Device for hoisting slideway beam
By designing devices for lifting slide beams, including winches, base limiting devices, pulley components and pulley support components, the problem of construction difficulty of lifting slide beams is solved, efficient lifting of slide beams is achieved, construction difficulty is reduced and lifting efficiency is improved.
Patent Information
- Application Number
- CN202422174134.7
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-09-04
- Publication Date
- 2025-06-17
- Estimated Expiration
- 2034-09-04
AI Technical Summary
In the prior art, the lifting construction of slide beams is difficult, especially when the waterway traffic area and lifting height and lifting width are limited, it is difficult to effectively lift the slide beams.
A device for lifting the slide beam is designed, including a hoist, base limiting device, pulley assembly and pulley support assembly. Through the combination of the hoist and the base limiting device, the pulley assembly and the pulley support assembly are installed, and the slide beam can be directly hoisted to the top of the steel truss, and the slide beam rises by the shrinkage of the wire rope.
This device can effectively reduce the difficulty of lifting construction of the slide beam, and solve the problem that the lifting device is restricted by lifting height and lifting width. The required lifting height of the slide beam is not affected by the height of the lifting device itself, thereby improving lifting efficiency and stability.
Smart Images

Figure CN222989655U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of bridge slide beam installation construction, in particular to a device for hoisting a slide beam. Background Technique
[0002] With the rapid development of the bridge industry and the continuous improvement of construction technology, incremental launching construction has become a conventional means in the process of bridge construction and demolition. The importance of the slide beam for incremental launching construction is self-evident, and the slide beam needs to be hoisted to the bottom of the steel truss beam.
[0003] Usually, floating cranes are used for hoisting construction on the river surface. However, how to drop the anchor and walk the anchor during floating crane construction is greatly affected by the surrounding construction environment, especially difficult for operations in the navigable area. Secondly, the installation of the slide beam is generally symmetrically installed on the upstream side and the downstream side. When any one of the upstream and downstream sides is restricted by the hoisting height and the hoisting radius, it is difficult for large-scale hoisting machinery to operate, and problems such as too short boom when standing on the upstream side to hoist the downstream side and inability to hoist often occur, thus increasing the hoisting construction difficulty of the slide beam. Content of the Utility Model
[0004] Aiming at the defects existing in the prior art, the technical problem solved by the utility model is: how to reduce the hoisting construction difficulty of the slide beam.
[0005] To achieve the above purpose, the device for hoisting a slide beam provided by the utility model includes:
[0006] A winch;
[0007] A base limiting device, which is installed at the bottom of the winch;
[0008] A pulley assembly, which is connected with the winch through a steel wire rope;
[0009] A pulley support assembly, which is arranged on the pulley assembly;
[0010] During installation, the winch is installed on the steel truss beam through the base limiting device, and the pulley assembly is installed on the top of the steel truss beam through the pulley support assembly.
[0011] In one embodiment, the base limiting device includes a ratchet chain tightener and a chain. The ratchet chain tightener is installed on the winch, one end of the chain is fixedly connected with the ratchet chain tightener, and the other end of the chain is fixedly connected with the longitudinal beam of the steel truss beam.
[0012] In one embodiment, the base limiting device further includes a hoist chain. One end of the hoist chain is fixedly connected with the bottom of the winch, and the other end of the hoist chain is fixedly connected with the upper flange of the longitudinal beam of the steel truss beam.
[0013] In one embodiment, the pulley support assembly includes a steel truss beam connection assembly, a support assembly, and a pulley connection assembly. The support assembly is fixed to the top of the steel truss beam through the steel truss beam connection assembly, and the pulley connection assembly is arranged at the bottom of the steel truss beam connection assembly.
[0014] In one embodiment, the steel truss beam connection assembly includes high-strength rolled thread steel and a high-strength rolled thread steel fixing plate. The high-strength rolled thread steel is arranged on the top of the steel truss beam, and the high-strength rolled thread steel is fixedly connected to the support assembly through the high-strength rolled thread steel fixing plate.
[0015] In one embodiment, the support assembly includes two vertical load-bearing plates, multiple transverse stiffening plates, multiple vertical stiffening plates, and a vertical load-bearing plate connection assembly. The two vertical load-bearing plates are fixedly connected through the load-bearing plate connection assembly. Multiple transverse stiffening plates are arranged between the two vertical load-bearing plates, and multiple vertical stiffening plates are arranged between the vertical load-bearing plate and the vertical load-bearing plate connection assembly.
