Large-span early-dismantling jacking and shelving device capable of achieving disc buckle base conversion
By designing a large span early removal top support shelving device for converting the buckle base, combined with the existing buckle support frame base and the top support shelving mechanism, the problems of inefficient construction efficiency and increased cost in the existing technology are solved, and the early removal function is realized and construction efficiency is improved.
Patent Information
- Application Number
- CN202421759859.6
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-07-24
- Publication Date
- 2025-06-03
- Estimated Expiration
- 2034-07-24
AI Technical Summary
In the existing construction technology, additional top structures with top braces and early top brackets are required to be processed, which increases the processing volume and these structures can only be used in conjunction and cannot be disassembled separately, resulting in inefficient construction efficiency and increased costs.
A large span early dismantling roof shelving device for converting the buckle base is designed. By combining the existing buckle support frame base and the top support shelving mechanism, a support roof structure that can realize the large span support and early dismantling system is formed. The device includes a buckle scaffolding base, a support mechanism and a top support shelf mechanism, a screw and a rotary nut are used to fix the top support shelf mechanism, and a wooden keel support and a wooden formwork are provided on the support mechanism to achieve large span support.
The early removal function is realized, and the additional processing and production of top support is eliminated, the mold removal time is shortened by half, the material purchase volume and manual construction volume are reduced, and the construction efficiency is improved.
Smart Images

Figure CN222936414U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the field of building construction, and particularly relates to a large-span early demolition jack supporting device for disc buckle base conversion. Background Art
[0002] In the existing building construction technology, it is usually necessary to additionally process a set of supporting structures with top braces and early demolition jacks. This not only increases the processing amount, but also these structures can only be used in a supporting manner and cannot be disassembled and used separately, which is not suitable for the situation of non-early demolition construction technology. The disadvantages of the existing technology lie in the cumbersome processes and material waste, resulting in low construction efficiency and increased costs. Summary of the Utility Model
[0003] The purpose of the utility model is to provide a large-span early demolition jack supporting device for disc buckle base conversion, which combines the existing disc buckle support frame base and the jack supporting mechanism to form a set of supporting jacks that can achieve large-span support frames and early demolition systems, thereby overcoming the deficiencies of the existing technology.
[0004] To achieve the above purpose, the technical solution of the utility model is as follows:
[0005] A large-span early demolition jack supporting device for disc buckle base conversion includes a disc buckle scaffold base, a support mechanism, and a jack supporting mechanism. The disc buckle scaffold base is provided with a screw rod. The jack supporting mechanism is provided with a hole and passes through the screw rod of the disc buckle scaffold base through the hole. A rotating nut is also provided on the screw rod, and the rotating nut fixes the jack supporting mechanism on the screw rod of the disc buckle scaffold base. The support mechanism is symmetrically arranged on the jack supporting mechanism.
[0006] As an improvement of the utility model, a wooden keel support is provided on the support mechanism, a wooden formwork is laid on the wooden keel support, and the disc buckle scaffold base passes through the wooden keel support and is connected to the wooden formwork.
[0007] As an improvement of the utility model, shoulders are further arranged at both ends of the jack supporting mechanism to prevent the support mechanism from slipping.
[0008] As an improvement of the utility model, the support mechanism is a large-span main beam or keel.
[0009] As an improvement of the utility model, the material of the support mechanism is section steel, preferably square steel.
[0010] As an improvement of the utility model, the other end of the screw rod far from the support mechanism is connected to the support scaffold vertical pole.
[0011] The beneficial effects of the utility model are as follows:
[0012] Through innovative design, this application realizes the conversion of the socket base into an early removal prop and a jack, eliminating the process of separately machining and manufacturing the prop. The early removal function can be achieved using existing materials. Compared with the traditional method, the form removal time is shortened by half, enabling the support mechanism and the formwork to be removed in advance for turnover use, reducing the procurement volume during the enterprise production process, and saving materials. Through the support mechanism and the upright rod of the socket scaffold, a large-span support structure is formed, which can achieve a spacing of more than 1.5 m between the upright rods, reducing the procurement volume of the upright rods and the manual construction volume, and improving the construction efficiency. BRIEF DESCRIPTION OF THE DRAWINGS
[0013] Figure 1 It is a schematic structural diagram of the present utility model.
[0014] Figure 2 It is a top view of the jack placement mechanism.
[0015] LIST OF REFERENCE NUMERALS IN THE DRAWINGS:
[0016] 1, socket base of the socket scaffold; 2, support mechanism; 3, jack placement mechanism; 4, rotating nut; 5, wooden keel support; 6, wooden formwork; 7, concrete floor slab; 8, screw rod; 9, support scaffold upright rod; 10, shoulder. DETAILED DESCRIPTION OF THE EMBODIMENTS
[0017] The present utility model will be further clarified below in conjunction with the drawings and the detailed description of the embodiments. It should be understood that the following detailed description is only used to illustrate the present utility model and not to limit the scope of the present utility model. It should be noted that the terms "front", "rear", "left", "right", "upper" and "lower" used in the following description refer to the directions in the drawings, and the terms "inner" and "outer" refer to the directions towards or away from the geometric center of a specific component respectively.
[0018] In addition, the terms "installation", "connection" and "coupling" should be understood in a broad sense. For example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be directly connected or indirectly connected through an intermediate medium, and it can be the communication inside two components. For those of ordinary skill in the art, the specific meanings of the above terms in the present utility model can be understood according to specific circumstances.
