Water conservancy pipeline mounting device capable of being stably mounted for water conservancy project

By designing a water conservancy pipeline installation device including a roof plate and adjustment components, using the combination of rotating shaft, main umbrella wheel, secondary umbrella wheel, ball screw and ball nut, the problems of unstable and low efficiency of water conservancy pipeline installation in the prior art are solved, and stable and efficient water conservancy pipeline installation is achieved.

CN222880520UActive Publication Date: 2025-05-16THE ENG & TECHN COLLEGE OF CHENGDU UNIV OF TECH
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202421786919.3
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-07-26
Publication Date
2025-05-16
Estimated Expiration
2034-07-26

AI Technical Summary

Technical Problem

When supporting and adjusting water conservancy pipelines, the manual adjustment effect of existing water conservancy pipelines is poor, resulting in unstable installation and reducing installation efficiency.

Method used

A water conservancy pipeline installation device including a roof plate and adjustment components is designed. Through the combination of the rotating shaft, main umbrella wheel, secondary umbrella wheel, ball screw and ball nut, stable lifting and lowering adjustment of the water conservancy pipeline is achieved, and the angle adjustment function is provided through the coordination of the adjustment screw and the fixing nut.

Benefits of technology

Through the smooth movement of ball screws and ball nuts, the device provides stable adjustment when supporting the water conservancy pipeline, improves the stability and efficiency of installation, and can adapt to water conservancy pipelines of different sizes.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222880520U_ABST
    Figure CN222880520U_ABST
Patent Text Reader

Abstract

The utility model relates to the technical field of water conservancy pipeline installation, and discloses a water conservancy pipeline installation device capable of being stably installed for water conservancy project, which comprises a top plate and an adjusting component, the adjusting component is arranged below the top plate, and the adjusting component comprises an adjusting sleeve, a connecting block, a rotating shaft, a main umbrella wheel, an auxiliary umbrella wheel, a ball screw, a ball nut and an adjusting rod. A connecting block is connected to the lower end of the front face of the adjusting sleeve in a penetrating mode, a rotating shaft is connected into the connecting block in a penetrating mode, a main umbrella wheel is welded to one end of the rotating shaft, and an auxiliary umbrella wheel is connected to the lower portion of the main umbrella wheel in an engaged mode. When the pipeline installation device conducts auxiliary installation work on a water conservancy pipeline, the rotating shaft is matched with the main umbrella wheel to rotate the auxiliary umbrella wheel, so that the rotating auxiliary umbrella wheel drives the ball screw to be matched with the ball nut to achieve the purpose of lifting adjustment on the adjusting rod, and the ball nut stably moves on the ball screw; and therefore, stability is provided for adjustment during supporting of the water conservancy pipeline, and the mounting efficiency of the water conservancy pipeline is guaranteed.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of water conservancy pipeline installation, in particular to a water conservancy pipeline installation device for a water conservancy project which can be stably installed. Background Art

[0002] Water conservancy projects are a general term for various engineering projects built to control, utilize and protect surface and underground water resources and the environment. Water conservancy pipelines are one of the necessary infrastructures in the construction process of water conservancy projects. During the installation of water conservancy pipelines, water conservancy projects need to support and lift the pipelines through pipeline installation devices to assist in the docking and fixing of the two pipelines.

[0003] The applicant believes that:

[0004] When the pipeline installation device assists in the installation of the water conservancy pipeline, the water conservancy pipeline is generally supported by a bracket. However, most brackets have poor manual adjustment effects and cannot stably adjust the water conservancy pipeline when supporting it, which affects the installation stability of the water conservancy pipeline and reduces the installation efficiency of the water conservancy pipeline. Therefore, improvements are needed. Utility Model Content

[0005] 1. Technical issues to be resolved

[0006] In view of the shortcomings of the prior art, the utility model provides a water conservancy pipeline installation device for water conservancy projects that can be stably installed. It has the advantage of stable adjustment of the pipeline installation device, and solves the problem that the water conservancy pipeline cannot be stably adjusted when supported, thereby affecting the installation stability of the water conservancy pipeline and further reducing the installation efficiency of the water conservancy pipeline.