[0016] In one embodiment, the load-bearing plate connection assembly includes a bolt connection plate, a limit section steel, and a section steel connection plate. The limit section steel is arranged on the top of the vertical load-bearing plate through the bolt connection plate, and the two limit section steels are connected through the section steel connection plate.
[0017] In one embodiment, the pulley connection assembly includes an ear plate, an ear plate stiffening plate, a pulley shackle connection plate, and a pulley shackle connection plate stiffening plate. The pulley shackle connection plate is arranged inside the vertical load-bearing plate, one side of which is connected to the vertical load-bearing plate, and the other side is connected to the ear plate. The pulley shackle connection plate stiffening plate is arranged on the pulley shackle connection plate. One end of the pulley assembly is connected to the ear plate, and the other end is connected to the vertical load-bearing plate away from the pulley shackle connection plate. Ear plate stiffening plates are arranged on both the ear plate and this vertical load-bearing plate.
[0018] In one embodiment, the pulley assembly includes a fixed pulley, a fixed pulley pin shaft, a movable pulley, and a pulley shackle. The movable pulley is rotatably arranged between the ear plate and the vertical load-bearing plate away from the pulley shackle connection plate through the fixed pulley pin shaft. The fixed pulley and the movable pulley are connected by a steel wire rope. One end of the movable pulley is connected to the pulley shackle connection plate through the pulley shackle.
[0019] In one embodiment, there are two winches, two base limit devices, two pulley assemblies, and two pulley support assemblies. The two winches are respectively installed on both sides of the bridge center line in the transverse direction of the bridge through the corresponding base limit devices. The two pulley support assemblies are spanned on the top of the steel truss beam through fixing parts, and corresponding pulley assemblies are respectively arranged at their bottoms. One of the two pulley assemblies is connected to one of the two winches through a steel wire rope, and the other of the two pulley assemblies is connected to the other of the two winches through a steel wire rope.
[0020] Compared with the prior art, the advantages of the present utility model are as follows:
[0021] In the present utility model, the winch is installed on the steel truss beam through the base limiting device, the pulley assembly is installed on the top of the steel truss beam through the pulley support assembly, and the pulley assembly and the winch are connected by a steel wire rope. Compared with the existing hoisting device for the slideway beam, this device for hoisting the slideway beam can be directly installed on the steel truss beam. In the original construction, it was necessary to hoist the slideway beam to the bottom of the steel truss beam. During the construction process, one end of the steel wire rope can be fixed to the slideway beam, and by driving the contraction of the steel wire rope by the winch, the slideway beam can be lifted. Since the pulley assembly is installed on the top of the steel truss beam through the pulley support assembly, the problem that the hoisting device is restricted by the hoisting height and the hoisting radius is solved. The required hoisting height of the slideway beam will not be affected by the height of the hoisting device itself, thereby reducing the hoisting construction difficulty of the slideway beam. Description of the Drawings
[0022] Figure 1 is a schematic structural diagram of the device for hoisting the slideway beam according to the embodiment of the present utility model;
[0023] Figure 2 is Figure 1 a side view of
[0024] Figure 3 is a schematic structural diagram of the pulley support assembly and the pulley assembly according to the embodiment of the present utility model;
[0025] Figure 4 is Figure 3 a side view of
[0026] In the figure: 1 - winch, 2 - base limiting device, 201 - ratchet chain tightener, 202 - chain, 203 - chain block, 3 - pulley support assembly, 301 - high-strength threaded steel, 302 - vertical load-bearing plate, 303 - transverse stiffening plate, 304 - pulley shackle connecting plate, 305 - ear plate, 306 - ear plate reinforcing plate, 307 - bolt connecting plate, 308 - vertical stiffening plate, 309 - limiting section steel, 310 - section steel connecting plate, 311 - high-strength threaded steel fixing plate, 312 - pulley shackle connecting plate reinforcing plate, 4 - pulley assembly, 401 - fixed pulley, 402 - fixed pulley pin shaft, 403 - movable pulley, 404 - pulley shackle, 5 - steel truss beam, 501 - longitudinal beam, 502 - cross beam. Detailed Embodiment
[0027] The following further describes the embodiments of the present utility model in detail with reference to the drawings.
