Steel wire rope tying device for discharging platform

By designing a wire rope knotting device for unloading platform including a U-frame, clamping assembly and protective plate, the wire rope wear and aerial work safety problems in traditional devices are solved, and lower wear and higher safety is achieved.

CN222991173UActive Publication Date: 2025-06-17CSCEC BRIDGES CO LTD +1
View PDF 1 Cites 0 Cited by

Patent Information

Application Number
CN202421962913.7
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-08-14
Publication Date
2025-06-17
Estimated Expiration
2034-08-14

AI Technical Summary

Technical Problem

In the traditional unloading platform knotting device, the arc portion of the U-shaped round steel is large, causing the wire rope to displace when under stress and cause wear. At the same time, workers need to work at high altitude during the installation process, which poses a risk of falling accidents.

Method used

A wire rope knotting device including a U-frame, a clamping assembly and a protective plate is designed. The first straight part of the U-shaped frame is two-thirds of the length of the second straight part, and is smoothly connected by the arc-shaped part to reduce the displacement amount when the wire rope is subjected to stress. The clamping assembly uses a clamping arm of elastic material to improve the clamping stability of the traction rope. The protective plate passes through the pad and the tube column to avoid wear of the U-shaped frame on the floor.

Benefits of technology

By reducing the stress area of ​​the arc-shaped part, the wear of the wire rope is reduced, and high-altitude operations are avoided through vertical installation, thereby improving safety.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222991173U_ABST
    Figure CN222991173U_ABST
Patent Text Reader

Abstract

The utility model provides a steel wire rope pulling and knotting device for a discharging platform, which comprises a U-shaped frame, a first straight part, a second straight part and an arc-shaped part, the arc-shaped part is smoothly connected with one end of the first straight part and one end of the second straight part, the length of the first straight part is two thirds that of the second straight part, and the length of the arc-shaped part is two thirds that of the second straight part. The ends, away from the arc-shaped part, of the first straight part and the second straight part are in threaded connection with nuts. The two clamping assemblies are arranged at the threaded end of the first straight part and the threaded end of the second straight part correspondingly, and the clamping assemblies are used for clamping the traction rope; the protection plate is arranged between the U-shaped frame and the floor and used for preventing the U-shaped frame from abrading the floor; by changing a conventional U-shaped structure, setting the length of the first straight part to be two thirds of the length of the second straight part, and smoothly connecting the ends forming the height difference through the arc-shaped part, the stress area of the arc-shaped part connected with the steel wire rope is reduced, the displacement of the steel wire rope at the arc-shaped part when the steel wire rope is stressed is reduced, and thus the problem of abrasion is reduced.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of building construction, in particular to a steel wire rope tying device for a discharging platform. Background Technique

[0002] The discharging platform is a commonly used temporary construction platform in high-rise building construction. It is usually erected on one side of the building. During installation, an anchoring device needs to be erected on the building, and then fixed by connecting a steel wire rope to the discharging platform.

[0003] For example, the Chinese utility model with the publication number CN211143757U discloses "an anchoring device for a steel wire rope of a profiled steel cantilever discharging platform". The device includes an upper structural floor and a lower structural floor. A discharging platform is fixedly arranged above the lower structural floor. Through holes are respectively arranged on the upper and lower sides of the outer side wall of the upper structural floor. PVC sleeve joints matching the through holes are arranged in the through holes. A U-shaped round steel is inserted and matched in the two PVC sleeve joints. The straight edge of the U-shaped round steel extends out of the inner side of the outer side wall of the upper structural floor. The extending end of the straight edge of the U-shaped round steel is a threaded structure, and a nut is arranged in a matching manner. A steel wire rope is connected between the bent edge of the U-shaped round steel and the discharging platform.

[0004] When using the above device to tie and fix the discharging platform, there are the following problems: First, when installing the U-shaped round steel and tying the steel wire rope of the discharging platform, workers need to work at heights using a scaffolding near the edge of the main structure, which is prone to high-altitude falling accidents; second, the traditional U-shaped round steel has a relatively large arc part, and the steel wire rope will displace at the arc part when stressed, causing wear. Content of the Utility Model

[0005] Aiming at the deficiencies in the prior art, the utility model provides a steel wire rope tying device for a discharging platform, which solves the problem that in the prior art, due to the relatively large arc part of the traditional tying device, the steel wire rope will displace at the arc part when stressed, causing wear.

[0006] According to an embodiment of the utility model, a steel wire rope tying device for a discharging platform includes a U-shaped frame, which includes a first straight part and a second straight part, and an arc part smoothly connected to one end of the first straight part and the second straight part. Among them, the length of the first straight part is two-thirds of the length of the second straight part, and nuts are threadedly connected to the ends of the first straight part and the second straight part far from the arc part; two sets of clamping components are respectively arranged at the threaded ends of the first straight part and the second straight part, and the clamping components are used for clamping the towing rope; a protective plate is arranged between the U-shaped frame and the floor slab to prevent the U-shaped frame from wearing the floor slab.

