Painting equipment for building wall decoration
By designing a building wall decoration plastering equipment containing components such as conduit pipes and brushing structures, the dangers and inefficiency of traditional manual painting are solved, and an efficient and safe wall painting effect is achieved.
Patent Information
- Application Number
- CN202421444683.5
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-06-24
- Publication Date
- 2025-05-30
- Estimated Expiration
- 2034-06-24
AI Technical Summary
Traditional building exterior wall painting relies on manual lifting, which poses dangers, inefficiency and threats to workers' health.
A plastering equipment for building wall decoration is designed, including conduit pipes, brushing structures, lifting structures, limiting structures, positioning structures, restricting structures and diverting structures. Through the coordinated work of these structures, the continuous conveying of paint and smooth coating on the wall are achieved.
The equipment can facilitate continuous paint painting on high walls, significantly improving the efficiency of painting construction and reducing workers' safety risks.
Smart Images

Figure CN222924073U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of wall painting, in particular to a painting device for building wall decoration. Background Technique
[0002] The wall painting project is the most common and frequently used item in the building decoration project. It is the last process in the whole project and also a necessary condition for the project to reach excellent quality. The traditional building exterior wall painting work is all completed manually.
[0003] For the present, urban areas are generally high-rise buildings. For newly built high-rise buildings, when performing decorative painting on the outside, it is generally carried out by manual hoisting and painting through hanging baskets or ropes. Not only is the activity area small, it is difficult to maintain balance, but also the working environment is harsh. It is a very dangerous construction process. Moreover, the paint carried by workers is limited, resulting in the need for multiple repeated hoistings to fill the paint, and then painting the wall again. This not only has low efficiency, but also poses a great threat to the health and life safety of workers.
[0004] Therefore, it is necessary to provide a new painting device for building wall decoration to solve the above technical problems. Content of the Utility Model
[0005] To solve the above technical problems, the utility model provides a painting device for building wall decoration that is convenient for continuously painting the wall surface with paint at a high wall and improves the construction efficiency of wall painting.
[0006] The painting equipment for building wall decoration provided by the utility model includes: a guiding and conveying pipe, a painting structure, one end of the guiding and conveying pipe is fixedly penetrated at the center of the back surface of the painting structure, the painting structure includes a housing, a positioning frame, a painting roller, fixing blocks, a first pulley, a roller shaft and a spring, one end of the guiding and conveying pipe is fixed at the center of the back surface of the housing, the positioning frame is slidably connected to the side wall of the front surface of the housing, the fixing blocks are fixedly arranged oppositely at both ends of the middle of the back surface of the housing, the first pulley is fixed to the side wall of the edge of the back surface of the housing, the roller shaft is rotatably connected to the inner side wall of one end of the positioning frame, the painting roller is fixed to the side wall of the roller shaft, and the spring is supported between the inner side wall of the housing and the side wall of the other end of the positioning frame; a lifting structure, the lifting structure is fixed to the upper and lower end surfaces of the fixing blocks, the lifting structure includes a first motor, a winding wheel, a steel cable, a base and a connecting pipe, both ends of the steel cable are respectively fixed to the upper and lower end surfaces of the fixing blocks, the steel cable is wound around the side wall of the winding wheel, the winding wheel is fixed to one end of the surface of the base, the connecting pipe penetrates and is fixed to the side wall of the bottom end of the base, and the first motor is installed on the back surface of the top end of the base; a limiting structure, the limiting structure is installed at both ends of the edge of the top surface of the building body, the limiting structure includes a limiting frame, a second motor, a limiting rod and a first lead screw, the limiting frame is installed at both ends of the edge of the top surface of the building body, the second motor is installed on the side wall of the limiting frame, and the limiting rod and the first lead screw are installed oppositely on the inner side wall of one end of the limiting frame; a positioning structure, the positioning structure is fixed to the side wall of the bottom edge of the building body; a restricting structure, the restricting structure is installed between the positioning structure and the limiting structure, the restricting structure includes a restricting rope, a restricting frame and a second pulley, the restricting rope is installed between the positioning structure and the limiting structure, the restricting frame is fixed to the upper and lower ends of the restricting rope, and the second pulley is fixed to the inner side wall of the restricting frame fixed to the bottom end of the restricting rope; a flow dividing structure, the flow dividing structure is fixedly connected to the side wall of one end of the guiding and conveying pipe.
