External scaffold pulling node

By designing the external scaffolding pulling points, the problems of cutting and large construction workload in the existing technology are solved, and the structure is simple to install and disassemble and recyclable.

CN222893959UActive Publication Date: 2025-05-23CHINA CONSTR SCI & IND CORP LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420873944.9
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-04-24
Publication Date
2025-05-23
Estimated Expiration
2034-04-24

AI Technical Summary

Technical Problem

After the existing external scaffolding is removed, the pull-up rod needs to be cut, resulting in a large construction workload.

Method used

An external scaffolding pulling point is designed, including a sleeve, a base, a fixing rod, a fastening assembly and a pulling rod, which is detachably arranged on the structural beam by connecting the pulling rod to the base and by the fixing rod and a fastening assembly.

Benefits of technology

It reduces the leakage risks of external scaffolding nodes, reduces the difficulty of secondary construction in the later stage, is simple to install and disassemble, and can be turned and recycled. The fastening components improve the stability of base installation.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222893959U_ABST
    Figure CN222893959U_ABST
Patent Text Reader

Abstract

The utility model relates to the technical field of building construction, and discloses an external scaffold pulling joint which comprises a sleeve suitable for being pre-buried in a structural beam, and a base provided with at least one mounting hole; the number of the fixing rods is at least one, the fixing rods penetrate through the mounting holes and are in one-to-one correspondence with the mounting holes, part of the fixing rods are arranged in the sleeves, and threads are arranged at the two ends of each fixing rod; the number of the fastening assemblies is at least two, the two fastening assemblies are arranged corresponding to one fixing rod, and the two fastening assemblies are in threaded connection with the two ends of the fixing rod correspondingly. And the tie rod is connected with the base. According to the external scaffold node, the tie rod is connected with the base, and the base is detachably arranged on the structural beam through the fixing rod and the fastening assembly, so that the leakage hidden danger of the external scaffold node is reduced, and the later secondary construction difficulty is reduced; the structure is simple to mount and dismount and can be recycled; the fastening assemblies fix the base on the two sides, and the base installation stability is improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of building construction, in particular to an external scaffolding tie point. Background Art

[0002] External scaffolding refers to the scaffolding erected outside the building. External scaffolding is widely used, and various types of floor-standing external scaffolding, hanging scaffolding, cantilever scaffolding, hanging scaffolding, etc. are generally erected outside the building. External scaffolding is mostly used for exterior wall masonry, facade decoration and reinforced concrete engineering.

[0003] In the existing external scaffolding, tie rods are pre-buried in the structural beams. After the external frame is dismantled, the tie rods need to be cut off and scrapped, which results in a large amount of construction work. Utility Model Content

[0004] In view of this, the utility model provides an external scaffolding tie point to solve the problem that the tie rod needs to be cut off and the construction workload is large.

[0005] The utility model provides an external scaffolding tie point, comprising: a sleeve, suitable for being embedded in a structural beam; a base, at least one mounting hole is provided on the base; at least one fixing rod is provided, the fixing rod passes through the mounting hole and is arranged one-to-one with the mounting hole, part of the fixing rod is arranged in the sleeve, and threads are arranged at both ends of the fixing rod; at least two fastening components are provided, two fastening components are arranged corresponding to one fixing rod, and the two fastening components are respectively connected with threads at both ends of the fixing rod; a tie rod, the tie rod is connected to the base.

[0006] Beneficial effects: By connecting the tie rod with the base and detachably setting the base on the structural beam through the fixing rod and the fastening assembly, the leakage risk of the external scaffolding node is reduced and the difficulty of secondary construction in the later stage is reduced; the structure is simple to install and disassemble and can be circulated and reused; the fastening assembly fixes the base on both sides to improve the stability of the base installation.

[0007] In an optional embodiment, the external scaffolding tie point further includes a fastener, and the fastener is suitable for connecting the tie rod and the vertical pole.

[0008] In an optional embodiment, the fastener includes a connecting part and a main body part, and two main body parts are provided. The two main body parts are arranged at an interval, and the first ends of the two main body parts are respectively connected to the two ends of the connecting part to form a first installation groove, and the first installation groove is suitable for setting the vertical rod. The main body part is formed with a second installation groove, and the tie rod is arranged through the second installation grooves of the two main body parts.

[0009] In an optional embodiment, the fastener further includes a mounting plate, and the mounting plate is connected to the second ends of the two main bodies.

[0010] In an optional embodiment, the tie rod is connected to the base by welding; or, the tie rod is detachably connected to the base.