[0007] (II) Technical solution

[0008] To achieve the above-mentioned purpose, the utility model provides the following technical solution: a stably installable water conservancy pipeline installation device for water conservancy projects, comprising a top plate and an adjusting component, wherein the adjusting component is arranged below the top plate.

[0009] The adjusting component comprises an adjusting sleeve, a connecting block, a rotating shaft, a main umbrella wheel, a secondary umbrella wheel, a ball screw, a ball nut and an adjusting rod. The lower end of the front side of the adjusting sleeve is connected with the connecting block, the interior of the connecting block is connected with the rotating shaft, one end of the rotating shaft is welded with the main umbrella wheel, the lower part of the main umbrella wheel is meshed with the secondary umbrella wheel, the upper part of the secondary umbrella wheel is fixedly connected with a ball screw, the outer wall of the ball screw is cooperated with the ball nut, and the outer wall of the ball nut is fixedly connected with the adjusting rod.

[0010] Furthermore, the other end of the rotating shaft is fixedly connected with a crank, and the lower part of the auxiliary umbrella wheel is connected to the inner wall of the adjusting sleeve through a bearing.

[0011] Furthermore, a threaded sleeve is connected through the upper interior of the connection block, and the internal thread of the threaded sleeve is connected to a threaded rod.

[0012] Furthermore, the lower end of the threaded rod is connected to a clamping block via a bearing.

[0013] Furthermore, telescopic rods are fixedly connected to both sides of the bottom of the top plate, and the other end of the telescopic rods is fixedly connected to the base. The upper end of the adjusting rod is connected to the bottom of the top plate, and the lower end of the threaded sleeve is connected to the inside of the base.

[0014] Furthermore, a tube clamping component is arranged above the top plate, and the tube clamping component includes a fixed block, a main bracket, a main roller, an adjusting block, a secondary bracket, a secondary roller, an adjusting screw and a fixing nut, and the fixing blocks are welded on both sides above the top plate.

[0015] Furthermore, a main bracket is welded to one side of the fixed block, and main rollers are installed at equal intervals inside the main bracket. An adjustment block is movably connected to one side of the fixed block, and a secondary bracket is welded to one side of the adjustment block, and secondary rollers are installed at equal intervals inside the secondary bracket.

[0016] Furthermore, an adjusting screw is connected through the interior of the fixing block and the adjusting block, and both ends of the adjusting screw are threadedly connected with fixing nuts.

[0017] Compared with the prior art, the utility model provides a water conservancy pipeline installation device for water conservancy projects that can be stably installed, and has the following beneficial effects:

[0018] 1. When the pipeline installation device assists in the installation of water conservancy pipelines, the rotating shaft cooperates with the main umbrella wheel to rotate the auxiliary umbrella wheel, so that the rotating auxiliary umbrella wheel drives the ball screw to cooperate with the ball nut to provide the purpose of lifting and lowering adjustment for the adjustment rod, and the ball nut moves smoothly on the ball screw, thereby providing stability for the adjustment of the water conservancy pipeline support and ensuring the installation efficiency of the water conservancy pipeline.

[0019] 2. When the pipeline installation device assists in the installation of water conservancy pipelines, the main bracket and the auxiliary bracket can be provided with an angle adjustment function by adjusting the cooperation between the screw and the fixing nut, so as to facilitate the placement of water conservancy pipelines of different sizes. In addition, multiple main rollers and auxiliary rollers are arranged inside the main bracket and the auxiliary bracket, which provides convenience for the rotation adjustment of the water conservancy pipelines placed inside the main bracket and the auxiliary bracket. BRIEF DESCRIPTION OF THE DRAWINGS