[0007] Preferably, the lifting structure further includes a transmission wheel and a transmission belt, there are two groups of winding wheels, and one end of each group of winding wheels is fixed with the transmission wheel, and the two transmission wheels are driven by the transmission belt, and one end of the winding wheel on the leftmost side is connected to the first motor.
[0008] Preferably, the steel cable is wound in the same direction with each winding wheel, and the two winding wheels are driven to rotate in the same direction by the transmission belt.
[0009] Preferably, there are two sets of the second pulleys, and the two sets of the second pulleys are opposite to each other. The distance between the two sets of the second pulleys is equal to the distance between the two sets of the reel drums. The bottom end of the steel cable slides on the side walls of the two sets of the second pulleys. There are also two sets of the fixed blocks. The two ends of the steel cable are respectively fixed to the upper and lower ends of the fixed block on the left side. There is a through hole in the other fixed block, and the steel cable passes through the through hole and slides inside the other fixed block.
[0010] Preferably, the positioning structure further includes a positioning frame, a third motor, a positioning rod and a second lead screw. The positioning frame is fixed to the side wall of the bottom edge of the building main body. The third motor is installed on the side wall of one end of the positioning frame. The positioning rod is fixed to the inner side wall of the positioning frame. The second lead screw is rotatably connected to the inner side wall of the positioning frame in parallel with the positioning rod.
[0011] Preferably, the limiting frame is supported between the positioning rod and the second lead screw. The two ends of the limiting frame respectively slide on the side walls of the positioning rod and the second lead screw. The adjacent two sets of the limiting frames are connected by the connecting pipe. The connecting pipe sleeved on the side walls of the second lead screw and the first lead screw is threadedly connected thereto. The connecting pipe sleeved on the side walls of the limiting rod and the positioning rod is slidably connected thereto.
[0012] Preferably, the flow splitting structure further includes a flow splitting pipe and a fixed shaft. One end of the flow splitting pipe is communicated with the side wall of one end of the guiding pipe. The fixed shaft passes through the inside of the roller shaft and is fixed to the inner side wall of the positioning frame. There is an opening at the bottom end of the fixed shaft. The roller shaft is rotatably connected to the fixed shaft. There are through holes on the side wall of the roller shaft. The other end of the flow splitting pipe is communicated with the inside of the fixed shaft.
[0013] Compared with the related art, the painting equipment for building wall decoration provided by the present utility model has the following beneficial effects:
[0014] The present utility model provides a painting device for building wall decoration. First, the limiting structure and the positioning structure are respectively and fixedly installed on the top edge of the building main body and the side wall at the bottom end of the building main body, so that the positions of the positioning structure and the limiting structure are symmetrical. Then, the lifting structure is installed on the limiting structure to hoist the painting structure. Then, two sets of limiting structures are installed between the limiting structure and the positioning structure, so that the upper and lower ends of the two sets of limiting structures are connected together through the fixed pipe, and the limiting structure slides on the back of the painting structure through the first pulley, so that the limiting structure has a certain squeezing effect on the painting structure, and one end of the painting structure abuts against the side wall of the building main body. Under the extrusion of the limiting structure, the abutting end of the painting structure is in a compressed state, restricting the position of the paint-removing structure. Then, by connecting the lifting structure to an external power source, the painting structure can be driven to move up and down on the side wall of the building main body by winding the steel cable. Under the guiding of the conveying pipe by the feeding pump, the paint is conveyed to the inside of the corresponding painting roller through the flow-dividing structure. The paint is absorbed by the painting roller and smeared on the side wall of the building main body under the extrusion with the side wall of the building main body. By connecting the first motor and the second motor in the limiting structure and the positioning structure to an external power source at the same time, the two motors operate synchronously to drive the painting structure to move horizontally and paint other positions on the side wall of the building main body. This device has the advantages of being able to continuously paint high walls and improving the construction efficiency of wall painting. BRIEF DESCRIPTION OF THE DRAWINGS
[0015] Figure 1 FIG. 1 is a schematic structural diagram of a preferred embodiment of the painting device for building wall decoration provided by the present utility model;
[0016] Figure 2 FIG. Figure 1 2 is a schematic structural diagram of the overall side view shown;
[0017] Figure 3 FIG. Figure 1 3 is a schematic structural diagram of the cross-section of the painting structure shown;
[0018] Figure 4 FIG. Figure 3 4 is a schematic structural diagram of the side view cross-section of the painting roller shown;
[0019] Figure 5 FIG. Figure 1 5 is a schematic structural diagram of the overall three-dimensional display of the painting structure shown;
[0020] Figure 6 FIG. Figure 1Schematic diagram of the overall three-dimensional display of the lifting structure shown;
[0021] Figure 7 is Figure 1 Schematic diagram of the three-dimensional display of the connection between the positioning structure and the limiting structure shown;
[0022] Figure 8 is Figure 1 Schematic diagram of the top view of the lifting structure shown.
