Environment-friendly plastic paving lattice

By designing structures such as annular grooves, card holders, plug-in grooves, card slots and cross partitions on the plastic paving grid, combined with a variety of drainage holes, the problem of inconvenience is solved, rapid fixation and excellent drainage effects are achieved, and construction efficiency is improved.

CN223074549UActive Publication Date: 2025-07-08江西金牛座科技有限公司
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202422340229.1
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-09-25
Publication Date
2025-07-08
Estimated Expiration
2034-09-25

AI Technical Summary

Technical Problem

The existing plastic paving grid is not convenient for quick fixing and installation during construction, and the drainage effect is poor, resulting in an extended construction time.

Method used

The structures such as annular groove, card holder block, plug-in groove, card slot, cross partition are designed, combined with the settings of a variety of drainage holes to achieve quick connection and excellent drainage effects.

Benefits of technology

Improve construction efficiency, ensure rapid fixed installation and excellent drainage performance, and reduce construction time.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN223074549U_ABST
    Figure CN223074549U_ABST
Patent Text Reader

Abstract

The utility model discloses an environment-friendly plastic paving lattice which comprises a plastic paving lattice body, an annular groove is formed in the top of the plastic paving lattice body, the left side and the front face of the plastic paving lattice body are evenly provided with clamping frame blocks, and the total number of the clamping frame blocks is six. The positions, located on the two sides of the annular groove, of the interior of the plastic paving lattice body are provided with inserting grooves which are evenly distributed, the total number of the inserting grooves is four, the right side and the back face of the plastic paving lattice body are provided with clamping grooves which are evenly distributed, and the total number of the clamping grooves is six. And a cross-shaped partition plate is fixedly mounted at the top of the inner cavity of the plastic paving lattice main body. The environment-friendly plastic paving lattice provided by the utility model has the advantages of good drainage effect and convenience in construction, and solves the problems that the joints of the paving lattice in the prior art are inconvenient to quickly fix and mount during construction, and the drainage effect is poor, so that constructors spend a long time during construction.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of plastic paving grids, and particularly relates to an environment-friendly plastic paving grid. Background Art

[0002] A paving grid is a durable and sustainable ground reinforcement system for stabilizing permeable ground. It is simple to construct, easy to install, eliminates the need for pouring concrete, quickly infiltrates rainwater, and has a flat road surface. It is a new road surface system for building a sponge city and is widely applicable to urban road surfaces, villa communities, landscaping and civil engineering, as well as forestry and agricultural applications.

[0003] A plastic paving grid is a material for ground paving, usually made of high-density polyethylene or polypropylene, mainly for environmental protection. However, the existing paving grids are inconvenient for quickly fixing and installing their joints during construction, and the drainage effect is not good, resulting in longer construction time for construction workers. Therefore, there is an urgent need for an environment-friendly plastic paving grid to overcome the above defects. Summary of the Utility Model

[0004] The purpose of the utility model is to provide an environment-friendly plastic paving grid, which has the advantages of good drainage effect and convenient construction, so as to solve the problems raised in the above background art.

[0005] To achieve the above purpose, the utility model provides the following technical solution: an environment-friendly plastic paving grid, including a plastic paving grid main body. An annular groove is opened at the top of the plastic paving grid main body. Clamping frame blocks are evenly installed on the left side and the front of the plastic paving grid main body, and the total number of clamping frame blocks is six. Insertion slots are evenly opened on both sides of the annular groove inside the plastic paving grid main body, and the total number of insertion slots is four. Slots are evenly opened on the right side and the back of the plastic paving grid main body, and the total number of slots is six. A cross partition is fixedly installed at the top of the inner cavity of the plastic paving grid main body.

[0006] Further, sixteen first annular drainage holes are opened around the top of the plastic paving grid main body, and positioning grooves are evenly opened inside the plastic paving grid main body and on the inner side of the annular groove.

[0007] Further, the total number of the positioning grooves is sixteen, and vertical strip-shaped drainage holes are evenly opened around the bottom of the plastic paving grid main body.

[0008] Further, the total number of the vertical strip-shaped drainage holes is twenty-eight, and a second annular drainage hole is opened at the bottom of the plastic paving grid main body and on one side where the vertical strip-shaped drainage holes are relatively close to each other in pairs.

[0009] Furthermore, the total number of the second annular drainage holes is twenty-four, and semi-circular drainage holes are evenly distributed on the top of the plastic paving grid body.

[0010] Furthermore, the total number of the semi-circular drainage holes is twenty-four, and the aperture of the first annular drainage hole is larger than that of the second annular drainage hole.

