Prefabricated wallboard horizontal connecting structure

Through the combined structure of the first steel bar, the second steel bar and the third steel bar, the problems of large steel volume, complex process and poor indoor blank effect in prefabricated wall panel connection are solved, and the effect of simplifying operation and enhancing the integrity of the connection is achieved.

CN223074962UActive Publication Date: 2025-07-08CHANGSHA BROAD HOMES IND ANHUI CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202421880472.6
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-08-06
Publication Date
2025-07-08
Estimated Expiration
2034-08-06

AI Technical Summary

Technical Problem

The existing horizontal connection method of prefabricated wall panels has large steel volume, complex technology, cumbersome operation and affects the indoor blank effect.

Method used

Using a combined structure of the first steel bar, the second steel bar and the third steel bar, the direct connection between the wall panel and the foundation is achieved through the groove and the slurry layer, the L-shaped connection is eliminated, the operation steps are simplified and the amount of steel is reduced.

Benefits of technology

It improves the indoor blank effect, simplifies process steps, reduces construction difficulty, and enhances the integrity of the connection and load-bearing performance.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN223074962U_ABST
    Figure CN223074962U_ABST
Patent Text Reader

Abstract

The utility model provides a horizontal connecting structure for prefabricated wall panels. The prefabricated wallboard horizontal connecting structure comprises a first reinforcing steel bar, a second reinforcing steel bar and a third reinforcing steel bar, grooves are formed in the wallboards, the grooves penetrate through one sides, in the length direction X, of the wallboards, the grooves in the two butted wallboards are communicated, the first reinforcing steel bar is pre-buried in a foundation and extends into the grooves, and the second reinforcing steel bar is pre-buried in the foundation and extends into the third reinforcing steel bar. The second steel bars are embedded in the wall plate and extend into the grooves, the third steel bars surround the first steel bars and the second steel bars in the two grooves at the same time, and the grooves are filled with slurry layers used for fixing the first steel bars, the second steel bars and the third steel bars. According to the utility model, no connecting point is arranged at the abutted seam of the wallboard, the construction of a plugging box on site is not needed, the effect of an indoor blank is improved, the production process steps of a factory are reduced, and the controllable quality is realized.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of prefabricated buildings, in particular to a horizontal connection structure for precast wall panels. Background Art

[0002] In prefabricated buildings, it is usually necessary to horizontally join precast wall panels (hereinafter referred to as wall panels) on the foundation. The existing connection method is as follows: The wall panels are embedded with protruding steel bars in the horizontal direction (length direction X). When two wall panels are butted, the protruding steel bars are connected and then grouted to seal. The wall panels and the foundation are fixed by connectors and bolts. The connector is L-shaped, with one side lapped on the outer surface of the wall panel and the other side lapped on the foundation, and then the connector is fixed to the wall panel and the foundation by bolts. This connection method has the following problems:

[0003] (1) The protruding steel bars need to be set in the height direction Y of the wall panel, resulting in more steel consumption and a more complex prefabrication process;

[0004] (2) Bolt connection makes the operation steps cumbersome and increases the workload;

[0005] (3) Bolt connection forms connection points at the joint of the wall panels. After connection, a covering box needs to be covered, affecting the indoor roughcast effect. Summary of the Utility Model

[0006] The purpose of the utility model is to provide a horizontal connection structure for precast wall panels, which simplifies the operation and reduces the steel consumption.

[0007] The technical solution of the utility model is: A horizontal connection structure for precast wall panels is used for connecting two horizontally butted wall panels and the foundation. The foundation is placed at the lower end of the wall panel. The horizontal connection structure for precast wall panels includes a first steel bar, a second steel bar, and a third steel bar. A groove is provided in the wall panel, and the groove penetrates one side in the length direction X of the wall panel. The grooves in two butted wall panels are connected. The first steel bar is embedded in the foundation and extends into the groove. The second steel bar is embedded in the wall panel and extends into the groove. The third steel bar encloses the first steel bar and the second steel bar in the two grooves at the same time. A slurry layer for fixing the first steel bar, the second steel bar, and the third steel bar is filled in the groove.

