Novel telescopic construction rack for tunnel construction

By designing a retractable construction bench, the problems of difficulty in moving the bench, inconvenient installation of steel arch frames and safety hazards in tunnel construction are solved, and flexible movement, safety protection and efficient construction are achieved.

CN223075547UActive Publication Date: 2025-07-08LANZHOU JIAOTONG UNIV
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202422450576.X
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-10-11
Publication Date
2025-07-08
Estimated Expiration
2034-10-11

AI Technical Summary

Technical Problem

The existing tunnel construction benches have problems such as low efficiency, many safety hazards, inability to flexibly adjust the length, inconvenient wire management and limited construction progress when moving and installing steel arch frames.

Method used

A retractable construction bench is designed, adopting bolted support columns, tabletops and support rod structures, equipped with telescopic wheel components, telescopic guardrails and wire storage boxes. The mobile wheels and extension plates are driven by hydraulic cylinders to achieve flexible movement and length adjustment of the bench and provide safety protection.

Benefits of technology

It improves the movement convenience and safety of the construction bench, reduces dependence on excavators and forklifts, enhances construction efficiency and safety, prevents dust and Mars sputtering, and optimizes wire management.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN223075547U_ABST
    Figure CN223075547U_ABST
Patent Text Reader

Abstract

The utility model belongs to the technical field of tunnel construction racks, and particularly relates to a novel telescopic construction rack for tunnel construction, which comprises supporting columns, first table tops and an upper table top, the outer edge of the upper table top is connected with the supporting columns through bolts, the supporting columns on the left side and the right side are connected with the first table tops through bolts, and the first table tops are connected with the upper table top through bolts. A first supporting rod is connected between the first table top and the supporting column through a bolt, a second supporting rod is connected between the upper table top and the supporting column through a bolt, the bottom of the supporting column is fixedly connected with a telescopic wheel assembly, the telescopic wheel assembly comprises a storage seat, a hydraulic cylinder and a moving wheel, and an inner cavity of the storage seat is slidably connected with a sliding plate. The upper side of the storage seat is connected with a hydraulic cylinder through a bolt, the lower side of the telescopic end of the hydraulic cylinder is connected with a sliding plate, and when the construction rack needs to be moved, moving wheels stretch out to make contact with the ground and reach the proper supporting height, and moving can be convenient.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the field of tunnel construction frames, in particular to a novel telescopic construction platform frame used for tunnel construction. Background Art

[0002] During the tunnel excavation process, a construction platform is needed to provide a stable working platform for the drilling equipment. During the first phase of tunnel construction, hard rocks will be blasted. For example, in the drilling and blasting method, the accuracy and angle of the drilling are crucial to the subsequent blasting effect. The construction platform can lift the drilling equipment to the appropriate height and position to ensure the smooth progress of the drilling operation. After removing the slag from the blasted rocks, construction workers often use the construction platform to install the steel arch frame used for tunnel construction at the arch crown and arch waist. At this time, the role of the construction platform is to send construction workers to the vicinity of the arch crown and arch waist for easy installation.

[0003] Disadvantages of ordinary construction scaffolds:

[0004] 1. During the construction process, the construction platform needs to be moved to the section for construction, and when blasting, the platform needs to be moved to a place far away from the blasting site. However, such a construction platform cannot be moved by manpower alone, and a forklift or large excavator is required to drag the platform to the construction site. Therefore, an excavator or forklift is often required for auxiliary movement during construction, which not only occupies construction resources but also affects the construction progress;

[0005] 2. Due to construction needs, construction workers need to use a construction platform to install the steel arch frame at the arch waist. However, because the steel arch frame is long and very heavy, it is impossible to install the steel arch frame at the arch waist by just standing on the work platform. A ladder is often needed for auxiliary construction. This method is inefficient and very dangerous.

[0006] 3. The length of the first platform of the construction platform is fixed. Therefore, during construction, the construction workers often cannot reach the wall at the waist of the arch because the platform is too far away from the wall. If the first platform is too long, the entire construction platform will be too long, making it inconvenient to move horizontally in the tunnel section;

[0007] 4. When workers are working on the upper platform, due to the use of electric welding and other equipment, sparks, dust and rocks often splash to the bottom of the platform, causing the construction workers at the bottom of the platform to be unable to work at the same time as the upper workers, delaying the construction process;

[0008] 5. There are many wires on the construction platform, and they are often tangled and placed randomly during construction, which poses a safety hazard;

[0009] 6. Since the steel arch is transported to the upper table surface by an excavator or a forklift during construction and then moved from the upper table surface to the arch waist or arch top for installation, in order to facilitate transportation, guardrails are usually not installed on the construction bench, posing a safety hazard.

