Large frame shot blasting fixing device

By designing an adjustable fixing device, the problem that the bracket structure fixation in the prior art cannot be adjusted is solved, and a more uniform rust removal effect is achieved, and the appearance quality and production efficiency of the frame are improved.

CN222945298UActive Publication Date: 2025-06-06LINYI CHANGLIDE ENG MACHINERY EQUIP
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202422113942.2
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-08-29
Publication Date
2025-06-06
Estimated Expiration
2034-08-29

AI Technical Summary

Technical Problem

During the existing large frame shot blasting and rust removal process, the bracket structure is fixed and the gap cannot be adjusted according to the size of the frame, resulting in incomplete rust removal and affecting the appearance quality.

Method used

A fixing device including columns, chassis, lifting rods, main support rods, secondary support rods, brackets and buckles is designed. The height adjustment of the lifting rod is achieved through the combination of screws and knobs, and the position of the bracket is adjusted through the combination of slide grooves and hand-tight bolts to ensure uniform rust removal effect.

Benefits of technology

By adjusting the gap, the effect of shot blasting and rust removal of large frames is improved, the appearance quality of the frame is improved, and the production efficiency is improved.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222945298U_ABST
    Figure CN222945298U_ABST
Patent Text Reader

Abstract

The utility model discloses a large frame shot blasting fixing device which comprises a stand column, a chassis is fixedly connected to the bottom of the stand column, a lifting rod is slidably connected to the top of the chassis, a screw rod is rotatably connected to the interior of the stand column, the lifting rod is in threaded connection with the screw rod, a rotary knob is fixedly connected to the bottom of the screw rod, and the rotary knob is in threaded connection with the lifting rod. When the frame is long or wide, the height of the lifting rod is adjusted under the threaded rotation of the screw rod by rotating the knob arranged at the bottom of the chassis, then the fixing mechanism on the lifting rod can be moved to a proper height, and the support slides above the main supporting rod and the auxiliary supporting rod through the sliding groove and the hand-screwing bolt. In this way, the problem of uneven rust removal caused by shielding can be avoided, the situation that the fixing mechanism at the lower end blocks the rust removal effect of shot blasting treatment of the vehicle frame at the upper end can be avoided, the shot blasting rust removal effect of the large vehicle frame can be improved by changing the gap between the vehicle frames, and the appearance quality of the vehicle frame is improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model belongs to the technical field of rust removal equipment, and in particular relates to a large-scale vehicle frame shot blasting fixing device. Background Art

[0002] The large frame shot blasting fixture is a highly efficient equipment specially used for the surface treatment of large frames. It can firmly fix the frame in a specific position and clean the frame surface by high-speed projectiles of hard projectiles to remove rust, oxide scale and old paint layers, providing a clean and rough metal surface for subsequent coating processes, thereby improving the service life and appearance quality of the frame.

[0003] At present, during the shot blasting and rust removal process of large vehicle frames, it is necessary to use brackets to fix the frames. However, the brackets of the hook frames are all fixed structures, and the gap between the upper and lower brackets cannot be adjusted according to the size of the frame, resulting in incomplete processing of the frame during the shot blasting and rust removal process, thereby affecting the appearance quality of the frame. Utility Model Content

[0004] The technical problem to be solved by the utility model is to overcome the existing defects and provide a large-scale frame shot blasting fixing device to solve the problem raised in the above-mentioned background technology that during the shot blasting and rust removal process of the large-scale frame, the frame needs to be fixed by a bracket, but the brackets of the hook frame are all fixed structures, and the gap between the upper and lower brackets cannot be adjusted according to the size of the frame, resulting in incomplete treatment of the frame during the shot blasting and rust removal process, thereby affecting the appearance quality of the frame.

[0005] To achieve the above-mentioned purpose, the utility model provides the following technical solutions: a large-scale vehicle frame shot blasting fixing device, comprising a column, the bottom of the column is fixedly connected to a chassis, the top of the chassis is slidably connected to a lifting rod, the inside of the column is rotatably connected to a screw rod, the lifting rod and the screw rod are threadedly connected, the bottom of the screw rod is fixedly connected to a knob, the outer sides of the column and the lifting rod are circular and evenly fixedly connected to a main support rod, one end of the main support rod is slidably connected to a secondary support rod, one side of the secondary support rod is provided with a positioning hole, the top of the main support rod and the secondary support rod are provided with a slide groove, the top of the main support rod and the secondary support rod are provided with a bracket, and the top of the bracket is fixedly connected with a hanging buckle.

[0006] Preferably, the upper end of the outer side of the column is threadedly connected to a limiting ring.

[0007] Preferably, a lifting ring is fixedly connected to the top of the lifting rod.

[0008] Preferably, the knob is located at the lower end of the chassis, and a slot is provided at the bottom of the knob.

[0009] Preferably, the secondary support rod and the positioning hole are fixedly connected to the main support rod via a latch.

[0010] Preferably, a plurality of the brackets are provided, and the brackets are fixedly connected to the slide slots by hand-tightened bolts.

