Fixing device for water pumping pipe of blast furnace

By designing a water pipe fixing device for blast furnaces, the labor intensity and safety hazards caused by water pipe flushing workers holding water pipes for a long time are solved, and more efficient and safe water pipe flushing operations are achieved.

CN223002950UActive Publication Date: 2025-06-20BEIJING SHOUGANG CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420944998.X
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-05-06
Publication Date
2025-06-20
Estimated Expiration
2034-05-06

AI Technical Summary

Technical Problem

Before pouring the blast furnace cylinder as a whole, the water pumping operator needs to hold the water pumping pipe for a long time to sharpen the furnace material, which is very labor-intensive and has safety hazards.

Method used

A blast furnace water pipe fixing device is designed, including a frame, a first sleeve and a second sleeve, which is fixed to the large sleeve of the blast furnace air outlet by clamping components. The water pipe extends into the furnace cylinder through the sleeve, and the tail and middle of the water pipe are fixed with an adjustable fixing member.

Benefits of technology

It significantly reduces the labor intensity of water-fetching workers, improves operating efficiency and safety, and reduces personal safety threats.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN223002950U_ABST
    Figure CN223002950U_ABST
Patent Text Reader

Abstract

The utility model discloses a blast furnace water fetching pipe fixing device which comprises a frame, a first sleeve and a second sleeve, the frame comprises a first rod, a second rod, a third rod, a fourth rod and at least two clamping assemblies, and the two ends of the first rod are connected with one end of the second rod and one end of the third rod respectively. The other end of the second rod and the other end of the third rod are both connected to a rod body of the fourth rod, the two clamping assemblies are both connected with the fourth rod, the clamping assemblies are clamped on a tuyere large sleeve of the blast furnace, the first sleeve is installed on the first rod, a plurality of first adjustable fixing pieces capable of locking a water fetching pipe are installed on the first sleeve, and the second sleeve is installed on the fourth rod. A plurality of second adjustable fixing pieces capable of locking the water fetching pipe are mounted on the second sleeve, and the first sleeve and the second sleeve are respectively used for sleeving the tail part and the middle part of the water fetching pipe, so that the head part of the water fetching pipe extends into the hearth of the blast furnace from the tuyere large sleeve. According to the scheme, a water fetching worker does not need to hold the water fetching pipe at the tuyere zone for a long time to fetch water.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of integral pouring of blast furnace hearths, and particularly relates to a fixing device for blast furnace water injection pipes. Background Art

[0002] In recent years, when large and medium-sized blast furnaces reach their production campaigns or when the hearths are severely eroded, affecting the safe production and smelting of blast furnaces, the integral hearth pouring technology will be adopted, which is more conducive to the long life and safe production of blast furnaces.

[0003] Before the hearth is poured, the residual iron in the hearth needs to be drained and the materials need to be removed. During the process of lowering the burden surface of the blast furnace, the materials in the furnace are in a pile tip shape. The water injection operators need to hold the water injection pipes outside the furnace to perform the tip cutting operation on the pile tip of the material surface, flatten the tip of the material, so that a small excavator can be hoisted down from the manhole at the top of the furnace for the material removal operation.

[0004] Each operator can only hold one water injection pipe to perform the water injection operation at different positions of the materials. The water injection personnel hold the water injection pipes for a long time at the tuyere zone to perform the water injection operation, with a large labor intensity. In addition, the water flow will decompose and generate hydrogen when hitting the material surface. If the hydrogen concentration reaches a certain range, it will cause detonation, threatening the personal safety of the water injection operators. Content of the Utility Model

[0005] This application provides a fixing device for blast furnace water injection pipes, which solves the technical problems of high labor intensity and threat to personal safety existing in the prior art when performing the tip cutting operation on the piled-up tip-shaped materials in the furnace before the integral pouring of the blast furnace hearth due to the long-term manual holding of the water injection pipes by personnel.

