Combined aluminum alloy fold line modeling decoration line curtain wall installation system

Through the combined aluminum alloy folding line decorative line curtain wall installation system, the problems of increased production costs and cumbersome installation connections caused by the increase in the size of aluminum alloy profiles are solved, and the effect of reducing production costs, improving decoration effects and construction efficiency is achieved.

CN222909160UActive Publication Date: 2025-05-27CSCEC XINKE DECORATION ENG CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202421901211.8
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-08-07
Publication Date
2025-05-27
Estimated Expiration
2034-08-07

AI Technical Summary

Technical Problem

When the size of the existing aluminum alloy profile molding lines increases, the increase in the mold opening cost of production molds and the thickening of the profile wall thickness leads to an increase in the use of materials and the cost of increasing the cost. At the same time, the installation and connection process of the large-segment curtain wall decorative panel is cumbersome and the safety is poor.

Method used

The combined aluminum alloy folding line shape decorative line curtain wall installation system is adopted. The system includes aluminum veneer connected to the aluminum alloy beam. There is a hanging seat at the joint of the adjacent aluminum veneer. The hanging seat is connected to the aluminum alloy beam through the bolt group passing through the joint. The detachable hanging parts on the hanging seat are connected with decorative line components, and the mounting system and semi-assembly construction method are adopted.

Benefits of technology

By optimizing the cross-sectional size and combination connection methods of profiles, we can reduce production costs, improve decorative effects and construction efficiency, and ensure construction safety.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222909160U_ABST
    Figure CN222909160U_ABST
Patent Text Reader

Abstract

The utility model discloses a combined type aluminum alloy fold line modeling decoration line curtain wall installation system which comprises aluminum single plates connected with an aluminum alloy cross beam, hanging seats are arranged on the outer sides of abutted seams of the adjacent aluminum single plates, and the abutted seams are parallel and correspond to the aluminum alloy cross beam. The hanging seat is connected with the aluminum alloy cross beam through a first bolt group penetrating through the abutted seam; a hanging piece is detachably hung on the hanging seat, and the outer side of the hanging piece is connected with a decoration line assembly. The curtain wall installation system can well solve the problems that the mold opening cost of a production mold is increased due to the fact that the size of a decorative profile is increased, and the material usage amount and the cost are increased due to the fact that the profile wall thickness is increased; the decorative effect of the corresponding curtain wall can be improved, the assembling efficiency is improved, the machining precision and the assembling quality of components are improved, meanwhile, the construction efficiency can be greatly improved, and the construction safety is guaranteed.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of curtain wall construction, in particular to an installation system for a combined aluminum alloy broken line-shaped decorative strip curtain wall. Background Art

[0002] With the continuous development and progress of the processing technology of building curtain wall materials, more and more aluminum alloy profiles have developed from being used solely as the keel of glass curtain walls in the traditional sense to being processed into decorative strips and directly applied to the surface decoration field of metal curtain walls. The commonly used aluminum alloy profile decorative strips in the market generally have relatively small cross-sectional dimensions. If the cross-sectional dimensions are increased, larger molds need to be opened, which increases the mold opening difficulty and cost. At the same time, restricted by the existing production technology, as the size increases, the wall thickness of the profile needs to be increased to ensure that the produced finished products have a good yield rate and good appearance. However, large-sized molds and thicker profile wall thicknesses will greatly increase the project cost. At the same time, the installation and connection process of large-grid curtain wall facing plates is cumbersome and has poor safety. Summary of the Invention

[0003] The purpose of the utility model is to provide an installation system for a combined aluminum alloy broken line-shaped decorative strip curtain wall aiming at the problems existing in the prior art.

[0004] To achieve the above purpose, the technical solution adopted by the utility model is:

[0005] An installation system for a combined aluminum alloy broken line-shaped decorative strip curtain wall includes an aluminum single plate connected to an aluminum alloy cross beam. A hanging seat is arranged on the outer side of the joint between adjacent aluminum single plates. The joint is arranged parallel to and corresponding to the aluminum alloy cross beam. The hanging seat is connected to the aluminum alloy cross beam through a first bolt group passing through the joint; a hanging member is detachably hung on the hanging seat, and a decorative strip assembly is connected to the outer side of the hanging member.

