[0043] The first connecting rib 10 and the second connecting rib 11 are detachably connected via a connecting piece 13 . Similarly, based on different needs and application scenarios, connecting pieces 13 of different structures or forms may be selected to achieve the connection between the first connecting rib 10 and the second connecting rib 11 .

[0044] In a specific embodiment of the present invention, referring to Figure 2 and Figure 3 The connecting member 13 includes a second threaded portion 130 and a second nut 131; wherein the second threaded portion 130 is arranged on one of the first connecting rib 10 and the second connecting rib 11, and the second nut 131 is arranged on the other, and the second nut 131 is threadedly connected to the second threaded portion 130.

[0045] In practical applications, the connection between the first connecting rib 10 and the second connecting rib 11 can be achieved by docking the second nut 131 on one of the first connecting rib 10 and the second connecting rib 11 with the second threaded portion 130 of the other; after the anchor sealing is completed, the end sealing template 22 is removed, and the end of the second connecting rib 11 away from one end of the first connecting rib 10 is pinched with pliers or other tools, and then the second connecting rib 11 is rotated to separate the second threaded portion 130 and the second nut 131, so as to facilitate the second connecting rib 11 to be pulled out axially.

[0046] It is understandable that after the anchoring is completed, the second connecting rib 11 needs to be pulled out, so it is necessary to ensure that the outer diameter of the second nut 131 or the second threaded portion 130 connected to the second connecting rib 11 is not larger than the diameter of the second connecting rib 11, otherwise the second connecting rib 11 may not be pulled out.

[0047] In a specific embodiment of the present invention, the second nut 131 is fixedly connected to the end of the first connecting rib 10 away from the anchor plate 21, and the second threaded portion 130 is connected to the end of the second connecting rib 11. In this way, since the second nut 131 does not need to be disassembled, the restriction of the diameter of the second connecting rib 11 on the size of the second nut 131 can be minimized, thereby ensuring the stability of the connection between the first connecting rib 10 and the second connecting rib 11.

[0048] Specifically, there are a variety of optional connection methods between the second nut 131 and the first connecting rib 10. For example, the two can be welded, integrally formed, or connected by threads. The specific selection can be flexibly made according to actual needs and application scenarios.

[0049] Specifically, there are a variety of optional connection methods between the second threaded portion 130 and the second connecting rib 11. For example, the two can be fixed by welding, or the second threaded portion 130 can be formed by threading the end of the second connecting rib 11, so that the second threaded portion 130 and the second connecting rib 11 are integrally formed. The specific selection can be flexibly made according to actual needs and application scenarios.

[0050] It is understandable that the connecting member 13 includes but is not limited to the structures or forms listed above, and other structures or forms of connecting members 13 are applicable as long as they can achieve axially detachable connection between the first connecting rib 10 and the second connecting rib 11.

[0051] In order to facilitate the connection of the mesh in the anchor hole 20, in a specific embodiment of the utility model, a threaded hole 210 is provided on the anchor plate 21, and a third threaded portion 100 is provided at one end of the first connecting rib 10 away from the second connecting rib 11, and the third threaded portion 100 is threadedly connected to the threaded hole 210 on the anchor plate 21, and a hook end 101 is provided at one end of the first connecting rib 10 away from the anchor plate 21 for hooking the mesh.

[0052] In actual applications, the third threaded portion 100 on the first connecting rib 10 is threadedly connected to the threaded hole 210 on the anchor plate 21 to achieve the connection and fixation of the first connecting rib 10 on the anchor plate 21, and then the mesh is hooked through the hook end 101 at the end of the first connecting rib 10 to achieve the connection and fixation of the mesh in the anchor hole 20.

[0053] Specifically, there are a variety of optional connection methods between the third threaded portion 100 and the first connecting rib 10. For example, the two can be fixed by welding, or the third threaded portion 100 can be formed by threading the end of the first connecting rib 10, so that the third threaded portion 100 and the first connecting rib 10 are integrally formed. The specific selection can be flexibly made according to actual needs and application scenarios.

[0054] In a specific embodiment of the present invention, the hook end 101 and the first connecting rib 10 can be fixed by welding, or can be integrally formed, or can be connected in a detachable manner. Specifically, they can be flexibly configured according to actual needs and application scenarios.

[0055] It should be noted that, in the absence of conflict, the technical features in the embodiments of the present invention can be combined.

[0056] The anchoring template provided by the present invention is described below. The anchoring template described below and the anchoring template connection structure described above can be referred to each other.

[0057] A sealing anchor template comprises an anchor pad 21, a mesh and an end-sealing template 22; wherein the anchor pad 21 is arranged at the bottom of an anchor hole 20, and the mesh is arranged in the anchor hole 20; and also comprises the above-mentioned sealing anchor template connection structure for connecting the anchor pad 21, the mesh and the end-sealing template 22.