[0007] Compared with the prior art, the utility model has the following beneficial effects: By changing the conventional U-shaped structure, setting the length of the first straight part to two-thirds of the length of the second straight part, and then smoothly connecting one end with a height difference through an arc part, the stress area of the arc part connected to the steel wire rope is reduced, the displacement amount of the steel wire rope at the circular arc part during stress is reduced, thereby reducing wear. At the same time, according to its characteristics, its installation position is changed from the conventional horizontal installation to vertical installation, avoiding the problem of high-altitude operation.

[0008] Preferably, each clamping assembly includes two clamping arms arranged mirror-symmetrically, and each clamping arm is made of an elastic material.

[0009] Preferably, each clamping arm includes a short-axis part, a long-axis part, and a special-shaped part connecting one end of the short-axis part and the long-axis part. The ends of the short-axis part and the long-axis part far from the special-shaped part are fixedly arranged on the U-shaped frame.

[0010] Preferably, a rubber sleeve is sleeved on each special-shaped part.

[0011] Preferably, the protective plate includes a backing plate part and two pipe column parts arranged on the backing plate part. The first straight part and the second straight part are respectively located in the corresponding pipe column parts. Among them, the backing plate part is located under each nut.

[0012] Preferably, gaskets are sleeved on the first straight part and the second straight part, and the gaskets are located between the corresponding nuts and the backing plate part. BRIEF DESCRIPTION OF THE DRAWINGS

[0013] Figure 1 is the installation and use schematic diagram of the embodiment of the utility model.

[0014] Figure 2 is the three-dimensional structure schematic diagram of the embodiment of the utility model.

[0015] Figure 3 is Figure 2 the enlarged view of area A in

[0016] In the above-mentioned drawings: 1. U-shaped frame; 100. Floor slab; 101. First straight part; 102. Arc part; 103. Second straight part; 2. Protective plate; 201. Backing plate part; 202. Pipe column part; 3. Nut; 301. Gasket; 4. Clamping arm; 401. Special-shaped part; 402. Short-axis part; 403. Long-axis part; 404. Rubber sleeve. DETAILED DESCRIPTION OF THE EMBODIMENTS

[0017] The technical solutions in the utility model will be further described below with reference to the drawings and embodiments.

[0018] As Figures 1 to 3As shown, an embodiment of the utility model proposes a wire rope pulling device for a discharge platform, which includes a U-shaped frame 1, including a first straight portion 101 and a second straight portion 103, and an arc portion 102 smoothly connected to one end of the first straight portion 101 and the second straight portion 103, wherein the length of the first straight portion 101 is two-thirds of the length of the second straight portion 103, and the ends of the first straight portion 101 and the second straight portion 103 away from the arc portion 102 are both threadedly connected with nuts 3; a clamping assembly, which is divided into two groups and is respectively arranged at the threaded ends of the first straight portion 101 and the second straight portion 103, and the clamping assembly is used to clamp the traction rope; a protective plate 2 is arranged between the U-shaped frame 1 and the floor 100, and is used to prevent the U-shaped frame 1 from causing wear to the floor 100.

[0019] The detailed working process of this embodiment is as follows: the U-shaped frame 1 is used to be installed on the building to tie and fix the unloading platform, and the clamping assembly is used to clamp the traction rope, and the U-shaped frame 1 is vertically lifted to the designated position by the traction rope for installation.

[0020] By changing the conventional U-shaped structure, the length of the first straight portion 101 is set to two-thirds of the length of the second straight portion 103, and then one end with a height difference is smoothly connected through the arc portion 102, so that the force-bearing area of ​​the arc portion 102 connected to the wire rope is reduced, reducing the displacement of the wire rope in the arc portion when it is stressed, thereby reducing wear and tear. At the same time, its installation position is changed according to its characteristics, from the conventional horizontal installation to the vertical installation, avoiding the problem of high-altitude operations.

[0021] like Figure 3 As shown, each clamping assembly includes two clamping arms 4 that are arranged in mirror image, and each clamping arm 4 is made of elastic material.

[0022] like Figure 3 As shown, each clamping arm 4 includes a short axis portion 402 and a long axis portion 403 and a heterogeneous portion 401 connecting one end of the short axis portion 402 and the long axis portion 403 , and one end of the short axis portion 402 and the long axis portion 403 away from the heterogeneous portion 401 is fixedly arranged on the U-shaped frame 1 .

[0023] The detailed working process of this embodiment is as follows: by clamping one end of the traction rope through the two clamping arms 4, the U-shaped frame 1 can be lifted by lifting the traction rope, and when the two clamping arms 4 clamp the traction rope, the elastic force of their own elastic material is used to provide support. At the same time, since one end of the short axis portion 402 and the long axis portion 403 are correspondingly fixedly installed on the first straight portion 101 and the second straight portion 103, when clamping, the two corresponding clamping arms 4 are directly pried apart to move away from each other. At this time, the clamping arms 4 accumulate force, and then the traction rope is placed between the two corresponding clamping arms 4. When the clamping arms 4 are released and reset, the traction rope can be clamped.

