Packed tower for flue gas purification and desulfurization
By designing a packing tower for flue gas purification and desulfurization with a multi-stage structure, the problems of inconvenience in cleaning and difficulty in hierarchy adjustment of traditional packing towers are solved, and flexible and efficient flue gas treatment is achieved.
Patent Information
- Application Number
- CN202421759553.0
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-07-24
- Publication Date
- 2025-07-04
- Estimated Expiration
- 2034-07-24
AI Technical Summary
The integrated structure of the traditional flue gas purification and desulfurization packing tower is caused by inconvenient cleaning and maintenance, and it is difficult to adjust the filtration level according to needs, and it is poor flexibility and applicability.
It is designed as a multi-stage structure, including the upper, middle and bottom tower bodies, which are fixed by flanges and bolts, and are clamped with the slots by sealing clamps. The sealing between the tower bodies is good, allowing the filtering level to be adjusted according to needs, making it easy to disassemble and maintain.
It improves the flexibility and applicability of the equipment, reduces the difficulty of maintenance and cleaning, enhances the contact area between flue gas and filler, and improves the desulfurization efficiency.
Smart Images

Figure CN223055380U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of flue gas purification equipment, in particular to a packing tower for flue gas purification and desulfurization. Background Technique
[0002] Flue gas purification is mainly achieved through a device called a packing tower. A packing tower is a device used to treat pollutants in flue gas. During the desulfurization process, the packing tower adsorbs, absorbs, or oxidizes sulfides such as sulfur dioxide in the flue gas by filling some specific packing materials, thereby reducing the sulfur content in the flue gas. As a kind of flue gas purification equipment, the packing tower is widely used in fields such as coal combustion, oil refining, and chemical industry in industrial production, and is one of the important devices for protecting the environment and reducing air pollution.
[0003] However, most traditional packing towers for flue gas purification and desulfurization adopt an integral structure, which makes it take a lot of time for users to clean and replace the packing inside the packing tower, resulting in poor convenience for maintaining and cleaning the packing tower. Moreover, traditional packing towers usually adopt a single structure and it is difficult to adjust or increase the filtration levels according to actual needs. Therefore, they are less flexible in adapting to various flue gas treatment requirements.
[0004] Therefore, those skilled in the art have provided a packing tower for flue gas purification and desulfurization to solve the problems raised in the above background technique. Content of the Utility Model
[0005] The purpose of the utility model is to solve the shortcomings existing in the prior art, and a packing tower for flue gas purification and desulfurization is proposed. Compared with most traditional packing towers for flue gas purification and desulfurization, the packing tower for flue gas purification and desulfurization is respectively provided with an upper tower body, a middle tower body and a bottom tower body, which are fixed to each other under the action of flanges and bolts, and the sealing between the tower bodies is good through the clamping fit between the sealing blocks and the sealing grooves, so that the packing tower is composed of multiple sections. The multi-section structure enables the packing tower to adjust the filtration levels of the packing tower according to actual needs to adapt to different flue gas treatment requirements, improves the flexibility and applicability of the equipment, and the multi-section structure design enables the packing tower to be relatively easily disassembled and maintained, facilitating cleaning and replacing the packing, thereby reducing the work difficulty and cost of users, and further enhancing the convenience of maintaining and cleaning the packing tower.
[0006] To achieve the above purpose, the utility model provides the following technical solutions:
[0007] A packing tower for flue gas purification and desulfurization, comprising a fixing frame and a housing. The inner wall of the fixing frame is fixedly connected with a bottom tower body. The middle of the inner wall of the bottom tower body is fixedly connected with a first packing plate. The upper surface of the first packing plate is provided with a plurality of air-permeable holes. The upper end of the outer wall of the bottom tower body is fixedly connected with a first flange. The periphery of the upper surface of the bottom tower body is provided with a first sealing groove. The upper surface of the bottom tower body is fixedly connected with a middle tower body. The lower end of the outer wall of the middle tower body is fixedly connected with a second flange. The upper end of the outer wall of the middle tower body is fixedly connected with a third flange. The periphery of the lower surface of the middle tower body is fixedly connected with a first sealing block. The periphery of the upper surface of the middle tower body is provided with a second sealing groove. The lower end of the inner wall of the middle tower body is fixedly connected with a second packing plate. The middle of the inner wall of the middle tower body is fixedly connected with a limiting ring. The upper surface of the limiting ring is provided with a third packing plate. The upper surface of the middle tower body is fixedly connected with an upper tower body. The lower end of the outer wall of the upper tower body is fixedly connected with a fourth flange. The periphery of the lower surface of the upper tower body is fixedly connected with a second sealing block. The center of the upper surface of the upper tower body is fixedly connected with a placing block. The middle of the upper surface of the placing block is provided with a placing groove.