[0006] This installation system for a combined aluminum alloy broken line-shaped decorative strip curtain wall can well solve the problems of increased mold opening cost for production molds caused by the increase in the size of decorative profiles, increased material usage and cost caused by the thickening of the profile wall thickness; through the use of the decorative strip assembly, the decorative effect of the corresponding curtain wall can be improved. By adopting a hanging connection system and a semi-assembled construction method, the assembly efficiency can be improved, the processing precision and assembly quality of components can be improved, and at the same time, the construction efficiency can be greatly improved and the construction safety can be ensured.

[0007] This installation system enables the aluminum single panel and the hanging seat to be installed on the same side of the aluminum alloy crossbeam simultaneously. The hanging member can be directly hung and installed on the hanging seat, so that the decorative line component connected to the hanging member is installed on the outside of the hanging seat. This installation method is simple and convenient. The decorative line component and the hanging member can be assembled first, and the aluminum single panel and the hanging seat are installed on the aluminum alloy crossbeam at the same time, and then they are hung and connected, greatly improving the installation construction efficiency and reducing the processing amount at the construction site.

[0008] Furthermore, a first bolt connection groove is provided along the length direction on the side surface of the aluminum alloy crossbeam. An aluminum single panel connecting member is provided outside the first bolt connection groove. The aluminum single panel connecting member is in a U-shaped structure. The bottom of the U-shaped structure corresponds to the first bolt connection groove and is connected to the aluminum alloy crossbeam by first self-tapping screws. The two side walls of the U-shaped structure are respectively connected to the folded edges of the aluminum single panel; the first bolt connection groove is also staggered from the first self-tapping screws to connect the first bolt group.

[0009] Furthermore, the hanging seat includes a hanging seat plate. An outwardly bent hanging member support portion is provided above the hanging seat plate. A hanging groove is provided below the hanging seat plate. The hanging seat plate is connected to the first bolt group. A plurality of reserved grooves are also provided on the surface of the hanging seat plate facing the aluminum single panel. A sealing rubber strip abutting against the aluminum single panel is connected to the reserved grooves, forming a sealing structure at this position.

[0010] Furthermore, the hanging member includes a hanging member plate. The hanging member plate is connected to the decorative line component by a second bolt group. A bent hanging portion is provided above the hanging member plate. A plug-in portion is provided below the hanging member plate.

[0011] When the hanging member is hung on the hanging seat, the hanging portion is hung on the hanging member support portion from above, and the plug-in portion is just inserted into the hanging groove from below, and the hanging installation is simple and convenient.

[0012] Furthermore, the length of the hanging member is less than the length of the hanging seat. Limit screws are respectively provided on both sides above the hanging seat on both sides of the hanging member, which can limit the hanging member on both sides.

[0013] Furthermore, the decorative line component includes a first line and a second line. The mating end faces of the first line and the second line are clamped together and connected and fixed by a third bolt group. A plurality of second bolt connection grooves are respectively provided on the surfaces of the first line and the second line facing the hanging member.

[0014] Furthermore, a foam rod and a sealant are filled in the joint.

[0015] Furthermore, an aluminum alloy square tube is also connected below the joint by a second self-tapping screw to share the force together and improve the support stability.

[0016] Furthermore, an aluminum angle is connected to the end of the aluminum alloy cross beam by a third self-tapping screw, and the aluminum angle is connected to the aluminum alloy column by a fourth self-tapping screw.