[0019] A large-span early removal jack placement device with a converted socket base includes a socket base 1 of the socket scaffold, a support mechanism 2, and a jack placement mechanism 3. The socket base 1 of the socket scaffold is provided with a screw rod 8. The jack placement mechanism 3 is provided with a hole and passes through the screw rod 8 of the socket base 1 of the socket scaffold through the hole. A rotating nut 4 is further provided on the screw rod 8, and the rotating nut 4 fixes the jack placement mechanism 3 on the screw rod 8 of the socket base 1 of the socket scaffold. The support mechanism 2 is symmetrically arranged on the jack placement mechanism 3.
[0020] On the support mechanism 2 of the present utility model, there is a wooden keel support 5, on which a wooden formwork 6 is laid. The socket scaffolding base 1 passes through the wooden keel support 5 and is connected to the wooden formwork 6. Above the wooden formwork 6, the structure that needs to be supported during building construction, such as a concrete floor slab 7, is placed.
[0021] On both ends of the jack support mechanism 3 of the present utility model, shoulders 10 are further provided to prevent the support mechanism 2 from slipping.
[0022] The support mechanism 2 of the present utility model is a long-span main beam or keel.
[0023] The material of the support mechanism 2 of the present utility model is section steel, preferably square steel.
[0024] The other end of the screw rod 8 of the present utility model, which is far from the support mechanism 2, is connected to the support scaffolding vertical pole 9.
[0025] Specifically, the working process of the present utility model is as follows:
[0026] Place the socket scaffolding base 1 in a predetermined position. There is a screw rod 8 on the base. The jack support mechanism 3 is provided with a hole, and through this hole, the jack support mechanism 3 is sleeved on the screw rod 8 of the socket scaffolding base 1. Screw the rotating nut 4 onto the screw rod 8 and tighten it to the jack support mechanism 3 to ensure that the jack support mechanism 3 is fixed on the screw rod 8 of the socket scaffolding base 1. The support mechanism 2 is symmetrically installed on the jack support mechanism 3. The material of the support mechanism 2 is section steel, preferably square steel, which can provide sufficient load-bearing capacity. Shoulders 10 are provided at both ends of the jack support mechanism 3 to prevent the support mechanism 2 from slipping, ensuring the stability and safety of the entire device.
[0027] Set a wooden keel support 5 on the support mechanism 2, and lay a wooden formwork 6 on the wooden keel support 5.
[0028] Place the building structure that needs to be supported (such as a concrete floor slab 7) on the wooden formwork 6. Ensure that the wooden formwork 6 can evenly disperse the weight of the building structure, and transfer the weight to the ground through the socket scaffolding base 1 and the support mechanism 2.
[0029] Through innovative design, it is realized that the socket base is converted into an early demolition jack and a jack support, eliminating the process of separately processing and manufacturing the jack support. This application can achieve the early demolition function using existing materials. Compared with the traditional method, the formwork removal time is shortened by half, enabling the support mechanism 2 and the formwork to be removed in advance for turnover use, reducing the procurement volume during the enterprise production process and saving materials. By forming a long-span support structure with the support mechanism 2 and the socket scaffolding vertical pole, the vertical pole spacing is greater than 1.5 meters, reducing the procurement volume of vertical poles and the manual construction volume, and improving the construction efficiency.
[0030] During the construction process, check the fastening conditions of each component at any time to ensure construction safety. After the building structure is initially formed and has the self-supporting ability, according to the formwork removal process, gradually remove the top support shelving device and the support mechanism 2 to achieve the early removal function and improve the construction efficiency.
[0031] Through the above steps, the utility model realizes the function of converting the disk buckle base into a large-span early removal top support shelving device, which not only saves materials but also improves the construction efficiency, and has a wide application prospect.
[0032] It should be noted that the attached drawings only illustrate the technical idea of the utility model, and the protection scope of the utility model cannot be limited by this shape. For those of ordinary skill in the art, without departing from the principle of the utility model, several improvements and retouches can be made, and these improvements and retouches all fall within the protection scope of the claims of the utility model.
Claims
1. A large-span early-removal top support shelving device converted from a buckle base, comprising a buckle scaffolding base, a supporting mechanism, and a top support shelving mechanism, characterized in that: The base of the buckle scaffolding is provided with a screw, the top supporting and shelving mechanism is provided with a hole and the screw passes through the base of the buckle scaffolding through the hole, and the screw is also provided with a rotating nut, which fixes the top supporting and shelving mechanism on the screw of the base of the buckle scaffolding. The supporting mechanism is symmetrically arranged on the top supporting and shelving mechanism.
2. The large-span early-removal top support and shelving device for converting a buckle base according to claim 1 is characterized in that: The supporting mechanism is provided with a wooden keel support, a wooden template is laid on the wooden keel support, and the base of the coiled scaffold passes through the wooden keel support and is connected with the wooden template.
3. The large-span early-removal top support and shelving device for converting a buckle base according to claim 1 is characterized in that: Stop shoulders are also arranged at both ends of the jacking and shelving mechanism.
4. The large-span early-removal top support and shelving device for converting a buckle base according to claim 1 is characterized in that: The supporting mechanism is a long-span main beam or a keel.
5. The large-span early-removal top support and shelving device for converting a buckle base according to claim 4 is characterized in that: The support mechanism is made of square steel.
6. The large-span early-removal top support and shelving device for converting a buckle base according to any one of claims 1 to 5, characterized in that: The other end of the screw rod away from the supporting mechanism is connected to the supporting scaffolding upright pole.