[0023] Reference numerals in the figure: 1, guide pipe; 2, painting structure; 21, outer shell; 22, positioning frame; 23, painting roller; 24, fixing block; 25, first pulley; 26, roller shaft; 27, spring; 3, lifting structure; 31, first motor; 32, winding wheel; 33, steel cable; 34, base; 35, connecting pipe; 36, driving wheel; 37, transmission belt; 4, limiting structure; 41, limiting frame; 42, second motor; 43, limiting rod; 44, first lead screw; 5, positioning structure; 51, positioning frame; 52, third motor; 53, positioning rod; 54, second lead screw; 6, building main body; 7, limiting structure; 71, limiting rope; 72, limiting frame; 73, second pulley; 8, shunt structure; 81, shunt pipe; 82, fixed shaft. Detailed implementation mode
[0024] The present utility model will be further described below in conjunction with the accompanying drawings and the implementation mode.
[0025] Please refer to Figures 1 - 8 , where Figure 1 is the schematic diagram of the structure of a preferred embodiment of the painting equipment for building wall decoration provided by the present utility model; Figure 2 is Figure 1 the schematic diagram of the overall side view shown; Figure 3 is Figure 1 the schematic diagram of the cross-section of the painting structure shown; Figure 4 is Figure 3 the schematic diagram of the side view cross-section of the painting roller shown; Figure 5 is Figure 1 the schematic diagram of the overall three-dimensional display of the painting structure shown; Figure 6 is Figure 1 the schematic diagram of the overall three-dimensional display of the lifting structure shown; Figure 7 is Figure 1 the schematic diagram of the three-dimensional display of the connection between the positioning structure and the limiting structure shown; Figure 8 is Figure 1Schematic structural view of the lifting structure shown from above. The painting equipment for building wall decoration includes: a conveying pipe 1, a painting structure 2. One end of the conveying pipe 1 is fixedly penetrated at the center of the back surface of the painting structure 2. The painting structure 2 includes a housing 21, a positioning frame 22, a painting roller 23, a fixing block 24, a first pulley 25, a roller shaft 26, and a spring 27. One end of the conveying pipe 1 is fixed at the center of the back surface of the housing 21. The positioning frame 22 is slidably connected to the side wall of the front surface of the housing 21. The fixing blocks 24 are fixedly arranged oppositely at both ends of the middle of the back surface of the housing 21. The first pulley 25 is fixed to the side wall of the edge of the back surface of the housing 21. The roller shaft 26 is rotatably connected to the inner side wall of one end of the positioning frame 22. The painting roller 23 is fixed to the side wall of the roller shaft 26. The spring 27 is supported between the inner side wall of the housing 21 and the side wall of the other end of the positioning frame 22; a lifting structure 3, the lifting structure 3 is fixed to the upper and lower end surfaces of the fixing block 24. The lifting structure 3 includes a first motor 31, a winding wheel 32, a steel cable 33, a base 34, and a connecting pipe 35. Both ends of the steel cable 33 are respectively fixed to the upper and lower end surfaces of the fixing block 24. The steel cable 33 is wound around the side wall of the winding wheel 32. The winding wheel 32 is fixed to one end of the surface of the base 34. The connecting pipe 35 penetrates and is fixed to the side wall of the bottom end of the base 34. The first motor 31 is installed on the back surface of the top end of the base 34; a limiting structure 4, the limiting structure 4 is installed at both ends of the edge of the top surface of the building main body. The limiting structure 4 includes a limiting frame 41, a second motor 42, a limiting rod 43, and a first lead screw 44. The limiting frames 41 are installed at both ends of the edge of the top surface of the building main body. The second motor 42 is installed on the side wall of the limiting frame 41. The limiting rod 43 and the first lead screw 44 are installed oppositely on the inner side wall of one end of the limiting frame 41; a positioning structure 5, the positioning structure 5 is fixed to the side wall of the bottom edge of the building main body 6; a limiting structure 7, the limiting structure 7 is installed between the positioning structure 5 and the limiting structure 4. The limiting structure 7 includes a limiting rope 71, a limiting frame 72, and a second pulley 73. The limiting rope 71 is installed between the positioning structure 5 and the limiting structure 4. The limiting frames 72 are fixed to the upper and lower ends of the limiting rope 71. The second pulley 73 is fixed to the inner side wall of the limiting frame 72 fixed to the bottom end of the limiting rope 71; a flow splitting structure 8, the flow splitting structure 8 is fixedly connected to the side wall of one end of the conveying pipe 1.
