Gas extraction pneumatic control operation platform
By designing a gas extraction pneumatic control operation platform, the problem of difficulty in gas leakage pipe control during gas extraction drilling construction is solved, and the gas control effect with simple operation and sensitive reaction is achieved, reducing the occurrence of gas leakage accidents.
Patent Information
- Application Number
- CN202422111823.3
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-29
- Publication Date
- 2025-06-17
- Estimated Expiration
- 2034-08-29
AI Technical Summary
In the construction of gas extraction drilling, the existing technology is difficult to effectively control gas leakage, resulting in slow reaction speed, insensitive operation, and frequent gas leakage accidents.
A gas extraction pneumatic control operation platform is designed, including a housing, a pneumatic component mounting panel and a pneumatic connecting pipe fitting. The pneumatic control valve is arranged side by side and connected to the pneumatic control valve through a centralized air inlet and multiple air outlets, so as to achieve flexible control of multiple valves and systems.
This platform makes the operation simple and responsive, and can quickly and effectively control the gas in the drilling hole, reducing the occurrence of gas leakage accidents.
Smart Images

Figure CN222991500U_ABST
Abstract
Description
Technical Field
[0001] The utility model belongs to the technical field of gas prevention and control in the gas drainage construction drill site, and particularly relates to a pneumatic control operation platform for gas drainage. Background Technique
[0002] Mine gas control mainly relies on directional gas drainage boreholes. Due to the wide coverage area and long single-hole footage of directional boreholes, it is difficult to control the gas in the boreholes during the construction process. In the gas drainage system of each drill site, the blowout prevention system during drilling mainly conducts control through measures such as the orifice five-way joint combined with the orifice blowout prevention device, blowout prevention water tank, blowout prevention airbag, standby after-drainage, and double-layer water drainer. When gas anomalies occur in the borehole, it is necessary to timely open the control valves of each blowout prevention device for regulation. Since there are many blowout prevention devices at the drilling site, manually opening each one not only takes time and effort but also consumes a long time, and gas leakage accidents often occur due to untimely opening.
[0003] The existing gas blowout prevention and warning devices in drill sites in China are relatively bulky and are controlled after the sensor senses the leaked gas, resulting in a problem of time delay. Due to unreasonable designs, other pneumatic controllers are not sensitive in operation during use, and at the same time, they can only control a single valve or a single pneumatic system separately and cannot control multiple valves or multiple systems. Content of the Utility Model
[0004] The utility model provides a pneumatic control operation platform for gas drainage to solve the problems of difficult control of gas leakage, insensitive control, slow reaction speed, and difficult operation for operators during the construction of gas drainage boreholes in the prior art.
[0005] The utility model is realized by adopting the following technical scheme: A pneumatic control operation platform for gas drainage includes a housing. An air-operated component installation panel and pneumatic connection pipe fittings are installed inside the housing. A plurality of pneumatic control valves are fixedly installed on the air-operated component installation panel. Openings corresponding to the positions of the pneumatic control valves are provided on the panel of the housing for the control rods of the pneumatic control valves to extend out. A centralized air inlet and a plurality of air outlets are arranged on the housing. The pneumatic connection pipe fittings connect the centralized air inlet and the air outlets with the pneumatic control valves.
[0006] Furthermore, the centralized air inlet and the air outlets are arranged on the side plates of the housing.
[0007] Furthermore, the pneumatic connection pipe fittings include an inlet pipe and an outlet pipe. One end of the inlet pipe is connected to the centralized air inlet, and the other end branches out to connect the air inlet holes of each pneumatic control valve. Both ends of the outlet pipe are respectively connected to the air outlet holes of the pneumatic control valves and the air outlets.
[0008] Furthermore, three pneumatic control valves are arranged side by side.
[0009] Further, the outer shell is made of stainless steel plate.
[0010] Compared with the prior art, the utility model has the following beneficial effects:
[0011] It is simple to operate, sensitive in response, convenient for random installation, can reduce the labor intensity of workers, and effectively avoid the accident of gas leakage. BRIEF DESCRIPTION OF THE DRAWINGS
[0012] Figure 1 is a schematic structural diagram of the utility model;
[0013] Figure 2 is a pneumatic system diagram of the utility model;
[0014] Figure 3 is a schematic structural diagram of the outer shell panel and side plate of the utility model;
[0015] Figure 4 is a schematic structural diagram of the bottom plate of the outer shell of the utility model;
[0016] Figure 5 is a schematic structural diagram of the pneumatic component installation panel of the utility model.
[0017] In the figure: 1. Outer shell; 11. Opening; 12. Central air inlet; 13. Air outlet; 14. Panel; 15. Side plate; 16. Back plate; 2. Pneumatic component installation panel; 3. Pneumatic control valve; 31. Control rod; 4. Inlet pipe; 5. Outlet pipe. DETAILED DESCRIPTION OF THE EMBODIMENTS
[0018] In order to better understand the purpose, structure and function of the utility model, the following further describes in detail a pneumatic control operation platform for gas drainage of the utility model with reference to the drawings.