[0011] Beneficial effects: The tie rod is welded to the base to obtain a higher connection strength and improve the overall structural strength; the tie rod and the base are detachably connected, and after the external scaffolding tie point is used, the tie rod and the base can be disassembled and reassembled for use.

[0012] In an optional embodiment, the external scaffolding tie point further includes a reinforcing rib, and the reinforcing rib connects the tie rod and the base.

[0013] Beneficial effect: By setting the reinforcing ribs, the connection strength between the tie rod and the base is improved, and the stability of the external scaffolding tie point structure is improved.

[0014] In an optional embodiment, a plurality of the reinforcing ribs are provided, and the plurality of the reinforcing ribs are arranged at intervals.

[0015] Beneficial effect: By providing a plurality of reinforcing ribs, the connection strength between the tie rod and the base is further improved.

[0016] In an optional embodiment, the tie rod is spaced apart from the mounting hole.

[0017] In an optional embodiment, the fastening assembly includes a nut and a washer, the washer is arranged on a side of the nut close to the base, and the nut is threadedly connected to the fixing rod.

[0018] In an optional embodiment, a plurality of nuts are provided, and the plurality of nuts are connected to the fixing rod in sequence.

[0019] Beneficial effect: by stacking a plurality of nuts in sequence and connecting them with the fixing rod, the stability of the nut fixing is improved, and the safety performance of the fastening assembly is improved. BRIEF DESCRIPTION OF THE DRAWINGS

[0020] In order to more clearly illustrate the specific implementation methods of the utility model or the technical solutions in the prior art, the drawings required for use in the specific implementation methods or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are some implementation methods of the utility model. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.

[0021] Figure 1It is a schematic diagram of the overall structure of the external scaffolding tie point of the embodiment of the utility model;

[0022] Figure 2 It is a partial structural exploded schematic diagram of the external scaffolding tie point of the embodiment of the utility model;

[0023] Figure 3 It is a schematic structural diagram of a fastening member according to an embodiment of the utility model.

[0024] Description of reference numerals:

[0025] 10. Base; 11. Mounting hole; 20. Fixing rod; 30. Fastening assembly; 31. Nut; 32. Gasket; 40. Tie rod; 50. Fastener; 51. Connecting part; 52. Main body; 53. Mounting plate; 60. Reinforcing rib; 70. Structural beam; 80. Vertical pole. DETAILED DESCRIPTION

[0026] In order to make the purpose, technical solution and advantages of the embodiment of the utility model clearer, the technical solution in the embodiment of the utility model will be clearly and completely described below in conjunction with the drawings in the embodiment of the utility model. Obviously, the described embodiment is a part of the embodiment of the utility model, not all the embodiments. Based on the embodiment of the utility model, all other embodiments obtained by those skilled in the art without creative work are within the scope of protection of the utility model.

[0027] Combine the following Figures 1 to 3 , describing an embodiment of the utility model.

[0028] According to an embodiment of the utility model, an external scaffolding tie point is provided, including a sleeve, a base 10, a fixing rod 20, a fastening assembly 30 and a tie rod 40. The sleeve is suitable for being embedded in the structural beam; at least one mounting hole 11 is provided on the base 10; at least one fixing rod 20 is provided, the fixing rod 20 passes through the mounting hole 11 and is arranged one-to-one with the mounting hole 11, part of the fixing rod 20 is arranged in the sleeve, and both ends of the fixing rod 20 are provided with threads; the fastening assembly 30, at least two fastening assemblies 30 are provided, two fastening assemblies 30 are arranged corresponding to one fixing rod 20, and the two fastening assemblies 30 are respectively connected with the two ends of the fixing rod 20 by threads; the tie rod 40, the tie rod 40 is connected to the base 10.

[0029] The external scaffolding tie points of this embodiment are applied. By connecting the tie rod 40 with the base 10, and detachably setting the base 10 on the structural beam 70 through the fixing rod 20 and the fastening assembly 30, the leakage risk of the external scaffolding node is reduced and the difficulty of secondary construction in the later stage is reduced; the structure is simple to install and disassemble, and can be circulated and reused; the fastening assembly 30 fixes the base 10 on both sides to improve the stability of the installation of the base 10.

[0030] Specifically, the sleeve is a hollow cylinder, the middle portion of the fixing rod 20 is disposed in the sleeve, and both ends of the fixing rod 20 are exposed outside the sleeve.

[0031] Specifically, in this embodiment, the base 10 is provided with two mounting holes 11 , two fixing rods 20 are provided, and four fastening assemblies 30 are provided.