[0028] The device for hoisting the slideway beam in the embodiment of the present utility model, refer to Figure 1As shown in the figure, it includes a winch 1, and a base limiting device 2 is installed at the bottom of the winch 1; the winch 1 is connected to a pulley assembly 4 through a steel wire rope, and a pulley support assembly 3 is arranged on the pulley assembly 4; during installation, the winch 1 is installed on the steel truss girder through the base limiting device 2, and the pulley assembly 4 is installed on the upper chord of the steel truss girder 5 through the pulley support assembly 3, and the specific installation is to surround and closely adhere to the upper chord of the steel truss girder 5.
[0029] It can be seen from this that in the present utility model, the winch 1 is installed on the steel truss girder 5 through the base limiting device 2, the pulley assembly 4 is installed on the top of the steel truss girder 5 through the pulley support assembly 3, and the pulley assembly 4 and the winch 1 are connected through a steel wire rope. Compared with the existing hoisting device for the slideway beam, this device for hoisting the slideway beam can be directly installed on the steel truss girder 5. In the original construction, it was necessary to hoist the slideway beam to the bottom of the steel truss girder 5. During the construction process, one end of the steel wire rope can be fixed to the slideway beam, and by driving the contraction of the steel wire rope by the winch 1, the slideway beam can be lifted. Since the pulley assembly is installed on the top of the steel truss girder 5 through the pulley support assembly 4, the problem that the hoisting device is restricted by the hoisting height and hoisting amplitude is solved, and the required hoisting height of the slideway beam will not be affected by the height of the hoisting device itself, thereby reducing the hoisting construction difficulty of the slideway beam.
[0030] Preferably, a specific structure of the base limiting device 2 is provided:
[0031] The base limiting device 2 includes a ratchet chain tightener 201 and a chain 202. The ratchet chain tightener 201 is installed on the winch 1. One end of the chain 202 is fixedly connected to the ratchet chain tightener 201, and the other end is fixedly connected to the longitudinal beam of the steel truss girder. This fixed connection is that the chain 202 is fixed to the longitudinal beam 501 of the steel truss girder 5 in a bottom-holding manner to resist the vertical tension borne by the winch 1.
[0032] Another specific structure of the base limiting device 2 is provided:
[0033] The base limiting device 2 further includes a chain block 203. One end of the chain block 203 is fixedly connected to the bottom of the winch 1, and the other end is fixedly connected to the upper flange of the longitudinal beam of the steel truss girder to resist the horizontal tension borne by the winch 1.
[0034] It should be noted that both the longitudinal beam 501 and the cross beam 502 are part of the structure of the steel truss girder 5. The longitudinal beam 501 is continuously laid along the longitudinal bridge direction, and the cross beam 502 is intermittently laid between the longitudinal beams 501 along the transverse bridge direction.
[0035] Preferably, a specific structure of the pulley support assembly 3 is provided:
[0036] The pulley support assembly 3 includes a steel truss beam 5 connection assembly, a support assembly, and a pulley connection assembly. The support assembly is fixed to the top of the steel truss beam 5 through the steel truss beam 5 connection assembly, and the pulley connection assembly is arranged at the bottom of the steel truss beam 5 connection assembly.
[0037] Furthermore, the steel truss beam 5 connection assembly includes a precision rolled threaded steel 301 and a precision rolled threaded steel fixing plate 311. The precision rolled threaded steel 301 is arranged at the bottom of the upper chord of the steel truss beam 5, and the precision rolled threaded steel 301 is fixedly connected to the support assembly through the precision rolled threaded steel fixing plate 311.
[0038] Preferably, a specific structure of the support assembly is provided:
[0039] The support assembly includes two vertical load-bearing plates 302, multiple transverse stiffening plates 303, multiple vertical stiffening plates 308, and a vertical load-bearing plate 302 connection assembly. The two vertical load-bearing plates 302 are fixedly connected through the load-bearing plate connection assembly. Multiple transverse stiffening plates 303 are arranged between the two vertical load-bearing plates 302, and multiple vertical stiffening plates 308 are arranged between the vertical load-bearing plate 302 and the vertical load-bearing plate 302 connection assembly.
[0040] Furthermore, the load-bearing plate connection assembly includes a bolt connection plate 307, a limit section steel 309, and a section steel connection plate 310. The limit section steel 309 is arranged at the top of the vertical load-bearing plate 302 through the bolt connection plate 307, and the two limit section steels 309 are connected through the section steel connection plate 310.
