Iron tower foundation convenient to install
By adjusting the depth of the load-bearing foundation by structures such as support pipes and fixed plates, the stability problem of precast concrete tower foundation during elevated installation is solved, and more efficient and stable tower installation is achieved.
Patent Information
- Application Number
- CN202421853219.1
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-01
- Publication Date
- 2025-07-08
- Estimated Expiration
- 2034-08-01
AI Technical Summary
In the prior art, the precast concrete tower foundation has poor stability when elevated, and there is a risk of shaking, which affects the overall stability.
The main mechanism and support mechanism are adopted to support and adjust the buried depth of the load-bearing foundation through structures such as support pipes and fixing plates, and fix them with casting liquid to ensure the stability of the foundation.
It improves the stability and installation efficiency of the tower foundation, reduces the risk of foundation instability, and adapts to different erection needs.
Smart Images

Figure CN223074777U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to a tower foundation, in particular to a tower foundation convenient for installation, belonging to the technical field of tower foundations. Background Technique
[0002] A tower refers to a high tower built with steel materials; a tower made of iron-colored glazed bricks. A tower foundation refers to automatically optimizing the foundation size using the intelligent grid method and automatically reinforcing the foundation according to the structural requirements. When erecting a tower, a foundation pit is usually dug on the construction site, and reinforced concrete is poured in the foundation pit to form a solid base. When pouring the concrete structure, anchor bolts are embedded, and the tower is fixed on the anchor bolts to complete the erection of the tower.
[0003] Chinese Patent Publication (CN202120308131.1) discloses a precast concrete tower foundation. When erecting a power line tower, only need to dig a foundation pit, bury the precast concrete tower foundation in the foundation pit, and backfill and compact it to install the power line tower in time, reducing the time required for concrete to solidify, thus improving the installation efficiency of the tower and further enhancing the construction progress of power line erection. However, when in use, the application only fixes the foundation by backfilling and compacting, with poor stability. When erecting a tower with a relatively high height, there is a risk of foundation shaking, affecting the overall stability.
[0004] To solve the above technical problems, a tower foundation convenient for installation is proposed. Content of the Utility Model
[0005] In view of this, the utility model provides a tower foundation convenient for installation to solve or alleviate the technical problems existing in the prior art, and at least provide a beneficial choice.
[0006] The technical solution of the utility model is realized as follows: A tower foundation convenient for installation includes a main body mechanism and a support mechanism.
[0007] The main body mechanism includes a load-bearing foundation. One side of the load-bearing foundation is integrally formed with a pouring groove. A plurality of mounting holes are equidistantly distributed on one side of the load-bearing foundation. A support pipe is engaged inside the mounting hole. A strip hole is symmetrically opened on one side of the support pipe.
[0008] The support mechanism includes a support column. The support columns are fixedly connected to one side of the load-bearing foundation at equal intervals.
[0009] Further preferably, a fixing frame is sleeved on one side of the support column. One side of the fixing frame is fixedly connected to the load-bearing foundation. A plurality of reinforcing plates are fixedly connected to one side of the fixing frame at equal intervals. One side of the reinforcing plate is fixedly connected to the load-bearing foundation.
[0010] Further preferably, a placement groove is integrally formed on one side of the support column.
[0011] Further preferably, a dust cover is engaged inside the placement groove.
[0012] Further preferably, a fixing plate is fixedly connected to one side of the load-bearing foundation. A plurality of pouring holes are equidistantly distributed on one side of the fixing plate. One end of the support pipe is engaged with the fixing plate through the pouring hole.
[0013] Further preferably, a fixing disk is sleeved on one side of the support pipe. A plurality of insertion holes are equidistantly distributed on one side of the support pipe. A bolt penetrates through the fixing disk, and one end of the bolt penetrates through the insertion hole.
[0014] Due to the adoption of the above technical solutions in the embodiments of the present utility model, the following advantages are achieved:
[0015] 1. The present utility model supports the load-bearing foundation by arranging the support pipe, and guides the concrete pouring liquid to the lower part of the load-bearing foundation through the support pipe, so that the pouring liquid fills the foundation pit and the pouring groove, thereby quickly pouring and fixing the load-bearing foundation, and preventing the instability of the load-bearing foundation from affecting the erection of the iron tower.