[0011] Preferably, a connecting ring is fixedly connected to the bottom of the main support rod.

[0012] Preferably, the columns, chassis, lifting rods, main support rods, auxiliary support rods, brackets and hanging buckles are all made of high manganese steel.

[0013] Compared with the prior art, the utility model provides a large frame shot blasting fixing device, which has the following beneficial effects:

[0014] 1. The utility model forms a fixing mechanism by arranging uprights, chassis, lifting rods, main support rods, secondary support rods, brackets and hanging buckles. When in use, the frame is placed on the brackets provided at the tops of the main support rods and the secondary support rods, and the frame is positioned by the hanging buckles provided at the tops of the brackets, so that the frame can be shot blasted and rust-removed. When the frame is long or wide, the lifting rod can be height-adjusted under the rotation of the screw thread by turning the knob provided at the bottom of the chassis, so that the fixing mechanism on the lifting rod can be moved to a suitable height, and the bracket is located above the main support rod and the secondary support rod through the slide groove and the hand-tightening bolt to slide, so that the problem of uneven rust removal caused by obstruction can be avoided, thereby avoiding the fixing mechanism at the lower end from blocking the rust removal effect of the frame shot blasting at the upper end, and by changing the gap between the frames, the shot blasting and rust removal effect of the large frame can be improved, so as to improve the appearance quality of the frame;

[0015] 2. The utility model provides an adjustment mechanism consisting of a main support rod, a secondary support rod, a positioning hole and a latch. When in use, the secondary support rod is pulled out and then the length of the secondary support rod is fixed by the latch, thereby increasing the number of hanging frames to further improve the production efficiency of the frames.

[0016] The parts not involved in the device are the same as the existing technology or can be implemented by using the existing technology. The utility model has a scientific and reasonable structure, is safe and convenient to use, and provides great help to people. BRIEF DESCRIPTION OF THE DRAWINGS

[0017] The accompanying drawings are used to provide a further understanding of the present invention and constitute a part of the specification. Together with the embodiments of the present invention, they are used to explain the present invention and do not constitute a limitation of the present invention. In the accompanying drawings:

[0018] Figure 1 This is a schematic diagram of the shaft side structure of one side of a large frame shot blasting fixing device proposed by the utility model;

[0019] Figure 2 This is a schematic diagram of the axial structure of the other side of a large frame shot blasting fixing device proposed by the utility model;

[0020] Figure 3 This is a front view structural schematic diagram of a large frame shot blasting fixing device proposed by the utility model;

[0021] Figure 4 This is a schematic diagram of the top view of a large frame shot blasting fixing device proposed by the utility model;

[0022] Figure 5 This is a schematic diagram of the column structure of a large-scale frame shot blasting fixing device proposed by the utility model;

[0023] Figure 6 This is a schematic cross-sectional structure diagram of a large-scale vehicle frame shot blasting fixing device proposed by the utility model;

[0024] In the figure: column 1, chassis 2, lifting rod 3, limit ring 4, screw 5, lifting eye 6, knob 7, slot 8, main support rod 9, auxiliary support rod 10, positioning hole 11, latch 12, bracket 13, hanging buckle 14, slide groove 15, hand bolt 16, connecting ring 17. DETAILED DESCRIPTION

[0025] The following will be combined with the drawings in the embodiments of the utility model to clearly and completely describe the technical solutions in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments in the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.

[0026] See also Figure 1-6The utility model provides a technical solution: a large-scale vehicle frame shot blasting fixing device, including a column 1, a chassis 2 is fixedly connected to the bottom of the column 1, a lifting rod 3 is slidably connected to the top of the chassis 2, a screw 5 is rotatably connected inside the column 1, the lifting rod 3 and the screw 5 are threadedly connected, and a knob 7 is fixedly connected to the bottom of the screw 5, and the outer sides of the column 1 and the lifting rod 3 are evenly and circularly fixedly connected with a main support rod 9, one end of the main support rod 9 is slidably connected with a secondary support rod 10, and a positioning hole 11 is provided on one side of the secondary support rod 10, and a slide groove 15 is provided on the top of the main support rod 9 and the secondary support rod 10, and a bracket 13 is provided on the top of the main support rod 9 and the secondary support rod 10, and a hanging buckle 14 is fixedly connected to the top of the bracket 13. The frame is placed on the main support rod 9 and the secondary support rod 1 0 is provided on the bracket 13 at the top, and the frame is positioned by the hanging buckle 14 provided on the top of the bracket 13, so that the frame can be shot blasted and rust-removed. When the frame is long or wide, the lifting rod 3 is adjusted in height under the threaded rotation of the screw rod 5 by turning the knob 7 provided at the bottom of the chassis 2, so that the fixing mechanism on the lifting rod 3 can be moved to a suitable height, and the bracket 13 is located above the main support rod 9 and the auxiliary support rod 10 through the slide groove 15 and the hand-tightening bolt 16 to slide, so as to avoid the problem of uneven rust removal caused by obstruction, thereby avoiding the fixing mechanism at the lower end from blocking the rust removal effect of the frame shot blasting at the upper end, and by changing the gap between the frames, the shot blasting and rust removal effect of the large frame can be improved, so as to improve the appearance quality of the frame.