[0041] Preferably, a specific structure of the pulley connection assembly is provided:
[0042] The pulley connection assembly includes an ear plate 305, an ear plate reinforcing plate 306, a pulley shackle connection plate 304, and a pulley shackle connection plate reinforcing plate 312. The pulley shackle connection plate 304 is arranged inside the vertical load-bearing plate 302, one side of which is connected to the vertical load-bearing plate 302, and the other side is connected to the ear plate 305. The pulley shackle connection plate reinforcing plate 312 is arranged on the pulley shackle connection plate 304. One end of the pulley assembly 4 is connected to the ear plate 305, and the other end is connected to the vertical load-bearing plate 302 away from the pulley shackle connection plate 304. Ear plate reinforcing plates 306 are arranged on both the ear plate 305 and the vertical load-bearing plate 302.
[0043] Furthermore, a specific structure of the pulley assembly 4 is provided:
[0044] The pulley assembly 4 includes a fixed pulley 401, a fixed pulley pin shaft 402, a movable pulley 403, and a pulley shackle 404. The movable pulley 403 is rotatably arranged between the ear plate 305 and the vertical load-bearing plate 302 away from the pulley shackle connecting plate 304 through the fixed pulley pin shaft 402. The fixed pulley 401 and the movable pulley 403 are connected by a steel wire rope. One end of the movable pulley 403 is connected to the pulley shackle connecting plate 304 through the pulley shackle 404.
[0045] Preferably, there are two winches 1, two base limit devices 2, two pulley assemblies 4, and two pulley support assemblies 3. The two winches 1 are respectively installed on both sides of the bridge center line in the transverse direction of the bridge through the corresponding base limit devices 2. The two pulley support assemblies 3 are straddled on the top of the steel truss beam 5 through fixing members, and the corresponding pulley assemblies 4 are respectively arranged at their bottoms. One of the two pulley assemblies 4 is connected to one of the two winches 1 by a steel wire rope, and the other of the two pulley assemblies 4 is connected to the other of the two winches 1 by a steel wire rope.
[0046] Preferably, multiple devices for hoisting the slideway beam can be erected on one steel truss beam 5, and a slideway beam can be hoisted simultaneously to improve the stability of the hoisting process.
[0047] In the description of the present application, it should be noted that the orientation or positional relationship indicated by terms such as "upper" and "lower" is based on the orientation or positional relationship shown in the drawings. It is only for the convenience of describing the present application and simplifying the description, rather than indicating or implying that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation. Therefore, it should not be construed as a limitation to the present application. Unless otherwise clearly specified and defined, the terms "installation", "connection", and "connection" should be understood in a broad sense. For example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be directly connected or indirectly connected through an intermediate medium, and it can be the communication inside two elements. For those of ordinary skill in the art, the specific meanings of the above terms in the present application can be understood according to specific circumstances.
[0048] It should be noted that in this application, relational terms such as "first" and "second" are only used to distinguish one entity or operation from another entity or operation, and do not necessarily require or imply any actual relationship or order between these entities or operations. Moreover, the term "comprising", "including" or any other variation thereof is intended to cover non-exclusive inclusion, such that a process, method, article or device comprising a series of elements not only includes those elements but also includes other elements not expressly listed, or elements inherent to such process, method, article or device. Without further limitation, an element defined by the statement "comprising an..." does not exclude the presence of additional identical elements in the process, method, article or device comprising said element.
[0049] The above are only specific embodiments of this application, enabling those skilled in the art to understand or implement this application. Various modifications to these embodiments will be obvious to those skilled in the art, and the general principles defined herein can be implemented in other embodiments without departing from the spirit or scope of this application. Therefore, this application will not be limited to these embodiments shown herein, but rather will conform to the broadest scope consistent with the principles and novel features claimed herein.
Claims
1. A device for hoisting a slideway beam, characterized in that: It includes: Winch (1); A base limiting device (2) installed at the bottom of the winch (1); A pulley assembly (4) connected to the winch (1) via a steel wire rope; A pulley support assembly (3), which is arranged on the pulley assembly (4); During installation, the winch (1) is installed on the steel truss (5) through the base limiting device (2), and the pulley assembly (4) is installed on the top of the steel truss (5) through the pulley support assembly (3).