[0008] Through the above technical solution, compared with most traditional packing towers for flue gas purification and desulfurization, this packing tower for flue gas purification and desulfurization is provided with a second packing plate and a third packing plate in the middle tower body. The detachable third packing plate not only reduces the trouble during cleaning, but also divides the middle tower body into two filtration levels, so that the user can install an appropriate number of middle tower bodies according to the usage requirements, and then adjust the filtration level of this packing tower. By increasing the filtration level, the packing tower can provide more contact area, increase the chance of contact between the flue gas and the packing, and thus improve the desulfurization efficiency.
[0009] Further, legs are fixedly connected to the four peripheries of the outer wall of the fixing frame, and a base is fixedly connected to the lower surface of the legs;
[0010] Through the above technical solution, the packing tower can be stably placed at the required position.
[0011] Further, an air inlet is fixedly connected to the lower end of one side of the outer wall of the bottom tower body;
[0012] Through the above technical solution, by setting the air inlet, the flue gas to be filtered can enter the packing tower.
[0013] Further, a liquid storage block is fixedly connected to the lower surface of the bottom tower body, and a liquid discharge port is fixedly connected to the center of the lower surface of the liquid storage block;
[0014] Through the above technical solution, the desulfurizer after filtration and adsorption can be collected in the liquid storage block and then discharged through the liquid discharge port.
[0015] Further, in the middle of one side of the outer wall of the upper tower body, a liquid inlet is fixedly connected, and a liquid spray head is fixedly connected to the outer wall on one side of the liquid inlet;
[0016] Through the above technical solution, the liquid inlet 23 can be connected to the pipeline for transporting the desulfurizing agent, and then the desulfurizing agent is sprayed into the packed tower through the liquid spray head.
[0017] Further, a cover plate is fixedly connected to the upper surface of the placing block, and an air outlet is fixedly connected to the center of the upper surface of the cover plate;
[0018] Through the above technical solution, the filtered gas can be discharged from the packed tower through the air outlet, and the provided cover plate can also limit and fix the position of the housing.
[0019] Further, limiting card slots are provided on the four sides of the inner wall of the placing groove, limiting blocks are fixedly connected to the four sides of the outer wall of the housing, and a taking handle is fixedly connected to the upper end of the inner wall of the housing;
[0020] Through the above technical solution, the housing can be firmly clamped in the placing groove, and the user can conveniently disassemble or install the housing through the taking handle.
[0021] Further, a filter element is arranged at the lower end of the inner wall of the placing block, and a ventilation groove is provided at the center of the bottom surface of the placing groove;
[0022] Through the above technical solution, the filtered gas can enter the filter element through the ventilation groove for re - filtration.
[0023] The utility model has the following beneficial effects:
[0024] 1. A packed tower for flue gas purification and desulfurization proposed by the utility model, compared with most traditional packed towers for flue gas purification and desulfurization, this packed tower for flue gas purification and desulfurization is respectively provided with an upper tower body, a middle tower body and a bottom tower body, which are fixed to each other under the action of flanges and bolts, and the sealing performance between the tower bodies is good through the clamping fit between the sealing blocks and the sealing grooves, so that the packed tower is composed of multiple sections. The multi - section structure enables the packed tower to adjust the filtration levels of the packed tower according to actual needs to meet the requirements of different flue gas treatments, improving the flexibility and applicability of the equipment. And the multi - section structure design makes the packed tower relatively easy to disassemble and maintain, facilitating cleaning and replacement of the packing, thereby reducing the work difficulty and cost of the user, and further improving the convenience of maintenance and cleaning of the packed tower.