[0058] The novelty of the utility model is that when the end-capping template 22 is connected, the first connecting rib 10 is first used to connect the mesh and the anchor pad 21 to achieve the connection and fixation of the mesh in the anchor hole 20. On this basis, the end of the second connecting rib 11 is butted with the first connecting rib 10, and the second connecting rib 11 can provide a connection basis for the end-capping template 22. After the end-capping template 22 is buckled on the anchor hole 20, the end-capping template 22 and the second connecting rib 11 are connected by the locking member 12, so that the end-capping template 22 is locked on the anchor hole 20, and the connection and fixation of the end-capping template 22 on the anchor hole 20 is achieved, and then the anchor hole 20 is filled with concrete. After the concrete solidifies, the locking piece 12 is removed to disassemble the end-capping formwork 22, and then the second connecting rib 11 is pulled axially to separate the second connecting rib 11 from the first connecting rib 10, and the second connecting rib 11 is pulled out of the solidified concrete, and finally the hole is sealed. Compared with the related art, the second connecting rib 11 connected to the first connecting rib 10 provides a connection basis for the end-capping formwork 22, without the need to use bulky connecting components such as full-length back ribs or U-shaped clips, and without the need to use rivets, expansion screws and other components for auxiliary reinforcement, so that the connection of the end-capping formwork 22 is simpler and more convenient, and the connection process is more time-saving and labor-saving.

[0059] Finally, it should be noted that the above embodiments are only used to illustrate the technical solutions of the utility model, rather than to limit it. Although the utility model has been described in detail with reference to the aforementioned embodiments, those skilled in the art should understand that they can still modify the technical solutions described in the aforementioned embodiments, or make equivalent replacements for some of the technical features therein. However, these modifications or replacements do not deviate the essence of the corresponding technical solutions from the spirit and scope of the technical solutions of the various embodiments of the utility model.

Claims

1. A sealing and anchoring template connection structure, characterized in that: include: A first connecting rib (10), a second connecting rib (11) and a locking member (12); One end of the first connecting rib (10) is fixedly connected to the anchor pad (21) in the anchor hole (20), and the other end opposite thereto is used to connect to the mesh in the anchor hole (20); One end of the second connecting rib (11) is detachably connected to an end of the first connecting rib (10) away from the anchor plate (21) along the axial direction, and the other opposite end is detachably connected to the end sealing template (22) via a locking member (12) for locking the end sealing template (22) on the anchor hole (20).

2. The anchoring template connection structure according to claim 1 is characterized in that: The locking member (12) comprises a first threaded portion (120) and a first nut (121); The first threaded portion (120) is connected to an end of the second connecting rib (11) away from the first connecting rib (10); and the first nut (121) is used for threaded connection with the first threaded portion (120) passing through the end-sealing template (22).

3. The anchoring template connection structure according to claim 2 is characterized in that: The first connecting rib (10) and the second connecting rib (11) are detachably connected via a connecting piece (13).

4. The anchoring template connection structure according to claim 3 is characterized in that: The connecting member (13) comprises a second threaded portion (130) and a second nut (131); The second threaded portion (130) is connected to one of the first connecting rib (10) and the second connecting rib (11), and the second nut (131) is connected to the other, and the second nut (131) is threadedly connected to the second threaded portion (130).

5. The anchoring template connection structure according to claim 4 is characterized in that: The second nut (131) is fixedly connected to an end of the first connecting rib (10) away from the anchor plate (21), and the second threaded portion (130) is arranged at an end of the second connecting rib (11).

6. The anchoring template connection structure according to claim 4, characterized in that: A threaded hole (210) is provided on the anchor plate (21), and a third threaded portion (100) is provided on one end of the first connecting rib (10) away from the second connecting rib (11), and the third threaded portion (100) is threadedly connected to the threaded hole (210).

7. The anchoring template connection structure according to claim 6 is characterized in that: One end of the first connecting rib (10) away from the anchor plate (21) is provided with a hook end (101), and the hook end (101) is used to hook the mesh.

8. The anchoring template connection structure according to claim 4, characterized in that: The first threaded portion (120) and / or the second threaded portion (130) are integrally formed with the second connecting rib (11).

9. The anchoring template connection structure according to claim 6, characterized in that: The third threaded portion (100) and / or the second nut (131) are integrally formed with the first connecting rib (10).

10. An anchoring template, characterized in that: It comprises an anchor plate (21), a mesh and an end-sealing template (22); the anchor plate (21) is arranged at the bottom of the anchor hole (20), and the mesh is arranged in the (20); It also comprises an anchoring template connection structure as described in any one of claims 1 to 9 for connecting the anchor plate (21), the mesh and the end-sealing template (22).