[0024] likeFigure 3 As shown, each of the opposite sex parts 401 is covered with a rubber sleeve 404 .

[0025] The detailed working process of this embodiment is as follows: the function of the rubber sleeve 404 is to increase the friction force and improve the clamping stability.

[0026] like Figure 2 As shown, the protective plate 2 includes a pad portion 201 and two pipe column portions 202 arranged on the pad portion 201 , the first straight portion 101 and the second straight portion 103 are respectively located in the corresponding pipe column portions 202 , wherein the pad portion 201 is located at the lower side of each nut 3 .

[0027] The detailed working process of this embodiment is as follows: the function of the pad portion 201 is to increase the force-bearing area of ​​the nut 3, and the function of the pipe column portion 202 is to prevent the building wall from directly contacting the first straight portion 101 and the second straight portion 103 to cause wear.

[0028] like Figure 2 As shown, washers 301 are sleeved on the first straight portion 101 and the second straight portion 103 , and the washers 301 are located between the corresponding nuts 3 and the pad portion 201 .

[0029] The detailed working process of this embodiment is as follows: the function of the gasket 301 is to disperse the pressure of the nut 3 on the surface of the connecting piece during the tightening process, so as to avoid damage to the connecting piece caused by excessive local pressure.

[0030] The implementation principle of the embodiment of the present application is as follows: first, a hole is drilled on the floor 100 at the installation position at the construction site, and then the pipe column part 202 in the protective plate 2 is inserted into the corresponding hole, and then the traction rope is passed through the pipe column part 202 and placed on the ground, and then the two corresponding clamping arms 4 are opened to make them move away from each other, and then one end of the traction rope is placed between the two corresponding clamping arms 4, and then the clamping arms 4 are released and reset to clamp the traction rope, and then the traction rope is recovered to lift the U-shaped frame 1 and pass it through the pipe column part 202, and then the gasket 301 is installed, the nut 3 is tightened, and the U-shaped frame 1 is fixed in the worthwhile position, and then one end of the wire rope can be connected to the U-shaped frame 1 to tie and fix the unloading platform.

[0031] Finally, it should be noted that the above embodiments are only used to illustrate the technical solution of the utility model rather than to limit it. Although the utility model has been described in detail with reference to the preferred embodiments, ordinary technicians in the field should understand that the technical solution of the utility model can be modified or replaced by equivalents without departing from the purpose and scope of the technical solution of the utility model, which should be included in the scope of the claims of the utility model.

Claims

1. A wire rope pulling device for a discharge platform, installed on a floor slab (100), characterized in that: include: The U-shaped frame (1) comprises a first straight portion (101) and a second straight portion (103), and an arc-shaped portion (102) smoothly connected to one end of the first straight portion (101) and the second straight portion (103), wherein the length of the first straight portion (101) is two-thirds of the length of the second straight portion (103), and one end of the first straight portion (101) and the second straight portion (103) away from the arc-shaped portion (102) are both threadedly connected to a nut (3); The clamping components are divided into two groups and are respectively arranged at the threaded ends of the first straight portion (101) and the second straight portion (103), and the clamping components are used to clamp the traction rope; A protective plate (2) is arranged between the U-shaped frame (1) and the floor slab (100) and is used to prevent the U-shaped frame (1) from causing wear to the floor slab (100).

2. The wire rope pulling device for the unloading platform according to claim 1 is characterized in that: Each of the clamping assemblies comprises two clamping arms (4) arranged in mirror images, and each of the clamping arms (4) is made of elastic material.

3. The wire rope pulling device for the unloading platform according to claim 2 is characterized in that: Each of the clamping arms (4) comprises a short axis portion (402), a long axis portion (403), and a heterogeneous portion (401) connecting the short axis portion (402) and one end of the long axis portion (403); one end of the short axis portion (402) and one end of the long axis portion (403) away from the heterogeneous portion (401) are fixedly arranged on the U-shaped frame (1).

4. The wire rope pulling device for the unloading platform according to claim 3 is characterized in that: Each of the heterogeneous parts (401) is sleeved with a rubber sleeve (404).

5. The wire rope pulling device for the unloading platform according to claim 3 is characterized in that: The protective plate (2) comprises a pad portion (201) and two pipe column portions (202) arranged on the pad portion (201), the first straight portion (101) and the second straight portion (103) are respectively located in the corresponding pipe column portions (202), wherein the pad portion (201) is located at the lower side of each nut (3).

6. The wire rope pulling device for the unloading platform according to claim 5 is characterized in that: A gasket (301) is sleeved on the first straight portion (101) and the second straight portion (103), and the gasket (301) is located between the corresponding nut (3) and the gasket portion (201).

Citation Information

Patent Citations

  • Anchoring device for steel wire rope of section steel overhanging type discharging platform

    CN211143757U