[0010] Therefore, the present utility model provides a novel telescopic construction bench for tunnel construction. Summary of the Utility Model

[0011] The purpose of the present utility model is to provide a novel telescopic construction bench for tunnel construction to solve the above problems raised in the above background technology.

[0012] To achieve the above purpose, the present utility model provides the following technical solution: A novel telescopic construction bench for tunnel construction, including support columns, a first table surface, and an upper table surface. The outer edge of the upper table surface is bolted to the support columns, and the support columns on both left and right sides are bolted to the first table surface. A first support rod is bolted between the first table surface and the support columns, and a second support rod is bolted between the upper table surface and the support columns. The bottom of the support column is fixedly connected with a telescopic wheel assembly. The telescopic wheel assembly includes a storage seat, a hydraulic cylinder, and a moving wheel. A sliding plate is slidably connected to the inner cavity of the storage seat. The upper side of the storage seat is bolted with a hydraulic cylinder, and the lower side of the telescopic end of the hydraulic cylinder is connected to the sliding plate. A moving wheel is installed on the lower side of the sliding plate. An extension plate is slidably connected to the first table surface, and a telescopic guardrail is installed on the upper table surface.

[0013] Preferably, a limiting block is provided at the bottom of the inner cavity of the storage seat.

[0014] Preferably, a protection plate is bolted between the second support rods.

[0015] Preferably, a wire storage box is bolted to the protection plate.

[0016] Preferably, a storage plate is bolted to the outside of the upper table surface, and the telescopic guardrail is installed in the storage plate.

[0017] Preferably, a cargo platform is provided directly below the upper table surface.

[0018] Compared with the prior art, the beneficial effects of the present utility model are:

[0019] 1) With the construction bench of the present utility model, when the construction bench needs to be moved, by extending the moving wheels to contact the ground and reaching an appropriate support height, it can be conveniently moved;

[0020] 2) By providing an extension plate on the first table surface, the length at both ends can be lengthened, facilitating construction;

[0021] 3) Through the setting of the protective plate, it can prevent dust from falling and the sputtering of sparks. An electric wire storage box is installed on the protective plate, which is convenient for storing electric wires;

[0022] 4) Through the setting of the retractable guardrail, when no construction work is carried out, the retractable guardrail is retracted into the storage board, and when construction is carried out, the retractable guardrail is extended, which can play a very good protective role for the staff;

[0023] 5) A goods transportation platform is placed directly below the upper table surface. By installing pulleys or other components on the upper table surface to pull the goods, the purpose of transporting the steel arch frame from the bottom of the bench to the upper table surface can be achieved, avoiding the use of excavators and forklifts to transport goods. Description of the Drawings

[0024] Figure 1 It is a schematic structural diagram of the present utility model;

[0025] Figure 2 It is a schematic structural diagram of the telescopic wheel assembly of the present utility model;

[0026] Figure 3 It is a schematic internal structure diagram of the storage seat of the present utility model.

[0027] In the figure: 1, support column; 2, telescopic wheel assembly; 3, second support rod; 4, connecting rod; 5, first table surface; 6, first support rod; 7, extension plate; 8, storage board; 9, retractable guardrail; 10, protective plate; 11, electric wire storage box; 12, goods transportation platform; 13, storage seat; 14, sliding plate; 15, hydraulic cylinder; 16, moving wheel; 17, limit block; 18, upper table surface. Detailed Embodiment

[0028] Next, the technical solutions in the embodiments of the present utility model will be clearly and completely described in conjunction with the accompanying drawings in the embodiments of the present utility model. Obviously, the described embodiments are only a part of the embodiments of the present utility model, rather than all the embodiments. Based on the embodiments in the present utility model, all other embodiments obtained by those of ordinary skill in the art without making creative efforts shall fall within the protection scope of the present utility model.

[0029] In the description of the present utility model, it should be noted that the orientation or positional relationship indicated by the terms "upper", "lower", "inner", "outer", "top / bottom end", etc. is based on the orientation or positional relationship shown in the accompanying drawings, and is only for the convenience of describing the present utility model and simplifying the description, rather than indicating or implying that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood as a limitation of the present utility model. In addition, the terms "first" and "second" are only used for descriptive purposes and cannot be understood as indicating or implying relative importance.