[0017] Compared with the prior art, the beneficial effects of the present utility model are as follows: 1. The combined aluminum alloy broken line-shaped decorative strip curtain wall installation system optimizes the cross-sectional dimensions, combined connection methods and installation forms of profiles such as hanging seats, hanging parts, and aluminum single plates, so as to achieve the purposes of improving the cross-sectional dimensions of decorative strips, reducing production costs and enhancing the decorative effect; 2. The combined aluminum alloy broken line-shaped decorative strip curtain wall installation system can well solve the problems of increased mold opening costs for production molds caused by the increase in the size of decorative profiles, increased material usage and increased costs caused by the thickening of the profile wall thickness; 3. By using the decorative strip components, the decorative effect of the corresponding curtain wall can be improved. The use of a hanging system and a semi-assembled construction method can improve the assembly efficiency, improve the processing accuracy and assembly quality of components, and at the same time greatly improve the construction efficiency and ensure construction safety; 4. This installation system enables the hanging parts to be directly hung and installed on the hanging seat, so that the decorative strip components connected to the hanging parts are installed on the outer side of the hanging seat. This installation method is simple and convenient. The decorative strip components can be assembled with the hanging parts first, and at the same time the aluminum single plate and the hanging seat are installed on the aluminum alloy cross beam, and then the hanging connection is carried out, which greatly improves the installation and construction efficiency and reduces the processing volume at the construction site. BRIEF DESCRIPTION OF THE DRAWINGS

[0018] Figure 1 It is a cross-sectional view of the combined aluminum alloy broken line-shaped decorative strip curtain wall installation system of the present utility model;

[0019] Figure 2 It is a longitudinal sectional view of the combined aluminum alloy broken line-shaped decorative strip curtain wall installation system of the present utility model;

[0020] Figure 3 It is a schematic connection structure diagram of the hanging part and the hanging seat of the present utility model;

[0021] In the figure: 1. Aluminum alloy column; 2. Aluminum alloy cross beam; 201. First bolt connection groove; 3. Aluminum single panel; 4. Hanging seat; 401. Hanging seat plate; 402. Hanging part support; 403. Hanging groove; 5. Hanging part; 501. Hanging part plate; 502. Hanging connection part; 503. Insertion part; 6. First line; 7. Second line; 8. Aluminum single panel connector; 9. Sealant; 10. Foam rod; 11. First bolt group; 12. Second bolt group; 13. Third bolt group; 14. First self-tapping screw; 15. Limit screw; 16. Aluminum alloy square tube; 17. Third self-tapping screw; 18. Aluminum angle code; 19. Fourth self-tapping screw; 20. Second bolt connection groove; 21. Reserved groove; 22. Sealant strip. Detailed implementation manners

[0022] Next, the technical solutions of the present utility model will be clearly and completely described in conjunction with the accompanying drawings in the present utility model. Obviously, the described embodiments are only a part of the embodiments of the present utility model, rather than all of the embodiments. Based on the embodiments in the present utility model, all other embodiments obtained by those of ordinary skill in the art without creative work conditions belong to the scope of protection of the present utility model.

[0023] In the description of the present utility model, it should be noted that the orientation or positional relationship indicated by the terms "middle", "upper", "lower", "left", "right", "inner", "outer", etc. is based on the orientation or positional relationship shown in the accompanying drawings. It is only for the convenience of describing the present utility model and simplifying the description, rather than indicating or implying that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood as a limitation of the present utility model. In addition, the terms "first", "second", etc. are only used for descriptive purposes and cannot be understood as indicating or implying relative importance.

[0024] As Figure 1 and Figure 2 shown, a combined aluminum alloy broken line-shaped decorative line curtain wall installation system includes an aluminum single panel 3 connected to the aluminum alloy cross beam 1. A hanging seat 4 is provided on the outer side of the joint between adjacent aluminum single panels 3. The joint is arranged parallel to and corresponding to the aluminum alloy cross beam 2. The hanging seat 4 is connected to the aluminum alloy cross beam 2 through a first bolt group 11 passing through the joint; a hanging part 5 is detachably hung on the hanging seat 4, and a decorative line component is connected to the outer side of the hanging part 5.

[0025] This combined aluminum alloy broken line-shaped decorative line curtain wall installation system optimizes the cross-sectional dimensions, combined connection methods, and installation forms of profiles such as the hanging seat 4, the hanging part 5, and the aluminum single panel 3 to achieve the purposes of improving the cross-sectional dimensions of the decorative line, reducing production costs, and enhancing the decorative effect.

