Multipurpose assembly type fence bearing frame

Through the design of a multi-purpose prefabricated fence support frame, the problems of single partitions and inconvenient pipeline maintenance of existing fences have been solved, and construction safety and efficiency have been improved.

CN223048558UActive Publication Date: 2025-07-01HUNAN FIFTH ENG CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202421842052.9
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-07-31
Publication Date
2025-07-01
Estimated Expiration
2034-07-31

AI Technical Summary

Technical Problem

The existing engineering fence can only play a single partition role. The pipeline is buried underground and is inconvenient for maintenance. When exposed, it is time-consuming and labor-intensive and easy to touch it by mistake, which affects construction efficiency and safety.

Method used

A multi-purpose assembled fence support frame is adopted to enhance stability through the connection between the outer and inner poles, and the pipeline is sorted and fixed, and the support frame group is used for installation to reduce the risk of accidental contact.

Benefits of technology

Improve construction safety and efficiency, simplify pipeline maintenance operations, and reduce the risk of accidental contact during construction.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN223048558U_ABST
    Figure CN223048558U_ABST
Patent Text Reader

Abstract

The utility model provides a multi-purpose assembly type fence bearing frame. The multi-purpose assembly type fence bearing frame comprises an outer vertical rod and an inner vertical rod which are assembled on a foundation base; the outer vertical rod and the inner vertical rod are detachably and fixedly connected; the inner vertical rod is connected with a supporting frame group which extends horizontally; the supporting frame group comprises a vertical frame which is assembled in parallel with the inner vertical rod, and a telescopic frame group which is assembled in a manner of being perpendicular to the vertical frame; and a bridge protection sleeve and a plurality of U-shaped pipeline fixers capable of telescopically adjusting positions are assembled on the telescopic frame group. According to the building fence, through connection of the outer vertical rods and the inner vertical rods, the stability of fence supporting is enhanced, pipelines used in construction are classified, smoothened and fixedly installed through the bearing frame sets, operation is more convenient and faster in the maintenance process, meanwhile, the construction accidental touch risk is reduced, and the construction safety is improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This application relates to the technical field of building construction protection, and particularly to a multi-purpose prefabricated enclosure support frame. Background Art

[0002] During the process of engineering construction, for considerations of city appearance, environment, and good construction site management, it is necessary to set up construction site enclosures to ensure construction safety and play the roles of anti-theft and fire prevention. At present, the construction site enclosures generally install vertical poles on the installed bases arranged at intervals, and install baffles between adjacent vertical poles to complete the protection of the construction site enclosures. After the engineering enclosures are installed, they can enclose the construction site and have many advantages such as ensuring construction safety and improving the city appearance. However, the existing engineering enclosures can only play a single partition role.

[0003] During the process of engineering construction, it is necessary to temporarily lay many pipelines such as cables, pipelines, and water pipes. In the past, the method of burying such pipelines underground was mostly used to improve the aesthetics. However, after the pipelines are buried underground, when performing operations such as inspection, repair, operation and maintenance, and pipe connection, it is necessary to dig out the buried pipelines for maintenance and then backfill them, which is very inconvenient in daily construction use and greatly affects the construction efficiency. If such pipelines are exposed in the construction site, although the inspection operations for the pipelines can be carried out in a timely manner compared with the method of burying the pipelines underground, however, for the inspection operations of the pipelines, it is necessary to straighten the pipelines first before proceeding, which is time-consuming and laborious and affects the construction efficiency. Moreover, such pipelines are distributed in a complex manner throughout the construction site, making the construction site messy, and the exposed pipelines are extremely likely to be accidentally touched during other construction operations, affecting construction safety. Summary of the Utility Model

[0004] This application provides a multi-purpose prefabricated enclosure support frame, which completes the installation of the enclosure by a simple installation method, has reliable overall stability, and fixes multiple pipelines after classifying and straightening them, making it have good maintenance convenience, reducing accidental touch operations during construction, and improving construction efficiency and safety.

