Pavement construction maintenance equipment

By designing a pavement construction and maintenance equipment including a mobile rack, a cooling bin, a water outlet pipe, a water supply unit and a cooling unit, the problem of water waste after cooling is solved, and the efficiency of pavement cooling and maintenance and the effective utilization of resources are achieved.

CN223047864UActive Publication Date: 2025-07-01SHAANXI ROAD & BRIDGE GRP ROAD SURFACE CONSTR
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202422206491.7
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-09-09
Publication Date
2025-07-01
Estimated Expiration
2034-09-09

AI Technical Summary

Technical Problem

During road maintenance construction, most of the cooled water is in a state of waiting for use, gradually heating up and wasted, resulting in waste of resources.

Method used

A pavement construction and maintenance equipment is designed, including a mobile rack, a cooling bin, a water outlet pipe, a water supply unit and a cooling unit. The water in use is cooled through the cooling unit, and water is supplied to the outlet pipe through the water supply unit. The cooled water is sprayed onto the road surface to achieve cooling and maintenance on the road surface, while reducing the waste of cooling resources.

Benefits of technology

It effectively reduces the waste of cooling resources, improves the efficiency of road cooling and maintenance, and facilitates movement on the road through the design of mobile racks, achieving comprehensive cooling and maintenance on the road.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN223047864U_ABST
    Figure CN223047864U_ABST
Patent Text Reader

Abstract

The utility model relates to the technical field of pavement construction, in particular to pavement construction maintenance equipment which comprises a moving frame, and a plurality of moving wheels are connected to the moving frame; the lower end of the cooling bin is opened, and the cooling bin is connected to the movable frame; the water outlet pipe is located in the cooling bin, and a plurality of water outlet holes are formed in the water outlet pipe; the water supply unit is used for supplying water into the water outlet pipe, is mounted on the movable frame and is connected with the water outlet pipe; the cooling unit is mounted on the cooling bin, and a cold air outlet of the cooling unit faces the water outlet pipe; a cooling space with an opening in one side can be formed by matching the cooling bin with the water outlet pipe, water can be conveniently supplied to the water outlet pipe through the water supply unit, cooling of the water in the water outlet pipe is achieved by matching with the cooling unit, then cooling maintenance of the road surface is completed, the cooling unit only cools water in use, and the cooling effect is good. And the waste of cooling resources can be reduced.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This application relates to the technical field of road construction, and particularly relates to a road construction and maintenance equipment. Background Art

[0002] Road construction refers to the process of carrying out engineering activities such as road construction, renovation, and maintenance, providing convenience and guarantee for people's travel. During the road construction process, it usually includes main steps such as earth excavation, foundation treatment, and road surface paving. After the concrete pouring is completed, it is necessary to timely maintain the road surface to improve the performance of the road surface and extend the service safety and service life of the road.

[0003] The prior art discloses an asphalt pavement cooling device for road engineering, which includes a first water tank. A hook is arranged on the left side of the outer wall of the first water tank. Wheels are arranged at the four corners of the bottom of the outer wall of the first water tank. A cooling mechanism is arranged on the first water tank. The cooling mechanism includes: a semiconductor refrigeration sheet fixedly installed on the left side of the inner wall of the first water tank; a sealing plate fixedly installed on the inner wall of the first water tank and attached to the right side of the semiconductor refrigeration sheet; a water inlet hole opened on the right side of the top of the first water tank; a water inlet fixedly installed on the top of the outer wall of the first water tank and communicated with the water inlet hole; a pipeline fixedly connected to the right side of the outer wall of the first water tank and communicated; a valve fixedly installed on the pipeline.

