High-altitude construction waste discharging device

By designing the material drag, stabilization and unloading mechanism of high-altitude construction waste discharge device, the coordination of the stable plate and the support plate is used to solve the problem of dumping construction waste after bagging, the stable and efficient unloading of garbage is achieved, and the cleaning efficiency is improved.

CN223059755UActive Publication Date: 2025-07-04山东启域建筑劳务工程有限公司
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202422047965.8
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-08-23
Publication Date
2025-07-04
Estimated Expiration
2034-08-23

AI Technical Summary

Technical Problem

Construction waste is easily dumped after being bagged, causing the garbage to be scattered and affecting the progress of cleaning work.

Method used

A high-altitude construction waste discharge device is designed, including a drag mechanism, a stabilization mechanism and a discharge mechanism. Through the combination of the stabilization plate and the support plate, the container bags are prevented from pouring. The L-shaped stabilization plate and a triangular support plate made of plastic materials are in contact with the ground, and the push plate connected to the support plate and the cylinder pushes the stabilization plate down to achieve the stability and discharge of garbage.

Benefits of technology

Effectively prevent the dumping of container bags, prevent the scattering of garbage, ensure the smooth progress of cleaning work, and improve the comfort and work efficiency of staff.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN223059755U_ABST
    Figure CN223059755U_ABST
Patent Text Reader

Abstract

The utility model discloses a high-altitude construction waste discharging device which comprises a material dragging mechanism, the material dragging mechanism comprises a trailer, a shallow groove formed in the top of the trailer and a stabilizing mechanism, and the stabilizing mechanism comprises a stabilizing plate attached to the bottom of an inner cavity of the shallow groove, two supporting plates movably installed on one side of the stabilizing plate and a discharging mechanism. The discharging mechanism comprises two baffles installed in the shallow groove, an air cylinder arranged between the two baffles and connected with the trailer, and a push plate connected with the movable end of the air cylinder. According to the utility model, after the stabilizing plates on which the flexible freight bags are placed are arranged in order, a user opens the two supporting plates on one sides of the stabilizing plates, and the supporting plates abut against the flexible freight bags, so that the flexible freight bags are effectively prevented from toppling over, garbage scattering is avoided, and the work progress of garbage cleaning is ensured.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of construction waste discharge, in particular to an aerial construction waste discharge device. Background Technique

[0002] Construction waste refers to the muck, waste soil, waste materials, surplus mud and other waste generated during the construction, laying or demolition and repair of various buildings, structures, pipe networks, etc. by construction, construction units or individuals.

[0003] In order to improve the space utilization rate, after the construction waste is bagged, they will be arranged one by one. During this process, the phenomenon of the container bags tipping over easily occurs, causing the waste to scatter and affecting the progress of the cleaning work.

[0004] The utility model aims to solve one of the technical problems existing in the prior art or related technologies. Content of the Utility Model

[0005] For this reason, the technical solution adopted by the utility model is as follows:

[0006] An aerial construction waste discharge device includes a material towing mechanism, the material towing mechanism includes a trailer, a shallow groove opened at the top of the trailer, a stabilizing mechanism, the stabilizing mechanism includes a stabilizing plate attached to the bottom of the inner cavity of the shallow groove, two support plates movably installed on one side of the stabilizing plate, and a discharging mechanism, the discharging mechanism includes two baffles installed inside the shallow groove, a cylinder arranged between the two baffles and connected to the trailer, and a push plate connected to the movable end of the cylinder.

[0007] By adopting the above technical solution, after the stabilizing plates with container bags are neatly arranged, the user opens the two support plates on one side of the stabilizing plate, and the support plates press against the container bags, effectively preventing the container bags from tipping over, preventing the waste from scattering, and ensuring the progress of the work of cleaning the waste.

[0008] In a preferred example of the utility model, it can be further configured that: the stabilizing plate is set to be L-shaped and is made of plastic material.

