Drilling centralizing device for geological exploration
By designing a drilling and straightening device including curved brackets, airbags and gas pressure gauge, the problem of easy bending and damage of the drilling rod during drilling is solved, effective support and real-time safety monitoring are achieved, and the safety and efficiency of drilling are improved.
Patent Information
- Application Number
- CN202422317769.8
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-09-23
- Publication Date
- 2025-06-03
- Estimated Expiration
- 2034-09-23
AI Technical Summary
During the drilling process of drilling, the drill rod is easy to fit on the inner wall of the drilling hole, causing bending and damage in the middle, and lacking effective support measures.
A drilling and straightening device for geological exploration is designed, including multiple sets of drill rods, and each set of drill rods is equipped with a straightening support mechanism between the first and second mounting rings on the outer wall. The support mechanism consists of a curved bracket, an airbag and a gas pressure gauge, which provides support through the airbag expansion, and detects and controls the status of the airbag through the solenoid valve and a gas pressure gauge.
Effectively support the drill pipe to prevent bending and damage. At the same time, by detecting air pressure in real time, the operator is warned to be squeezed by the mountain, improving drilling safety and efficiency.
Smart Images

Figure CN222936689U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of geological exploration, in particular to a drilling straightening device for geological exploration. Background Art
[0002] At present, geological exploration is the use of geological science and technology to investigate and study the geological conditions such as rocks, strata, structures, groundwater, and landforms in a certain area in order to find out the distribution, reserves, and quality of underground mineral resources and evaluate their development and utilization value. At the same time, it studies the earth's geological structure, rock composition, and paleontological evolution, etc., to provide basic data and scientific basis for mineral resource development, environmental protection, disaster prevention, and other work.
[0003] Among them, geological exploration does require the use of a variety of equipment, and drilling rigs are one of the indispensable equipment for geological exploration, which is used to drill groundwater sources or conduct geological exploration sampling.
[0004] After the drilling rig guides the drill rod into the ground, the outer diameter of the drill bit is larger than the outer diameter of the drill rod, which causes the drill rod to easily fit against the inner wall of the borehole during movement, causing the middle part of the drill rod to bend and easily break and become damaged. Therefore, a new technical solution needs to be designed to solve the problem, which can effectively support the middle part of the drill rod. Utility Model Content
[0005] The utility model aims to provide a drilling straightening device for geological exploration, which solves the problems raised in the background technology.
[0006] To achieve the above-mentioned purpose, the utility model provides the following technical solutions: a drilling straightening device for geological exploration, comprising a drill rod, wherein the drill rod is provided with multiple groups, a first mounting ring is fixedly installed on one side of the outer wall of the multiple groups of drill rods, and a second mounting ring is fixedly installed on the other side of the outer wall of the multiple groups of drill rods, and a straightening support mechanism is installed between two adjacent groups of the first mounting ring and the second mounting ring;
[0007] The straightening support mechanism includes a plurality of groups of equally spaced arc brackets fixedly installed between the first mounting ring and the second mounting ring, air bags installed on the inner sides of the plurality of groups of arc brackets, and a pressure gauge installed in communication with one side of the air bags, each group of the arc brackets is in the shape of a circular bow, and the air bags are fixedly installed on the outer wall of the drill pipe.
[0008] As an optional solution of the technical solution of the present application, an air outlet pipe is installed in communication with the other side of the airbag, and a solenoid valve is fixedly installed at the other end of the air outlet pipe.
[0009] As an optional solution of the technical solution of the present application, a drill bit is fixedly installed at one end of the drill rod on one side, and the drill bit is rotatably connected to the borehole, and multiple groups of the drill rods are distributed inside the borehole.
[0010] As an optional solution of the technical solution of the present application, the outer wall of each group of the first mounting ring and the second mounting ring is provided with multiple groups of equidistantly distributed connecting holes, and each group of the connecting holes is threaded with connecting bolts, so that the first mounting ring and the second mounting ring can be positioned on the drill rod.
[0011] As an optional solution of the technical solution of the present application, positioning rings are fixedly installed on both sides of each group of airbags, positioning holes are opened on both sides of each group of positioning rings, and positioning bolts are threadedly installed in the two corresponding groups of positioning holes, so that the airbags can be positioned on the drill rod.
[0012] As an optional solution of the technical solution of the present application, each group of the side walls of the first mounting ring is fixedly installed with fixing parts, and each group of the fixing parts is fixedly installed with multiple groups of pressure gauges by bolts, so as to fix the pressure gauges.
[0013] Compared with the prior art, the beneficial effects of the utility model are as follows:
[0014] 1. The technical solution of the present application connects an external air pump with the airbag inside the straightening support mechanism, and slowly inflates the airbags inside the multiple groups of arc-shaped supports. After the airbags continue to expand, the middle part of the multiple groups of arc-shaped supports can be effectively supported, which not only further effectively straightens the drill rod, but also supports and protects the multiple groups of arc-shaped supports.