[0006] This application provides a fixing device for blast furnace water injection pipes, including a frame, a first sleeve and a second sleeve. The frame includes a first rod, a second rod, a third rod, a fourth rod and at least two clamping components. The two ends of the first rod are respectively connected to one end of the second rod and one end of the third rod. The other ends of the second rod and the third rod are both connected to the rod body of the fourth rod. The two clamping components are both connected to the fourth rod. The clamping components are used for clamping the tuyere outer sleeve of the blast furnace. The first sleeve is installed on the first rod, and a number of first adjustable fixing parts are installed on the first sleeve. The first adjustable fixing parts are used for locking the water injection pipe under the condition that the water injection pipe passes through the first sleeve. The second sleeve is installed on the fourth rod, and a number of second adjustable fixing parts are installed on the second sleeve. The second adjustable fixing parts are used for locking the water injection pipe under the condition that the water injection pipe passes through the second sleeve. Among them, the first sleeve and the second sleeve are respectively used for sleeving on the tail and middle parts of the water injection pipe, so that the head of the water injection pipe extends into the hearth of the blast furnace from the tuyere outer sleeve.

[0007] In some embodiments, the blast furnace water injection pipe fixing device further includes a first adjuster, which is movably sleeved outside the first rod, so that the first adjuster can rotate around the first rod and move along the length direction of the first rod. A plurality of third adjustable fixing members are installed on the first adjuster, and the third adjustable fixing members are used to lock or separate from the first rod; the first sleeve is installed on the first adjuster.

[0008] In some embodiments, the blast furnace water injection pipe fixing device further includes an adjusting stroke shaft and a second adjuster. One end of the adjusting stroke shaft in the length direction is fixedly connected to the first adjuster. The adjusting stroke shaft faces the fourth rod, and the length of the adjusting stroke shaft is greater than the length of the second adjuster. The second adjuster is movably sleeved outside the adjusting stroke shaft, so that the second adjuster can rotate around the adjusting stroke shaft and move along the length direction of the adjusting stroke shaft. A plurality of fourth adjustable fixing members are installed on the second adjuster, and the fourth adjustable fixing members are used to lock or separate from the adjusting stroke shaft; the first sleeve is fixedly connected to the second adjuster.

[0009] In some embodiments, the first rod is a straight rod, the first adjuster is a straight cylinder, the axis direction of the first adjuster is the same as the length direction of the first rod, and the axis directions of the first adjuster, the adjusting stroke shaft, and the first sleeve are perpendicular to each other in pairs.

[0010] In some embodiments, the blast furnace water injection pipe fixing device further includes a third adjuster, which is movably sleeved outside the fourth rod, so that the third adjuster can rotate around the fourth rod and move along the length direction of the fourth rod. A plurality of fifth adjustable fixing members are installed on the third adjuster, and the fifth adjustable fixing members are used to lock or separate from the fourth rod; the second sleeve is installed on the third adjuster.

[0011] In some embodiments, the blast furnace water injection pipe fixing device further includes a fourth adjuster and a rotating shaft. One end of the rotating shaft in the length direction is fixedly connected to the third adjuster. The fourth adjuster is rotatably sleeved outside the rotating shaft; the second sleeve is fixedly connected to the fourth adjuster.

[0012] In some embodiments, the fourth rod is a straight rod, the third adjuster is a straight cylinder, the axis direction of the third adjuster is the same as the length direction of the fourth rod, and the axis directions of the third adjuster, the rotating shaft, and the second sleeve are perpendicular to each other in pairs.

[0013] In some embodiments, a first connecting sleeve and a second connecting sleeve are fixedly connected to the rod body of the fourth rod. Both the first connecting sleeve and the second connecting sleeve are provided with pin holes. The first connecting sleeve is detachably connected to the second rod by a pin cooperating with the pin hole, and the second connecting sleeve is detachably connected to the third rod by a pin cooperating with the pin hole.

[0014] In some embodiments, the clamping assembly includes a pressing plate, two screw rods, and nuts threadedly mounted on each screw rod. One end of each screw rod is fixedly connected to the fourth rod. The two screw rods are arranged in parallel and at intervals. The pressing plate is provided with two through holes, and the two screw rods respectively pass through the two through holes movably. The nuts are arranged on the side of the pressing plate away from the fourth rod. Among them, a limiting area is enclosed among the fourth rod, the two screw rods, and the pressing plate. The limiting space is for the convex and vertical structure of the tuyere jacket to pass through. Under the condition that the nuts are tightened, the convex and vertical structure is pressed tightly between the fourth rod and the pressing plate.