[0026] In the specific implementation process, such as Figure 1 , Figure 2 , Figure 6 and Figure 8As shown in the figure, the lifting structure 3 further includes a transmission wheel 36 and a transmission belt 37. There are two sets of winding wheels 32, and one end of each set of winding wheels 32 is fixed with the transmission wheel 36. The two transmission wheels 36 are driven by the transmission belt 37. One end of the winding wheel 32 at the left end is connected to the first motor 31; the steel cable 33 is wound in the same direction as each set of winding wheels 32, and the two winding wheels 32 are driven to rotate in the same direction by the transmission belt 37; there are two sets of second pulleys 73, and the two second pulleys 73 are opposite to each other. The distance between the two second pulleys 73 is equal to the distance between the two winding wheels 32. The bottom end of the steel cable 33 slides on the side walls of the two second pulleys 73. There are also two sets of fixing blocks 24. The two ends of the steel cable 33 are respectively fixed to the upper and lower ends of the fixing block 24 on the left side. There is a through hole in the other fixing block 24, and the steel cable 33 passes through and slides inside the other fixing block 24 through the through hole.
[0027] It is convenient to operate through the first motor 31, so that it drives the winding wheel 32 at the left end to rotate. At the same time, the winding wheel 32 at the left end is driven through the cooperation of the transmission wheel 36 and the transmission belt 37, so that it drives the winding wheel 32 at the right end to rotate synchronously in the same direction. Furthermore, the winding wheel 32 at the left end winds up the steel cable 33 for lifting the housing 21 and releases the steel cable 33 wound by itself. The winding wheel 32 at its right end winds up the steel cable 33 released from the left end and releases the steel cable 33 wound by itself. The bottom end of the steel cable 33 forms a return flow under the restriction of the second pulley 73. Furthermore, it achieves the effect of lifting the housing 21 up and down.
[0028] In the specific implementation process, as Figure 1 、 Figure 2 and Figure 7 shown, the positioning structure 5 further includes a positioning frame 51, a third motor 52, a positioning rod 53 and a second lead screw 54. The positioning frame 51 is fixed to the side wall of the bottom edge of the building main body 6. The third motor 52 is installed on the side wall of one end of the positioning frame 51. The positioning rod 53 is fixed to the inner side wall of the positioning frame 51. The second lead screw 54 is rotatably connected to the inner side wall of the positioning frame 51 in parallel with the positioning rod 53; the limiting frame 72 is supported between the positioning rod 53 and the second lead screw 54, and the two ends of the limiting frame 72 slide on the side walls of the positioning rod 53 and the second lead screw 54 respectively. The adjacent two sets of limiting frames 72 are connected by the connecting pipe 35. The connecting pipe 35 sleeved on the side walls of the second lead screw 54 and the first lead screw 44 is threadedly connected to them, and the connecting pipe 35 sleeved on the side walls of the limiting rod 43 and the positioning rod 53 is slidably connected to them.
