Operation platform for welding curtain wall keel

By designing an operating platform for curtain wall keel installation, and using lifting components and motor drive technology, the construction progress and cost increase caused by floor-standing scaffolding are solved, and the effect of speeding up construction progress and reducing costs is achieved.

CN223048415UActive Publication Date: 2025-07-01CHINA CONSTR FIFTH ENG DIV CORP LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202422286276.2
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-09-19
Publication Date
2025-07-01
Estimated Expiration
2034-09-19

AI Technical Summary

Technical Problem

Floor-standing scaffolding leads to slowing down construction progress, increasing costs and crowding of construction work surfaces during curtain wall keel installation, affecting other professional construction.

Method used

An operating platform including a first lift assembly and a second lift assembly is designed, and the platform is raised and lowered by a motor-driven traction rope, and a stable support structure is formed in combination with a guardrail, a support plate and a fastening assembly.

Benefits of technology

Through the alternate use of lifting components, the purpose of speeding up construction progress and reducing construction costs is achieved, ensuring that the construction work surface is not affected.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN223048415U_ABST
    Figure CN223048415U_ABST
Patent Text Reader

Abstract

The utility model relates to an operation platform for welding curtain wall keels. The operation platform for welding the curtain wall keel comprises a first lifting assembly, a second lifting assembly and an operation platform body, the first lifting assembly and the second lifting assembly are the same in structure, the first lifting assembly and the second lifting assembly are alternately used, and each of the first lifting assembly and the second lifting assembly comprises a first hook, a traction rope and a motor; the motor is fixedly arranged on the operation platform, the first hook is connected with the motor through a traction rope, the traction rope is driven by adjusting forward rotation and reverse rotation of the motor, and ascending and descending of the operation platform are achieved. According to the operation platform for welding the curtain wall keel, the purposes of accelerating the construction progress and reducing the construction cost can be achieved through alternate use of the first lifting assembly and the second lifting assembly, and the vertical rod, the supporting plate and the second hook form a stable supporting structure.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model belongs to the technical field of construction tools for building structures, and particularly relates to an operating platform for welding curtain wall keels. Background Technique

[0002] At present, if a floor-standing scaffold is erected for the installation of a steel structure building curtain wall, the construction progress will be slowed down, the construction cost will be increased, and the construction operation surface will be occupied, affecting the construction of other specialties. Therefore, how to balance the interests of all parties, speed up the construction progress, and reduce the construction cost is a problem to be solved in the installation operation of curtain wall keels. Content of the Utility Model

[0003] The purpose of the utility model is to provide an operating platform for welding curtain wall keels to solve the technical problems of high construction cost of floor-standing scaffolds, occupying the construction operation surface, and affecting the construction of other specialties.

[0004] In order to achieve the above purpose, the technical solution adopted by the utility model is as follows:

[0005] An operating platform for welding curtain wall keels includes a first lifting component, a second lifting component and an operating platform. The first lifting component and the second lifting component have the same structure. The first lifting component and the second lifting component are used alternately. The first lifting component and the second lifting component both include a hook one, a towing rope and a motor. The motor is fixedly arranged on the operating platform. The hook one is connected with the motor through the towing rope. By adjusting the forward and reverse rotation of the motor, the towing rope is driven to realize the rising and falling of the operating platform.

[0006] Further, the hook one is used for hanging on the welded curtain wall keel, and the upper end of the towing rope is connected with the lower end of the hook one.

[0007] Further, the lower end of the towing rope is connected with the transmission shaft of the motor.

[0008] Further, the operating platform includes a guardrail, a support plate and a fastening component. The guardrail surrounds the support plate on all sides; the fastening component includes a hook two, a vertical rod and an inclined strut; the hook two is used for hanging on the welded curtain wall keel.

[0009] Further, the support plate extends in the left-right direction. The hook two is arranged on the side of the support plate close to the curtain wall keel. There are two hook twos, and the two hook twos are distributed on both sides of the support plate.

