By designing a detachable pipe pile for pile core sealing, the combination of steel plates and embedded piles is used to solve the problem of pile core blockage after prestressed pipe piles, and the construction process is simplified and the core filling quality is improved.
Patent Information
- Application Number
- CN202421887025.3
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-05
- Publication Date
- 2025-06-06
- Estimated Expiration
- 2034-08-05
AI Technical Summary
After the construction of prestressed pipe piles, the pile core is easily blocked by earth, resulting in manual hole cleaning to fill the core, which is low efficiency and human resources, and poor quality of hole cleaning.
A detachable pipe pile for pile core sealing is designed. By setting up steel plates, positioning rings, embedded piles, limit bolts, thin plates and threaded holes, the limit and fixation of the pipe pile body and steel plates can be realized. The embedded pile can be embedded inside the pile core, and the steel plate seals the pile core to avoid the entry of soil, thereby omitting the hole cleaning process.
It effectively avoids pile core blockage, simplifies the construction process, improves the core filling quality, reduces human resource consumption, and extends the service life of the steel plate.
Smart Images

Figure CN222948974U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of pipe piles, in particular to a detachable pipe pile for pile core plugging. Background Art
[0002] Prestressed pipe piles are a special type of structural engineering material used to enhance the bearing capacity of foundations and structures in civil engineering. Prestressed pipe piles are tubular structures made of concrete or composite materials, which contain prestressed steel bars or cables inside. They are used to enhance the bearing capacity of foundations, especially when they need to withstand large loads or unstable soil conditions.
[0003] After the construction of prestressed pipe piles is completed, the pile hole is exposed in the soil layer, and the soil and stones above mixed with rainwater and groundwater scatter into the pile hole, blocking the pile core. After the earth excavation is completed, the blocked pile core needs to be manually cleaned so that concrete can be used for core filling. The pile core is often seriously blocked, the manual hole cleaning is inefficient, and it consumes human resources seriously. In addition, the hole cleaning quality is poor, and it is difficult to clean the mud on the hole wall. In practice, the hole cleaning quality does not meet the expected effect. Therefore, it is particularly important to design a detachable pipe pile for pile core sealing. Utility Model Content
[0004] The utility model aims to provide a detachable pipe pile for pile core plugging, so as to solve the problem in the above background technology that the blocked pile core needs to be manually cleaned so as to use concrete for core pouring, the pile core is often severely blocked and the manual hole cleaning efficiency is low.
[0005] To achieve the above-mentioned purpose, the utility model provides the following technical solutions: a detachable pipe pile for pile core plugging, comprising a pipe pile body, a positioning ring is provided at one end of the pipe pile body, a plurality of threaded holes are provided on the surface of the positioning ring, a steel plate is provided at one end of the pipe pile body, an embedded pile is provided at the bottom of the steel plate, a thin plate is fixedly sleeved at one end of the steel plate, a plurality of limiting bolts are provided on the top of the thin plate, a plurality of L-shaped blocks are provided on the outer wall of the steel plate, and reinforcing ribs are provided at the bottom ends of the plurality of L-shaped blocks.
[0006] As a preferred technical solution of the utility model, one end of each of the plurality of limit bolts is provided with a support ring, one end of each of the plurality of limit bolts is respectively connected with the internal threads of the plurality of threaded holes, and one end of the pipe pile body is provided with a pile core.
[0007] As a preferred technical solution of the present invention, the diameters of the plurality of support rings are all larger than the diameters of the plurality of limit bolts.
[0008] As a preferred technical solution of the utility model, one end of the plurality of reinforcing ribs is respectively fixedly connected to the bottom ends of the plurality of L-shaped blocks, and one end of the plurality of reinforcing ribs is sleeved with a cylindrical sleeve.
[0009] As a preferred technical solution of the utility model, the plurality of cylindrical sleeves are respectively fixedly sleeved on one end of the plurality of reinforcing ribs, and a triangular rib plate is fixedly installed on one side of the plurality of cylindrical sleeves.
[0010] As a preferred technical solution of the present utility model, the plurality of triangular rib plates are arranged at equal intervals.
[0011] As a preferred technical solution of the utility model, one side of the plurality of L-shaped blocks is respectively fixedly connected to the outer wall of the steel plate.
[0012] Compared with the prior art, the beneficial effects of the utility model are:
[0013] 1. The utility model discloses a detachable pipe pile for pile core plugging. The steel plate, the positioning ring, the embedded pile, the limiting bolt, the thin plate and the threaded hole are provided. The bottom surface of the thin plate and the surface of the positioning ring are fitted with each other. The threaded connection of a plurality of limiting bolts and the threaded hole is utilized to limit and fix the pipe pile body and the steel plate. The embedded pile can be embedded into the interior of the pile core. The steel plate seals the pile core, and the soil cannot enter in the later stage. The hole cleaning process can be omitted, which is helpful to improve the efficiency of underground structure engineering. The pile hole is not polluted, and the quality in the hole is guaranteed, which is helpful to improve the quality of core filling. By rotating a plurality of supporting rings in the opposite direction, the limiting bolt can be withdrawn from the interior of the threaded hole, so that the steel plate and the pipe pile body can be separated from each other, and the core filling can continue.
