Combined type anti-toppling structure of tree planting bag

Through the combined anti-tilt structure of tree planting bags, the reinforcement frame connected to the adjustment components is used to solve the problem of time-consuming and low efficiency in fixing of existing tree planting bags, and achieve rapid and simple fixing and removal, improving work efficiency and reducing the cumbersomeness of post-processing.

CN223008056UActive Publication Date: 2025-06-24JINMANTUN FOREST FARM IN LUOBEI COUNTY
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202422238890.1
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-09-12
Publication Date
2025-06-24
Estimated Expiration
2034-09-12

AI Technical Summary

Technical Problem

The existing tree bag fixing method is time-consuming, inefficient and may damage the seedlings. The residue after removal affects reuse, and the later processing is cumbersome and difficult to remove.

Method used

The combination tree planting bag anti-tilt structure is adopted, including the first reinforcement frame and the second reinforcement frame being connected by adjustment components to form an anti-tilt structure. The combination of threaded rods, adjustment nuts, hanging rings and spring buckles is used to achieve rapid installation and removal, and can be adjusted to adapt to different tree trunk sizes.

Benefits of technology

Fast and simple fixing and dismantling of tree planting bags is achieved, which avoids damage to the saplings, improves work efficiency, and can reuse the reinforcement frame, reducing the cumbersomeness of post-processing.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN223008056U_ABST
    Figure CN223008056U_ABST
Patent Text Reader

Abstract

The utility model relates to an anti-toppling structure of a combined tree planting bag. At present, when anti-toppling supporting is carried out on tree planting bags, tools such as ribbons, ropes and adhesive tapes are generally used for fixing, in the process, for a large number of tree planting bags, time is consumed, the working efficiency is low, and meanwhile the tree planting bags and tree seedlings can be damaged. A combined type tree planting bag anti-toppling structure comprises a first reinforcing frame and a second reinforcing frame, the first reinforcing frame and the second reinforcing frame are arranged on the two sides of a tree trunk, the first reinforcing frame and the second reinforcing frame are connected through an adjusting assembly to form the anti-toppling structure, and an upper layer anti-toppling structure is vertically installed above the anti-toppling structure; the first reinforcing frame and the second reinforcing frame are the same in structure, the first reinforcing frame and the second reinforcing frame are of a parallel structure, and the first reinforcing frame and the second reinforcing frame are detachably connected through an adjusting assembly. The protection device is applied to the field of tree planting bag protection.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model is applied to the field of tree planting, and particularly relates to an anti-tipping structure of a combined tree planting bag. Background Technique

[0002] Tree planting bags are mainly used to reinforce saplings during the cultivation process. Most saplings are cultivated in outdoor environments, especially in areas with strong winds. The reinforced tree planting bags can better resist the wind, prevent the saplings from being blown down, maintain the integrity of the root system, and the reinforcement can make the tree planting bags better maintain their shapes, provide a stable growth space for the root systems of saplings, and improve the survival rate of saplings after transplantation.

[0003] When carrying out anti-tipping support for tree planting bags, tools such as cable ties, ropes, and tapes are generally used for fixation. Not only is the installation time-consuming, but it usually takes a certain amount of time and skills to fix the tree planting bags. For example, when using a cable tie for fixation, the cable tie needs to be passed through the tree planting bag and tightened. This process will be time-consuming for a large number of tree planting bags, with low work efficiency, and at the same time, it will cause damage to the tree planting bags and saplings. If the cable tie or rope is tied too tightly or the operation is improper, the tool may scratch the stem or root system of the sapling and damage the sapling; when using iron wire for fixation, the sharp part of the iron wire may pierce the tree planting bag and then harm the sapling; after using fixation tools such as tapes and removing them, residual glue marks may be left on the tree planting bag, affecting the reuse of the tree planting bag. Moreover, these fixation methods are cumbersome in later processing and difficult to remove. When it is necessary to replace the tree planting bag or transplant the sapling, it will be more troublesome to remove the fixation tools. Content of the Utility Model

[0004] The purpose of the utility model is to provide an anti-tipping structure of a combined tree planting bag.