[0015] In some embodiments, both the first adjustable fixing member and the second adjustable fixing member are set screws.

[0016] The beneficial effects of the present application are as follows: A blast furnace water injection pipe fixing device is provided, which includes a frame, a first sleeve, and a second sleeve. At least two clamping assemblies are installed on the fourth rod in the frame, and the second sleeve is sleeved on the fourth rod. The first sleeve is sleeved on the first rod arranged at an interval relative to the fourth rod. During specific use, the frame is located outside the hearth. The clamping assembly firmly clamps the tuyere jacket of the blast furnace. The water injection pipe passes through the first sleeve and the second sleeve and then extends into the hearth. The first adjustable fixing member cooperates with the first sleeve to fix the tail of the water injection pipe, and the second adjustable fixing member cooperates with the second sleeve to fix the middle part of the water injection pipe, so that the water injection pipe passes through the tuyere jacket and the head of the water injection pipe extends from the tuyere jacket into the hearth of the blast furnace to perform the operation of watering and shaving the pile tip of the furnace charge in the furnace, and the operation of cooling the remaining iron and coke in the hearth; adopting the solution of the present application, it is not necessary for the water injection personnel to hold the water injection pipe for a long time at the tuyere zone to perform the water injection operation, which significantly reduces the labor intensity. Each person can simultaneously take care of the water injection operations of multiple water injection pipes, improving the operation efficiency. On the other hand, it also improves the safety hazards existing when holding the water injection pipe by hand, improving the operation safety. BRIEF DESCRIPTION OF THE DRAWINGS

[0017] In order to more clearly illustrate the technical solutions in the embodiments of the present invention or the prior art, the following will briefly introduce the drawings required for the description of the embodiments. Obviously, the following drawings are only some embodiments of the present invention.

[0018] Figure 1 It is a schematic diagram of the use state of a blast furnace water injection pipe fixing device provided by the present application;

[0019] Figure 2 It is a schematic diagram of the overall structure of a blast furnace water injection pipe fixing device provided by the present application;

[0020] Figure 3 It is a schematic diagram of the specific installation of the second sleeve in a blast furnace water injection pipe fixing device provided by the present application;

[0021] Figure 4 For Figure 3Schematic diagram of another perspective of the shown structure;

[0022] Figure 5 Specific installation schematic diagram of the first sleeve in a blast furnace water injection pipe fixing device provided by the present application

[0023] Figure 6 is Figure 5 Schematic diagram of another perspective of the shown structure.

[0024] Reference numerals in the drawings: 1 - second sleeve, 2 - fourth adjuster, 3 - third adjuster, 4 - rotating shaft, 5 - clamping assembly, 5a - pressing plate, 5b - screw rod, 5c - nut, 5dd - limiting area, 6 - frame, 6a - first rod, 6b - second rod, 6c - third rod, 6d - fourth rod, 7 - adjusting stroke shaft, 8 - second adjuster, 9 - first sleeve, 10 - first adjuster, 11a - first connecting sleeve, 11b - second connecting sleeve, 12 - pin, 13 - fifth adjustable fixing member, 14 - second adjustable fixing member, 15 - fourth adjustable fixing member, 16 - third adjustable fixing member, 17 - first adjustable fixing member, 18 - tuyere water jacket of blast furnace, 18a - outwardly convex and vertical structure, 19 - water injection pipe. Detailed implementation manners

[0025] Please refer to Figure 2 , the present application provides a blast furnace water injection pipe fixing device, including a frame 6, a first sleeve 9 and a second sleeve 1.

[0026] It should be pointed out in advance that Figure 2 is the top view of this device, Figure 2 the orientations of the first sleeve 9 and the second sleeve 1 in Figure 1 are not the respective orientations of the sleeves when this device is in the working state, Figure 1 while

[0027] shows the respective orientations of the sleeves when this device is in the working state. As shown in

[0028] Regarding the first sleeve 9, the first sleeve 9 is installed on the first rod 6a, and a number of first adjustable fixing members 17 are installed on the first sleeve 9. When the water injection pipe 19 passes through the first sleeve 9, the water injection pipe 19 is locked by the first adjustable fixing member 17.