[0025] 2. A packing tower for flue gas purification and desulfurization proposed by the present utility model. Compared with most traditional packing towers for flue gas purification and desulfurization, this packing tower for flue gas purification and desulfurization is provided with a second packing plate and a third packing plate in the middle tower body. The detachable third packing plate not only reduces the trouble during cleaning but also divides the middle tower body into two filtration levels, enabling the user to install an appropriate number of middle tower bodies according to the usage requirements, thereby adjusting the filtration levels of the packing tower. By increasing the filtration levels, the packing tower can provide more contact areas, increasing the chance of contact between the flue gas and the packing, and thus improving the desulfurization efficiency. BRIEF DESCRIPTION OF THE DRAWINGS
[0026] Figure 1 is a schematic structural diagram of a packing tower for flue gas purification and desulfurization proposed by the present utility model;
[0027] Figure 2 is a schematic structural diagram of the upper tower body of a packing tower for flue gas purification and desulfurization proposed by the present utility model;
[0028] Figure 3 is a schematic structural diagram of the middle tower body of a packing tower for flue gas purification and desulfurization proposed by the present utility model;
[0029] Figure 4 is a schematic structural diagram of the bottom tower body of a packing tower for flue gas purification and desulfurization proposed by the present utility model;
[0030] Figure 5 is a schematic structural diagram of the housing of a packing tower for flue gas purification and desulfurization proposed by the present utility model.
[0031] LEGEND DESCRIPTION:
[0032] 1. Fixed frame; 2. Leg; 3. Base; 4. Bottom tower body; 5. Air inlet; 6. Liquid storage block; 7. Drainage port; 8. First packing plate; 9. Vent hole; 10. First flange; 11. First sealing groove; 12. Middle tower body; 13. Second flange; 14. Third flange; 15. First sealing block; 16. Second sealing groove; 17. Second packing plate; 18. Limiting ring; 19. Third packing plate; 20. Upper tower body; 21. Fourth flange; 22. Second sealing block; 23. Liquid inlet; 24. Liquid spray head; 25. Placing block; 26. Cover plate; 27. Air outlet; 28. Placing groove; 29. Limiting card slot; 30. Ventilation groove; 31. Housing; 32. Taking handle; 33. Filter element; 34. Limiting card block. DETAILED DESCRIPTION OF THE EMBODIMENTS
[0033] Next, the technical solutions in the embodiments of the present invention will be clearly and completely described in conjunction with the accompanying drawings in the embodiments of the present invention. Obviously, the described embodiments are only a part of the embodiments of the present invention, rather than all the embodiments. All other embodiments obtained by those of ordinary skill in the art based on the embodiments of the present invention without creative efforts shall fall within the protection scope of the present invention.
[0034] Referring to Figures 1-5 , an embodiment provided by the present invention is as follows:
[0035] A packing tower for flue gas purification and desulfurization includes a fixing frame 1 and a housing 31. Legs 2 are fixedly connected to the periphery of the outer wall of the fixing frame 1, and a base 3 is fixedly connected to the lower surface of the legs 2, so that the packing tower can be stably placed at the required position. The inner wall of the fixing frame 1 is fixedly connected to a bottom tower body 4. An air inlet 5 is fixedly connected to the lower end of one side of the outer wall of the bottom tower body 4. By providing the air inlet 5, the flue gas to be filtered can enter the packing tower. A liquid storage block 6 is fixedly connected to the lower surface of the bottom tower body 4, and a liquid discharge port 7 is fixedly connected to the center of the lower surface of the liquid storage block 6, so that the desulfurizer after filtration and adsorption can be collected in the liquid storage block 6 and then discharged through the liquid discharge port 7. A first packing plate 8 is fixedly connected to the middle of the inner wall of the bottom tower body 4. A plurality of air holes 9 are opened on the upper surface of the first packing plate 8. A first flange 10 is fixedly connected to the upper end of the outer wall of the bottom tower body 4. A first sealing groove 11 is opened on the periphery of the upper surface of the bottom tower body 4. The upper surface of the bottom tower body 4 is fixedly connected to a middle tower body 12;
[0036] A second flange 13 is fixedly connected to the lower end of the outer wall of the middle tower body 12, a third flange 14 is fixedly connected to the upper end of the outer wall of the middle tower body 12, a first sealing block 15 is fixedly connected to the periphery of the lower surface of the middle tower body 12, a second sealing groove 16 is opened on the periphery of the upper surface of the middle tower body 12. A second packing plate 17 is fixedly connected to the lower end of the inner wall of the middle tower body 12, a limiting ring 18 is fixedly connected to the middle of the inner wall of the middle tower body 12, a third packing plate 19 is arranged on the upper surface of the limiting ring 18, the upper surface of the middle tower body 12 is fixedly connected to an upper tower body 20, a fourth flange 21 is fixedly connected to the lower end of the outer wall of the upper tower body 20, a second sealing block 22 is fixedly connected to the periphery of the lower surface of the upper tower body 20, and a placing block 25 is fixedly connected to the center of the upper surface of the upper tower body 20. A placing groove 28 is opened in the middle of the upper surface of the placing block 25.