[0011] In summary, due to the adoption of the above technology, the beneficial effects of the present utility model are as follows:

[0012] By providing the annular groove, the present utility model facilitates the connection and positioning between the plastic paving grid bodies; by providing the clamping frame blocks, it is convenient to penetrate through the clamping grooves into the interior of the plastic paving grid body for fixing; by providing the insertion grooves, the stability of the bottom of the plastic paving grid body is mainly improved; by providing the clamping grooves, it is mainly convenient to maintain the plastic paving grid body and improve the construction progress; by providing the cross partitions, some paving materials are mainly separated. It has the advantages of good drainage effect and convenient construction, and solves the problems in the prior art that the paving grids are inconvenient to be quickly fixedly installed at the joints during construction, and the drainage effect is not good, resulting in a long construction time for construction workers. BRIEF DESCRIPTION OF THE DRAWINGS

[0013] Figure 1 is a schematic structural view of the present utility model;

[0014] Figure 2 is a schematic bottom view structural view of the present utility model;

[0015] Figure 3 is a schematic structural view of another perspective of the present utility model.

[0016] In the figure: 1, plastic paving grid body; 2, annular groove; 3, clamping groove; 4, insertion groove; 5, first annular drainage hole; 6, semi-circular drainage hole; 7, clamping frame block; 8, vertical strip-shaped drainage hole; 9, second annular drainage hole; 10, cross partition; 11, positioning groove. DETAILED DESCRIPTION OF THE EMBODIMENTS

[0017] To make the objectives, technical solutions, and advantages of the embodiments of the present utility model clearer, the following will clearly and completely describe the technical solutions in the embodiments of the present utility model in conjunction with the accompanying drawings in the embodiments of the present utility model. Obviously, the described embodiments are part of the embodiments of the present utility model, rather than all of the embodiments. Based on the embodiments in the present utility model, all other embodiments obtained by those of ordinary skill in the art without creative efforts belong to the scope of protection of the present utility model. Therefore, the following detailed description of the embodiments of the present utility model provided in the accompanying drawings is not intended to limit the scope of the present utility model to be protected, but merely represents the selected embodiments of the present utility model. Based on the embodiments in the present utility model, all other embodiments obtained by those of ordinary skill in the art without creative efforts belong to the scope of protection of the present utility model.

[0018] The present utility model provides a Figures 1-3 shown environmentally friendly plastic paving grid, which includes a plastic paving grid main body 1. An annular groove 2 is opened at the top of the plastic paving grid main body 1. Clamping frame blocks 7 are evenly installed on the left side and the front of the plastic paving grid main body 1, and the total number of the clamping frame blocks 7 is six. Insertion slots 4 are evenly opened on both sides of the annular groove 2 inside the plastic paving grid main body 1, and the total number of the insertion slots 4 is four. Card slots 3 are evenly opened on the right side and the back of the plastic paving grid main body 1, and the total number of the card slots 3 is six. A cross partition 10 is fixedly installed at the top of the inner cavity of the plastic paving grid main body 1;

[0019] More specifically, by providing the annular groove 2, it is convenient to connect and position between the plastic paving grid main body 1 and the plastic paving grid main body 1. By providing the clamping frame blocks 7, it is convenient to penetrate through the card slots 3 into the inside of the plastic paving grid main body 1 to fix it. By providing the insertion slots 4, the stability of the bottom of the plastic paving grid main body 1 is mainly improved. By providing the card slots 3, it is mainly convenient to maintain the plastic paving grid main body 1 and improve the construction progress. By providing the cross partition 10, some paving materials are mainly separated, which has the advantages of good drainage effect and convenient construction, and solves the problems that the existing paving grid is inconvenient to quickly fix and install its joints during construction, and at the same time, the drainage effect is not good, resulting in a long time spent by construction workers during construction.

[0020] In some embodiments, sixteen first annular drainage holes 5 are opened around the top of the plastic paving grid main body 1. Positioning grooves 11 are evenly opened inside the plastic paving grid main body 1 and on the inner side of the annular groove 2. More specifically, by providing the first annular drainage holes 5, the drainage speed is mainly accelerated.

[0021] In some embodiments, the total number of the positioning grooves 11 is sixteen, and vertical strip-shaped drainage holes 8 are evenly arranged around the bottom of the plastic paving grid body 1. More specifically, the positioning grooves 11 are provided to engage with the ground connection object to ensure a secure connection.

[0022] In some embodiments, the total number of the vertical drainage holes 8 is twenty-eight, and a second annular drainage hole 9 is provided at the bottom of the plastic paving grid body 1 and on one side where the vertical drainage holes 8 are relatively close to each other. More specifically, the vertical drainage holes 8 are mainly arranged to cooperate with the second annular drainage holes 9, the semicircular drainage holes 6 and the first annular drainage holes 5, so as to achieve the effect of rapid diversion.