[0005] The multi-purpose prefabricated enclosure support frame provided by this application includes: an outer vertical pole and an inner vertical pole assembled on a foundation base;

[0006] The outer vertical pole and the inner vertical pole are detachably and fixedly connected;

[0007] The inner vertical pole is connected with a horizontally extending support frame group; wherein,

[0008] The support frame group includes: a vertical frame assembled parallel to the inner vertical pole, and a telescopic frame group assembled perpendicular to the vertical frame;

[0009] A bridge protection sleeve and a plurality of telescopically adjustable U-shaped pipe fixers are assembled on the telescopic frame group.

[0010] In this application, by connecting the outer vertical pole and the inner vertical pole, the stability of the enclosure support is enhanced, and the support frame group classifies and straightens the pipelines used in the construction for fixed installation, making the operation more convenient during the maintenance process. At the same time, the risk of accidental contact during construction is reduced, and the construction safety is improved.

[0011] In a specific feasible implementation scheme, the outer vertical pole is connected to the foundation base through anchor fixing bolts. Using the anchor connection for the foundation base enhances the stability of the support.

[0012] In a specific feasible implementation scheme, the outer vertical pole is a T-shaped vertical pole that is vertically arranged and has a hollow cavity; or,

[0013] The outer vertical pole is a rectangular vertical pole that is vertically arranged and has a hollow cavity. It has various forms of assembly methods, providing convenience for the enclosure construction.

[0014] In a specific feasible implementation scheme, the inner vertical pole is connected to the foundation base in a pre-embedded manner; or,

[0015] The inner vertical pole is connected to the foundation base through an anchor bolt assembly. A prefabricated foundation base can be used, and the inner vertical pole can be pre-embedded in the foundation base synchronously, or an installation groove can be opened on the foundation base, and the inner vertical pole can be installed in the foundation base in an anchored manner.

[0016] In a specific feasible implementation scheme, when the inner vertical pole is connected to the foundation base through an anchor bolt assembly,

[0017] The gap between the inner vertical pole and the outer vertical pole is filled with a noise reduction ring. When opening an installation groove on the base of the foundation, it is necessary to check the gap between the inner vertical pole and the outer vertical pole, and use a noise reduction ring for filling to avoid large noise between the inner vertical pole and the outer vertical pole due to the shaking of the enclosure affected by the wind force.

[0018] In a specific feasible implementation scheme, when the outer vertical pole is a T-shaped vertical pole that is vertically arranged and has a hollow cavity,

[0019] The inner vertical pole is a grooved rod body that is inserted and matched with the T-shaped vertical pole. The insertion and matching method is used to improve the installation convenience.

[0020] In a specific feasible implementation scheme, when the outer vertical pole is a rectangular vertical pole that is vertically arranged and has a hollow cavity,

[0021] The inner vertical pole is a square rod body that is connected and matched with the rectangular vertical pole through a bolt assembly. It has high connection stability.

[0022] In a specific feasible implementation scheme, at least four installation hole positions are arranged along the height direction on the side of the inner vertical pole facing away from the outer vertical pole;

[0023] At least two fixing bolts are assembled on the vertical frame, and at least two of the fixing bolts are threadedly connected to at least two of the mounting holes. Adjusting the fixing height of the positioning pipeline has strong installation stability.

[0024] In a specific feasible embodiment, the telescopic frame group includes: a fixed frame perpendicular to the vertical frame at 90°, and a movable frame slidably connected to the fixed frame; wherein,

[0025] The bridge protection sleeve is fixedly connected to the fixed frame, and the U-shaped pipe fixer is detachably fixedly connected to the fixed frame and / or the movable frame. By using the bridge protection sleeve to fix and protect the cable, and using the U-shaped pipe fixer to fix the water pipeline or other pipelines, the overall classification is good and there is a good maintenance space.

[0026] In a specific feasible embodiment, the fixed frame is provided with oblong holes along the length direction, and the movable frame is connected to the fixed frame through a plurality of positioning bolt assemblies that can be locked inside the oblong holes. The adjustment method is simple and convenient. Description of the Drawings

[0027] Figure 1 It is a schematic structural diagram of the multi-purpose assembled enclosure support provided by the embodiment of the present application;

[0028] Figure 2 It is a front view of the first state of the outer vertical pole provided by the embodiment of the present application;

[0029] Figure 3 It is a top view of the first state of the outer vertical pole provided by the embodiment of the present application;

[0030] Figure 4 It is a front view of the second state of the outer vertical pole provided by the embodiment of the present application;

[0031] Figure 5 It is a top view of the second state of the outer vertical pole provided by the embodiment of the present application;

[0032] Figure 6 It is a schematic structural diagram of the inner vertical pole provided by the embodiment of the present application;

[0033] Figure 7 It is a schematic structural diagram of the noise reduction ring provided by the embodiment of the present application;

[0034] Figure 8 It is a schematic structural diagram of the support frame group provided by the embodiment of the present application.