[0020] Figure 1 It is a schematic diagram of the three-dimensional structure of a water conservancy pipeline installation device for a water conservancy project that can be stably installed, provided by an embodiment of the utility model;

[0021] Figure 2 It is a schematic diagram of the disassembled structure of the regulating component of the water conservancy pipeline installation device for water conservancy projects that can be stably installed provided by an embodiment of the utility model;

[0022] Figure 3 This is a schematic diagram of the clamping block structure of a water conservancy pipeline installation device for a water conservancy project that can be stably installed, provided by an embodiment of the utility model;

[0023] Figure 4 It is a structural schematic diagram of a pipe clamping component of a water conservancy pipeline installation device for a water conservancy project that can be stably installed, provided by an embodiment of the utility model.

[0024] Wherein: 1. top plate; 2. adjusting component; 201. adjusting sleeve; 202. connecting block; 203. rotating shaft; 204. crank; 205. main umbrella wheel; 206. auxiliary umbrella wheel; 207. ball screw; 208. ball nut; 209. adjusting rod; 210. threaded sleeve; 211. threaded rod; 212. clamping block; 3. pipe clamping component; 301. fixing block; 302. main bracket; 303. main roller; 304. adjusting block; 305. auxiliary bracket; 306. auxiliary roller; 307. adjusting screw; 308. fixing nut; 4. telescopic rod; 5. base. DETAILED DESCRIPTION

[0025] The following will be combined with the drawings in the embodiments of the utility model to clearly and completely describe the technical solutions in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments in the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.

[0026] See also Figures 1 to 4 The utility model provides a technical solution: a water conservancy pipeline installation device for a water conservancy project that can be stably installed, comprising a top plate 1 and an adjusting component 2, the adjusting component 2 is arranged below the top plate 1, telescopic rods 4 are fixedly connected to both sides below the top plate 1, the other end of the telescopic rod 4 is fixedly connected to a base 5, and a pipe clamping component 3 is arranged above the top plate 1.

[0027] Among them: when the pipeline installation device assists in the installation of the water conservancy pipeline, the water conservancy pipeline is first placed through the pipe clamping component 3, and then the water conservancy pipeline is raised and lowered to a suitable height through the adjustment component 2. While the top plate 1 is raised and lowered, the telescopic rods 4 on both sides of the top plate 1 can support and limit the top plate 1.

[0028] See also Figure 1 , Figure 2 Anthracene Figure 3A water conservancy pipeline installation device for a water conservancy project that can be stably installed, the adjustment component 2 includes an adjustment sleeve 201, a connecting block 202, a rotating shaft 203, a main umbrella wheel 205, a secondary umbrella wheel 206, a ball screw 207, a ball nut 208, and an adjustment rod 209. The lower end of the front side of the adjustment sleeve 201 is connected with the connecting block 202, and the interior of the connecting block 202 is connected with the rotating shaft 203. One end of the rotating shaft 203 is welded and connected with the main umbrella wheel 205, and the lower part of the main umbrella wheel 205 is meshed and connected with the secondary umbrella wheel 206. The upper part of the secondary umbrella wheel 206 is fixedly connected with the ball screw 207, and the ball screw 207 is fixedly connected with the ball screw 207. A ball nut 208 is installed on the outer wall of the screw rod 207, and an adjusting rod 209 is fixedly connected to the outer wall of the ball nut 208. The other end of the rotating shaft 203 is fixedly connected to the crank 204. The lower part of the auxiliary umbrella wheel 206 is connected to the inner wall of the adjusting sleeve 201 through a bearing. A threaded sleeve 210 is penetrated and connected to the upper interior of the connecting block 202. The internal thread of the threaded sleeve 210 is connected to a threaded rod 211. The lower end of the threaded rod 211 is connected to a clamping block 212 through a bearing. The upper end of the adjusting rod 209 is connected to the lower part of the top plate 1, and the lower end of the threaded sleeve 210 is connected to the inside of the base 5.