[0015] 2. The technical solution of the present application is connected to an air outlet pipe installed on the other side of the airbag, and an electromagnetic valve is fixedly installed on the other end of the air outlet pipe. Through a pressure gauge installed on one side of the airbag, the internal air pressure of the airbag can be detected at all times. When the internal air pressure of the airbag reaches the set value of the pressure gauge, a signal will be transmitted to the control processor to control the electromagnetic valve at the port of the air outlet pipe, which will not only discharge the gas inside the airbag and protect the airbag, but also the control processor that receives the signal will synchronously transmit the signal to the operator's central control computer to warn the operator that the drill rod is squeezed by the mountain. BRIEF DESCRIPTION OF THE DRAWINGS
[0016] Other features, objects and advantages of the present invention will become more apparent by reading the detailed description of non-limiting embodiments with reference to the following drawings:
[0017] Figure 1 This is a schematic diagram of the overall structure of a drilling straightening device for geological exploration according to the utility model;
[0018] Figure 2 The utility model is a schematic diagram of the structure of a righting support mechanism of a drilling righting device for geological exploration.
[0019] In the figure: 1, drill pipe; 11, drill hole; 12, first mounting ring; 13, second mounting ring; 2, arc-shaped bracket; 21, airbag; 22, pressure gauge; 23, air outlet pipe; 24, solenoid valve; 3, connecting bolt; 31, positioning ring; 32, fixing piece. Specific implementation manner
[0020] Please refer to Figure 1-2 , the present utility model provides a technical solution: a drilling straightening device for geological exploration, including a drill pipe 1, multiple groups of drill pipes 1 are provided, a first mounting ring 12 is fixedly installed on one side of the outer wall of multiple groups of drill pipes 1, a second mounting ring 13 is fixedly installed on the other side of the outer wall of multiple groups of drill pipes 1, and a straightening support mechanism is installed between adjacent two groups of the first mounting ring 12 and the second mounting ring 13;
[0021] The straightening support mechanism includes multiple groups of arc-shaped brackets 2 fixedly installed at equal intervals between the first mounting ring 12 and the second mounting ring 13, an airbag 21 installed inside multiple groups of arc-shaped brackets 2, and a pressure gauge 22 communicated and installed on one side of the airbag 21. Each group of arc-shaped brackets 2 is in a circular arc shape. The airbag 21 is fixedly installed on the outer wall of the drill pipe 1. A drill bit is fixedly installed at one end of one side of the drill pipe 1, and the drill bit is rotatably connected to the drill hole 11. Multiple groups of drill pipes 1 are all distributed inside the drill hole 11.
[0022] In this technical solution, an external air pump is docked with the airbag 21 inside the straightening support mechanism, and the airbag 21 inside multiple groups of arc-shaped brackets 2 is slowly inflated. After the airbag 21 continuously expands, it can effectively support the middle part of multiple groups of arc-shaped brackets 2, not only further straighten the drill pipe 1 effectively, but also support and protect multiple groups of arc-shaped supports.
[0023] In some technical solutions, an air outlet pipe 23 is communicated and installed on the other side of the airbag 21, and a solenoid valve 24 is fixedly installed at the other end of the air outlet pipe 23.
[0024] In this technical solution, through the pressure gauge 22 communicated and installed on one side of the airbag 21, the air pressure inside the airbag 21 can be detected at all times. When the air pressure inside the airbag 21 reaches the set value of the pressure gauge 22, a signal will be sent to the control processor to control the solenoid valve 24 at the port of the air outlet pipe 23. Not only the gas inside the airbag 21 is discharged to protect the airbag 21, but also the control processor receiving the signal will synchronously transmit the signal to the operator's central control computer to warn the operator that the drill pipe 1 is squeezed by the mountain body.
[0025] In some technical solutions, a fixing piece 32 is fixedly installed on the side wall of each group of the first mounting rings 12, and each group of fixing pieces 32 is fixedly installed with multiple groups of pressure gauges 22 through bolts respectively, so as to fix the pressure gauges 22.
[0026] In this technical solution, when each group of drill rods 1 is installing the first mounting ring 12, the second mounting ring 13, the arc bracket 2, the airbag 21 and the barometer 22, the barometer 22 can be fixed by connecting the barometer 22 to the fixing part 32, thereby preventing the loose barometer 22 from falling and being damaged when the drill rod 1 is working inside the drill rod 1.
[0027] In some technical solutions, positioning rings 31 are fixedly installed on both sides of each group of airbags 21, and positioning holes are opened on both sides of each group of positioning rings 31. Positioning bolts are threadedly installed in the two corresponding groups of positioning holes, so that the airbags 21 can be positioned on the drill rod 1.