[0004] In view of the above related technologies, during the maintenance construction, in order to improve the cooling effect, the water in the water tank is cooled by the cooling mechanism, and then the cooled water is sprayed onto the road surface through the spraying mechanism to achieve the cooling and maintenance of the road surface. However, during the actual maintenance, most of the cooled water in the water tank is in a state of waiting to be used and will gradually warm up, and the water in the water tank may not be completely consumed, which results in the waste of the remaining cooled water and causes a certain amount of resource waste. Utility Model Content

[0005] In order to reduce the waste of cooling resources while completing the cooling and maintenance of the road surface, this application provides a road construction and maintenance equipment.

[0006] The road construction and maintenance equipment provided by this application adopts the following technical solutions:

[0007] A road construction and maintenance equipment includes:

[0008] A moving frame, on which a plurality of moving wheels are connected;

[0009] A cooling chamber with an open lower end, which is connected to the moving frame;

[0010] A water outlet pipe, the water outlet pipe is located in the cooling bin, and a plurality of water outlet holes are opened on the water outlet pipe;

[0011] A water supply unit for supplying water into the water outlet pipe, the water supply unit is installed on the moving frame, and the water supply unit is connected to the water outlet pipe;

[0012] A cooling unit for reducing the temperature of the liquid in the water outlet pipe, the cooling unit is installed on the cooling bin, and the cold air outlet of the cooling unit is arranged facing the water outlet pipe.

[0013] By adopting the above technical solutions, an external power supply provides electrical energy for the operation of the cooling unit. The cold air outlet of the cooling unit blows cold air towards the water outlet pipe. At the same time, the water supply unit operates to supply water into the water outlet pipe. The water flowing into the water outlet pipe is cooled under the cooling effect of the cooling unit. The cooled water is sprayed onto the road surface from the lower opening of the cooling bin through the water outlet holes. Then, the moving frame is driven to move along the road surface to complete the cooling and maintenance of the road surface; the designed road construction and maintenance equipment is provided with a moving base for the cooling bin, the water supply unit, and the cooling unit through the moving frame and moving wheels. A cooling and temperature reduction space with an opening on one side can be formed through the cooperation of the cooling bin and the water outlet pipe. The water supply unit facilitates the supply of water into the water outlet pipe, and in cooperation with the cooling unit, the water in the water outlet pipe is cooled and temperature-reduced, thereby completing the cooling and maintenance of the road surface. Moreover, the cooling unit only cools the water during use, which can also reduce the waste of cooling resources.

[0014] In a specific feasible implementation, the water supply unit includes:

[0015] A water tank, the water tank is connected to the moving frame;

[0016] A water pump, the water pump is connected to the water tank, and the water pump is located inside the water tank;

[0017] An infusion assembly, one end of the infusion assembly is connected to the water pump, and the other end is connected to the water outlet pipe, for conveying the water pumped by the water pump into the water outlet pipe.

[0018] By adopting the above technical solutions, the designed water supply unit can temporarily store the water for road surface maintenance through the water tank, and the water for road surface maintenance in the water tank can be conveyed into the water outlet pipe through the cooperation of the water pump and the infusion assembly.

[0019] In a specific feasible implementation, a clamping frame is connected to the moving frame. The clamping frame has a receiving hole. The water tank extends into the receiving hole and abuts against the moving frame, and there is a sliding gap between the outer side wall of the water tank and the hole wall of the receiving hole.

[0020] By adopting the above technical solution, the designed clamping frame can achieve the stability of the water tank position while facilitating the quick removal of the water tank to complete the water replenishment operation.

[0021] In a specific feasible embodiment, the infusion assembly includes:

[0022] A fixed pipe, one end of the fixed pipe is connected to the water pump, the other end is connected to the side wall of the water tank, and the fixed pipe extends out of the water tank;

[0023] A connecting hose, one end of the connecting hose is connected to the water outlet pipe, and the connecting hose is connected to the clamping frame;

[0024] A connecting valve, one end of the connecting valve is detachably and fixedly connected to the extended section of the fixed pipe, and the other end is connected to the connecting hose.