[0005] The above purpose is achieved through the following technical solutions:

[0006] An anti-tipping structure of a combined tree planting bag, including a first reinforcement frame and a second reinforcement frame. The first reinforcement frame and the second reinforcement frame are arranged on both sides of the tree trunk, and the first reinforcement frame and the second reinforcement frame are connected by an adjustment component to form an anti-tipping structure. An upper anti-tipping structure is vertically installed above the anti-tipping structure;

[0007] The first reinforcement frame and the second reinforcement frame have the same structure, and the first reinforcement frame and the second reinforcement frame are in a parallel structure. The first reinforcement frame and the second reinforcement frame are detachably connected by an adjustment component.

[0008] For the anti-tipping structure of the combined tree planting bag, the adjustment component includes a threaded rod, an adjustment nut, a hanging ring, and a spring buckle;

[0009] The end of the threaded rod is fixedly connected to the hanging ring, the adjusting nut is screwed onto the threaded rod, and two hanging rings on the same vertical plane are connected by a spring buckle.

[0010] For the combined tree-planting bag anti-tipping structure, a set of adjusting jacks are equidistantly arranged on the sides of the first reinforcing frame and the second reinforcing frame, and the threaded rod passes through the adjusting jacks.

[0011] For the combined tree-planting bag anti-tipping structure, the ends of the first reinforcing frame and the second reinforcing frame are hemmed structures, and docking jacks are provided on the hemmed structures. When two adjacent hems are aligned, the adjacent two fixing frames are connected by a spring buckle.

[0012] For the combined tree-planting bag anti-tipping structure, the diameter of the hanging ring is smaller than the diameter of the adjusting jack on the reinforcing frame, so that the hanging ring can pass through the adjusting jack on the reinforcing frame.

[0013] For the combined tree-planting bag anti-tipping structure, the first reinforcing frame and the second reinforcing frame are arranged above the tree-planting bag.

[0014] The beneficial effects achieved by the present utility model are:

[0015] 1. The structure of the present utility model is simple and easy to operate. No other installation tools are required during the entire installation process. At the same time, the reinforcing frame can be quickly installed and removed, and the removed reinforcing frame can be reused.

[0016] 2. The diameter of the threaded rod of the present utility model is smaller than the diameter of the adjusting jack. The hanging ring is fixed to the bottom of the threaded rod by welding. The adjusting nut can rotate on the threaded rod. By rotating the adjusting nut, the length of the threaded rod inserted into the adjusting jack can be adjusted. By setting the adjusting component, the distance between the adjacent first reinforcing frame and the second reinforcing frame can be adjusted, so as to support tree trunks of different sizes.

[0017] 2. The present utility model is provided with hemmed structures at both ends of the reinforcing frame. When increasing the length of the fixing frame, the bent structures on two adjacent fixing frames are fitted together, so that the jacks on the two bent structures are aligned, and the two bent structures are connected by a spring buckle, so that the installation of the two fixing frames can be quickly completed and the length of the fixing frame can be increased.

[0018] 3. The utility model is provided with a first reinforcing frame and a second reinforcing frame, which are arranged in a parallel structure above the tree-planting bag. The top end face of the tree-planting bag supports the bottoms of the first reinforcing frame and the second fixing frame. The hanging rings and threaded rods on the adjusting component are respectively inserted into the adjusting jacks on the reinforcing frame, and the two hanging rings are connected by spring buckles, so as to connect the first reinforcing frame and the second reinforcing frame, and complete the construction of the bottom reinforcing frame. Similarly, the upper reinforcing frame is erected above the lower reinforcing frame. After the erection is completed, the lower fixing frame and the upper fixing frame are in a vertical structure, and the upper reinforcing frame and the lower reinforcing frame form a cross-shaped structure at the tree trunk, surrounding the tree trunk to play a role in limiting the position of the tree trunk. Through the folded edge structure at both ends of the reinforcing frame, the length of the reinforcing frame is extended, so that a group of reinforcing frames form a grid-like structure in a top view. The inserting rods are inserted at the four corners and into the ground to ensure the overall stability, thereby forming a whole for a group of tree-planting bags and preventing the saplings from toppling, increasing the survival rate of the saplings. Description of the Drawings