[0029] It is convenient to fix the positioning frame 51 on the side wall at the bottom end of the building main body 6, so that the positioning frame 51 plays a role in supporting and restricting. Through the operation of the third motor 52, the second lead screw 54 can drive the positioning frame 51 to slide on the positioning rod 53, thereby adjusting the position of the restricting frame 72.
[0030] In the specific implementation process, as Figure 3 and Figure 4 shown, the flow splitting structure 8 further includes a flow splitting pipe 81 and a fixed shaft 82. One end of the flow splitting pipe 81 is communicated with the side wall at one end of the guiding and conveying pipe 1. The fixed shaft 82 penetrates through the inside of the roller shaft 26 and is fixed to the inner side wall of the positioning frame 22. An opening is provided at the bottom end of the fixed shaft 82. The roller shaft 26 is rotatably connected to the fixed shaft 82. Through holes are provided on the side wall of the roller shaft 26. The other end of the flow splitting pipe 81 is communicated with the inside of the fixed shaft 82.
[0031] It is convenient to split and guide the paint conveyed by the guiding and conveying pipe 1 through the flow splitting pipe 81 into the inside of the upper and lower groups of the fixed shafts 82. It flows into the inside of the roller shaft 26 from the opening at its bottom end, and is then absorbed by the painting roller 23 through the through holes provided on its side wall, and then painted on the wall.
[0032] The working principle of the painting equipment for building wall decoration provided by the present utility model is as follows:
[0033] During use, first fix the positioning frame 51 on the side wall at the bottom end of the building body 6, then install and fix the limiting frame 41 on the top surface of the building body 6 according to the position of the positioning frame 51, so that the positions of the second lead screw 54 and the positioning rod 53 installed between the positioning frames 51 correspond to the positions of the first lead screw 44 and the limiting rod 43 installed between the limiting frames 41. Then, hoist the outer shell 21 with the side of the fixed block 24 facing outwards on the limiting frame 41 through the steel cable 33, so that the painting roller 23 abuts against the side wall of the building body 6. Adjust the position of the outer shell 21 by winding and releasing the steel cable 33 by the reel 32. Then, respectively sleeve the two ends of the two groups of limiting frames 72 on the side walls of the first lead screw 44 and the limiting rod 43, so that the first lead screw 44 and the limiting rod 43 are supported and limited by the limiting frames 72. Sleeve the two ends of the other two groups of limiting frames 72 on the side walls of the second lead screw 54 and the positioning rod 53 respectively, so that the second lead screw 54 and the positioning rod 53 are supported and limited by the limiting frames 72. And a connecting pipe 35 is supported and fixed between the corresponding two groups of limiting frames 72. And two of the connecting pipes 35 are threadedly connected to the corresponding first lead screw 44 and the second lead screw 54, and the other two connecting pipes 35 are slidably connected to the corresponding positioning rod 53 and the limiting rod 43, so that the positions of the first lead screw 44 and the second lead screw 54 are symmetric up and down. Then, respectively fix the two limiting ropes 71 to the two groups of limiting frames 72 in an up-and-down connection state, adjust the position of the limiting ropes 71 so that they abut against the side wall of the first pulley 25, and then adjust the length of the limiting ropes 71 to make the limiting ropes 71 taut. Further, the limiting ropes 71 squeeze the outer shell 21 through the first pulley 25, and further the outer shell 21 squeezes the positioning frame 22, so that the spring 27 is in a certain degree of compressed state, and the painting roller 23 is in a squeezed state and abuts against the side wall of the building body 6. Then, connect the first motor 31 to an external power source, so that the first motor 31 drives the reel 32 to rotate, and further the reel 32 winds and releases the steel cable 33, driving the outer shell 21 to move up and down, and further the painting roller 23 rolls on the side wall of the building body 6. Connect the other end of the conveying pipe 1 to a feeding pump, and the length of the conveying pipe 1 can adapt to the maximum degree of movement of the outer shell 21, so that the paint is transported through the conveying pipe 1, and then is branched and conveyed to the interiors of the two painting rollers 23 by the shunt pipe 81. Under the extrusion of the building body 6 and its own rolling, the paint is applied to the side wall of the building body 6. After one group of paint is applied, connect the second motor 42 and the third motor 52 to an external power source, so that the two motors run synchronously.Furthermore, the first lead screw 44 and the second lead screw 54 are synchronously rotated, so that the four upper and lower limiting frames 72 are synchronously moved, and the positions of the reel 32 and the housing 21 are laterally adjusted, so that the side wall of another group of the building main body 6 is painted. This device has the advantages of being convenient for continuous painting on high walls and enhancing the wall painting construction efficiency.