[0025] By adopting the above technical solution, the designed infusion assembly, through the cooperation of the fixed pipe, the connecting hose and the connecting valve, can quickly install and disassemble the infusion pipeline while quickly removing and replenishing water for the water tank.

[0026] In a specific feasible embodiment, the cooling unit includes:

[0027] A refrigeration component, the refrigeration component is connected to the cooling chamber, and the cold air outlet of the refrigeration component is communicated with the inner cavity of the cooling chamber;

[0028] A cold air fan, the cold air fan is rotatably connected to the cooling chamber, and the cold air fan is arranged facing the water outlet pipe;

[0029] A driving motor, the driving motor is connected to the cooling chamber, and the output shaft of the driving motor is connected to the cold air fan.

[0030] By adopting the above technical solution, the designed cooling unit can generate cold air through the refrigeration component, drive the cold air fan to rotate through the driving motor, and blow the cold air to the water outlet pipe through the cold air fan, improving the cooling efficiency of the maintenance water in the water outlet pipe.

[0031] In a specific feasible embodiment, the cold air fan is located below the water outlet pipe, and there is a return air space between the water outlet pipe and the inner top wall of the cooling chamber.

[0032] By adopting the above technical solution, the cold air fan designed to be located below the water outlet pipe can increase the number of heat exchange times between the cold air and the water outlet pipe, and further improve the cooling effect of the maintenance water in the water outlet pipe.

[0033] In a specific feasible implementation, a sliding adjustment column is connected to the moving wheel. The sliding adjustment column is slidably connected to the moving frame. An adjustment bolt is rotatably connected to the moving frame. The adjustment bolt is threadedly connected to the sliding adjustment column and is used to drive the sliding adjustment column to move up and down in the vertical direction.

[0034] By adopting the above technical solution, the designed adjustment bolt and sliding adjustment column can realize the lifting of the moving wheel, and then change the ground clearance of the cooling bin by changing the ground clearance of the moving frame, so as to adjust the road surface cooling and maintenance effect.

[0035] In a specific feasible implementation, a hand push frame is connected to the moving frame, and the hand push frame is located on the side of the moving frame away from the cooling bin.

[0036] By adopting the above technical solution, the designed hand push frame facilitates the maintenance operator to push the moving frame to move.

[0037] In summary, the present application includes at least one of the following beneficial technical effects:

[0038] 1. The designed road surface construction and maintenance equipment facilitates providing a moving base for the cooling bin, the water supply unit and the cooling unit through the moving frame and the moving wheel. A cooling and cooling space with an opening on one side can be formed by the cooling bin and the water outlet pipe. The water supply unit facilitates supplying water into the water outlet pipe, and the cooling unit is used to cool and cool the water in the water outlet pipe, thereby completing the cooling and maintenance of the road surface. Moreover, the cooling unit only cools the water in use, which can also reduce the waste of cooling resources.

[0039] 2. The designed road surface construction and maintenance equipment can quickly install and disassemble the infusion pipeline while quickly taking and replenishing water for the water tank through the cooperation of the fixed pipe, the connecting hose and the connecting valve.

[0040] 3. The designed road surface construction and maintenance equipment, the cold air fan located below the water outlet pipe, can increase the number of heat exchange times between the cold air and the water outlet pipe, thereby further improving the cooling effect of the maintenance water in the water outlet pipe. BRIEF DESCRIPTION OF THE DRAWINGS

[0041] Figure 1 It is a schematic structural diagram of the moving frame, the moving wheel and the hand push frame in the embodiment of the present application.

[0042] Figure 2 is Figure 1 front view of

[0043] Figure 3 is in Figure 2 Based on the above, it is a schematic structural diagram after adding the water supply unit and the cooling bin.

[0044] Figure 4Yes Figure 3 Partial structural schematic diagram after cross-sectioning.

[0045] Figure 5 It is a schematic diagram of the structure of the pavement construction and maintenance equipment according to the embodiment of the present application.