[0035] Reference Numerals in the Drawings:

[0036] Outer vertical pole - 100, Anchoring fixing bolt - 110, Inner vertical pole - 200, Mounting hole position - 210, Foundation base - 300, Noise reduction ring - 400, Vertical frame - 500, Fixing bolt - 510, Fixing bracket - 600, Movable bracket - 610, Positioning bolt assembly - 620, Bridge protection sleeve - 700, U-shaped pipe holder - 800. Detailed implementation mode

[0037] To make the purpose, technical solutions and advantages of the present disclosure clearer and more understandable, the following further elaborates on the present disclosure in detail with reference to specific embodiments and the accompanying drawings.

[0038] It should be noted that unless otherwise defined, the technical terms or scientific terms used in one or more embodiments of this specification should have the ordinary meanings understood by those of ordinary skill in the art to which the present disclosure pertains. The "first", "second" and similar terms used in one or more embodiments of this specification do not denote any order, quantity or importance, but are only used to distinguish different components. Words such as "including" or "comprising" mean that the elements or objects appearing before this word cover the elements or objects listed after this word and their equivalents, without excluding other elements or objects. "Connection" or "connection" and similar words are not limited to physical or mechanical connections, but may include electrical connections, whether direct or indirect. "Upper", "lower", "left", "right", etc. are only used to represent relative positional relationships, and when the absolute position of the object being described changes, the relative positional relationship may also change accordingly.

[0039] In order to facilitate the understanding of the multi-purpose assembled enclosure support frame provided by the embodiment of the present application, its application scenario is first explained. During the construction process, for the consideration of the city appearance, environment, and good construction site management, it is necessary to set up the construction site enclosure to ensure construction safety and play the role of anti-theft and fire prevention. At present, the construction site enclosure generally adopts the installation base arranged at intervals to install the vertical poles, and the baffle is installed between the adjacent vertical poles to complete the protection of the construction site enclosure. After the installation of the engineering enclosure, the construction site can be closed, which has many advantages such as ensuring construction safety and improving the city appearance, but the existing engineering enclosure can only play a single partition role. During the construction process, it is necessary to temporarily lay cables, pipelines, water pipes and other pipelines. In the past, the method of burying such pipelines underground was often used to improve the aesthetics. However, after the pipelines are buried underground, when performing inspection, repair, operation and maintenance, and taking over, the buried pipelines need to be dug out and repaired and then backfilled, which has many inconveniences in daily construction and greatly affects the construction efficiency. If such pipelines are exposed in the construction site, although the method of burying the pipelines underground can be timely inspected and repaired, the inspection and repair operations on the pipelines need to be straightened out before they can be carried out, which is time-consuming and labor-intensive and affects the construction efficiency. In addition, such pipelines are intricately distributed throughout the construction site, which will make the construction site messy. Such exposed pipelines are very easy to be accidentally hit during other construction operations, affecting construction safety. In view of this, the present application provides a multi-purpose assembled enclosure support frame, which uses a simple installation method to complete the installation of the enclosure, has reliable overall stability, and adopts the method of classifying and straightening multiple pipelines before fixing them, so that it has better maintenance convenience, reduces accidental collision operations during construction, and improves construction safety.

[0040] refer to Figure 1 The multi-purpose assembled enclosure support frame provided in the embodiment of the present application includes: an outer pole 100 assembled on a basic base 300, and an inner pole 200; the basic base 300 is prefabricated with concrete or cast on site, and embedded parts for installing the outer pole 100 are embedded in the basic base 300, and the inner pole 200 is connected to the basic base 300 in two different ways. The first way for the inner pole 200 to connect to the basic base 300 is to embed it in the basic base 300, so as to ensure the overall firmness and integrity. When the concrete prefabricated basic base 300 is used, the inner pole 200 is embedded in the basic base 300 as a whole, so as to achieve the circulation and turnover usability. In the second way, when the concrete prefabricated or on-site cast basic base 300 is used, an installation groove is opened on the basic base 300, and embedded parts for installing the inner pole 200 and the outer pole 100 are embedded in the installation groove, so as to ensure the rapid installation of the inner pole 200 and the outer pole 100.