[0010] Further, the inner side of the hook two is square in shape and adapted to the structure of the welded curtain wall keel. The vertical rod is arranged on the lower plane at the left end of the support plate and fits with the welded curtain wall keel; the vertical rod, the support plate and the hook two form a stable support structure.

[0011] Furthermore, the upper end of the diagonal brace is connected to the lower plane of the left end of the support plate, and the lower end of the diagonal brace is connected to the vertical pole. The diagonal brace, the support plate, and the vertical pole form a stable triangular structure to support the support plate.

[0012] Advantages of the present utility model:

[0013] The operating platform for welding curtain wall keels of the present utility model can achieve the purpose of accelerating the construction progress and reducing the construction cost by alternately using the first lifting component and the second lifting component. The vertical pole, the support plate, and the second hook form a stable support structure. Description of the drawings

[0014] Figure 1 It is a schematic diagram of the overall structure of the operating platform for welding curtain wall keels in Embodiment 1;

[0015] Figure 2 It is a schematic diagram of the structures of the first lifting component and the second lifting component of the operating platform for welding curtain wall keels in Embodiment 1;

[0016] Figure 3 It is a schematic diagram of the second hook of the operating platform for welding curtain wall keels in Embodiment 1.

[0017] In the figure: 1, the first hook; 2, the towing rope; 3, the motor; 4, the operating platform; 5, the curtain wall keel; 6, the guardrail; 7, the support plate; 8, the second hook; 9, the vertical pole; 10, the diagonal brace; 11, the first lifting component; 12, the second lifting component. Specific embodiments

[0018] Next, the technical solutions in the embodiments of the present utility model will be clearly and completely described in conjunction with the drawings in the embodiments of the present utility model.

[0019] The embodiments of the operating platform for welding curtain wall keels in the present utility model are as Figures 1-3 shown.

[0020] Embodiment 1

[0021] An operating platform for welding curtain wall keels, comprising a first lifting assembly 11, a second lifting assembly 12 and an operating platform 4. The first lifting assembly 11 and the second lifting assembly 13 have the same structure. The first lifting assembly 11 and the second lifting assembly 12 are used alternately. The first lifting assembly 11 and the second lifting assembly 12 are both two groups of lifting assemblies, and the two groups of lifting assemblies are respectively arranged on both sides of the operating platform 4. The first lifting assembly 11 and the second lifting assembly 12 both include a first hook 1, a towing rope 2 and a motor 3. The motor 3 is fixedly arranged on the operating platform 4. The first hook 1 is connected to the motor 3 through the towing rope 2. By adjusting the forward and reverse rotation of the motor 3, the towing rope 2 is driven to realize the rise and fall of the operating platform 4.

[0022] The first hook 1 is used to hang on the welded curtain wall keel 5, and the upper end of the towing rope 2 is connected to the lower end of the first hook 1.

[0023] The lower end of the towing rope 2 is connected to the transmission shaft of the motor 3.

[0024] The operating platform includes a guardrail 6, a support plate 7 and a fastening assembly. The guardrail 6 surrounds the support plate 7 on all sides; the fastening assembly includes a second hook 8, a vertical rod 9 and a diagonal brace 10; the second hook 8 is used to hang on the welded curtain wall keel 5.

[0025] The support plate 7 extends in the left-right direction. The second hook 8 is arranged on the side of the support plate 7 close to the welded curtain wall keel 5. There are two second hooks 8, and the two second hooks 8 are distributed on both sides of the support plate 7.

[0026] The inner side of the second hook 8 is square in shape and adapted to the structure of the welded curtain wall keel 5. The vertical rod 9 is arranged on the lower plane of the left end of the support plate 7 and fits with the welded curtain wall keel 5; the vertical rod 9, the support plate 7 and the second hook 8 form a stable support structure.

[0027] The upper end of the diagonal brace 10 is connected to the lower plane of the left end of the support plate 7, and the lower end of the diagonal brace 10 is connected to the vertical rod 9. The diagonal brace 10, the support plate 7 and the vertical rod 9 form a stable triangular structure to support the support plate 7.