[0009] In a preferred example of the utility model, it can be further configured that: an opening is opened on the stabilizing plate, and the opening is close to the top of the stabilizing plate.

[0010] In a preferred example of the utility model, it can be further configured that: the support plate is set to be triangular, and the bottom is flush with the bottom of the stabilizing plate, and the manufacturing material of the support plate is the same as that of the stabilizing plate.

[0011] In a preferred example of the utility model, it can be further configured that: the push plate hangs inside the shallow groove, and the push plate is movably attached to one stabilizing plate.

[0012] In a preferred embodiment, the utility model can be further configured as follows: a bracket is installed on one side of the trailer, and a plurality of stabilizing plates are movably arranged on the top of the bracket.

[0013] By adopting the above technical solution, the beneficial effects achieved by the utility model are as follows:

[0014] 1. In the utility model, after the stabilizing plates with the flexible intermediate bulk containers are neatly arranged, the user opens the two support plates on one side of the stabilizing plate, and the support plates abut against the flexible intermediate bulk containers, effectively preventing the flexible intermediate bulk containers from tipping over, preventing garbage from scattering, and ensuring the progress of the garbage cleaning work.

[0015] 2. In the utility model, the stabilizing plate placed in the shallow groove position carries the flexible intermediate bulk container. After the flexible intermediate bulk container is filled with construction waste, the air cylinder is started, and then the push plate pushes the stabilizing plate off the trailer, which is convenient for the staff to unload the materials and improves the use comfort. BRIEF DESCRIPTION OF THE DRAWINGS

[0016] Figure 1 is a three-dimensional view of the overall structure of the utility model;

[0017] Figure 2 is a rear view of the overall structure of the utility model;

[0018] Figure 3 is a schematic diagram of the material towing mechanism of the utility model;

[0019] Figure 4 is a schematic diagram of the stabilizing mechanism of the utility model;

[0020] Figure 5 is a schematic diagram of the unloading mechanism of the utility model.

[0021] REFERENCE SIGNS:

[0022] 100, material towing mechanism; 110, trailer; 120, shallow groove;

[0023] 200, stabilizing mechanism; 210, stabilizing plate; 220, support plate;

[0024] 300, unloading mechanism; 310, baffle; 320, air cylinder; 330, push plate;

[0025] 400, opening;

[0026] 500, bracket. DETAILED DESCRIPTION OF THE EMBODIMENTS

[0027] In order to make the purpose, technical solution and advantages of the utility model clearer, the utility model will be further described in detail below with reference to the specific embodiments and the accompanying drawings. It should be noted that, without conflict, the embodiments of the utility model and the features in the embodiments can be combined with each other.

[0028] It should be understood that these descriptions are only exemplary and are not intended to limit the scope of the present utility model.

[0029] The following describes a high-altitude construction waste discharging device provided by some embodiments of the present utility model in conjunction with the accompanying drawings. Embodiment 1:

[0030] Combined with Figures 1-5 As shown, a high-altitude construction waste discharging device provided by the present utility model includes a material dragging mechanism 100, a stabilizing mechanism 200, and a discharging mechanism 300. The material dragging mechanism 100 includes a trailer 110 and a shallow groove 120 opened at the top of the trailer 110;

[0031] The stabilizing mechanism 200 includes a stabilizing plate 210 that fits against the bottom of the inner cavity of the shallow groove 120, and two support plates 220 movably installed on one side of the stabilizing plate 210;

[0032] The discharging mechanism 300 includes two baffle plates 310 installed inside the shallow groove 120, a cylinder 320 disposed between the two baffle plates 310 and connected to the trailer 110, and a push plate 330 connected to the movable end of the cylinder 320.

[0033] Furthermore, the stabilizing plate 210 is provided in an L shape and is made of a plastic material. The stabilizing plate 210 made of a plastic material has a light mass and a very small load on the trailer 110, facilitating the staff to push.