[0016] 2. The present utility model is in contact with the bottom of the foundation pit by arranging the fixing disk, which is convenient for adjusting the embedding depth of the load-bearing foundation according to different erection requirements.
[0017] The above summary is only for the purpose of the specification and is not intended to be limiting in any way. In addition to the above-described illustrative aspects, embodiments and features, further aspects, embodiments and features of the present utility model will be readily apparent by reference to the drawings and the following detailed description. BRIEF DESCRIPTION OF THE DRAWINGS
[0018] In order to more clearly illustrate the technical solutions in the embodiments of the present application or the prior art, the following will briefly introduce the drawings required for the description of the embodiments or the prior art. Obviously, the following drawings are only some embodiments of the present application. For those of ordinary skill in the art, other drawings can be obtained based on these drawings without creative efforts.
[0019] Figure 1 It is a structural diagram of the present utility model;
[0020] Figure 2 It is an installation structural diagram of the support column in the present utility model;
[0021] Figure 3 It is a structural diagram of the support column in the present utility model;
[0022] Figure 4 Partial sectional view structure diagram of the load-bearing foundation in the present utility model;
[0023] Figure 5 Bottom view structure diagram of the load-bearing foundation in the present utility model.
[0024] Reference numerals: 10, main body mechanism; 11, load-bearing foundation; 12, installation hole; 13, pouring groove; 14, fixing plate; 15, pouring hole; 16, support pipe; 17, strip-shaped hole; 18, insertion hole; 19, fixing disk; 31, bolt; 20, support mechanism; 21, support column; 22, dust cover; 23, fixing frame; 24, reinforcing plate; 25, placing groove. Detailed implementation manners
[0025] In the following, only some exemplary embodiments are simply described. As those skilled in the art can recognize, the described embodiments can be modified in various different ways without departing from the spirit or scope of the present utility model. Therefore, the drawings and the description are considered to be exemplary in nature rather than restrictive.
[0026] The embodiments of the present utility model will be described in detail below with reference to the drawings.
[0027] As Figures 1-5 shown, the embodiment of the present utility model provides a tower foundation convenient for installation, which is composed of a main body mechanism 10 and a support mechanism 20.
[0028] The main body mechanism 10 includes a load-bearing foundation 11. A pouring groove 13 is integrally formed on one side of the load-bearing foundation 11. The pouring groove 13 guides the pouring liquid to fill the inside of the pouring groove 13 and the foundation pit, increasing the contact surface between the pouring liquid and the load-bearing foundation 11 and connecting them as a whole. A plurality of installation holes 12 are equidistantly distributed on one side of the load-bearing foundation 11. A support pipe 16 is clamped inside the installation hole 12. A strip-shaped hole 17 is symmetrically formed on one side of the support pipe 16. The strip-shaped hole 17 enables the pouring liquid to quickly fill the pouring groove 13. One end of the support pipe 16 is inserted into the foundation pit to support the load-bearing foundation 11, facilitating the adjustment of the embedding depth of the load-bearing foundation 11. A fixing disk 19 is sleeved on one side of the support pipe 16. The fixing disk 19 contacts the inside of the foundation pit to limit the insertion depth of the support pipe 16. A plurality of insertion holes 18 are equidistantly distributed on one side of the support pipe 16. A bolt 31 penetrates through the inside of the fixing disk 19. One end of the bolt 31 penetrates through the insertion hole 18. The installation height of the fixing disk 19 is adjusted by the cooperation of the bolt 31 and the insertion hole 18, facilitating the depth of the load-bearing foundation 11 located inside the foundation pit according to different erection requirements.
[0029] In one embodiment, in order to make the pouring surface smoother, one side of the load-bearing foundation 11 is fixedly connected with a fixing plate 14. Pouring holes 15 are equidistantly distributed on one side of the fixing plate 14. One end of the support pipe 16 is engaged with the fixing plate 14 through the pouring hole 15.