[0041] The outer vertical pole 100 and the inner vertical pole 200 are detachably and fixedly connected; in the embodiment of the present application, the connection between the outer vertical pole 100 and the inner vertical pole 200 is realized by means of plug-in fit or bolt connection and fixation to achieve detachable and fixed connection. Both the outer vertical pole 100 and the inner vertical pole 200 are prefabricated in a factory to appropriate specifications and then assembled. The overall installation method is simple and convenient, with relatively high strength, ensuring the stable support of the enclosure.

[0042] Combined with Figure 2 and Figure 3 As shown in, when the connection between the outer vertical pole 100 and the inner vertical pole 200 adopts the connection method of plug-in fit, Figure 2 and Figure 3 The structural schematic diagram of the first embodiment of the external force pole is shown; the outer vertical pole 100 is a T-shaped vertical pole that is vertically arranged and has a hollow cavity; the bottom of the outer vertical pole 100 is bolted to the embedded part of the connection foundation base 300 through the anchor fixing bolt 510110. The use of the anchor connection foundation base 300 enhances the stability of the support. When the outer vertical pole 100 is a vertically arranged T-shaped vertical pole with a hollow cavity, the inner vertical pole 200 is a groove-shaped rod body that is plug-in fit with the T-shaped vertical pole. The use of the plug-in fit method improves the installation convenience. Of course, it should be understood that in other embodiments of the present application, it is not excluded that the outer vertical pole 100 adopts a dovetail block structure design, and the inner vertical pole 200 is provided with a dovetail groove structure that matches the dovetail block structure, so as to further achieve a tight plug-in fit.

[0043] On both sides of the outer vertical pole 100, a plurality of connecting ear holes are arranged along the height direction, and the connecting ear holes are used to be connected to the fixed columns on both sides of the enclosure through bolts. When the outer vertical pole 100 is a vertically arranged T-shaped vertical pole with a hollow cavity and the inner vertical pole 200 is a groove-shaped rod body that is plug-in fit with the T-shaped vertical pole, the inner vertical pole 200 is also provided with screw holes that match the connecting ear holes on both sides. The fixed columns of the enclosure, the outer vertical pole 100 and the inner vertical pole 200 are connected into one body through bolts, and the overall structural strength is relatively large, enhancing the stability of the enclosure.

[0044] Combined with Figure 4 and Figure 5 As shown in, when the connection between the outer vertical pole 100 and the inner vertical pole 200 adopts the connection method of bolt assembly, Figure 4 and Figure 5 The structural schematic diagram of the second embodiment of the external force pole is shown; the outer vertical pole 100 is a rectangular vertical pole that is vertically arranged and has a hollow cavity; the bottom of the outer vertical pole 100 is bolted to the embedded part of the connection foundation base 300 through the anchor fixing bolt 510110. The use of the anchor connection foundation base 300 enhances the stability of the support. When the outer vertical pole 100 is a vertically arranged rectangular vertical pole with a hollow cavity, the inner vertical pole 200 is a square rod body that is connected and matched with the rectangular vertical pole through a bolt assembly. It has relatively high connection stability.

[0045] Four connecting ear plates are rectangularly distributed on the side wall of the outer vertical rod 100. A plurality of screw holes are spaced along the height direction of the outer vertical rod 100 on all four connecting ear plates. Two opposite connecting ear plates at the outer end are connected to the fixed columns on both sides of the enclosure by bolts, and two opposite connecting ear plates at the inner end are connected to the inner vertical column by bolts. Of course, long bolts can also be used to insert the fixed columns on both sides of the enclosure into the space between two connecting ear plates on the same side, so that the long bolts penetrate through the connecting ear plates at the outer end, the fixed columns, and the connecting ear plates at the inner end to achieve a stable connection and installation relationship, connecting the fixed columns, the outer vertical rod 100, and the inner vertical rod 200 into one body, with a relatively large overall structural strength and enhanced stability of the enclosure.

