Shot blasting frame of casting shot blasting machine
By designing the interlaced hanging rod assembly and movable hook structure, the problems of insufficient number of hooks and inflexible adjustments of existing flywheel shot blasting frames are solved, and efficient and flexible flywheel shot blasting treatment is achieved.
Patent Information
- Application Number
- CN202422089133.2
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-27
- Publication Date
- 2025-07-01
- Estimated Expiration
- 2034-08-27
AI Technical Summary
The number of hooks of existing flywheel shot blasting racks is limited and cannot be flexibly adjusted, resulting in limited number of flywheels, low working efficiency, and not meeting the suspension needs of workpieces of different sizes.
A shot blasting frame including columns, hooks, multi-layer hanging rings and universal pulleys is designed. The columns are equipped with fixed round tables and interlaced hanging rod components. The hooks are movably arranged in the hook installation rings to increase the number of hooks, and flexibly adjust and move through clamping devices and universal pulleys.
It improves the efficiency of flywheel shot blasting, increases the number of suspendable parts, adapts to the suspension needs of workpieces of different sizes, and enhances operating flexibility and stability.
Smart Images

Figure CN223044360U_ABST
Abstract
Description
Technical Field
[0001] The utility model belongs to the technical field of flywheel production, and particularly relates to a shot blasting frame of a casting shot blasting machine. Background Art
[0002] A flywheel is a commonly used component in automobiles and engines, which is a metal disc with teeth on the edge fixed at one end of the crankshaft. Currently, during flywheel production, shot blasting treatment is required for the flywheel. Shot blasting treatment is a surface strengthening process for castings, that is, using pellets (sand) to bombard the surface of the casting and implant residual compressive stress, improving the fatigue strength of the casting, improving the surface roughness of the part, and enhancing the physical properties. During the shot blasting treatment process, a shot blasting frame is an essential tool. However, the existing flywheel shot blasting frames still have the following problems:
[0003] First, the shot blasting frame is provided with hooks at certain intervals according to the height of the flywheel workpiece. Due to the height limitation of the shot blasting machine, the number of hooks provided on the shot blasting frame is limited, and the number of flywheels that can be placed at one time is limited. The number of flywheels treated by shot blasting each time is small, resulting in low work efficiency.
[0004] Second, the hanging frame of the shot blasting frame is generally fixedly arranged, and the height of the hanging parts is fixed. When hanging parts of different heights, flexible adjustment cannot be performed.
[0005] Third, when hanging workpieces of different sizes, since the distance between two hooks is fixed and the hooks are fixed by welding, it is not convenient to hang wider workpieces, thus reducing the practicality of the hanging frame. Summary of the Invention
[0006] The purpose of the utility model is to provide a shot blasting frame for a casting shot blasting machine, which has a simple structure, increases the number of shot blasted workpieces, and expands the scope of application, aiming at the deficiencies of the existing technology.
[0007] The purpose of the utility model is achieved by adopting the following technical solutions:
[0008] A shot blasting frame for a casting shot blasting machine includes a shot blasting frame body. The shot blasting frame body includes a column, several hooks, and multiple layers of hanging rings. A base is provided at the lower end of the column, and a lifting ring is provided at the upper end of the column. Fixed round platforms are arranged on the column at certain intervals, and hanging rod assemblies are provided on each fixed round platform. Each hanging rod assembly is provided with at least two hanging rods. One end of each hanging rod is horizontally connected to the fixed round platform, and the hanging rods of adjacent two hanging rod assemblies are staggered; one hanging ring is arranged between every two adjacent hanging rod assemblies, and the hanging ring is fixedly connected to the other end of the hanging rod. Hook mounting rings are provided on both the hanging ring and the hanging rod, and the hooks are movably arranged in the hook mounting rings.
[0009] Further, it further includes universal wheels, and the universal wheels are provided on the lower end surface of the base.
[0010] Further, the base adopts a disc structure, and a plurality of counterweight ribs are provided on the disc.
[0011] Further, the hook is in an S-shaped structure.
[0012] Further, the hanging rod assembly is provided with six hanging rods.
[0013] Further, the two adjacent hanging rod assemblies are respectively a second hanging rod assembly and a first hanging rod assembly for connecting the hanging ring. The first hanging rod assembly for connecting the hanging ring is horizontally fixed on the fixing table of the column, and the hanging rods of the second hanging rod assembly are movably arranged on the fixing table of the column through a clamping device.