[0046] Figure 6 Yes Figure 5 Cross-sectional structural schematic diagram of the cooling bin, the water outlet pipe and the cooling unit in

[0047] Explanation of reference numerals: 1, moving frame; 2, moving wheels; 3, cooling bin; 4, water outlet pipe; 5, water supply unit; 51, water tank; 52, water pump; 53, infusion assembly; 531, fixed pipe; 532, connecting hose; 533, connection valve; 54, clamping frame; 6, cooling unit; 61, refrigeration assembly; 62, cold air fan; 63, drive motor; 7, sliding adjustment column; 8, adjustment bolt; 9, hand push frame. Detailed implementation manners

[0048] The following will further describe the present application in detail Figures 1-6 with reference to the accompanying drawings.

[0049] The embodiment of the present application discloses a pavement construction and maintenance equipment.

[0050] Referring to Figure 1 and Figure 2 , a pavement construction and maintenance equipment includes a moving frame 1, moving wheels 2 and a hand push frame 9. The number of moving wheels 2 is multiple. The moving wheels 2 are connected to the moving frame 1. The hand push frame 9 is bolted to one side of the moving frame 1. The maintenance construction personnel apply force to the moving frame 1 through the hand push frame 9 and cooperate with the moving wheels 2 to realize the movement of the moving frame 1. In the present application, the number of moving wheels 2 can be four, five, or seven, as long as the stable movement of the moving frame 1 can be achieved. In this embodiment, the number of moving wheels 2 is four.

[0051] Referring to Figure 1 and Figure 2 , in order to be able to adjust the height of the moving frame 1 from the ground, a sliding adjustment column 7 is welded and fixed on the moving wheels 2. The sliding adjustment column 7 is slidably connected to the moving frame 1. And an adjustment bolt 8 is rotatably connected to the moving frame 1. The adjustment bolt 8 is threadedly connected to the sliding adjustment column 7, and the axial direction of the adjustment bolt 8 is vertically arranged. By rotating the adjustment bolt 8, the sliding adjustment column 7 is driven to move up and down in the vertical direction. In the present application, the cross-sectional shape of the sliding adjustment column 7 is rectangular.

[0052] Referring to Figure 3 and Figure 4, To facilitate the maintenance of the road surface, the road construction and maintenance equipment further includes a cooling bin 3, a water outlet pipe 4, and a water supply unit 5. The cooling bin 3 is provided with an opening at the lower end, and the cooling bin 3 is fixedly welded to the mobile frame 1, and the cooling bin 3 is located on one side of the mobile frame 1 away from the connection with the hand push frame 9. The water outlet pipe 4 is located inside the cooling bin 3, and a plurality of water outlet holes are formed in the water outlet pipe 4, and the water outlet holes are arranged facing the road surface; the water supply unit 5 is installed on the mobile frame 1, and the water supply unit 5 is connected to the water outlet pipe 4 for supplying water into the water outlet pipe 4.

[0053] Referring to Figure 3 and Figure 4 , the water supply unit 5 includes a water tank 51, a water pump 52, and an infusion assembly 53. The water tank 51 is connected to the mobile frame 1, the water pump 52 is bolted to the water tank 51, and the water pump 52 is located inside the inner cavity of the water tank 51. One end of the infusion assembly 53 is connected to the water pump 52, and the other end is connected to the water outlet pipe 4 for delivering the water pumped by the water pump 52 into the water outlet pipe 4.

[0054] Referring to Figure 3 and Figure 4 , in order to be able to quickly remove the water tank 51 for easy water replenishment, a clamping frame 54 is fixedly welded on the mobile frame 1. The clamping frame 54 has a receiving hole. The water tank 51 extends into the receiving hole, and the lower end of the water tank 51 abuts against the mobile frame 1. A sliding gap is left between the outer side wall of the water tank 51 and the hole wall of the receiving hole, and a lifting ring is welded on the top wall of the water tank 51.