[0037] Compared with the traditional packing towers for most flue gas purification and desulfurization, this packing tower for flue gas purification and desulfurization is respectively provided with an upper tower body 20, a middle tower body 12 and a bottom tower body 4, which are fixed to each other under the action of flanges and bolts, and the sealing performance between the tower bodies is good through the clamping fit between the sealing blocks and the sealing grooves, so that this packing tower is composed of multiple sections. The multi-section structure enables this packing tower to adjust the filtration levels of the packing tower according to actual needs to meet the requirements of different flue gas treatments, improving the flexibility and applicability of the equipment. Moreover, the multi-section structure design makes the packing tower relatively easy to disassemble and maintain, facilitating the cleaning and replacement of the packing, thus reducing the work difficulty and cost of the users, and further enhancing the convenience of maintaining and cleaning this packing tower.
[0038] In the middle of one side of the outer wall of the upper tower body 20, a liquid inlet 23 is fixedly connected. On the outer wall of one side of the liquid inlet 23, a liquid spray head 24 is fixedly connected, so that the liquid inlet 23 can be connected to the pipeline for transporting the desulfurizing agent, and then the desulfurizing agent is sprayed into the packing tower through the liquid spray head 24. On the upper surface of the placing block 25, a cover plate 26 is fixedly connected. At the center of the upper surface of the cover plate 26, an air outlet 27 is fixedly connected, so that the filtered gas can be discharged from this packing tower through the air outlet 27. The provided cover plate 26 can also limit and fix the position of the housing 31. On the four sides of the inner wall of the placing groove 28, limiting clamping grooves 29 are respectively opened. On the four sides of the outer wall of the housing 31, limiting clamping blocks 34 are fixedly connected. At the upper end of the inner wall of the housing 31, a taking handle 32 is fixedly connected, so that the housing 31 can be firmly clamped in the placing groove 28, and the user can disassemble or install the housing 31 more conveniently through the taking handle 32. At the lower end of the inner wall of the placing block 25, a filter element 33 is arranged. At the center of the bottom surface of the placing groove 28, a ventilation groove 30 is opened, so that the filtered gas can enter the interior of the filter element 33 through the ventilation groove 30 for final filtration.
[0039] Working principle: First, select an appropriate number of middle tower bodies 12, fill the adsorption packing on the first packing plate 8, the second packing plate 17 and the third packing plate 19 on the middle tower body 12 and the bottom tower body 4, then fix multiple middle tower bodies 12 and the bottom tower body 4 together, and finally fix the upper tower body 20 on the middle tower body 12. Connect the air inlet 5 to the pipeline for transporting flue gas, connect the liquid discharge port 7 to the pipeline for transporting waste liquid, and connect the liquid inlet 23 to the pipeline for transporting the desulfurizing agent. The flue gas enters the tower body and contacts the packing filled on each packing plate. The packing and the desulfurizing agent adsorb, absorb or oxidize sulfides such as sulfur dioxide in the flue gas, thereby reducing the sulfur content in the flue gas. Finally, it is discharged after passing through the filter element 33 in the housing 31 for the last filtration.