[0029] Among them: when the adjusting component 2 is working on the stable adjustment of the water conservancy pipeline, the crank handle 204 is first rotated to drive the rotating shaft 203 to cooperate with the main umbrella wheel 205 to rotate the auxiliary umbrella wheel 206, and then the rotating auxiliary umbrella wheel 206 will drive the ball screw 207 to cooperate with the ball nut 208 to adjust the adjusting rod 209 to a suitable height on the adjusting sleeve 201, thereby providing the water conservancy pipeline with a height adjustment function, and after the water conservancy pipeline is adjusted to a suitable height, the threaded rod 211 is tightened to cooperate with the threaded sleeve 210 to fix the rotating shaft 203 with the clamp 212 to prevent the rotating shaft 203 from rotating in the opposite direction and the adjusting rod 209 from descending, causing the water conservancy pipeline to fall, and the ball nut 208 moves smoothly on the ball screw 207, thereby providing stability for the adjustment of the water conservancy pipeline during support, thereby ensuring the installation efficiency of the water conservancy pipeline.

[0030] See also Figure 1 and Figure 4, a water conservancy pipeline installation device for a water conservancy project that can be stably installed, the pipe clamping component 3 includes a fixed block 301, a main bracket 302, a main roller 303, an adjusting block 304, a sub-bracket 305, a sub-roller 306, an adjusting screw 307 and a fixing nut 308, both sides of the top plate 1 are welded with fixed blocks 301, one side of the fixed block 301 is welded with the main bracket 302, the main roller 303 is evenly installed inside the main bracket 302, one side of the fixed block 301 is movably connected with the adjusting block 304, one side of the adjusting block 304 is welded with the sub-bracket 305, the sub-roller 306 is evenly installed inside the sub-bracket 305, the fixing block 301 and the adjusting block 304 are connected with adjusting screws 307, and both ends of the adjusting screw 307 are threadedly connected with fixing nuts 308.

[0031] Among them: when the pipe clamping component 3 is placing the water conservancy pipeline, first, the angle between the main bracket 302 and the auxiliary bracket 305 is adjusted by adjusting the screw 307 according to the diameter of the water conservancy pipeline. After adjusting to a suitable angle, the fixing nuts 308 at both ends of the adjusting screw 307 are tightened to fix the main bracket 302 and the auxiliary bracket 305, so as to facilitate the placement of water conservancy pipelines of different sizes. In addition, multiple main rollers 303 and auxiliary rollers 306 are arranged inside the main bracket 302 and the auxiliary bracket 305, which provides convenience for the rotation adjustment of the water conservancy pipeline placed inside the main bracket 302 and the auxiliary bracket 305.

[0032] The working principle of the utility model is as follows: when the pipeline installation device assists in the installation of the water conservancy pipeline, firstly, the angle between the main bracket 302 and the auxiliary bracket 305 is adjusted by adjusting the screw 307 according to the diameter of the water conservancy pipeline. After adjusting to a suitable angle, the fixing nuts 308 at both ends of the adjusting screw 307 are tightened to fix the main bracket 302 and the auxiliary bracket 305. Then, the water conservancy pipeline is placed inside the main bracket 302 and the auxiliary bracket 305. Then, the crank 204 is turned to drive the rotating shaft 203 to cooperate with the main umbrella wheel 205 to rotate the auxiliary umbrella wheel 206, so that the rotating auxiliary umbrella wheel 206 will drive the ball screw 207 to cooperate with the ball nut 208 to adjust the adjusting rod 209 to a suitable height on the adjusting sleeve 201. After the water conservancy pipeline is adjusted to a suitable height, Then tighten the threaded rod 211 and cooperate with the threaded sleeve 210 to fix the clamp 212 to the rotating shaft 203, and while the top plate 1 is raised and lowered, the telescopic rods 4 on both sides of the top plate 1 can support and limit the top plate 1, and then the supported and lifted water conservancy pipeline is docked and fixed with another water conservancy pipeline, and when the water conservancy pipeline is docked, the main roller 303 and the auxiliary roller 306 inside the main bracket 302 and the auxiliary bracket 305 can assist the water conservancy pipeline placed inside the main bracket 302 and the auxiliary bracket 305 to rotate and adjust, thus completing the working principle and working process of a water conservancy pipeline installation device for a water conservancy project that can be stably installed, and the contents not described in detail in this specification belong to the prior art known to professional and technical personnel in this field.