[0027] In the present invention, preferably, the upper end of the outer side of the column 1 is threadedly connected to a limiting ring 4 .

[0028] In the utility model, preferably, a lifting ring 6 is fixedly connected to the top of the lifting rod 3 .

[0029] In the present invention, preferably, the knob 7 is located at the lower end of the chassis 2 , and a slot 8 is provided at the bottom of the knob 7 .

[0030] In the present invention, preferably, the secondary support rod 10 and the positioning hole 11 are fixedly connected to the main support rod 9 through a latch 12 .

[0031] In the present invention, preferably, a plurality of brackets 13 are provided, and the brackets 13 are fixedly connected to the slide slots 15 by hand-tightening bolts 16 .

[0032] In the present invention, preferably, a connecting ring 17 is fixedly connected to the bottom of the main support rod 9 .

[0033] In the present invention, preferably, the column 1, the chassis 2, the lifting rod 3, the main support rod 9, the auxiliary support rod 10, the bracket 13 and the hanging buckle 14 are all made of high manganese steel.

[0034] The working principle and use process of the utility model: when in use, the device is fixed to the ground through the chassis 2, and the column 1 is vertically fixed on the chassis 2 to form a stable support structure. When a large frame needs to be handled, the frame is placed on the bracket 13 on the top of the main support rod 9 and the auxiliary support rod 10, and the frame is positioned and fixed using the hanging buckle 14 on the top of the bracket 13. The auxiliary support rod 10 is fixedly connected to the main support rod 9 through the pin 12 and the positioning hole 11 to ensure the stability of the entire support structure. When the length or width of the frame is large, the operator can turn the knob 7 at the bottom of the chassis 2 and rotate it with the tool through the slot 8. The knob 7 drives the screw 5 to rotate, thereby causing the lifting rod 3 to move up and down inside the column 1 to adjust the height to adapt to different sizes. The frame, at the same time, the bracket 13 is fixedly connected to the slide groove 15 by the hand-tightened bolts 16, and can slide above the main support rod 9 and the auxiliary support rod 10 to adjust the gap between the frames to avoid the lower end fixing mechanism blocking the shot blasting of the upper end frame to ensure uniform rust removal effect. After the frame is fixed, the shot blasting machine starts to work, and high-speed hard projectiles are used to impact and clean the surface of the frame. Since the main components such as the column 1, the chassis 2, and the lifting rod 3 are made of high manganese steel, they have high wear resistance and strength and can withstand the strong impact generated during the shot blasting process. Through this highly adjustable and stable fixing method, the large-scale frame shot blasting fixing device effectively improves the effect of frame shot blasting and rust removal, improves the appearance quality of the frame, and also improves production efficiency.

[0035] Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and spirit of the present invention, and that the scope of the present invention is defined by the appended claims and their equivalents.

Claims

1. A large frame shot blasting fixing device, comprising a column (1), characterized in that: The bottom of the column (1) is fixedly connected to a chassis (2), the top of the chassis (2) is slidably connected to a lifting rod (3), the column (1) is rotatably connected to a screw rod (5), the lifting rod (3) and the screw rod (5) are threadedly connected, the bottom of the screw rod (5) is fixedly connected to a knob (7), the outer sides of the column (1) and the lifting rod (3) are evenly and circularly fixedly connected to a main support rod (9), one end of the main support rod (9) is slidably connected to a secondary support rod (10), one side of the secondary support rod (10) is provided with a positioning hole (11), the tops of the main support rod (9) and the secondary support rod (10) are provided with a slide groove (15), the tops of the main support rod (9) and the secondary support rod (10) are provided with a bracket (13), and the top of the bracket (13) is fixedly connected with a hanging buckle (14).

2. A large frame shot blasting fixing device according to claim 1, characterized in that: The upper end of the outer side of the column (1) is threadedly connected to a limiting ring (4).

3. A large frame shot blasting fixing device according to claim 1, characterized in that: The top of the lifting rod (3) is fixedly connected with a lifting ring (6).

4. A large frame shot blasting fixing device according to claim 1, characterized in that: The knob (7) is located at the lower end of the interior of the chassis (2), and a slot (8) is provided at the bottom of the knob (7).

5. A large frame shot blasting fixing device according to claim 1, characterized in that: The auxiliary support rod (10) and the positioning hole (11) are fixedly connected to the main support rod (9) via a latch (12).

6. A large frame shot blasting fixing device according to claim 1, characterized in that: A plurality of the brackets (13) are provided, and the brackets (13) are fixedly connected to the slide grooves (15) by means of hand-tightened bolts (16).

7. A large frame shot blasting fixing device according to claim 1, characterized in that: A connecting ring (17) is fixedly connected to the bottom of the main support rod (9).

8. A large frame shot blasting fixing device according to claim 1, characterized in that: The upright column (1), chassis (2), lifting rod (3), main support rod (9), auxiliary support rod (10), bracket (13) and hanging buckle (14) are all made of high manganese steel.