[0008] Preferably, a grouting hole is provided in the wall panel. One end of the grouting hole penetrates the outer surface of the wall panel, and the other end of the grouting hole is communicated with the groove.

[0009] Preferably, the first steel bar is arranged close to the edge of the wall panel, the second steel bar is arranged close to the inside of the wall panel, and there are two second steel bars in the thickness direction Z of the wall panel. The first steel bar and the two second steel bars form a triangle.

[0010] Preferably, each groove in the wall panel is provided with at least one first steel bar and a second steel bar, and the first steel bar and the second steel bar extend along the height direction Y of the wall panel.

[0011] Preferably, at least two of the third steel bars are arranged at intervals in the height direction Y.

[0012] Preferably, a grouting layer is provided between the foundation and the wall panel.

[0013] Preferably, a joint is formed between two butt-jointed wall panels, and a sealing layer is provided in the joint.

[0014] Compared with the related art, the beneficial effects of the present utility model are as follows:

[0015] First, the L-shaped connecting piece is cancelled, and the foundation and the wall panel are directly connected by steel bars, so that there is no connection point at the joint of the wall panel, and there is no need to construct the on-site plugging box anymore, which improves the indoor roughcast effect and reduces the factory production process steps, realizing quality control.

[0016] Second, the protruding steel bars extending in the X direction are no longer provided in the height direction Y of the precast wall panel, and only the first steel bar and the second steel bar need to be connected by the third steel bar, reducing the steel consumption.

[0017] Third, the construction difficulty is reduced, the operation steps are simplified, the construction period is shortened, the structural integrity is enhanced, the bearing force performance of the connecting piece is increased, and full-assembly installation is realized. BRIEF DESCRIPTION OF THE DRAWINGS

[0018] Figure 1 is a front view and a partial cross-sectional structural schematic diagram of the precast wall panel horizontal connection structure provided by the present utility model;

[0019] Figure 2 is Figure 1 a cross-sectional structural schematic diagram.

[0020] In the drawings: 1, foundation; 2, wall panel; 3, groove; 4, first steel bar; 5, second steel bar; 6, third steel bar; 7, grouting layer; 8, joint; 9, grouting hole; 10, sealing layer; 11, slurry layer. DETAILED DESCRIPTION OF THE EMBODIMENTS

[0021] The present utility model will be described in detail below with reference to the drawings and in conjunction with the embodiments. It should be noted that, without conflict, the embodiments in the present utility model and the features in the embodiments can be combined with each other. For the convenience of narration, words such as "upper", "lower", "left", and "right" in the following text only indicate the same direction as the upper, lower, left, and right directions of the drawings themselves, and do not limit the structure.

[0022] As Figure 1 , Figure 2As shown in the figure, a horizontal connection structure of precast wall panels provided in this embodiment is used for connecting two horizontally butted wall panels 2 and a foundation 1, and the foundation 1 is placed at the lower end of the wall panel 2.

[0023] The horizontal connection structure of the precast wall panel includes a first steel bar 4, a second steel bar 5, and a third steel bar 6.

[0024] A groove 3 is provided in the wall panel 2, and the groove 3 penetrates one side of the wall panel 2 in the length direction X, and the grooves 3 in two butted wall panels 2 are communicated with each other.

[0025] The first steel bar 4 is embedded in the foundation 1 and extends into the groove 3, and the second steel bar 5 is embedded in the wall panel 2 and extends into the groove 3. A first steel bar 4 and a second steel bar 5 are provided in the groove 3 of each wall panel 2, and the first steel bar 4 and the second steel bar 5 extend along the height direction Y of the wall panel 2.

[0026] The first steel bar 4 is arranged close to the edge of the wall panel 2, the second steel bar 5 is arranged close to the inside of the wall panel 2, and two second steel bars 5 are arranged in the thickness direction Z of the wall panel 2, and the first steel bar 4 and the two second steel bars 5 form a triangle.

[0027] The third steel bar 6 is a rectangular frame, which encloses the first steel bar 4 and the second steel bar 5 in the two grooves 3 at the same time. The enclosure method is as Figure 2 shown, the third steel bar 6 is connected to four second steel bars 5, and the first steel bar 4 is located inside the third steel bar 6.