[0034] Compared with the related art, the painting device for building wall decoration provided by the present invention has the following beneficial effects:
[0035] The present invention provides a painting device for building wall decoration. First, the limiting structure 4 and the positioning structure 5 are respectively and fixedly installed on the top edge of the building main body 6 and the side wall at the bottom end of the building main body 6 in a corresponding manner, so that the positions of the positioning structure 5 and the limiting structure 4 are symmetrical. Then, the lifting structure 3 is installed on the limiting structure 4, so that the lifting structure 3 hoists the painting structure 2. Then, two groups of the limiting structures 7 are installed between the limiting structure 4 and the positioning structure 5, so that the upper and lower ends of the two groups of the limiting structures 7 are connected together through the fixed pipe, and the limiting structure 7 slides on the back of the painting structure 2 through the first pulley 25. Furthermore, the limiting structure 7 has a certain squeezing effect on the painting structure 2, so that one end of the painting structure 2 abuts against the side wall of the building main body 6. Under the squeezing of the limiting structure 7, the abutting end of the painting structure 2 is in a compressed state, restricting the position of the brush retracting structure. Then, by connecting the lifting structure 3 to an external power source, the painting structure 2 can be driven to move up and down on the side wall of the building main body 6 by winding the steel cable 33. Under the guiding of the guiding pipe 1 by the feeding pump, the paint is conveyed to the inside of the corresponding painting roller 23 through the flow dividing structure 8. The paint is absorbed by the painting roller 23 and then smeared on the side wall of the building main body 6 under the extrusion of the side wall of the building main body 6. By connecting the first motor 31 and the second motor 42 in the limiting structure 4 and the positioning structure 5 to an external power source at the same time, the two motors operate synchronously, so as to drive the painting structure 2 to displace laterally and paint other positions on the side wall of the building main body 6. This device has the advantages of being convenient for continuous painting on high walls and enhancing the wall painting construction efficiency.
[0036] The above are only the embodiments of the present invention, and do not limit the patent scope of the present invention accordingly. Any equivalent structure or equivalent process transformation made by using the specification and drawings of the present invention, or directly or indirectly applied in other related technical fields, shall be included in the patent protection scope of the present invention by the same token.
Claims
1. A painting device for building wall decoration, characterized in that: include: Catheter (1), A coating structure (2), wherein one end of the guide tube (1) penetrates and is fixed at the center of the back of the coating structure (2), the coating structure (2) comprises a housing (21), a positioning frame (22), a coating roller (23), a fixing block (24), a first pulley (25), a roller shaft (26) and a spring (27), one end of the guide tube (1) is fixed at the center of the back of the housing (21), the positioning frame (22) is slidably connected to the front of the housing (21) side wall, the fixing blocks (24) are fixed to the two ends of the middle of the back side of the shell (21) in a relative manner, the first pulley (25) is fixed to the side wall at the edge of the back side of the shell (21), the roller shaft (26) is rotatably connected to the inner side wall of one end of the positioning frame (22), the brush roller (23) is fixed to the side wall of the roller shaft (26), and the spring (27) is supported between the inner side wall of the shell (21) and the side wall of the other end of the positioning frame (22); A lifting structure (3), the lifting structure (3) being fixed to the upper and lower end surfaces of the fixed block (24), the lifting structure (3) comprising a first motor (31), a reel (32), a steel cable (33), a base (34) and a connecting pipe (35), the two ends of the steel cable (33) being respectively fixed to the upper and lower end surfaces of the fixed block (24), the steel cable (33) being wound around the side wall of the reel (32), the reel (32) being fixed to one end of the surface of the base (34), the connecting pipe (35) penetrating and being fixed to the bottom end side wall of the base (34), and the first motor (31) being mounted on the back side of the top end of the base (34); A limiting structure (4), the limiting structure (4) being installed at both ends of the edge of the top surface of the main body of the building, the limiting structure (4) comprising a limiting frame (41), a second motor (42), a limiting rod (43) and a first screw rod (44), the limiting frame (41) being installed at both ends of the edge of the top surface of the main body of the building, the second motor (42) being installed on the side wall of the limiting frame (41), and the limiting rod (43) and the first screw rod (44) being installed on the inner side wall of one end of the limiting frame (41) in an opposed manner; A positioning structure (5), wherein the positioning structure (5) is fixed to a side wall at the bottom edge of the building body (6); a limiting structure (7), the limiting structure (7) being installed between the positioning structure (5) and the limiting structure (4), the limiting structure (7) comprising a limiting rope (71), a limiting frame (72) and a second pulley (73), the limiting rope (71) being installed between the positioning structure (5) and the limiting structure (4), the limiting frame (72) being fixed to the upper and lower ends of the limiting rope (71), and the second pulley (73) being fixed to the inner side wall of the limiting frame (72) to which the bottom end of the limiting rope (71) is fixed; A flow diversion structure (8), wherein the flow diversion structure (8) is fixedly connected to a side wall at one end of the conveying tube (1).