[0014] Further, the clamping device adopts a fastening bolt. A bolt hole and a hanging rod mounting groove are provided on the fixing round table for mounting the second hanging rod assembly. The hanging rod of the second hanging rod assembly is provided with a flat head for connecting with the fixing round table, and the fastening bolt is used to press against the flat head of the hanging rod.
[0015] Adopting the above technical solutions has the following beneficial effects:
[0016] The structure of the utility model is simple and is composed of a column, a hanging ring and multiple layers of hanging rings. The column is provided with fixing round tables at intervals. Hanging rod assemblies are provided on the fixing round tables. Each hanging rod assembly is composed of a plurality of hanging rods, and the hanging rods of two adjacent hanging rod assemblies are arranged in a staggered manner. A hanging ring is arranged between two adjacent hanging rod assemblies. Hook mounting rings are provided on both the hanging ring and the hanging rod, increasing the hooks for the components to be processed. The staggered hanging rods are used to place the parts to be shot peened so that the parts to be shot peened do not block each other, ensuring that the parts can be evenly shot peened, improving the shot peening effect of the shot peening machine on the parts, increasing the number of shot peening, and improving the working efficiency. The hook is movably arranged in the hook mounting ring, which is convenient for taking and placing the hook according to the size of the casting to be processed and flexibly adjusting the position of the hook.
[0017] The universal wheels are added. In addition to hoisting and moving, it is convenient for the shot peening rack to move on the ground, increasing the flexibility of operation.
[0018] The two adjacent hanging rod assemblies are respectively a second hanging rod assembly and a first hanging rod assembly for connecting the hanging ring. The first hanging rod assembly for connecting the hanging ring is horizontally fixed on the fixing table of the column, and the hanging rods of the second hanging rod assembly are movably arranged on the fixing table of the column through a clamping device. For parts to be shot peened with different heights, the hanging rod assemblies on the vertical rods can be disassembled, expanding the scope of use.
[0019] The following further explains in conjunction with the accompanying drawings and specific embodiments. Description of the Drawings
[0020] Figure 1 It is a schematic structural diagram of Specific Embodiment 1;
[0021] Figure 2 It is a front view of Specific Embodiment 1;
[0022] Figure 3 It is a top view of Specific Embodiment 1;
[0023] Figure 4 It is a schematic structural diagram of the hanging rod assembly movably arranged on the fixed circular platform in Specific Embodiment 2;
[0024] Figure 5 For Figure 4 A sectional view of the hanging rod and the fixed circular platform in
[0025] In the drawings, 1 is a column, 1-1 is a fixed circular platform, 2 is a hook, 3 is a hanging rod assembly, 3-1 is a flat head, 4 is a hanging ring, 5 is a base, 6 is a lifting ring, 7 is a hook mounting ring, and 8 is a fastening bolt. Specific Embodiments Specific Embodiment 1:
[0027] Refer to Figures 1 to 3 As shown, a shot blasting frame of a casting shot blasting machine includes a shot blasting frame body. The shot blasting frame body includes a column 1, several hooks 2, multiple hanging rings 4, and multiple layers of hanging rod assemblies 3. A base 5 is provided at the lower end of the column 1. The base 5 adopts a disc structure. Multiple weight ribs are provided on the disc, and the disc is greater than or equal to the hanging ring, making the shot blasting frame more stable when placed on the ground by the disc plus weight ribs. A lifting ring 6 is provided at the upper end of the column 1. The column 1, hanging ring 4, hanging rod assembly 3, base 5, and lifting ring 6 are all made of steel bars.
[0028] The column 1 is provided with fixed frustums 1-1 at intervals, and hanging rod assemblies are provided on each of the fixed frustums. Each of the hanging rod assemblies 3 is provided with at least two hanging rods. In this specific embodiment: the hanging rod assembly 3 is provided with six hanging rods, which ensures the connection stability strength of the hanging rings and can also increase the number of hooks through the hanging rods. One end of each hanging rod is horizontally connected to the fixed frustum 1-1 of the column 1. The hanging rod is welded and fixed to the lower end surface of the fixed frustum, and the hanging rods of adjacent two hanging rod assemblies 3 are arranged staggeredly. One hanging ring 4 is provided between every two adjacent hanging rod assemblies 3. The hanging ring 4 is welded and fixed to the other end of the hanging rod. Hook mounting rings 7 are provided on both the hanging ring 4 and the hanging rod. The hook mounting rings 7 on the hanging ring 4 are evenly distributed along the circumference of the hanging ring, and the hook mounting rings 7 on the hanging rod are distributed along the axial direction of the hanging rod. In this specific embodiment: the hook mounting ring 7 is a nut, and the nut is welded to the hanging ring and the hanging rod. Three hook mounting rings 7 are evenly distributed on the hanging rod. Each of the hooks 2 is movably arranged in the hook mounting ring 7. The hook 2 is used for hooking the parts to be shot peened. The hook 2 is in an S-shaped structure, which is convenient for taking and placing.