[0026] This combined aluminum alloy folded-line-shaped decorative strip curtain wall installation system can well solve the problems of increased mold opening costs for production molds caused by increased sizes of decorative profiles, increased material usage and cost caused by increased wall thickness of profiles; by using decorative strip components, the decorative effect of the corresponding curtain wall can be improved. The use of a hanging system and a semi-assembled construction method can improve the assembly efficiency, improve the processing accuracy and assembly quality of components, and at the same time greatly improve the construction efficiency and ensure construction safety.

[0027] This installation system allows the aluminum single panel 3 and the hanging seat 4 to be installed on the same side of the aluminum alloy cross beam 2 at the same time. The hanging member 5 can be directly hung and installed on the hanging seat 4, so that the decorative strip component connected to the hanging member 5 is installed on the outside of the hanging seat 4. This installation method is simple and convenient. The decorative strip component and the hanging member can be assembled first, and at the same time the aluminum single panel and the hanging seat are installed on the aluminum alloy cross beam, and then the hanging connection is carried out, greatly improving the installation and construction efficiency and reducing the processing amount at the construction site.

[0028] Furthermore, a first bolt connection groove 201 is provided on the side surface of the aluminum alloy cross beam 2 along the length direction. An aluminum single panel connecting member 8 is provided outside the first bolt connection groove 201. The aluminum single panel connecting member 8 is of a U-shaped structure. The bottom of the U-shaped structure corresponds to the first bolt connection groove 201 and is connected to the aluminum alloy cross beam 2 through the first self-tapping screw 14. The two side walls of the U-shaped structure are respectively connected to the folded edges of the aluminum single panel 3; the first bolt connection groove 201 is also staggered from the first self-tapping screw 14 to connect the first bolt group 11.

[0029] The setting of the first bolt connection groove 201 facilitates the connection of the first bolt group 11 and can simultaneously connect and install the aluminum single panel 3 and the hanging seat 4 along the length direction of the aluminum alloy cross beam 2; the aluminum single panel connecting member 8 uses its U-shaped structure to connect the upper and lower aluminum single panels, and the U-shaped structure itself forms the joint. Before assembly, the aluminum single panel 3 and the aluminum single panel connecting member 8 can be assembled and connected together to form an aluminum single panel assembly, and then the entire aluminum single panel assembly is connected to the aluminum alloy cross beam through the first self-tapping screw.

[0030] Furthermore, as shown in Figure 3 the hanging seat 4 includes a hanging seat plate 401. An outwardly bent hanging member support portion 402 is provided above the hanging seat plate 401. A hanging groove 403 is provided below the hanging seat plate 401. The hanging seat plate 401 is connected to the first bolt group 11. A plurality of reserved grooves 21 are also provided on the surface of the hanging seat plate 401 facing the aluminum single panel. A sealing strip 22 abutted against the aluminum single panel is connected to the reserved grooves 21.

[0031] The hanging member 5 includes a hanging member plate 501. The hanging member plate 501 is connected to the decorative line component through a second bolt group 12. Above the hanging member plate 501, there is a bent hanging portion 502, and below the hanging member plate 501, there is a plug-in portion 503.

[0032] The hanging seat 4 and the hanging member 5 are respectively profile structures formed by integral molding. The two structures can form a good hanging fit. That is, when the hanging member is hung on the hanging seat, the hanging portion 502 is hung on the hanging member supporting portion 402 from above, and the plug-in portion 503 is exactly inserted into the hanging slot 403 below. In this way, the hanging installation is completed, which is simple, convenient, and easy to load and unload.

[0033] This connection structure between the hanging seat 4 and the hanging member 5 can also create a accommodating space between them, which can accommodate the head of the first bolt group 11 and the end of the second bolt group 12. The hanging seat 4 can insert a sealing strip 22 through a reserved groove 21 provided on its back surface to form a sealing structure with the aluminum single board.

[0034] Furthermore, the length of the hanging member 5 is less than the length of the hanging seat 4. On both sides of the hanging member 5 above the hanging seat 4, there are respectively limit screws 15, which can limit the hanging member on both sides to prevent the hanging member hung on the hanging seat from displacing and ensure its accurate hanging position.