2. The painting equipment for building wall decoration according to claim 1 is characterized in that: The lifting structure (3) further comprises a transmission wheel (36) and a transmission belt (37); the winding wheel (32) is provided with two groups, and one end of each of the two groups of winding wheels (32) is fixed with the transmission wheel (36); the two groups of transmission wheels (36) are driven by the transmission belt (37); one end of the winding wheel (32) on the left end is connected to the first motor (31).
3. The painting equipment for building wall decoration according to claim 2 is characterized in that: The steel cable (33) and each set of the reels (32) are wound in the same direction, and the two sets of the reels (32) are driven to rotate in the same direction through the transmission belt (37).
4. The painting equipment for building wall decoration according to claim 1 is characterized in that: The second pulley (73) is provided with two groups, and the two groups of the second pulleys (73) are opposite to each other, and the spacing between the two groups of the second pulleys (73) is equal to the spacing between the two groups of the reels (32), and the bottom end of the steel cable (33) slides on the side walls of the two groups of the second pulleys (73), and the fixing blocks (24) are also provided with two groups, and the two ends of the steel cable (33) are respectively fixed to the upper and lower ends of the fixing block (24) located on the left side, and the other fixing block (24) is provided with a through hole, and the steel cable (33) passes through the through hole and slides inside the other fixing block (24).
5. The painting equipment for building wall decoration according to claim 1 is characterized in that: The positioning structure (5) further comprises a positioning frame (51), a third motor (52), a positioning rod (53) and a second screw rod (54); the positioning frame (51) is fixed to the side wall at the bottom edge of the building body (6); the third motor (52) is mounted on the side wall at one end of the positioning frame (51); the positioning rod (53) is fixed to the inner side wall of the positioning frame (51); and the second screw rod (54) is rotatably connected to the inner side wall of the positioning frame (51) in parallel with the positioning rod (53).
6. The painting equipment for building wall decoration according to claim 5 is characterized in that: The limiting frame (72) is supported between the positioning rod (53) and the second screw rod (54), and the two ends of the limiting frame (72) slide on the side walls of the positioning rod (53) and the second screw rod (54), respectively, and two adjacent groups of the limiting frames (72) are connected through the connecting tube (35), and the connecting tube (35) sleeved on the side walls of the second screw rod (54) and the first screw rod (44) is threadedly connected thereto, and the connecting tube (35) sleeved on the side walls of the limiting rod (43) and the positioning rod (53) is slidably connected thereto.
7. The painting equipment for building wall decoration according to claim 1 is characterized in that: The flow diversion structure (8) further comprises a flow diversion tube (81) and a fixed shaft (82), one end of the flow diversion tube (81) being connected to the side wall of one end of the guide tube (1), the fixed shaft (82) penetrating the interior of the roller shaft (26) and being fixed to the inner side wall of the positioning frame (22), the bottom end of the fixed shaft (82) being provided with an opening, the roller shaft (26) and the fixed shaft (82) being rotatably connected, the side wall of the roller shaft (26) being provided with a through hole, and the other end of the flow diversion tube (81) being connected to the interior of the fixed shaft (82).