[0055] Referring to Figure 4 , in order to realize the function of the infusion assembly 53 on the basis of quickly removing the water tank 51, the infusion assembly 53 includes a fixed pipe 531, a connecting hose 532, and a connection valve 533. One end of the fixed pipe 531 is connected to the water outlet end of the water pump 52 through a flange, and the other end of the fixed pipe 531 is connected to the water tank 51 through a flange, and the fixed pipe 531 extends out of the water tank 51. One end of the connecting hose 532 is connected to the water outlet pipe 4 through a reducing flange, and the connecting hose 532 is embedded and clamped with the clamping frame 54. One end of the connection valve 533 is connected to the extended section of the fixed pipe 531 through a flange, and the other end is fixedly connected to the connecting hose 532. Before lifting the water tank 51, first disconnect the connection valve 533 from the fixed pipe 531.

[0056] Referring to Figure 5 and Figure 6 , in order to be able to reduce the waste of cooling resources on the premise of realizing the cooling and maintenance of the road surface, the road construction and maintenance equipment further includes a cooling unit 6. The cooling unit 6 is installed on the cooling bin 3, and the cold air outlet of the cooling unit 6 is arranged facing the water outlet pipe 4, and a return air space is left between the water outlet pipe 4 and the inner top wall of the cooling bin 3.

[0057] Referring to Figure 5 and Figure 6, the cooling unit 6 includes a refrigeration component 61, a cold air fan 62 and a driving motor 63. The refrigeration component 61 in this application is a refrigeration component 61 commonly used in the prior art and will not be described in detail here. Any refrigeration component 61 that can obtain cold air can be used. The refrigeration component 61 is connected to the cooling bin 3, and the cold air outlet of the refrigeration component 61 is communicated with the inner cavity of the cooling bin 3. In this application, the cold air outlet of the refrigeration component 61 is located above the water outlet pipe 4. The cold air fan 62 is rotatably connected to the cooling bin 3 and is arranged facing the water outlet pipe 4. The body of the driving motor 63 is bolted to the cooling bin 3, and the output shaft of the driving motor 63 extends into the cooling bin 3 and is key-connected to the cold air fan 62.

[0058] Referring to Figure 5 and Figure 6 , in order to improve the cooling efficiency of the water for road surface cooling and maintenance in the water outlet pipe 4, the cold air fan 62 is located below the water outlet pipe 4. The cold air is discharged from the cold air outlet of the refrigeration component 61 and moves toward the side of the water outlet pipe 4 under the action of the cold air fan 62 to complete the first cooling of the water outlet pipe 4. After the cold air encounters the inner top wall of the cooling bin 3, it flows back from top to bottom through the water outlet pipe 4 to complete the second cooling of the water outlet pipe 4, and then blows toward the road surface through the lower end outlet of the cooling bin 3 to cooperate with the cooled maintenance water to complete the cooling and maintenance of the road surface.

[0059] The implementation principle of a road construction and maintenance equipment in an embodiment of this application is as follows: an external power supply provides electrical energy for the operation of the cooling unit 6. The cold air outlet of the cooling unit 6 blows cold air toward the water outlet pipe 4. At the same time, the water supply unit 5 operates to supply water into the water outlet pipe 4. The cold air is discharged from the cold air outlet of the refrigeration component 61 and moves toward the side of the water outlet pipe 4 under the action of the cold air fan 62 to complete the first cooling of the water outlet pipe 4. After the cold air encounters the inner top wall of the cooling bin 3, it flows back from top to bottom through the water outlet pipe 4 to complete the second cooling of the water outlet pipe 4, and then blows toward the road surface through the lower end outlet of the cooling bin 3. The cooled water is sprayed onto the road surface from the lower end opening of the cooling bin 3 through the water outlet holes, and then by applying force to the hand push frame 9 to drive the moving frame 1 to move along the road surface, the cooling and maintenance of the road surface are completed.