[0030] The support mechanism 20 includes support columns 21. Four support columns 21 are equidistantly distributed and fixedly connected to one side of the load-bearing foundation 11. A placement groove 25 is integrally formed on one side of the support column 21, reserving an installation slot for the anchor bolts through the placement groove 25. A dust-proof cover 22 is engaged inside the placement groove 25, protecting the placement groove 25 from dust through the dust-proof cover 22 and reducing the cleaning work of the placement groove 25 when installing the anchor bolts.
[0031] In one embodiment, in order to enhance the stability of the support column 21, a fixing frame 23 is sleeved on one side of the support column 21. One side of the fixing frame 23 is fixedly connected with the load-bearing foundation 11. Reinforcing plates 24 are equidistantly distributed and fixedly connected to one side of the fixing frame 23. One side of the reinforcing plate 24 is fixedly connected with the load-bearing foundation 11, and the reinforcing plate 24 enhances the structural strength of the fixing frame 23.
[0032] When the utility model works: a foundation pit is dug at a specified position, and the size of the foundation pit matches that of the load-bearing foundation 11. The embedding depth of the load-bearing foundation 11 is adjusted according to the erection requirements. The fixing disc 19 is sleeved on the support pipe 16, and the position of the fixing disc 19 is fixed by the bolt 31 cooperating with the jacking hole 18. The load-bearing foundation 11 is placed into the foundation pit, one end of the support pipe 16 is inserted into the foundation pit, and the fixing disc 19 is attached to the foundation pit to prevent the load-bearing foundation 11 from sinking further. The pouring liquid is poured into the support pipe 16 through the pouring hole 15, and the pouring liquid flows out through the strip-shaped hole 17 to fill the pouring groove 13 and the foundation pit, and the load-bearing foundation 11 is fixed in the foundation pit by pouring. When installing the anchor bolts, the dust-proof cover 22 is taken out from the placement groove 25, the anchor bolts are placed into the placement groove 25, and after the equipment is positioned and aligned, it is poured with non-shrinking fine aggregate concrete one grade higher than the original foundation and tamped firmly.
[0033] The above is only the specific embodiment of the utility model, but the protection scope of the utility model is not limited thereto. Any person skilled in the art within the technical scope disclosed by the utility model can easily think of various changes or substitutions, and these should all be covered within the protection scope of the utility model. Therefore, the protection scope of the utility model should be subject to the protection scope of the claims.
Claims
1. A tower foundation that is convenient for installation, characterized in that: It includes a main body mechanism (10) and a support mechanism (20); The main body mechanism (10) includes a load-bearing foundation (11). One side of the load-bearing foundation (11) is integrally formed with a pouring groove (13). A plurality of mounting holes (12) are equidistantly distributed on one side of the load-bearing foundation (11). A support pipe (16) is engaged inside the mounting hole (12). A plurality of strip-shaped holes (17) are symmetrically formed on one side of the support pipe (16); The support mechanism (20) includes columns (21). The columns (21) are fixedly connected to one side of the load-bearing foundation (11) at equal intervals.
2. The tower foundation that is easy to install according to claim 1, wherein: A fixing frame (23) is sleeved on one side of the column (21). One side of the fixing frame (23) is fixedly connected to the load-bearing foundation (11). A plurality of reinforcing plates (24) are fixedly connected to one side of the fixing frame (23) at equal intervals. One side of the reinforcing plate (24) is fixedly connected to the load-bearing foundation (11).
3. A tower foundation that is easy to install according to claim 1, characterized in that: A placing groove (25) is integrally formed on one side of the column (21).
4. The tower foundation that is easy to install according to claim 3, characterized in that: A dust-proof cover (22) is engaged inside the placing groove (25).
5. The tower foundation that is easy to install according to claim 1, characterized in that: One side of the load-bearing foundation (11) is fixedly connected to a fixing plate (14). A plurality of pouring holes (15) are equidistantly distributed on one side of the fixing plate (14). One end of the support pipe (16) is engaged with the fixing plate (14) through the pouring hole (15).
6. The tower foundation that is easy to install according to claim 1, characterized in that: A fixing disc (19) is sleeved on one side of the support pipe (16). A plurality of jacks (18) are equidistantly distributed on one side of the support pipe (16). A bolt (31) penetrates through the inside of the fixing disc (19). One end of the bolt (31) penetrates through the jack (18).