[0028] The usage method of the operating platform for welding curtain wall keels:

[0029] Workers start construction from the bottom up on the ground. When the construction reaches a height that the workers can't reach, hook two 8 is hung on the already welded curtain wall keel. The workers move to the operation platform 4 and hang hook one 1 of the first lifting component 11 on the already welded curtain wall keel 5 above. Then start the motor 3 of the first lifting component 11. The operation platform 4 rises by the rotation of the transmission shaft of the motor 3. The operation platform 4 is made of a lighter material. When hook two rises to the position of the already welded curtain wall keel 5 above during the rising process, it needs to avoid the already welded curtain wall keel 5. It requires manual pushing to avoid the already welded curtain wall keel 5 above the already welded curtain wall keel 5 so that the operation platform 4 can rise to the construction height required by the construction workers. After the construction is completed, hang hook one 1 of the second lifting component 12 on the already welded curtain wall keel 5 above the already welded curtain wall keel 5 where hook one 1 of the first lifting component 11 is hung. Start the motor 3 of the second lifting component 12, take down hook one 1 of the first lifting component 11. The first lifting component 11 and the second lifting component 12 are used alternately according to the above method to realize the lifting of the operation platform 4.

[0030] Finally, it should be noted that: in the description of the present invention, it should be noted that the orientation or positional relationship indicated by the terms "vertical", "upper", "lower", "horizontal", etc. is based on the orientation or positional relationship shown in the drawings. It is only for the convenience of describing the present invention and simplifying the description, rather than indicating or implying that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation. Therefore, it should not be understood as a limitation to the present invention.

[0031] In the description of the present invention, it should also be noted that unless otherwise clearly specified and defined, the terms "set", "installed", "connected", "connected" should be understood in a broad sense. For example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection, or an electrical connection; it can be directly connected, or indirectly connected through an intermediate medium, and it can be the communication inside two elements. For those of ordinary skill in the art, the specific meanings of the above terms in the present invention can be understood according to specific situations.

Claims

1. An operating platform for welding curtain wall keels, characterized in that: The utility model comprises a first lifting assembly, a second lifting assembly and an operating platform. The first lifting assembly and the second lifting assembly have the same structure and are used alternately. The first lifting assembly and the second lifting assembly both comprise a hook 1, a traction rope and a motor. The motor is fixedly arranged on the operating platform. The hook 1 is connected to the motor through the traction rope. By adjusting the forward and reverse rotation of the motor, the traction rope is driven to realize the rising and falling of the operating platform.

2. The operating platform for welding curtain wall keels according to claim 1 is characterized in that: The hook one is used to be hung on the welded curtain wall keel, and the upper end of the traction rope is connected to the lower end of the hook one.

3. The operating platform for welding curtain wall keels according to claim 2 is characterized in that: The lower end of the traction rope is connected to the transmission shaft of the motor.

4. The operating platform for welding curtain wall keels according to claim 1 is characterized in that: The operating platform comprises a guardrail, a support plate and a fastening assembly, wherein the guardrail is arranged around the support plate; the fastening assembly comprises a second hook, a vertical pole and a diagonal brace; the second hook is used for hanging on the welded curtain wall keel.

5. The operating platform for welding curtain wall keels according to claim 4 is characterized in that: The support plate extends in left and right directions, and the hook 2 is arranged on one side of the support plate close to the curtain wall keel. Two hooks 2 are arranged, and the two hooks 2 are distributed on both sides of the support plate.

6. The operating platform for welding curtain wall keels according to claim 4 is characterized in that: The shape of the inner side of the second hook is a square that matches the structure of the welded curtain wall keel. The vertical rod is arranged on the lower plane of the left end of the support plate and fits the welded curtain wall keel. The vertical rod, support plate and the second hook form a stable supporting structure.

7. The operating platform for welding curtain wall keels according to claim 4 is characterized in that: The upper end of the diagonal brace is connected to the lower plane of the left end of the support plate, and the lower end of the diagonal brace is connected to the vertical pole. The diagonal brace, the support plate and the vertical pole form a stable triangular structure to support the support plate.