[0014] 2. The utility model provides a detachable pipe pile for pile core plugging, which is provided with an L-shaped block, a reinforcing rib, a cylindrical sleeve and a triangular rib plate. One end of the reinforcing rib and the bottom surface of the triangular rib plate are respectively in contact with the surface of the thin plate. Both are made of aluminum alloy material and have a certain hardness, thereby enhancing the external force resistance of the steel plate and the thin plate. The L-shaped blocks distributed at equal intervals make the compressive resistance of the triangular rib plate more comprehensive, thereby extending the service life of the steel plate. BRIEF DESCRIPTION OF THE DRAWINGS
[0015] Figure 1 This is a front view structural schematic diagram of the utility model;
[0016] Figure 2 For the utility model Figure 1 The enlarged view of point A in the middle;
[0017] Figure 3 It is a partial front view structural schematic diagram of the utility model;
[0018] Figure 4 It is a partial bottom view structural schematic diagram of the utility model.
[0019] In the figure: 1. Pipe pile body; 2. Steel plate; 3. Positioning ring; 4. Threaded hole; 5. Thin plate; 6. Embedded pile; 7. Limit bolt; 8. L-shaped block; 9. Reinforcement rib; 10. Cylinder sleeve; 11. Triangular rib plate; 12. Support ring. DETAILED DESCRIPTION
[0020] The following will be combined with the drawings in the embodiments of the utility model to clearly and completely describe the technical solutions in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments in the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.
[0021] See also Figure 1-4 The utility model provides a technical solution for a detachable pipe pile for pile core plugging:
[0022] Embodiment 1:
[0023] like Figure 1-3 As shown, a detachable pipe pile for pile core plugging comprises a pipe pile body 1, a positioning ring 3 is arranged at one end of the pipe pile body 1, a plurality of threaded holes 4 are opened on the surface of the positioning ring 3, a steel plate 2 is arranged at one end of the pipe pile body 1, an embedded pile 6 is arranged at the bottom of the steel plate 2, a thin plate 5 is fixedly sleeved at one end of the steel plate 2, a plurality of limiting bolts 7 are arranged on the top of the thin plate 5, a plurality of L-shaped blocks 8 are arranged on the outer wall of the steel plate 2, and a plurality of reinforcing ribs 9 are arranged at the bottom ends of the plurality of L-shaped blocks 8. Through the sealing of the pile core by the steel plate 2, soil cannot enter in the later stage, and the hole cleaning process can be omitted, which is helpful to improve the efficiency of underground structure engineering, the pile hole is not polluted, the quality in the hole is guaranteed, which is helpful to improve the quality of the core filling, and the limiting bolts 7 can be withdrawn from the inside of the threaded hole 4 by rotating the plurality of supporting rings 12 in the reverse direction.
[0024] Embodiment 2:
[0025] Based on the first embodiment, Figure 1 and Figure 4 As shown, one end of multiple reinforcing ribs 9 is fixedly connected to the bottom end of multiple L-shaped blocks 8, one end of multiple reinforcing ribs 9 is sleeved with a cylindrical sleeve 10, multiple cylindrical sleeves 10 are respectively fixedly sleeved with one end of multiple reinforcing ribs 9, and one side of multiple cylindrical sleeves 10 is fixedly installed with a triangular rib plate 11. The utility model provides a detachable pipe pile for pile core plugging, by arranging L-shaped blocks 8, reinforcing ribs 9, cylindrical sleeves 10 and triangular rib plates 11, one end of the reinforcing ribs 9 and the bottom surface of the triangular rib plate 11 are respectively abutted against the surface of the thin plate 5, both of which are made of aluminum alloy material and have a certain hardness.