[0029] Possibly, it further includes universal pulleys. The universal pulleys are arranged on the lower end surface of the base. Through the universal pulleys, it is convenient for the shot peening rack to move when moving on the ground. Specific Embodiment 2
[0031] See Figure 4 and Figure 5 As shown, the features of this specific embodiment are: the two adjacent hanging rod assemblies are respectively a second hanging rod assembly and a first hanging rod assembly for connecting the hanging ring. Among them, the first hanging rod assembly for connecting the hanging ring is horizontally fixed on the fixed platform of the column, and the hanging rods of the second hanging rod assembly are movably arranged on the fixed platform of the column through a clamping device. The clamping device uses a fastening bolt 8. Bolt holes and hanging rod mounting grooves are provided on the fixed frustum 1-1 for installing the second hanging rod assembly. The hanging rod of the second hanging rod assembly is provided with a flat head 3-1 for connecting with the fixed frustum. The flat head of the hanging rod is inserted into the hanging rod mounting groove of the fixed frustum, and the fastening bolt passes through the bolt hole of the fixed frustum and presses against the flat head of the hanging rod. The hanging rod assembly movably arranged on the column can be disassembled according to the height of the parts to be shot peened, so as to adapt to the height requirements of the parts to be shot peened and expand the scope of use.
[0032] Possibly, a gasket is provided between the hanging rod and the fixed frustum, which makes the connection between the hanging rod and the fixed frustum more stable. Other features are the same as those in Specific Embodiment 1, so this specific embodiment is omitted here.
Claims
1. A shot blasting frame of a casting shot blasting machine, comprising a shot blasting frame body, characterized in that: The shot blasting rack body includes a column, a plurality of hooks and a multi-layer hanging ring. The lower end of the column is provided with a base, the upper end of the column is provided with a hanging ring, the column is provided with a fixed truncated table at a certain interval, and the fixed truncated table is provided with a hanging rod assembly, the hanging rod assembly is provided with at least two hanging rods, one end of each hanging rod is horizontally connected to the fixed truncated table, and the hanging rods of two adjacent hanging rod assemblies are staggered; one hanging ring is provided for each two adjacent hanging rod assemblies, the hanging ring is fixedly connected to the other end of the hanging rod, the hanging ring and the hanging rod are provided with a hook mounting ring, and the hook is movably arranged in the hook mounting ring.
2. The shot blasting rack of a casting shot blasting machine according to claim 1, characterized in that: It also includes a universal pulley, which is arranged on the lower end surface of the base.
3. A shot blasting rack for a casting shot blasting machine according to claim 1 or 2, characterized in that: The base adopts a disc structure, and a plurality of counterweight ribs are arranged on the disc.
4. A shot blasting stand for a casting shot blasting machine according to claim 1 or 2, characterized in that: The hook is in an S-shaped structure.
5. A shot blasting rack for a casting shot blasting machine according to claim 1 or 2, characterized in that: The hanging rod assembly is provided with six hanging rods.
6. A shot blasting stand for a casting shot blasting machine according to claim 1 or 2, characterized in that: The two adjacent hanging rod assemblies are respectively a second hanging rod assembly and a first hanging rod assembly for connecting the hanging ring, wherein the first hanging rod assembly for connecting the hanging ring is horizontally fixed on the fixed platform of the column, and the hanging rod of the second hanging rod assembly is movably arranged on the fixed platform of the column through a clamping device.
7. The shot blasting rack of a casting shot blasting machine according to claim 6, characterized in that: The clamping device uses a fastening bolt, and a bolt hole and a hanging rod installation groove are opened on the fixed circular platform for installing the second hanging rod assembly. The hanging rod of the second hanging rod assembly is provided with a flat head for connecting with the fixed circular platform, and the fastening bolt is used to tighten the flat head of the hanging rod.