[0033] Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and spirit of the present invention, and that the scope of the present invention is defined by the appended claims and their equivalents.

Claims

1. A water conservancy pipeline installation device for a water conservancy project that can be stably installed, characterized in that: It comprises a top plate (1) and an adjusting component (2), wherein the adjusting component (2) is arranged below the top plate (1); The adjusting component (2) comprises an adjusting sleeve (201), a connecting block (202), a rotating shaft (203), a main umbrella wheel (205), a secondary umbrella wheel (206), a ball screw (207), a ball nut (208), and an adjusting rod (209); the lower end of the front side of the adjusting sleeve (201) is connected to the connecting block (202); the interior of the connecting block (202) is connected to the rotating shaft (203); one end of the rotating shaft (203) is welded to the main umbrella wheel (205); the lower part of the main umbrella wheel (205) is meshedly connected to the secondary umbrella wheel (206); the upper part of the secondary umbrella wheel (206) is fixedly connected to the ball screw (207); the outer wall of the ball screw (207) is cooperatively mounted with the ball nut (208); and the outer wall of the ball nut (208) is fixedly connected to the adjusting rod (209).

2. A stably installable water conservancy pipeline installation device for water conservancy projects according to claim 1, characterized in that: The other end of the rotating shaft (203) is fixedly connected to a crank handle (204), and the lower part of the auxiliary umbrella wheel (206) is connected to the inner wall of the adjustment sleeve (201) via a bearing.

3. A stably installable water conservancy pipeline installation device for water conservancy projects according to claim 1, characterized in that: A threaded sleeve (210) is connected through the upper interior of the connection block (202); the threaded sleeve (210) is internally threadedly connected to a threaded rod (211).

4. A stably installable water conservancy pipeline installation device for water conservancy projects according to claim 3, characterized in that: The lower end of the threaded rod (211) is connected to a clamping block (212) via a bearing.

5. The stably installable water conservancy pipeline installation device for water conservancy projects according to claim 3, characterized in that: Both sides of the bottom of the top plate (1) are fixedly connected to telescopic rods (4), the other end of the telescopic rods (4) is fixedly connected to a base (5), the upper end of the adjustment rod (209) is connected to the bottom of the top plate (1), and the lower end of the threaded sleeve (210) is connected to the inside of the base (5).

6. The stably installable water conservancy pipeline installation device for water conservancy projects according to claim 1, characterized in that: A tube clamping component (3) is arranged above the top plate (1), and the tube clamping component (3) comprises a fixing block (301), a main bracket (302), a main roller (303), an adjustment block (304), a secondary bracket (305), a secondary roller (306), an adjustment screw (307) and a fixing nut (308). The fixing blocks (301) are welded to both sides of the top of the top plate (1).

7. A stably installable water conservancy pipeline installation device for water conservancy projects according to claim 6, characterized in that: A main bracket (302) is welded to one side of the fixed block (301), and main rollers (303) are mounted at equal intervals inside the main bracket (302). An adjustment block (304) is movably connected to one side of the fixed block (301), and a secondary bracket (305) is welded to one side of the adjustment block (304), and secondary rollers (306) are mounted at equal intervals inside the secondary bracket (305).

8. The stably installable water conservancy pipeline installation device for water conservancy projects according to claim 7, characterized in that: An adjusting screw (307) is connected through the interior of the fixing block (301) and the adjusting block (304), and both ends of the adjusting screw (307) are threadedly connected with fixing nuts (308).