[0029] Regarding the second sleeve 1, the second sleeve 1 is installed on the fourth rod 6d, and a number of second adjustable fixing members 14 are installed on the second sleeve 1. When the water injection pipe 19 passes through the second sleeve 1, the water injection pipe 19 is locked by the second adjustable fixing member 14.

[0030] During specific use, please refer to Figure 1 and Figure 2 , the frame 6 is located outside the hearth, firmly clamping the clamping assembly 5 on the tuyere water-cooled copper plate 18, thereby fixing the device to the tuyere water-cooled copper plate 18. The tuyere water-cooled copper plate 18 is located at the shaft position of the hearth. The device maintains a horizontal state or a substantially horizontal state during use. Figure 1 and Figure 2 The figure shows a top view of the device. After fixing the device to the tuyere water-cooled copper plate 18, the water injection pipe 19 is installed on the device. Specifically, the water injection pipe 19 extends into the hearth through the first sleeve 9 and the second sleeve 1. The first adjustable fixing member 17 cooperates with the first sleeve 9 to fix the tail of the water injection pipe 19, and the second adjustable fixing member 14 cooperates with the second sleeve 1 to fix the middle of the water injection pipe 19, so that the water injection pipe 19 passes through the tuyere water-cooled copper plate 18 and the head of the water injection pipe 19 extends from the tuyere water-cooled copper plate 18 into the hearth of the blast furnace. After the water injection pipe 19 is installed, the water supply stop valve is opened to inject water into the furnace. Water injection is carried out on the furnace burden in the furnace to cut the heap top, and the residual iron and coke in the hearth are cooled.

[0031] Adopting the solution of the present application, it is not necessary for the water injection personnel to hold the water injection pipe 19 for a long time at the tuyere area for water injection operation, which significantly reduces the labor intensity. Each person can simultaneously take care of the water injection operations of multiple water injection pipes 19 corresponding to multiple tuyere water-cooled copper plates in the blast furnace one by one, reducing the number of operating personnel and improving the operation efficiency. On the other hand, it also improves the safety hazards existing when holding the water injection pipe 19 and improves the operation safety.

[0032] In some embodiments, both the first adjustable fixing member 17 and the second adjustable fixing member 14 are setscrews, which have the advantages of convenient implementation, low cost, and easy maintenance. Other adjustable fixing members involved below can also adopt the implementation form of setscrews. It should be added that the adjustable fixing member can also adopt other implementation schemes, such as pipe clamps and pipe hoops.

[0033] In some embodiments, the U-shaped bracket is detachably connected to the fourth rod 6d. Specifically, please refer to Figure 2, the rod body of the fourth rod 6d is fixedly connected to the first connecting sleeve 11a and the second connecting sleeve 11b. The first connecting sleeve 11a and the second connecting sleeve 11b are both provided with pin holes. The first connecting sleeve 11a and the second rod 6b are detachably connected through a pin 12 cooperating with the pin hole, and the second connecting sleeve 11b and the third rod 6c are detachably connected through a pin 12 cooperating with the pin hole. By detachably connecting with the fourth rod 6d through a U-shaped bracket-like structure, on the one hand, the portability of the device is improved, and it can be disassembled and then transported. On the other hand, it has the technical effect of meeting the requirements of different large sleeve sizes and working radii, and various sizes of U-shaped bracket-like structures can be set to connect with the fourth rod 6d.

[0034] Regarding the clamping assembly 5, it is defined above that the clamping assembly 5 clamps the tuyere large sleeve 18. Please refer to Figure 1 , the clamping assembly 5 generally clamps on the convex and vertical structure 18a of the tuyere large sleeve 18. In some embodiments, please refer to Figure 2 , the clamping assembly 5 includes a pressing plate 5a, two screw rods 5b, and nuts 5c threadedly installed on each screw rod 5b. One end of each screw rod 5b is fixedly connected to the fourth rod 6d. The two screw rods 5b are arranged in parallel at intervals. The pressing plate 5a is provided with two through holes, and the two screw rods 5b respectively pass through the two through holes movably. The nuts 5c are arranged on the side of the pressing plate 5a away from the fourth rod 6d. Among them, a limiting area 5dd is formed by enclosing the fourth rod 6d, the two screw rods 5b, and the pressing plate 5a. Figure 1 shows the convex and vertical structure 18a of the tuyere large sleeve 18. When the device is specifically installed, the convex and vertical structure 18a is placed in the limiting space. Tighten the nut 5c on the screw rod 5b to drive the pressing plate 5a to move towards the fourth rod 6d until the convex and vertical structure 18a is tightly pressed between the fourth rod 6d and the pressing plate 5a.