[0019] The drawings are used to provide a further understanding of the present utility model, and constitute a part of the specification. They are used together with the embodiments of the present utility model to explain the present utility model, and do not constitute a limitation to the present utility model. In the drawings:

[0020] Att Figure 1 is the structural schematic diagram of the present utility model;

[0021] Att Figure 2 is the structural schematic diagram of the adjusting component;

[0022] Att Figure 3 is the structural schematic diagram of the threaded rod and the adjusting nut;

[0023] Att Figure 4 is the structural schematic diagram of the second reinforcing frame;

[0024] Att Figure 5 is the structural schematic diagram of the use of the present utility model;

[0025] In the figures: 1, first reinforcing frame; 2, second reinforcing frame; 3, threaded rod; 4, adjusting nut; 5, hanging ring; 6, spring buckle; 7, adjusting jack; 8, folded edge structure; 9, tree-planting bag; 10, inserting rod; 11, tree trunk. Detailed Embodiment

[0026] The following describes the preferred embodiments of the present utility model with reference to the drawings. It should be understood that the preferred embodiments described herein are only used to illustrate and explain the present utility model, and are not used to limit the present utility model.

[0027] Embodiment 1:

[0028] A combined tree-planting bag anti-tipping structure, including a first reinforcement frame 1 and a second reinforcement frame 2. The first reinforcement frame and the second reinforcement frame are arranged on both sides of the tree trunk, and the first reinforcement frame and the second reinforcement frame are connected by an adjustment component to form an anti-tipping structure. An upper anti-tipping structure is vertically installed above the anti-tipping structure.

[0029] The first reinforcement frame and the second reinforcement frame have the same structure, and the first reinforcement frame and the second reinforcement frame are in a parallel structure. The first reinforcement frame and the second reinforcement frame are detachably connected by an adjustment component.

[0030] The first reinforcement frame and the second reinforcement frame have the same structure, and the cross-section of the first reinforcement frame and the second reinforcement frame is a rectangular structure; the first reinforcement frame and the second reinforcement frame are made of plastic or aluminum alloy.

[0031] The first reinforcement frame and the second reinforcement frame are integrally in a U-shaped structure, and the first reinforcement frame and the second reinforcement frame are arranged above the tree-planting bag, and the bottom of the first reinforcement frame and the second reinforcement frame is supported by the top end of the tree-planting bag.

[0032] Example 2:

[0033] For the combined tree-planting bag anti-tipping structure according to Example 1, the adjustment component includes a threaded rod 3, an adjustment nut 4, a hanging ring 5 and a spring buckle 6;

[0034] The end of the threaded rod is fixedly connected to the hanging ring, the adjustment nut is screwed onto the threaded rod, and two hanging rings on the same vertical plane are connected by a spring buckle.

[0035] The diameter of the threaded rod is smaller than the diameter of the adjustment jack. The hanging ring is fixed to the bottom of the threaded rod by welding. The adjustment nut can rotate on the threaded rod. By rotating the adjustment nut, the length of the threaded rod inserted into the adjustment jack can be adjusted. By setting the adjustment component, the distance between adjacent first reinforcement frames and second reinforcement frames can be adjusted, so as to support tree trunks of different sizes.

[0036] Example 3:

[0037] For the combined tree-planting bag anti-tipping structure according to Example 1 or 2, a set of adjustment jacks 7 are equidistantly arranged on the sides of the first reinforcement frame and the second reinforcement frame, and the threaded rod passes through the adjustment jacks.

[0038] The diameters of a set of adjustment jacks on the first reinforcement frame and the second reinforcement frame are the same. By opening adjustment jacks on the first reinforcement frame and the second reinforcement frame, the overall weight of the reinforcement frame can be reduced. At the same time, by opening a set of adjustment jacks, the adjustment component can be installed arbitrarily.

[0039] Example 4:

[0040] For the combined tree-planting bag anti-tipping structure according to Embodiment 1 or 2 or 3, the ends of the first reinforcement frame and the second reinforcement frame are hem structures 8, and docking jacks are provided on the hem structures. When two adjacent hems are aligned, the adjacent two fixing frames are connected by a spring buckle.