[0060] The above are all the preferred embodiments of this application. The protection scope of this application is not limited accordingly. Therefore, all equivalent changes made according to the structure, shape, and principle of this application should be covered within the protection scope of this application.

Claims

1. A road construction and maintenance equipment, characterized in that: include: A mobile frame (1), wherein a plurality of mobile wheels (2) are connected to the mobile frame (1); A cooling chamber (3) with an opening at the lower end, wherein the cooling chamber (3) is connected to the movable frame (1); A water outlet pipe (4), the water outlet pipe (4) is located in the cooling chamber (3), and a plurality of water outlet holes are provided on the water outlet pipe (4); a water supply unit (5) for supplying water to the water outlet pipe (4), the water supply unit (5) being mounted on the mobile frame (1), and the water supply unit (5) being connected to the water outlet pipe (4); A cooling unit (6) for reducing the temperature of liquid in a water outlet pipe (4), wherein the cooling unit (6) is installed on the cooling bin (3), and a cold air outlet of the cooling unit (6) is arranged toward the water outlet pipe (4).

2. The road surface construction and maintenance equipment according to claim 1, characterized in that: The water supply unit (5) comprises: A water tank (51), wherein the water tank (51) is connected to the mobile frame (1); A water pump (52), the water pump (52) is connected to the water tank (51), and the water pump (52) is located inside the water tank (51); An infusion component (53), one end of which is connected to the water pump (52) and the other end of which is connected to the water outlet pipe (4), and is used to transport the water pumped by the water pump (52) into the water outlet pipe (4).

3. The road surface construction and maintenance equipment according to claim 2, characterized in that: The movable frame (1) is connected to a clamping frame (54), the clamping frame (54) having a receiving hole, the water tank (51) extending into the receiving hole and abutting against the movable frame (1), and a sliding gap is left between the outer wall of the water tank (51) and the hole wall of the receiving hole.

4. The road surface construction and maintenance equipment according to claim 3, characterized in that: The infusion assembly (53) comprises: A fixed pipe (531), one end of the fixed pipe (531) is connected to the water pump (52), and the other end is connected to the side wall of the water tank (51), and the fixed pipe (531) is extended out of the water tank (51); A connecting hose (532), one end of which is connected to the water outlet pipe (4), and the connecting hose (532) is connected to the clamping frame (54); A connecting valve (533), one end of which is detachably fixedly connected to the extended section of the fixed pipe (531), and the other end of which is connected to the connecting hose (532).

5. The road surface construction and maintenance equipment according to claim 1, characterized in that: The cooling unit (6) comprises: A refrigeration component (61), the refrigeration component (61) is connected to the cooling chamber (3), and a cold air outlet of the refrigeration component (61) is in communication with an inner cavity of the cooling chamber (3); A cooling fan (62), the cooling fan (62) being rotatably connected to the cooling chamber (3), and the cooling fan (62) being arranged toward the water outlet pipe (4); A driving motor (63), wherein the driving motor (63) is connected to the cooling chamber (3), and an output shaft of the driving motor (63) is connected to the cooling fan (62).

6. The road surface construction and maintenance equipment according to claim 5, characterized in that: The cooling fan (62) is located below the water outlet pipe (4), and a return air space is left between the water outlet pipe (4) and the top wall of the cooling chamber (3).

7. The road surface construction and maintenance equipment according to claim 1, characterized in that: The moving wheel (2) is connected to a sliding adjustment column (7), the sliding adjustment column (7) is slidably connected to the moving frame (1), the moving frame (1) is rotatably connected to an adjustment bolt (8), the adjustment bolt (8) is threadedly connected to the sliding adjustment column (7), and is used to drive the sliding adjustment column (7) to rise and fall in a vertical direction.

8. The road surface construction and maintenance equipment according to claim 1, characterized in that: The mobile frame (1) is connected to a hand push frame (9), and the hand push frame (9) is located on a side of the mobile frame (1) away from the cooling bin (3).