[0035] Furthermore, the decorative line component includes a first line 6 and a second line 7. The mating end faces of the first line 6 and the second line 7 are clamped together and connected and fixed through a third bolt group 13. On the surfaces of the first line 6 and the second line 7 facing the hanging member, there are respectively a number of second bolt connection grooves 20 for connecting the second bolt group 12.

[0036] The first line 6 and the second line 7 are respectively three-dimensional hollow line profile structures. The cross-section of the first line 6 is a combination of a trapezoid and a triangle, and the cross-section of the second line 7 is an overall triangular structure. The large triangle is connected with the right-angle side of the trapezoid. There are an insertion slot and a clamping protrusion at their mating surface. After being assembled together, they are fastened through the third bolt group 13. The hypotenuses of the first line 6 and the second line 7 are on both sides respectively, and the vertices are at the bottom.

[0037] Furthermore, the joint is filled with a foam rod 10 and a sealant 9, which play a role in sealing and waterproofing to ensure the airtightness and watertightness of the entire connection node.

[0038] Further, an aluminum alloy square tube 16 is also connected to the aluminum alloy cross beam 2 below the joint by a second self-tapping screw. The aluminum alloy square tube 16 can support the aluminum veneer connector below, that is, support the aluminum veneer, which can improve the stability of the aluminum veneer and cooperate with the hanging seat to jointly bear the load from the line.

[0039] Further, an aluminum angle code 18 is connected to the end of the aluminum alloy cross beam 2 by a third self-tapping screw 17, and the aluminum angle code 18 is connected to the aluminum alloy column 1 by a fourth self-tapping screw 19. For the entire curtain wall system, there are many aluminum alloy columns, and many aluminum alloy cross beams are arranged between the aluminum alloy columns. Aluminum veneers are arranged between adjacent aluminum alloy cross beams, and the decorative line components are respectively hung and connected.

[0040] An installation and construction method of the combined aluminum alloy broken line-shaped decorative line curtain wall installation system is as follows:

[0041] The combined aluminum alloy broken line-shaped decorative line uses the male material and female material, namely the first line 6 and the second line 7. When the profile is die-cast, an insertion slot is reserved, and the combination is carried out through the insertion form. At the same time, corresponding components such as aluminum veneer 3, hanging piece 4, hanging seat 5, aluminum alloy cross beam 2, and aluminum alloy column 1 are supported.

[0042] The first line 6 and the second line 7 are combined through the insertion form to form a complete decorative line, and are limited and fastened by a stainless steel bolt group. Further, the stainless steel bolt group is used to connect with the hanging piece to form the upper half of the hanging structure; components such as the hanging seat, aluminum alloy cross beam, aluminum alloy column, and aluminum veneer are connected by stainless steel bolt groups, stainless steel self-tapping screws, etc. to form a stable stress structure.

[0043] The hanging part formed by the first line, the second line and the hanging piece is hung on the upper part of the hanging seat. After hanging, the stainless steel self-tapping screw is used to limit the hanging piece to form a complete metal curtain wall system.

[0044] Specifically, the first line 6 and the second line 7 are inserted and combined through the reserved insertion slots, and are tightly fixed and positioned by the third bolt group 13 to form a stable connection. Further, the second bolt group 12 is used to embed the second bolt connection slots 20 reserved in the first line 6 and the second line 7, and is tightly connected to the hanging piece 5.

[0045] The aluminum alloy cross beam 5 is connected and fixed to the aluminum angle code 18 by a third self-tapping screw 17, and the aluminum angle code 18 is connected and fixed to the aluminum alloy column 1 by a fourth self-tapping screw 19 to form a stable structure. Further, the aluminum alloy tube 16 is fixed to one side of the aluminum alloy cross beam 2 by a second self-tapping screw to cooperate with the hanging seat 4 to jointly bear the load.

[0046] Further, the aluminum veneer 3 is fixed to the aluminum alloy cross beam 2 by the first self-tapping screw 14. A foam rod 10 is stuffed into the joint of the aluminum plate glue 3, and sealant 9 is applied to play a role in sealing and waterproofing.