[0041] The hem structure and the two ends of the reinforcement frame are an integral structure. The two ends of the fixing frame are bent at 90 degrees. When the length of the fixing frame is increased, the bent structures on the adjacent two fixing frames are fitted, so that the jacks on the two bent structures are aligned, and the two bent structures are connected by a spring buckle, so that the installation of the two fixing frames can be quickly completed and the length of the fixing frame can be increased.

[0042] Example 5:

[0043] For the combined tree-planting bag anti-tipping structure according to Embodiment 1 or 2 or 3 or 4, the diameter of the hanging ring is smaller than the diameter of the adjustment jack on the reinforcement frame, so that the hanging ring can pass through the adjustment jack on the reinforcement frame.

[0044] When the adjustment component is inserted into the installation hole, first insert the hanging ring on the threaded rod into the adjustment hole, and then connect the hanging rings on the two threaded rods by a spring buckle, so as to connect the first reinforcement frame and the second reinforcement frame.

[0045] Example 6:

[0046] For the combined tree-planting bag anti-tipping structure according to Embodiment 1 or 2 or 3 or 4 or 5, the first reinforcement frame and the second reinforcement frame are arranged above the tree-planting bag 9.

[0047] When in use, the first reinforcing frame and the second reinforcing frame are arranged in a parallel structure above the tree planting bag. The top end face of the tree planting bag supports the bottoms of the first reinforcing frame and the second fixing frame. The hanging rings and threaded rods on the adjusting component are respectively inserted into the adjusting jacks on the reinforcing frame, and the two hanging rings are connected through spring buckles, so as to connect the first reinforcing frame and the second reinforcing frame and complete the construction of the bottom reinforcing frame. Similarly, the upper reinforcing frame is erected above the lower reinforcing frame. After the erection is completed, the lower fixing frame and the upper fixing frame are in a vertical structure. The upper reinforcing frame and the lower reinforcing frame form a cross-shaped structure at the tree trunk, and the tree trunk is surrounded by the upper reinforcing frame and the lower reinforcing frame, playing a role in limiting the tree trunk. Through the flanging structure at both ends of the reinforcing frame, the length of the reinforcing frame is extended, so that a group of reinforcing frames form a grid-like structure when viewed from above. The inserting rods are inserted at the four corners and into the ground to ensure the overall stability, thereby forming a whole for a group of tree planting bags, preventing the saplings from toppling and increasing the survival rate of the saplings.

Claims

1. A combined tree planting bag anti-dumping structure, characterized in that: It comprises a first reinforcement frame and a second reinforcement frame, wherein the first reinforcement frame and the second reinforcement frame are arranged on both sides of the tree trunk, and the first reinforcement frame and the second reinforcement frame are connected by an adjustment component to form an anti-dumping structure, and an upper anti-dumping structure is vertically installed above the anti-dumping structure; The first reinforcement frame and the second reinforcement frame have the same structure, and are in parallel structure with each other. The first reinforcement frame and the second reinforcement frame are detachably connected through an adjustment component.

2. The combined tree planting bag anti-dumping structure according to claim 1 is characterized in that: The adjustment assembly includes a threaded rod, an adjustment nut, a hanging ring and a spring buckle; The end of the threaded rod is fixedly connected to the hanging ring, the adjusting nut is screwed onto the threaded rod, and the two hanging rings on the same vertical plane are connected via a spring buckle.

3. The combined tree planting bag anti-dumping structure according to claim 1 is characterized in that: A group of adjustment holes are equidistantly provided on the sides of the first reinforcement frame and the second reinforcement frame, and the threaded rods pass through the adjustment holes.

4. The combined tree planting bag anti-dumping structure according to claim 3 is characterized in that: The ends of the first reinforcement frame and the second reinforcement frame are folded edge structures, and a docking socket is provided on the folded edge structures. When two adjacent folded edges are matched, the two adjacent fixing frames are connected by a spring buckle.

5. The combined tree planting bag anti-dumping structure according to claim 2 is characterized in that: The diameter of the hanging ring is smaller than the diameter of the adjusting socket on the reinforcement frame, so that the hanging ring can pass through the adjusting socket on the reinforcement frame.

6. The combined tree planting bag anti-dumping structure according to claim 2, 3 or 4, characterized in that: The first reinforcement frame and the second reinforcement frame are arranged above the tree planting bag.