[0019] As Figure 1 shown, a pneumatic control operation platform for gas drainage includes an outer shell 1. A pneumatic component installation panel 2 and pneumatic connection pipe fittings are installed inside the outer shell 1. A plurality of pneumatic control valves 3 are fixedly installed on the pneumatic component installation panel 2. An opening 11 is provided on the panel 14 of the outer shell 1 corresponding to the position of the pneumatic control valve 3 for the control rod 31 of the pneumatic control valve 3 to extend out. A central air inlet 12 and a plurality of air outlets 13 are provided on the outer shell 1. The pneumatic connection pipe fittings connect the central air inlet 12 and the air outlets 13 with the pneumatic control valves 3.
[0020] As Figure 2 shown, the pneumatic connection pipe fittings include an inlet pipe 4 and an outlet pipe 5. One end of the inlet pipe 4 is connected to the central air inlet 12, and the other end branches out to connect the air inlet holes of each pneumatic control valve 3. Both ends of the outlet pipe 5 are respectively connected to the air outlet holes of the pneumatic control valves 3 and the air outlets 13.
[0021] The pneumatic control operation platform of the present utility model is designed similarly to the drill rig operation platform, with sensitive response. It can be fixed on the drill rig operation platform. The drill rig operator can control the valves of all gas control systems in the drill site through the pneumatic control operation platform, which can reduce the risk of gas leakage in the borehole.
[0022] In this embodiment, the outer shell 1 is made of stainless steel plate. As Figure 3 and Figure 4 shown, side plates are arranged around the panel 14, and the back plate 16 is connected and fixed to the panel 14 by screws. The centralized air inlet 12 and the air outlet 13 are arranged on the side plates 15 on both sides. As Figure 5 shown, screw holes are provided on the pneumatic component mounting panel 2 to fix the pneumatic control valve 3 and the pneumatic connection pipe fittings by screws, and the pneumatic component mounting panel 2 can be fixed on the outer shell 1.
[0023] There are three pneumatic control valves 3 arranged side by side, which are respectively connected to control the emergency back extraction pipe, the double-layer drainer and the system drainer. The pneumatic control valve 3 and each pneumatic component are installed on the pneumatic component mounting panel 2 and fixed through the outer shell 1.
[0024] During use, the pneumatic control operation platform is installed on the side of the drill rig operation platform, the centralized air inlet 12 is connected, and the air outlet 13 is connected to each gas control system in the drill site by using an air pipe. According to the abnormal gas situation in the drill site, each pneumatic control valve 3 can control a set of systems separately or control multiple systems to achieve the purpose of effectively controlling the gas leakage from the borehole.
[0025] It can be understood that the present utility model is described through some embodiments. Those skilled in the art know that without departing from the spirit and scope of the present utility model, various changes or equivalent replacements can be made to these features and embodiments. In addition, under the teaching of the present utility model, these features and embodiments can be modified to adapt to specific situations and materials without departing from the spirit and scope of the present utility model. Therefore, the present utility model is not limited by the specific embodiments disclosed herein, and all embodiments falling within the scope of the claims of this application belong to the scope protected by the present utility model.
Claims
1. A gas extraction pneumatic control operation platform, characterized in that: The invention comprises a housing (1), a pneumatic component installation panel (2) and a pneumatic connecting pipe fitting are installed inside the housing (1), a plurality of pneumatic control valves (3) are fixedly installed on the pneumatic component installation panel (2), an opening (11) is provided on the panel of the housing (1) at a position corresponding to the pneumatic control valve (3) for allowing a control rod (31) of the pneumatic control valve (3) to extend, a centralized air inlet (12) and a plurality of air outlets (13) are provided on the housing (1), and the pneumatic connecting pipe fitting connects the centralized air inlet (12) and the air outlet (13) to the pneumatic control valve (3).
2. The gas extraction pneumatic control operation platform according to claim 1 is characterized in that: The centralized air inlet (12) and the air outlet (13) are arranged on the side plate (15) of the housing (1).
3. The gas extraction pneumatic control operation platform according to claim 1 is characterized in that: The pneumatic connecting pipe comprises an air inlet pipe (4) and an air outlet pipe (5); one end of the air inlet pipe (4) is connected to a centralized air inlet port (12); the other end of the air inlet pipe (4) branches off to connect to the air inlet port of each pneumatic control valve (3); and the two ends of the air outlet pipe (5) are respectively connected to the air outlet port (13) and the air outlet port of the pneumatic control valve (3).
4. The gas extraction pneumatic control operation platform according to claim 3 is characterized in that: Three pneumatic control valves (3) are arranged side by side.
5. The gas extraction pneumatic control operation platform according to any one of claims 1 to 4, characterized in that: The housing (1) is made of stainless steel plate.