[0035] In some embodiments, the blast furnace water injection pipe fixing device further includes a first regulator 10. Please refer to Figure 1 , Figure 2 , Figure 5 and Figure 6 , the first regulator 10 is sleeved on the first rod 6a movably. The first regulator 10 can rotate around the first rod 6a, and the first regulator 10 can also move along the length direction of the first rod 6a. Install the first sleeve 9 on the first regulator 10. Drive the first sleeve 9 to move along the length direction of the first rod 6a through the first regulator 10, so as to adjust the spatial position of the first sleeve 9; drive the first sleeve 9 to flip through the first regulator 10, so as to adjust the spatial position and orientation of the first sleeve 9. Overall, the spatial position of the tail of the water injection pipe 19 and the layout angle presented by the tail are adjusted.

[0036] It should be noted that in the case where the water injection pipe 19 is installed, the first sleeve 9 and the second sleeve 1 may be non-coaxial. The outer diameter of the water injection pipe 19 is smaller than the inner diameters of the first sleeve 9 and the second sleeve 1. By adjusting the first adjustable fixing member 17 and the second adjustable fixing member 14, the water injection pipe 19 is fixed in the first sleeve 9 and the second sleeve 1 respectively.

[0037] A number of third adjustable fixing members 16 are installed on the first regulator 10. The third adjustable fixing members 16 are used to lock or separate from the first rod 6a. When the third adjustable fixing members 16 are adjusted to be separated from the first rod 6a, the first regulator 10 can be adjusted actively. When the third adjustable fixing members 16 are adjusted to be locked with the first rod 6a, it is ensured that the tail of the water injection pipe 19 does not shake and is in a stable preset state.

[0038] In some embodiments, please refer to Figure 1 、 Figure 2 、 Figure 5 and Figure 6 where Figure 5 and Figure 6 do not show the adjustment stroke shaft 7. The blast furnace water injection pipe fixing device further includes an adjustment stroke shaft 7 and a second regulator 8. One end of the length of the adjustment stroke shaft 7 is fixedly connected to the first regulator 10. The adjustment stroke shaft 7 faces the fourth rod 6d. The length of the adjustment stroke shaft 7 is greater than the length of the second regulator 8. The second regulator 8 is movably sleeved outside the adjustment stroke shaft 7 so that the second regulator 8 can rotate around the adjustment stroke shaft 7 and can move along the length direction of the adjustment stroke shaft 7. Among them, the first sleeve 9 is fixedly connected to the second regulator 8. For example, the first sleeve 9 is welded to the second regulator 8. By adjusting the position of the second regulator 8 within the length range of the adjustment stroke shaft 7, the purpose of adjusting the distance between the first sleeve 9 and the fourth rod 6d is achieved; by adjusting the rotation of the second regulator 8 around the adjustment stroke shaft 7, the spatial orientation of the first sleeve 9 can be further adjusted.

[0039] A number of fourth adjustable fixing members 15 are installed on the second regulator 8. The fourth adjustable fixing members 15 are used to lock or separate from the adjustment stroke shaft 7. When the fourth adjustable fixing members 15 are adjusted to be separated from the adjustment stroke shaft 7, the second regulator 8 can be adjusted actively. When the fourth adjustable fixing members 15 are adjusted to be locked with the adjustment stroke shaft 7, it is ensured that the tail of the water injection pipe 19 does not shake and is in a stable preset state.

[0040] In some embodiments, please refer to Figures 1 to 4, the blast furnace water injection pipe fixing device further includes a third adjuster 3. The third adjuster 3 is movably sleeved outside the fourth rod 6d, so that the third adjuster 3 can rotate around the fourth rod 6d, and the third adjuster 3 can also move along the length direction of the fourth rod 6d. The second sleeve 1 is installed on the third adjuster 3. By rotating the third adjuster 3 around the fourth rod 6d, the spatial orientation of the second sleeve 1 can be adjusted; by moving the third adjuster 3 along the length direction of the fourth rod 6d, the spatial position of the second sleeve 1 can be adjusted. Overall, the spatial position of the middle part of the water injection pipe 19 and the arrangement angle presented by it are adjusted.