[0028] In this technical solution, each group of airbags 21 can be fixed by the positioning bolts installed through the positioning ring 31, ensuring that each group of airbags 21 is firmly positioned on the outer wall of the drill pipe 1 and distributed inside the arc-shaped bracket 2.
[0029] In some technical solutions, the outer walls of each set of first mounting rings 12 and second mounting rings 13 are provided with multiple sets of equidistantly distributed connecting holes, and each set of connecting holes is threadedly installed with connecting bolts 3, so that the first mounting rings 12 and second mounting rings 13 can be positioned on the drill pipe 1.
[0030] In this technical solution, multiple groups of first mounting rings 12 and second mounting rings 13 can be firmly fixed to the outer wall of the drill pipe 1 through the connecting bolts 3 installed with threads in each group of connecting holes, and the arc frame between the first mounting rings 12 and the second mounting rings 13 can be fixed.
[0031] When a drilling righting device for geological exploration is used, it should be noted that the utility model is a drilling righting device for geological exploration, and each component is a universal standard part or a component known to technical personnel in this field, and its structure and principle can be known to technical personnel through technical manuals or through conventional experimental methods.
[0032] When in use, firstly, by respectively fixing the first mounting ring 12 and the second mounting ring 13 on both sides of the middle of each group of drill rods 1, and cooperating with the multiple groups of equally spaced arc-shaped brackets 2 installed between each group of the first mounting rings 12 and the second mounting rings 13, the drill rod 1 can be supported so that the drill rod 1 is located in the middle of the borehole 11, so as to prevent the drill rod 1 from always being attached to the inner wall of the borehole 11, which may easily cause the drill rod 1 to bend. At the same time, the external air pump is connected to the airbag 21 in the straightening support mechanism, and the airbag 21 inside the multiple groups of arc-shaped brackets 2 is slowly inflated. After the airbag 21 is continuously expanded, the middle part of the multiple groups of arc-shaped brackets 2 can be effectively supported, which not only further effectively straightens the drill rod 1, but also effectively straightens the drill rod 1. At the same time, an air outlet pipe 23 is installed on the other side of the airbag 21, and a solenoid valve 24 is fixedly installed on the other end of the air outlet pipe 23. A pressure gauge 22 is installed on one side of the airbag 21 to detect the internal air pressure of the airbag 21 at all times. When the internal air pressure of the airbag 21 reaches the set value of the pressure gauge 22, a signal will be transmitted to the control processor to control the solenoid valve 24 at the port of the air outlet pipe 23, which not only discharges the internal gas of the airbag 21 and protects the airbag 21, but also the control processor that receives the signal will synchronously transmit the signal to the operator's central control computer to warn the operator that the drill rod 1 is squeezed by the mountain.
Claims
1. A drilling straightening device for geological exploration, comprising a drill rod (1), characterized in that: The drill rod (1) is provided with multiple groups, a first mounting ring (12) is fixedly mounted on one side of the outer wall of the multiple groups of drill rods (1), a second mounting ring (13) is fixedly mounted on the other side of the outer wall of the multiple groups of drill rods (1), and a straightening support mechanism is installed between two adjacent groups of the first mounting ring (12) and the second mounting ring (13); The straightening support mechanism comprises a plurality of groups of equally spaced arc-shaped brackets (2) fixedly mounted between the first mounting ring (12) and the second mounting ring (13), air bags (21) mounted on the inner sides of the plurality of groups of arc-shaped brackets (2), and a pressure gauge (22) mounted in communication with one side of the air bags (21), each group of the arc-shaped brackets (2) being in the shape of a circular arc, and the air bags (21) being fixedly mounted on the outer wall of the drill pipe (1).
2. A drilling straightening device for geological exploration according to claim 1, characterized in that: The other side of the air bag (21) is connected to an air outlet pipe (23), and the other end of the air outlet pipe (23) is fixedly installed with a solenoid valve (24).
3. A drilling straightening device for geological exploration according to claim 1, characterized in that: A drill bit is fixedly mounted on one end of the drill rod (1) located on one side, and the drill bit is rotatably connected to the borehole (11). Multiple groups of the drill rods (1) are distributed inside the borehole (11).
4. A drilling straightening device for geological exploration according to claim 1, characterized in that: The outer wall of each group of the first mounting ring (12) and the second mounting ring (13) is provided with a plurality of groups of connection holes distributed at equal distances, and each group of the connection holes is threadedly installed with a connection bolt (3).
5. A drilling straightening device for geological exploration according to claim 1, characterized in that: Positioning rings (31) are fixedly installed on both sides of each group of air bags (21), and positioning holes are opened on both sides of each group of positioning rings (31). Positioning bolts are threadedly installed in the two corresponding groups of positioning holes.
6. A drilling straightening device for geological exploration according to claim 1, characterized in that: A fixing part (32) is fixedly mounted on the side wall of each group of the first mounting rings (12), and each group of the fixing parts (32) is fixedly mounted to a plurality of groups of air pressure gauges (22) by bolts.