[0026] Working principle: Prestressed pipe pile is a special type of structural engineering material used to enhance the bearing capacity of foundations and structures in civil engineering. A pile hole is opened at the end of the prestressed pipe pile, and the pile hole is exposed in the soil layer. The soil and stones above are mixed with rainwater and groundwater and scattered into the pile hole, blocking the pile core. After the earth excavation is completed, the blocked pile core needs to be manually cleaned so that concrete can be used for core filling. The pile core is often seriously blocked, and the efficiency of manual hole cleaning is low, and it consumes a lot of human resources. In addition, the quality of hole cleaning is poor, and it is difficult to clean the mud on the hole wall. In practice, the quality of hole cleaning does not meet the expected effect. For this reason, the bottom surface of the thin plate 5 and the surface of the positioning ring 3 can be fitted with each other in advance, and a plurality of limit bolts 7 are used to connect the threads of the threaded holes 4, so that the pipe pile body 1 and the steel plate 2 can be limited and fixed, and the embedded pile 6 can be embedded in the interior of the pile core. The steel plate 2 seals the pile core, and the soil cannot enter in the later stage. The hole cleaning process can be omitted, which is helpful to improve the efficiency of underground structural engineering, the pile hole is not polluted, the quality of the hole is guaranteed, and it is helpful To improve the quality of core filling, the plurality of support rings 12 can be rotated in the opposite direction to withdraw the limit bolt 7 from the inside of the threaded hole 4, so that the steel plate 2 and the pipe pile body 1 can be separated from each other, and the core filling can be continued. One end of the reinforcing rib 9 and the bottom surface of the triangular rib plate 11 are respectively abutted against the surface of the thin plate 5. Both are made of aluminum alloy material and have a certain hardness, thereby enhancing the external force resistance of the steel plate 2 and the thin plate 5. The L-shaped blocks 8 distributed at equal intervals make the compressive effect of the triangular rib plate 11 more comprehensive and extend the service life of the steel plate 2. During the pile foundation construction stage, before the last section of the pile is pressed in, a steel plate 2 is added to the top of the pile to protect the finished product, the pipe pile body 1 and the steel plate 2. After the excavation is completed, the steel plate 2 can be opened to carry out the core filling process, which greatly saves the pile hole processing time and shortens the construction period. The steel plate 2 can be recycled and reused in subsequent projects without cost increase. In order to avoid pile core blocking, the steel plate 2 can be installed at the end of the pipe pile body 1. When core filling is required, the steel plate 2 and the pipe pile body 1 can be separated from each other.
[0027] In the description of the present invention, it is necessary to understand that the indicated orientation or positional relationship is based on the orientation or positional relationship shown in the accompanying drawings, and is only for the convenience of describing the present invention and simplifying the description, rather than indicating or implying that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood as a limitation on the present invention.
[0028] In the present invention, unless otherwise clearly stipulated and limited, for example, it can be a fixed connection, a detachable connection, or an integrated connection; it can be a mechanical connection or an electrical connection; it can be directly connected or indirectly connected through an intermediate medium, it can be the internal connection of two elements or the interaction relationship between two elements. Unless otherwise clearly defined, for ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood according to the specific circumstances.
[0029] Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and spirit of the present invention, and that the scope of the present invention is defined by the appended claims and their equivalents.
Claims
1. A detachable pipe pile for pile core plugging, comprising a pipe pile body (1), characterized in that: A positioning ring (3) is provided at one end of the pipe pile body (1), and a plurality of threaded holes (4) are provided on the surface of the positioning ring (3); a steel plate (2) is provided at one end of the pipe pile body (1), and an embedded pile (6) is provided at the bottom of the steel plate (2); a thin plate (5) is fixedly sleeved at one end of the steel plate (2), and a plurality of limiting bolts (7) are provided at the top of the thin plate (5); a plurality of L-shaped blocks (8) are provided on the outer wall of the steel plate (2), and a plurality of reinforcing ribs (9) are provided at the bottom ends of the plurality of L-shaped blocks (8).
2. The detachable pipe pile for pile core plugging according to claim 1, characterized in that: One end of each of the plurality of limit bolts (7) is provided with a support ring (12), one end of each of the plurality of limit bolts (7) is respectively connected to the internal threads of the plurality of threaded holes (4), and one end of the pipe pile body (1) is provided with a pile core.
3. The detachable pipe pile for pile core plugging according to claim 2, characterized in that: The diameters of the plurality of support rings (12) are all greater than the diameters of the plurality of limiting bolts (7).
4. The detachable pipe pile for pile core plugging according to claim 1, characterized in that: One end of each of the plurality of reinforcing ribs (9) is fixedly connected to the bottom end of each of the plurality of L-shaped blocks (8), and one end of each of the plurality of reinforcing ribs (9) is sleeved with a cylindrical sleeve (10).
5. The detachable pipe pile for pile core plugging according to claim 4, characterized in that: The plurality of cylindrical sleeves (10) are respectively fixedly sleeved on one end of the plurality of reinforcing ribs (9), and a triangular rib plate (11) is fixedly mounted on one side of the plurality of cylindrical sleeves (10).
6. The detachable pipe pile for pile core plugging according to claim 5, characterized in that: The plurality of triangular rib plates (11) are arranged at equal intervals.
7. The detachable pipe pile for pile core plugging according to claim 1, characterized in that: One side of the plurality of L-shaped blocks (8) is respectively fixedly connected to the outer wall of the steel plate (2).