[0040] Finally, it should be noted that the above are only the preferred embodiments of the present utility model and are not intended to limit the present utility model. Although the present utility model has been described in detail with reference to the foregoing embodiments, those skilled in the art can still modify the technical solutions recorded in the foregoing embodiments or perform equivalent replacements for some of the technical features. Any modifications, equivalent replacements, improvements, etc. made within the spirit and principle of the present utility model shall be included within the protection scope of the present utility model.
Claims
1. A packing tower for flue gas purification and desulfurization, comprising a fixing frame (1) and a shell (31), characterized in that: The inner wall of the fixing frame (1) is fixedly connected with a bottom tower body (4). The middle part of the inner wall of the bottom tower body (4) is fixedly connected with a first packing plate (8). The upper surface of the first packing plate (8) is provided with a plurality of air-permeable holes (9). The upper end of the outer wall of the bottom tower body (4) is fixedly connected with a first flange (10). The periphery of the upper surface of the bottom tower body (4) is provided with a first sealing groove (11). The upper surface of the bottom tower body (4) is fixedly connected with a middle tower body (12). The lower end of the outer wall of the middle tower body (12) is fixedly connected with a second flange (13). The upper end of the outer wall of the middle tower body (12) is fixedly connected with a third flange (14). The periphery of the lower surface of the middle tower body (12) is fixedly connected with a first sealing block (15). The periphery of the upper surface of the middle tower body (12) is provided with a second sealing groove (16); The lower end of the inner wall of the middle tower body (12) is fixedly connected with a second packing plate (17). The middle part of the inner wall of the middle tower body (12) is fixedly connected with a limiting ring (18). The upper surface of the limiting ring (18) is provided with a third packing plate (19). The upper surface of the middle tower body (12) is fixedly connected with an upper tower body (20). The lower end of the outer wall of the upper tower body (20) is fixedly connected with a fourth flange (21). The periphery of the lower surface of the upper tower body (20) is fixedly connected with a second sealing block (22). The center of the upper surface of the upper tower body (20) is fixedly connected with a placing block (25). The middle part of the upper surface of the placing block (25) is provided with a placing groove (28).
2. The packed tower for flue gas purification and desulfurization according to claim 1, characterized in that: The four sides of the outer wall of the fixing frame (1) are all fixedly connected with support legs (2). The lower surface of the support legs (2) is fixedly connected with a base (3).
3. The packed tower for flue gas purification and desulfurization according to claim 1, characterized in that: The lower end of one side of the outer wall of the bottom tower body (4) is fixedly connected with an air inlet (5).
4. A packed tower for flue gas purification and desulfurization according to claim 1, characterized in that: The lower surface of the bottom tower body (4) is fixedly connected with a liquid storage block (6). The center of the lower surface of the liquid storage block (6) is fixedly connected with a liquid discharge port (7).
5. The packed tower for flue gas purification and desulfurization according to claim 1, characterized in that: The middle part of one side of the outer wall of the upper tower body (20) is fixedly connected with a liquid inlet (23). The outer wall of one side of the liquid inlet (23) is fixedly connected with a liquid spray head (24).
6. The packed tower for flue gas purification and desulfurization according to claim 1, wherein: The upper surface of the placing block (25) is fixedly connected with a cover plate (26). The center of the upper surface of the cover plate (26) is fixedly connected with an air outlet (27).
7. A packing tower for flue gas purification and desulfurization according to claim 1, characterized in that: The four sides of the inner wall of the placing groove (28) are all provided with limiting grooves (29). The four sides of the outer wall of the housing (31) are all fixedly connected with limiting blocks (34). The upper end of the inner wall of the housing (31) is fixedly connected with a taking handle (32).
8. A packed tower for flue gas purification and desulfurization according to claim 1, characterized in that: The lower end of the inner wall of the placing block (25) is provided with a filter element (33). The center of the inner bottom surface of the placing groove (28) is provided with a ventilation groove (30).