[0047] Further, the sealant strip 22 is inserted into the reserved groove 21 at the rear of the hanging seat 4, and then the hanging seat 4 is connected to the aluminum alloy cross beam 2 by the first bolt group 11 to form a stable structure. The bolt holes at both ends of the first bolt group 11 need to be sealed with sealant to ensure the airtight and watertight performance of the curtain wall.

[0048] The hanging part formed by the first line 6, the second line 7 and the hanging piece 5 is hung on the upper part of the hanging seat 4 through the hanging piece 5. After hanging, the limit screw 15 is used to limit the hanging piece 5.

[0049] Although the embodiments of the present invention have been shown and described, for those of ordinary skill in the art, it can be understood that various changes, modifications, substitutions and variations can be made to these embodiments without departing from the principle and spirit of the present invention. The scope of the present invention is defined by the appended claims and their equivalents.

Claims

1. A combined aluminum alloy folding line decorative line curtain wall installation system, characterized in that: It includes an aluminum single plate connected to an aluminum alloy cross beam. A hanging seat is provided on the outer side of the joint between adjacent aluminum single plates. The joint is arranged parallel to and corresponding to the aluminum alloy cross beam. The hanging seat is connected to the aluminum alloy cross beam through a first bolt group passing through the joint; a hanging member is detachably hung on the hanging seat, and a decorative line component is connected to the outer side of the hanging member.

2. The combined aluminum alloy folding line decorative line curtain wall installation system according to claim 1 is characterized in that: A first bolt connection groove is provided on the side surface of the aluminum alloy cross beam along the length direction. An aluminum single plate connecting member is provided outside the first bolt connection groove. The aluminum single plate connecting member is of a U-shaped structure. The bottom of the U-shaped structure corresponds to the first bolt connection groove and is connected to the aluminum alloy cross beam through a first self-tapping screw. The two side walls of the U-shaped structure are respectively connected to the folded edges of the aluminum single plate; the first bolt connection groove is also staggered from the first self-tapping screw to connect the first bolt group.

3. The combined aluminum alloy folding line decorative line curtain wall installation system according to claim 1 is characterized in that: The hanging seat includes a hanging seat plate. A hanging member support portion bent outward is provided above the hanging seat plate. A hanging groove is provided below the hanging seat plate. The hanging seat plate is connected to the first bolt group. A plurality of reserved grooves are also provided on the surface of the hanging seat plate facing the aluminum single plate, and a sealing rubber strip abutting against the aluminum single plate is connected to the reserved grooves.

4. The combined aluminum alloy folding line decorative line curtain wall installation system according to claim 1 is characterized in that: The hanging member includes a hanging member plate. The hanging member plate is connected to the decorative line component through a second bolt group. A bent hanging portion is provided above the hanging member plate, and a plugging portion is provided below the hanging member plate.

5. The combined aluminum alloy folding line decorative line curtain wall installation system according to claim 1 is characterized in that: The length of the hanging member is less than the length of the hanging seat. Limit screws are respectively provided on both sides of the hanging seat above the hanging member.

6. The combined aluminum alloy folding line decorative line curtain wall installation system according to claim 1 is characterized in that: The decorative line component includes a first line and a second line. The mating end faces of the first line and the second line are clamped together and fixed through a third bolt group. A plurality of second bolt connection grooves are respectively provided on the surfaces of the first line and the second line facing the hanging member.

7. The combined aluminum alloy folding line decorative line curtain wall installation system according to claim 1 is characterized in that: A foam rod and a sealant are filled in the joint.

8. The combined aluminum alloy folding line decorative line curtain wall installation system according to claim 1 is characterized in that: An aluminum alloy square tube is also connected to the aluminum alloy cross beam below the joint through a second self-tapping screw.

9. The combined aluminum alloy folding line decorative line curtain wall installation system according to claim 1 is characterized in that: An aluminum angle is also connected to the end of the aluminum alloy cross beam through a third self-tapping screw, and the aluminum angle is connected to an aluminum alloy column through a fourth self-tapping screw.