[0028] A grouting hole 9 is provided in the wall panel 2. One end of the grouting hole 9 penetrates the outer surface of the wall panel 2, and the other end of the grouting hole 9 is communicated with the groove 3. By grouting into the grouting holes 9 on the two wall panels 2, mortar for fixing the first steel bar 4, the second steel bar 5, and the third steel bar 6 is filled in the groove 3 to form a slurry layer 11. At the same time, the mortar seals the grouting hole 9.

[0029] A mortar bedding layer 7 is provided between the foundation 1 and the wall panel 2. During construction, first tie and connect the second steel bar 5 and the third steel bar 6 in the groove 3 of the two horizontally butted wall panels 2. Since the groove 3 penetrates the bottom of the wall panel 2 in the height direction Y, there is an operation space formed. A sealing layer 10 is filled at the joint 8 between the two butted wall panels 2, and the sealing layer 10 is a sealing material (such as sealant, PE rod, etc.). Then apply a mortar bedding layer 7 on the upper surface of the foundation 1, and then insert the grooves 3 of the two butted wall panels 2 onto the first steel bar 4, so that the first steel bar 4 is located inside the third steel bar 6. Then grout into the groove 3 through the two grouting holes 9 until completion. The construction of the sealing layer 10 can also be placed at the end.

[0030] The utility model integrates the wall panel 2 and the foundation 1 through the first steel bar 4, the second steel bar 5 and the third steel bar 6, with good integrity and meeting the safety protection requirements.

[0031] The above are only the embodiments of the utility model, and do not limit the patent scope of the utility model accordingly. Any equivalent structure or equivalent process transformation made by using the content of the specification and drawings of the utility model, or directly or indirectly applied to other related technical fields, shall be included in the patent protection scope of the utility model by the same token.

Claims

1. A horizontal connection structure for precast wall panels, used for connecting two horizontally butted wall panels (2) and a foundation (1), the foundation (1) being placed at the lower end of the wall panel (2), characterized in that, It includes a first steel bar (4), a second steel bar (5) and a third steel bar (6). A groove (3) is provided in the wall panel (2), and the groove (3) penetrates one side of the wall panel (2) in the length direction X. The grooves (3) in two butted wall panels (2) are communicated with each other. The first steel bar (4) is embedded in the foundation (1) and extends into the groove (3). The second steel bar (5) is embedded in the wall panel (2) and extends into the groove (3). The third steel bar (6) encloses the first steel bar (4) and the second steel bar (5) in the two grooves (3) at the same time. A slurry layer (11) for fixing the first steel bar (4), the second steel bar (5) and the third steel bar (6) is filled in the groove (3).

2. The horizontal connection structure of the precast wall panel according to claim 1, wherein A grouting hole (9) is provided in the wall panel (2). One end of the grouting hole (9) penetrates the outer surface of the wall panel (2), and the other end of the grouting hole (9) is communicated with the groove (3).

3. The horizontal connection structure of the precast wall panel according to claim 1, characterized in that, The first steel bar (4) is arranged close to the edge of the wall panel (2), the second steel bar (5) is arranged close to the inside of the wall panel (2), and there are two second steel bars (5) arranged in the thickness direction Z of the wall panel (2). The first steel bar (4) and the two second steel bars (5) form a triangle.

4. The horizontal connection structure of the precast wall panel according to claim 1, characterized in that, At least one first steel bar (4) and one second steel bar (5) are arranged in the groove (3) of each wall panel (2), and the first steel bar (4) and the second steel bar (5) extend along the height direction Y of the wall panel (2).

5. The horizontal connection structure of the precast wall panel according to claim 1, characterized in that, At least two third steel bars (6) are arranged at intervals in the height direction Y.

6. The horizontal connection structure of the precast wall panel according to claim 1, characterized in that, A bedding course (7) is provided between the foundation (1) and the wall panel (2).

7. The horizontal connection structure of the precast wall panel according to claim 1, characterized in that, A joint (8) is formed between two butted wall panels (2), and a sealing layer (10) is arranged in the joint (8).