[0023] In some embodiments, the total number of the second annular drainage holes 9 is twenty-four, and the top of the plastic paving grid body 1 is provided with evenly distributed semicircular drainage holes 6. More specifically, the second annular drainage holes 9 are provided not only for drainage, but also for increasing the friction coefficient of the ground due to the convex points on the top, thereby preventing pedestrians from slipping.

[0024] In some embodiments, the total number of the semicircular drainage holes 6 is twenty-four, and the aperture of the first annular drainage hole 5 is larger than the aperture of the second annular drainage hole 9. More specifically, by setting a plastic paving grid body 1, the interior of which is made of environmentally friendly materials, it has light weight and high pressure resistance, and can withstand heavy-loaded vehicles and pedestrians.

[0025] Working principle:

[0026] When in use: by setting the annular groove 2, it is convenient to connect and position the plastic paving grid body 1 with the plastic paving grid body 1; by setting the bracket block 7, it is convenient to penetrate the inside of the plastic paving grid body 1 through the slot 3 to fix it; by setting the plug-in slot 4, the stability of the bottom of the plastic paving grid body 1 is mainly improved; by setting the slot 3, it is mainly convenient to maintain the plastic paving grid body 1 and improve the construction progress; by setting the cross partition 10, some paving materials are mainly separated; by setting the first annular drainage hole 5, the drainage speed is mainly accelerated; by setting the positioning groove 11, it is connected with the ground connection object to make it firmly connected; by setting The vertical strip drainage hole 8 is mainly coordinated with the second annular drainage hole 9, the semicircular drainage hole 6 and the first annular drainage hole 5, so as to achieve the effect of rapid diversion. The second annular drainage hole 9 is not only for drainage, but also because of the convex point on the top, the friction coefficient of the ground is increased to prevent pedestrians from slipping. The plastic paving grid body 1 is made of environmentally friendly materials, which is light in weight and highly compressive, and can withstand heavy-loaded vehicles and pedestrians. The problem that the paving grid in the prior art is inconvenient to quickly fix and install its connection during construction and the drainage effect is poor, resulting in the construction personnel spending a long time during construction is solved.

[0027] The above are only the preferred specific embodiments of the present utility model, but the protection scope of the present utility model is not limited thereto. Any person skilled in the art within the technical scope disclosed by the present utility model, according to the technical solution of the present utility model and its inventive concept, making equivalent substitutions or changes, shall be covered by the protection scope of the present utility model.

[0028] It should be noted that, in this article, relational terms such as first and second are only used to distinguish one entity or operation from another entity or operation, and do not necessarily require or imply any actual relationship or order between these entities or operations. Moreover, the term "comprising", "including" or any other variant thereof is intended to cover a non-exclusive inclusion, such that a process, method, article or device comprising a series of elements not only includes those elements, but also includes other elements not expressly listed, or further includes elements inherent to such process, method, article or device.

Claims

1. An environmentally friendly plastic paving grid, characterized in that: It includes a plastic paving grid main body (1). An annular groove (2) is formed at the top of the plastic paving grid main body (1). Clamping frame blocks (7) are evenly installed on the left side and the front side of the plastic paving grid main body (1), and the total number of the clamping frame blocks (7) is six. Plugging slots (4) are evenly formed on both sides of the annular groove (2) inside the plastic paving grid main body (1), and the total number of the plugging slots (4) is four. Slots (3) are evenly formed on the right side and the back side of the plastic paving grid main body (1), and the total number of the slots (3) is six. A cross partition (10) is fixedly installed at the top of the inner cavity of the plastic paving grid main body (1).

2. The environmentally friendly plastic paving grid according to claim 1, characterized in that: First annular drainage holes (5) are formed around the top of the plastic paving grid main body (1), and the total number of the first annular drainage holes (5) is sixteen. Positioning slots (11) are evenly formed inside the plastic paving grid main body (1) and on the inner side of the annular groove (2).

3. The environmentally friendly plastic paving grid according to claim 2, characterized in that: The total number of the positioning slots (11) is sixteen. Vertical strip-shaped drainage holes (8) are evenly formed around the bottom of the plastic paving grid main body (1).

4. The environmentally friendly plastic paving grid according to claim 3, characterized in that: The total number of the vertical strip-shaped drainage holes (8) is twenty-eight. Second annular drainage holes (9) are formed on one side where the vertical strip-shaped drainage holes (8) are close to each other in pairs at the bottom of the plastic paving grid main body (1).

5. The environmentally friendly plastic paving grid according to claim 4, characterized in that: The total number of the second annular drainage holes (9) is twenty-four. Semi-circular drainage holes (6) are evenly formed at the top of the plastic paving grid main body (1).

6. The environmentally friendly plastic paving grid according to claim 5, characterized in that: The total number of the semi-circular drainage holes (6) is twenty-four. The aperture of the first annular drainage hole (5) is larger than the aperture of the second annular drainage hole (9).