[0041] A fifth adjustable fixing member 13 is installed on the third adjuster 3. The fifth adjustable fixing member 13 is used to lock or separate from the fourth rod 6d. When the fifth adjustable fixing member 13 is adjusted to be separated from the fourth rod 6d, the third adjuster 3 can be adjusted movably. When the fifth adjustable fixing member 13 is adjusted to be locked with the fourth rod 6d, it is ensured that the middle part of the water injection pipe 19 does not shake and is in a stable preset state.

[0042] In some embodiments, please refer to Figures 1 to 4 , the blast furnace water injection pipe fixing device further includes a fourth adjuster 2 and a rotating shaft 4. One end of the length of the rotating shaft 4 is fixedly connected to the third adjuster 3, and the fourth adjuster 2 is rotatably sleeved outside the rotating shaft 4. The second sleeve 1 is fixedly connected to the fourth adjuster 2. For example, the second sleeve 1 is welded to the fourth adjuster 2. By adding the fourth adjuster 2 and the rotating shaft 4, when the fourth adjuster 2 rotates around the rotating shaft 4, the spatial position of the middle part of the water injection pipe 19 and the arrangement angle presented by it can be slightly adjusted.

[0043] As above, through the cooperation of each adjuster, the adjusting stroke shaft 7, and the rotating shaft 4, the angle and direction of the water injection pipe 19 can be adjusted arbitrarily, and it can be adjusted forward, backward, up, down, left, and right. The length of the water injection pipe 19 extending into the furnace can also be adjusted arbitrarily, so as to perform water injection and heap tip cutting operations on different positions of the burden in the furnace, and perform operations to cool the residual iron and coke in the hearth, improving the practicability and applicability of the device.

[0044] To further facilitate the arbitrary adjustment of the angle and direction of the water injection pipe 19 of the device, in some embodiments, please refer to Figure 2 , Figure 5 and Figure 6 , the first rod 6a is a straight rod, the first adjuster 10 is a straight cylinder, the axis direction of the first adjuster 10 is the same as the length direction of the first rod 6a, and the axis directions of the first adjuster 10, the adjusting stroke shaft 7, and the first sleeve 9 are perpendicular to each other in pairs. In some embodiments, please refer to Figure 2 , Figure 3 and Figure 4, the fourth rod 6d is a straight rod, the third adjuster 3 is a straight cylinder, the axial direction of the third adjuster 3 is the same as the length direction of the fourth rod 6d, and the axial directions of the third adjuster 3, the rotating shaft 4, and the second sleeve 1 are perpendicular to each other in pairs.

[0045] In this device, seamless welded sleeves are used for all sleeves, and the frame 6 is in the form of a steel metal frame, which improves the durability of the device, ensures stable operation, and is convenient for adjustment.

[0046] Although the preferred embodiments of the present invention have been described, those skilled in the art can make additional changes and modifications to these embodiments once they know the basic creative concept. Therefore, the appended claims are intended to be construed as including the preferred embodiments and all changes and modifications falling within the scope of the present invention.

[0047] Obviously, those skilled in the art can make various changes and modifications to the present invention without departing from the spirit and scope of the present invention. Thus, if these modifications and variations of the present invention fall within the scope of the claims of the present invention and their equivalent technologies, the present invention is also intended to include these modifications and variations.

Claims

1. A blast furnace water pipe fixing device, characterized in that: include: The frame comprises a first rod, a second rod, a third rod, a fourth rod and at least two clamping assemblies, wherein two ends of the first rod are respectively connected to one end of the second rod and one end of the third rod, the other end of the second rod and the other end of the third rod are both connected to the rod body of the fourth rod, and the two clamping assemblies are both connected to the fourth rod, and the clamping assemblies are used to clamp the tuyere sleeve of the blast furnace; A first sleeve is mounted on the first rod, and a plurality of first adjustable fixing members are mounted on the first sleeve, wherein the first adjustable fixing members are used to lock the pumping pipe when the pumping pipe is inserted into the first sleeve; a second sleeve, mounted on the fourth rod, and a plurality of second adjustable fixing members are mounted on the second sleeve, the second adjustable fixing members being used to lock the pumping pipe when the pumping pipe is passed through the second sleeve; The first sleeve and the second sleeve are respectively used to be sleeved on the tail and middle of the water pumping pipe, so that the head of the water pumping pipe extends from the tuyere sleeve into the furnace of the blast furnace.