[0046] And, in combination Figure 6 with Figure 7 as shown in, the inner vertical rod 200 is pre-buried and connected to the foundation base 300; alternatively, the inner vertical rod 200 is connected to the foundation base 300 through an anchor bolt assembly. The precast foundation base 300 can be used and the inner vertical rod 200 can be pre-buried in the foundation base 300 synchronously, or an installation groove can be opened on the foundation base 300 and the inner vertical rod 200 can be installed in the foundation base 300 in an anchored manner.

[0047] When the inner vertical rod 200 is connected to the foundation base 300 through an anchor bolt assembly, the gap between the inner vertical rod 200 and the outer vertical rod 100 is filled with a noise reduction ring 400. When an installation groove is opened on the base of the foundation, the gap between the inner vertical rod 200 and the outer vertical rod 100 needs to be checked and filled with a noise reduction ring 400 to avoid large noise between the inner vertical rod 200 and the outer vertical rod 100 due to the shaking of the enclosure affected by wind force. Of course, in another embodiment of the present application, the inner vertical rod 200 is fixedly connected to the foundation base 300 in a pre-buried manner, and a noise reduction ring 400 can also be installed in the gap existing when installing the outer vertical rod 100, thereby effectively reducing the generation of noise.

[0048] In combination Figure 1 with Figure 8 as shown in, the inner vertical rod 200 is connected with a horizontally extending support frame group; wherein, the support frame group extends towards the inside of the construction site, and the support frame group is used for classifying and fixing the cables, water pipes, and other pipelines temporarily erected during construction, improving the convenience of later maintenance.

[0049] The support frame group includes: a vertical frame 500 assembled in parallel with the inner vertical rod 200, and a telescopic frame group assembled perpendicular to the vertical frame 500; at least four mounting hole positions 210 are arranged along the height direction on the side of the inner vertical rod 200 facing away from the outer vertical rod 100; at least two fixing bolts 510 are assembled on the vertical frame 500, and at least two fixing bolts 510 are threadedly connected to at least two mounting hole positions 210. The fixed height of the positioning pipeline can be adjusted, and it has strong installation stability. In a specific embodiment of the present application, four mounting hole positions 210 are arranged at equal intervals along the height direction on the inner vertical rod 200, and four through holes matching the four mounting hole positions 210 are also opened on the vertical frame 500. Two of the four through holes coincide with two through holes on the inner column and are then connected and locked by fixing bolts 510. Of course, it is also possible to lock by opposing three through holes and three mounting hole positions 210, or lock by opposing four through holes and four mounting hole positions 210. By adopting at least two connection methods, the phenomenon of axial rotation caused by a single positioning point connection can be avoided, and the stability is enhanced.

[0050] Multiple types of bridge protection sleeves 700 for positioning cables and multiple telescopic and adjustable U-shaped pipe fixers 800 for positioning water pipes or other pipelines are assembled on the telescopic frame group. Specifically, the telescopic frame group includes: a fixed frame 600 perpendicular to the vertical frame 500 at 90°, and a movable frame 610 slidably connected to the fixed frame 600; among them, the bridge protection sleeve 700 is fixedly connected to the fixed frame 600, and the U-shaped pipe fixer 800 is detachably fixedly connected to the fixed frame 600 and / or the movable frame 610. By using the bridge protection sleeve 700 to fix and protect the cable, and using the U-shaped pipe fixer 800 to fix the water pipeline or other pipelines, the overall classification is good and there is a good maintenance space. The fixed frame 600 is provided with long waist holes along the length direction, and the movable frame 610 is connected to the fixed frame 600 through a plurality of positioning bolt assemblies 620 that can be locked inside the long waist holes. The adjustment method is simple and convenient.

[0051] In the embodiment of the present application, by sliding the movable frame 610 along the long waist hole, a drawer-type telescopic relationship is formed, and a stable connection is formed through a plurality of positioning bolt assemblies 620. The plurality of bolt assemblies are also at least provided with two, so as to prevent the phenomenon of axial rotation caused by a single positioning point connection and enhance the stability.

[0052] In the present application, by connecting the outer vertical rod 100 and the inner vertical rod 200, the stability of the enclosure support is enhanced, and the support frame group sorts and fixes the pipelines used in the construction, making the operation more convenient during the maintenance process, reducing the risk of accidental collision during construction, and improving construction safety.