[0032] Of course, in other alternative embodiments, the number of mounting holes 11 , the number of fixing rods 20 , and the number of fastening assemblies 30 may also be adjusted according to actual conditions.

[0033] Specifically, the fixing rod 20 in this embodiment is a wall-penetrating screw.

[0034] It should be noted that, during the construction of the structural beam 70 , it is necessary to pre-embed a PVC sleeve in the structural beam 70 to form a reserved hole for the fixing rod 20 to pass through the beam.

[0035] In one embodiment, Figure 1 As shown, the external scaffolding tie point further includes a fastener 50 , which is suitable for connecting the tie rod 40 and the vertical rod 80 .

[0036] In one embodiment, Figure 3 As shown, the fastener 50 includes a connecting portion 51 and a main body portion 52. Two main body portions 52 are provided. The two main body portions 52 are arranged at intervals, and the first ends of the two main body portions 52 are respectively connected to the two ends of the connecting portion 51 to form a first mounting groove. The first mounting groove is suitable for setting the vertical rod 80. The main body portion 52 is formed with a second mounting groove, and the tie rod 40 passes through the second mounting grooves of the two main body portions 52.

[0037] For details, please refer to Figure 3 The main body 52 is a U-shaped rod with a second mounting groove formed inside the U-shaped rod. The connecting portion 51 also forms a U-shaped rod structure after being connected to the first ends of the two main bodies 52, thereby forming a first mounting groove. The groove directions of the first mounting groove and the second mounting groove are perpendicular, that is, the axial direction of the tie rod 40 is perpendicular to the axial direction of the vertical rod 80.

[0038] Of course, in other alternative implementations, the directions of the openings of the first mounting groove and the second mounting groove may also be at other angles.

[0039] In one embodiment, Figure 3 As shown, the fastener 50 further includes a mounting plate 53 , which is connected to the second ends of the two main body portions 52 .

[0040] In one embodiment, the tie rod 40 is connected to the base 10 by welding.

[0041] It is worth noting that the tie rod 40 is welded to the base 10 to obtain a higher connection strength and improve the overall structural strength.

[0042] In other alternative embodiments, the tie rod 40 is detachably connected to the base 10 .

[0043] It is worth noting that the tie rod 40 and the base 10 are detachably connected, and after the external scaffolding tie point is used, the tie rod 40 and the base 10 can be disassembled and reassembled for use.

[0044] In one embodiment, Figure 1 As shown, the external scaffolding tie point further includes a reinforcing rib 60 , which connects the tie rod 40 and the base 10 .

[0045] Specifically, in this embodiment, the reinforcing rib 60 is connected to the tie rod 40 and the base 10 by welding.

[0046] Of course, in other alternative embodiments, the reinforcing rib 60 may also be connected to the tie rod 40 and the base 10 in a detachable connection manner, such as threaded connection.

[0047] It is worth noting that, by providing the reinforcing ribs 60 , the connection strength between the tie rod 40 and the base 10 is improved, and the stability of the tie point structure of the external scaffolding is improved.

[0048] In one embodiment, Figure 1 As shown, a plurality of reinforcing ribs 60 are provided, and the plurality of reinforcing ribs 60 are arranged at intervals.

[0049] Specifically, four reinforcing ribs 60 are provided, and the four reinforcing ribs 60 are arranged at intervals along the circumference of the tie rod 40 .

[0050] Of course, in other alternative embodiments, the number of reinforcing ribs 60 can also be selected according to actual conditions, such as three, five, etc.

[0051] It is worth noting that by providing a plurality of reinforcing ribs 60 , the connection strength between the tie rod 40 and the base 10 is further improved.

[0052] In one embodiment, Figure 1 and Figure 2 As shown, the tie rod 40 is spaced apart from the mounting hole 11 .

[0053] In one embodiment, Figure 2 As shown, the fastening assembly 30 includes a nut 31 and a washer 32 . The washer 32 is disposed on a side of the nut 31 close to the base 10 . The nut 31 is threadedly connected to the fixing rod 20 .

[0054] Specifically, the nut 31 is selected as a common flat-angle nut 31 , and the washer 32 is selected as a steel washer 32 .

[0055] It should be noted that in other alternative embodiments, the fastening assembly 30 may also use the nut 31 alone. However, the use of the washer 32 improves the fastening effect of the nut 31. Therefore, in order to improve the locking stability of the fastening assembly 30, the nut 31 and the washer 32 are selected to be used simultaneously.

[0056] In an optional embodiment, a plurality of nuts 31 are provided, and the plurality of nuts 31 are connected to the fixing rod 20 in sequence.