2. The blast furnace water pipe fixing device according to claim 1, characterized in that: The blast furnace water pipe fixing device also includes a first regulator, which is movably sleeved outside the first rod so that the first regulator can rotate around the first rod and move along the length direction of the first rod, and a plurality of third adjustable fixings are installed on the first regulator, and the third adjustable fixings are used to lock or separate from the first rod; The first sleeve is mounted on the first regulator.

3. The blast furnace water pipe fixing device according to claim 2, characterized in that: The blast furnace water pipe fixing device also includes an adjustment stroke shaft and a second adjuster, one end of the length of the adjustment stroke shaft is fixedly connected to the first adjuster, the adjustment stroke shaft faces the fourth rod, the length of the adjustment stroke shaft is greater than the length of the second adjuster, the second adjuster is movably sleeved outside the adjustment stroke shaft, so that the second adjuster can rotate around the adjustment stroke shaft and can move along the length direction of the adjustment stroke shaft, and a plurality of fourth adjustable fixings are installed on the second adjuster, and the fourth adjustable fixings are used to lock or separate from the adjustment stroke shaft; The first sleeve is fixedly connected to the second regulator.

4. The blast furnace water pipe fixing device according to claim 3, characterized in that: The first rod is a straight rod, the first adjuster is a straight tube, the axial direction of the first adjuster is the same as the length direction of the first rod, and the axial direction of the first adjuster, the axial direction of the adjustment stroke shaft and the axial direction of the first sleeve are perpendicular to each other.

5. The blast furnace water pipe fixing device according to any one of claims 1 to 4, characterized in that: The blast furnace water pipe fixing device also includes a third adjuster, which is movably sleeved outside the fourth rod so that the third adjuster can rotate around the fourth rod and move along the length direction of the fourth rod. A fifth adjustable fixing member is installed on the third adjuster, and the fifth adjustable fixing member is used to lock or separate from the fourth rod; The second sleeve is mounted on the third regulator.

6. The blast furnace water pipe fixing device according to claim 5, characterized in that: The blast furnace water pipe fixing device also includes a fourth regulator and a rotating shaft, one end of the rotating shaft is fixedly connected to the third regulator, and the fourth regulator is rotatably sleeved outside the rotating shaft; The second sleeve is fixedly connected to the fourth adjuster.

7. The blast furnace water pipe fixing device according to claim 6, characterized in that: The fourth rod is a straight rod, the third adjuster is a straight tube, the axial direction of the third adjuster is the same as the length direction of the fourth rod, and the axial directions of the third adjuster, the rotating shaft and the second sleeve are perpendicular to each other.

8. The blast furnace water pipe fixing device according to claim 1, characterized in that: The shaft of the fourth rod is fixedly connected to the first connecting sleeve and the second connecting sleeve. The first connecting sleeve and the second connecting sleeve both have pin holes. The first connecting sleeve and the second rod are detachably connected by pins that cooperate with the pin holes. The second connecting sleeve and the third rod are detachably connected by pins that cooperate with the pin holes.

9. The blast furnace water pipe fixing device according to claim 1, characterized in that: The clamping assembly includes a pressing plate, two screw rods and a nut threadedly mounted on each of the screw rods, one end of each of the screw rods is fixedly connected to the fourth rod, the two screw rods are arranged in parallel and spaced apart, the pressing plate is provided with two through holes, the two screw rods are movably inserted into the two through holes respectively, and the nut is arranged on a side of the pressing plate away from the fourth rod; A limiting area is formed between the fourth rod, the two screw rods and the pressure plate, and the limiting area is used for the protruding and vertical structure of the large air outlet sleeve to pass through. When the nut is tightened, the protruding and vertical structure is pressed tightly between the fourth rod and the pressure plate.

10. The blast furnace water pipe fixing device according to claim 1, characterized in that: The first adjustable fixing member and the second adjustable fixing member are both top screws.