[0053] Those of ordinary skill in the art should understand that: The discussion of any of the above embodiments is merely exemplary and is not intended to imply that the scope of the present disclosure (including the claims) is limited to these examples; Under the concept of the present disclosure, the technical features in the above embodiments or different embodiments can also be combined, the steps can be implemented in any order, and there are many other variations in different aspects of one or more embodiments of the present specification as above, and for the sake of brevity, they are not provided in detail.

[0054] In addition, for the sake of simplicity of explanation and discussion, and in order not to make one or more embodiments of the present specification difficult to understand, the well-known power / ground connections of other components may or may not be shown in the accompanying drawings. Furthermore, the device may be shown in the form of a block diagram in order not to make one or more embodiments of the present specification difficult to understand, and this also takes into account the fact that the details of the implementation of these block diagram devices are highly dependent on the platform on which one or more embodiments of the present specification are to be implemented (i.e., these details should be completely within the understanding of those skilled in the art). In the case where specific details are set forth to describe the exemplary embodiments of the present disclosure, it will be apparent to those skilled in the art that one or more embodiments of the present specification can be implemented without these specific details or with variations of these specific details. Therefore, these descriptions should be considered illustrative rather than restrictive.

[0055] One or more embodiments of the present specification are intended to cover all such substitutions, modifications, and variations that fall within the broad scope of the appended claims. Therefore, any omissions, modifications, equivalent substitutions, improvements, etc. made within the spirit and principles of one or more embodiments of the present specification shall be included within the protection scope of the present disclosure.

Claims

1. A multi-purpose assembled enclosure support frame, comprising an outer pole and an inner pole assembled on a base; characterized in that: The outer pole is detachably fixedly connected to the inner pole; The inner uprights are connected to a horizontally extending support frame group; wherein, The support frame group includes: a vertical frame assembled parallel to the inner upright pole, and a telescopic frame group assembled perpendicularly to the vertical frame; The telescopic frame group is equipped with a bridge frame protection cover and a plurality of telescopically adjustable U-shaped pipe fixers.

2. The multi-purpose assembled enclosure support frame according to claim 1, characterized in that: The outer pole is connected to the base base through anchoring bolts.

3. The multi-purpose assembled enclosure support frame according to claim 2, characterized in that: The outer pole is a T-shaped pole arranged vertically and having a hollow cavity; or, The outer pole is a vertically arranged rectangular pole with a hollow cavity.

4. The multi-purpose assembled enclosure support frame according to claim 3 is characterized in that: The inner upright is pre-buried and connected to the base base; or, The inner upright is connected to the base base via an anchor bolt assembly.

5. The multi-purpose assembled enclosure support frame according to claim 4, characterized in that: When the inner upright is connected to the base base through an anchor bolt assembly, The gap between the inner pole and the outer pole is filled with a noise reduction ring.

6. The multi-purpose assembled enclosure support frame according to claim 5, characterized in that: When the outer pole is a T-shaped pole arranged vertically and having a hollow cavity, The inner upright pole is a grooved pole body plugged and matched with the T-shaped upright pole.

7. The multi-purpose assembled enclosure support frame according to claim 6, characterized in that: When the outer pole is a vertically arranged rectangular pole with a hollow cavity, The inner upright pole is a square rod body connected and matched with the rectangular upright pole through a bolt assembly.

8. The multi-purpose assembled enclosure support frame according to claim 1, characterized in that: At least four mounting holes are arranged on a side of the inner pole facing away from the outer pole along the height direction; At least two fixing bolts are mounted on the vertical frame, and at least two of the fixing bolts are threadedly connected to at least two of the mounting holes.

9. The multi-purpose assembled enclosure support frame according to claim 8, characterized in that: The telescopic frame group includes: a fixed frame 90° perpendicular to the vertical frame, and a movable frame slidably connected to the fixed frame; wherein, The bridge protection cover is fixedly connected to the fixed frame, and the U-shaped pipe holder is detachably fixedly connected to the fixed frame and / or the movable frame.

10. The multi-purpose assembled enclosure support frame according to claim 9, characterized in that: The fixing frame is provided with a long waist hole along the length direction, and the movable frame is connected to the fixing frame through a plurality of positioning bolt assemblies which can be locked inside the long waist hole.