[0057] It should be noted that a plurality of nuts 31 are stacked in sequence, and the locking capabilities of the plurality of nuts 31 are utilized to ensure that the innermost nut 31 is in a stable locking state.

[0058] It is worth noting that by stacking a plurality of nuts 31 in sequence and connecting them to the fixing rod 20 , the fixing stability of the nuts 31 is improved, and the safety performance of the fastening assembly 30 is improved.

[0059] Of course, in other alternative embodiments, a self-locking nut 31 may also be used, and the self-locking nut 31 may ensure a stable locking state through its self-locking performance.

[0060] It should be noted that the self-locking nut 31 loses its self-locking ability when it is loosened after being tightened, so the cost of using the self-locking nut 31 is relatively high, while the ordinary flat-angle nut 31 can be used multiple times, thereby achieving the effect of cost saving.

[0061] To apply the external scaffolding tie points of this embodiment, first, a hole is reserved on the structural beam 70 for the fixing rod 20 to pass through the beam; then, one end of the tie rod 40 is welded to the base 10, and four reinforcing ribs 60 are welded to the connection between the base 10 and the tie rod 40; thereafter, the fixing rod 20 is passed through the reserved hole, and the base 10 is fixed to one side of the structural beam 70 by using the nut 31 and the gasket 32, and the nut 31 and the gasket 32 ​​are also tightened on the other side of the structural beam 70; finally, the tie rod 40 is connected to the vertical pole 80 by the fastener 50.

[0062] Although the embodiments of the present invention are described in conjunction with the accompanying drawings, those skilled in the art may make various modifications and variations without departing from the spirit and scope of the present invention, and such modifications and variations are all within the scope defined by the appended claims.

Claims

1. An external scaffolding anchor point, characterized in that: include: Casing, suitable for embedding in structural beams; A base (10), wherein at least one mounting hole (11) is provided on the base (10); At least one fixing rod (20) is provided, the fixing rod (20) passes through the mounting hole (11) and is arranged one-to-one with the mounting hole (11), a portion of the fixing rod (20) is arranged in the sleeve, and both ends of the fixing rod (20) are provided with threads; A fastening assembly (30), wherein at least two fastening assemblies (30) are provided, and two fastening assemblies (30) are provided corresponding to one fixing rod (20), and the two fastening assemblies (30) are respectively threadedly connected to two ends of the fixing rod (20); A tie rod (40), wherein the tie rod (40) is connected to the base (10).

2. The external scaffolding anchor point according to claim 1, characterized in that: The external scaffolding tie point further comprises a fastener (50), and the fastener (50) is suitable for connecting the tie rod (40) and the vertical rod (80).

3. The external scaffolding anchor point according to claim 2, characterized in that: The fastener (50) includes a connecting portion (51) and a main body portion (52), wherein two main bodies (52) are provided, and the two main bodies (52) are arranged at intervals, and the first ends of the two main bodies (52) are respectively connected to the two ends of the connecting portion (51) to form a first mounting groove, wherein the first mounting groove is suitable for setting the vertical rod (80), and the main body (52) is formed with a second mounting groove, and the tie rod (40) passes through the second mounting grooves of the two main bodies (52).

4. The external scaffolding anchor point according to claim 3, characterized in that: The fastening member (50) further comprises a mounting plate (53), wherein the mounting plate (53) is connected to the second ends of the two main body parts (52).

5. The external scaffolding anchor point according to any one of claims 1 to 4, characterized in that: The tie rod (40) is connected to the base (10) by welding; or the tie rod (40) is connected to the base (10) in a detachable manner.

6. The external scaffolding anchor point according to any one of claims 1 to 4, characterized in that: The external scaffolding tie point further comprises a reinforcing rib (60), wherein the reinforcing rib (60) connects the tie rod (40) and the base (10).

7. The external scaffolding anchor point according to claim 6, characterized in that: A plurality of the reinforcing ribs (60) are provided, and the plurality of the reinforcing ribs (60) are arranged at intervals.

8. The external scaffolding anchor point according to any one of claims 1 to 4, characterized in that: The tie rod (40) is spaced apart from the mounting hole (11).

9. The external scaffolding anchor point according to any one of claims 1 to 4, characterized in that: The fastening assembly (30) comprises a nut (31) and a washer (32), wherein the washer (32) is arranged on a side of the nut (31) close to the base (10), and the nut (31) is threadedly connected to the fixing rod (20).

10. The external scaffolding anchor point according to claim 9, characterized in that: A plurality of nuts (31) are provided, and the plurality of nuts (31) are connected to the fixing rod (20) in sequence.