[0034] Furthermore, the support plate 220 is provided in a triangular shape and the bottom is flush with the bottom of the stabilizing plate 210. The manufacturing material of the support plate 220 is the same as that of the stabilizing plate 210. Using the same material to manufacture the support plate 220 reduces the difficulty of material selection during manufacturing. Then, due to its shape design, it can well support the stabilizing plate 210 and reduce the probability of the stabilizing plate 210 tipping over.

[0035] Furthermore, the push plate 330 is suspended inside the shallow groove 120, and the push plate 330 is movably attached to one stabilizing plate 210. With this layout design, the movement of the push plate 330 is easier. Embodiment 2:

[0036] Combined with Figure 1 、 2 and Figure 4 As shown, on the basis of Embodiment 1, an opening 400 is provided on the stabilizing plate 210. The opening 400 is close to the top of the stabilizing plate 210. The provision of the opening 400 facilitates the user to hold the stabilizing plate 210. Embodiment 3:

[0037] Combined Figures 1-2 As shown, in the above embodiment, a bracket 500 is installed on one side of the trailer 110, and a plurality of stabilizing plates 210 are movably arranged on the top of the bracket 500. By setting the bracket 500, more stabilizing plates 210 can be placed on the trailer 110 to ensure that a larger number of flexible intermediate bulk containers can be stabilized.

[0038] The working principle and usage process of the present utility model: When the device is put into actual use, a stabilizing plate 210 is placed inside the shallow groove 120, and then the flexible intermediate bulk container filled with construction waste is placed on the stabilizing plate 210. Then, the trailer 110 is moved. After the flexible intermediate bulk container reaches the appropriate position, the cylinder 320 is started, and then the push plate 330 pushes the stabilizing plate 210 off the trailer 110, thereby realizing the discharge of the flexible intermediate bulk container. Then, two support plates 220 on one side of the stabilizing plate 210 are opened, and the support plates 220 come into contact with the ground, effectively preventing the stabilizing plate 210 from tipping over with the flexible intermediate bulk container, preventing garbage from scattering, and ensuring the progress of the garbage cleaning work.

[0039] Although the embodiments of the present utility model have been shown and described, those of ordinary skill in the art can understand that various changes, modifications, substitutions, and variations can be made to these embodiments without departing from the principles and spirit of the present utility model. The scope of the present utility model is defined by the claims and their equivalents.

Claims

1. An aerial construction waste discharge device, characterized in that, Including: A material dragging mechanism (100), the material dragging mechanism (100) includes a trailer (110) and a shallow groove (120) opened at the top of the trailer (110); a stabilizing mechanism (200), the stabilizing mechanism (200) includes a stabilizing plate (210) attached to the bottom of the inner cavity of the shallow groove (120) and two support plates (220) movably installed on one side of the stabilizing plate (210); a discharging mechanism (300), the discharging mechanism (300) includes two baffles (310) installed inside the shallow groove (120), a cylinder (320) disposed between the two baffles (310) and connected to the trailer (110), and a push plate (330) connected to the movable end of the cylinder (320).

2. The high-altitude construction waste discharging device according to claim 1, characterized in that, The stabilizing plate (210) is arranged in an L shape and is made of plastic material.

3. The high-altitude construction waste discharge device according to claim 1, characterized in that, An opening (400) is formed on the stabilizing plate (210), and the opening (400) is close to the top of the stabilizing plate (210).

4. The high-altitude construction waste discharging device according to claim 1, characterized in that, The support plate (220) is arranged in a triangle, and the bottom is flush with the bottom of the stabilizing plate (210). The manufacturing material of the support plate (220) is the same as that of the stabilizing plate (210).

5. The high-altitude construction waste discharging device according to claim 1, characterized in that, The push plate (330) hangs inside the shallow groove (120), and the push plate (330) is movably attached to one stabilizing plate (210).

6. The high-altitude construction waste discharging device according to claim 1, characterized in that, A bracket (500) is installed on one side of the trailer (110), and a plurality of stabilizing plates (210) are movably arranged on the top of the bracket (500).