2. The device for hoisting a slideway beam according to claim 1, characterized in that: The base limiting device (2) comprises a ratchet chain tightener (201) and a chain (202); the ratchet chain tightener (201) is mounted on the winch (1); one end of the chain (202) is fixedly connected to the ratchet chain tightener (201), and the other end of the chain (202) is fixedly connected to the longitudinal beam (501) of the steel truss beam (5).
3. The device for hoisting a slideway beam according to claim 1, characterized in that: The base limiting device (2) also includes a fall chain (203), one end of which is fixedly connected to the bottom of the winch (1), and the other end of which is fixedly connected to the upper flange of the longitudinal beam (501) of the steel truss beam (5).
4. The device for hoisting a slideway beam according to claim 1, characterized in that: The pulley support assembly (3) comprises a steel truss (5) connection assembly, a support assembly and a pulley connection assembly, wherein the support assembly is fixed to the top of the steel truss (5) through the steel truss (5) connection assembly, and the pulley connection assembly is arranged at the bottom of the steel truss (5) connection assembly.
5. The device for hoisting a slideway beam according to claim 4, characterized in that: The steel truss (5) connection assembly comprises a finely rolled threaded steel bar (301) and a finely rolled threaded steel bar fixing plate (311); the finely rolled threaded steel bar (301) is arranged on the top of the steel truss (5); and the finely rolled threaded steel bar (301) is fixedly connected to the support assembly via the finely rolled threaded steel bar fixing plate (311).
6. The device for hoisting a slideway beam according to claim 4, characterized in that: The support assembly comprises two vertical bearing plates (302), a plurality of transverse stiffening plates (303), a plurality of vertical stiffening plates (308) and a vertical bearing plate (302) connecting assembly; the two vertical bearing plates (302) are fixedly connected via the bearing plate connecting assembly; a plurality of transverse stiffening plates (303) are arranged between the two vertical bearing plates (302); and a plurality of vertical stiffening plates (308) are arranged between the vertical bearing plates (302) and the vertical bearing plate (302) connecting assembly.
7. The device for hoisting a slideway beam according to claim 6, characterized in that: The load-bearing plate connection assembly comprises a bolt connection plate (307), a limiting steel (309) and a steel connection plate (310); the limiting steel (309) is arranged on the top of the vertical load-bearing plate (302) through the bolt connection plate (307); and the two limiting steels (309) are connected through the steel connection plate (310).
8. The device for hoisting a slideway beam according to claim 6, characterized in that: The pulley connection assembly comprises an ear plate (305), an ear plate reinforcement plate (306), a pulley shackle connection plate (304), and a pulley shackle connection plate reinforcement plate (312). The pulley shackle connection plate (304) is arranged on the inner side of the vertical load-bearing plate (302), one side of which is connected to the vertical load-bearing plate (302), and the other side of which is connected to the ear plate (305). The pulley shackle connection plate reinforcement plate (312) is arranged on the pulley shackle connection plate (304). One end of the pulley assembly (4) is connected to the ear plate (305), and the other end of the pulley assembly (4) is connected to the vertical load-bearing plate (302) away from the pulley shackle connection plate (304). The ear plate reinforcement plate (306) is arranged on the ear plate (305) and the vertical load-bearing plate (302).
9. The device for hoisting a slideway beam according to claim 8, characterized in that: The pulley assembly (4) comprises a fixed pulley (401), a fixed pulley pin (402), a movable pulley (403) and a pulley shackle (404); the movable pulley (403) is rotatably arranged between the ear plate (305) and the vertical load-bearing plate (302) away from the pulley shackle connecting plate (304) through the fixed pulley pin (402); the fixed pulley (401) and the movable pulley (403) are connected by a steel wire rope; one end of the movable pulley (403) is connected to the pulley shackle connecting plate (304) through the pulley shackle (404).
10. The device for hoisting a slideway beam according to claim 1, characterized in that: The winches (1), the base limiting device (2), the pulley assembly (4) and the pulley support assembly (3) are each two in number. The two winches (1) are respectively installed on both sides of the bridge centerline in the transverse direction of the bridge through the corresponding base limiting devices (2). The two pulley support assemblies (3) are straddled on the top of the steel truss (5) through fixing parts, and the bottoms thereof are respectively provided with corresponding pulley assemblies (4). One of the two pulley assemblies (4) is connected to one of the two winches (1) through a steel wire rope, and the other of the two pulley assemblies (4) is connected to the other of the two winches (1) through a steel wire rope.