[0030] In the description of the present utility model, it should be noted that unless otherwise clearly specified and defined, terms such as "installation", "provided with", "sheathed / connected", "connection", etc. should be understood in a broad sense. For example, "connection" can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be directly connected or indirectly connected through an intermediate medium, and it can be the communication inside two components. For those of ordinary skill in the art, the specific meanings of the above terms in the present utility model can be understood according to specific circumstances.

[0031] Embodiment:

[0032] Please refer to Figures 1 - 3 , the present utility model provides a technical solution: a novel telescopic construction platform for tunnel construction, including support columns 1, a first tabletop 5 and an upper tabletop 18. The outer edge of the upper tabletop 18 is bolted to the support column 1. The support columns 1 on both the left and right sides are bolted to the first tabletop 5. A first support rod 6 is bolted between the first tabletop 5 and the support column 1. The first support rod 6 is connected to a steel ladder. A second support rod 3 is bolted between the upper tabletop 18 and the support column 1. A connecting rod 4 is bolted between the second support rod 3 and the support column 1. Steel ladders are also installed on the upper tabletop 18 and the first tabletop 5. The bottom of the support column 1 is fixedly connected to a telescopic wheel assembly 2. The telescopic wheel assembly 2 includes a storage seat 13, a hydraulic cylinder 15 and a moving wheel 16. A sliding plate 14 is slidably connected to the inner cavity of the storage seat 13. The hydraulic cylinder 15 is bolted to the upper side of the storage seat 13. The lower side of the telescopic end of the hydraulic cylinder 15 is connected to the sliding plate 14. The moving wheel 16 is installed on the lower side of the sliding plate 14. The position of the moving wheel 16 is adjusted by the hydraulic cylinder 15. An extension plate 7 is slidably connected to the first tabletop 5. After the extension plate 7 is pulled out, it is fixed by bolts. A telescopic guardrail 9 is installed on the upper tabletop 18. After the telescopic guardrail 9 is pulled out, it is fixed by bolts.

[0033] A limiting block 17 is provided at the bottom of the inner cavity of the storage seat 13.

[0034] A protection plate 10 is bolted between the second support rods 3 to prevent dust from falling and sparks from splashing.

[0035] An electric wire storage box 11 is bolted to the protection plate 10.

[0036] A storage plate 8 is bolted to the outside of the upper tabletop 18. The telescopic guardrail 9 is installed in the storage plate 8.

[0037] A cargo platform 12 is provided directly below the upper tabletop 18. By installing pulleys or other components on the upper tabletop 18 to pull the goods, the purpose of transporting steel arch frames from the bottom of the construction platform to the upper tabletop 18 can be achieved, avoiding the use of excavators and forklifts to lift the goods.

[0038] Working principle: When the construction gantry needs to be moved, the moving wheels 16 are driven to extend by the hydraulic cylinder 15. The moving wheels 16 come into contact with the ground and reach an appropriate support height, facilitating movement. The moving wheels 16 are made of high-strength alloy steel. The wheel rim part of the wheels undergoes special heat treatment to improve its wear resistance and load-bearing capacity. Bearings are provided inside the wheel hubs of the wheels to reduce rotational friction. By setting the extension plate 7 on the first tabletop 5, the lengths at both ends can be extended, facilitating construction. Through the setting of the protective plate 10, dust fall and sputtering of sparks can be prevented. The wire storage box 11 is installed on the protective plate 10 to facilitate wire storage. When no construction work is being carried out, the retractable guardrail 9 is retracted into the storage plate 8, and when constructing, the retractable guardrail 9 is extended, which can play a good protective role for the staff. A cargo platform 12 is placed directly below the upper tabletop 18. By installing pulleys or other components on the upper tabletop 18 to pull the goods, the purpose of transporting the steel arch frame from the bottom of the construction gantry to the upper tabletop 18 can be achieved (the steel arch frame is first transported to the cargo platform 12), avoiding the use of excavators and forklifts to lift the goods.

[0039] The above shows and describes the basic principles, main features and advantages of the present utility model. For those skilled in the art, it is obvious that the present utility model is not limited to the details of the above exemplary embodiments, and without departing from the spirit or basic features of the present utility model, the present utility model can be implemented in other specific forms. Therefore, from any point of view, the embodiments should be regarded as exemplary and non-restrictive. The scope of the present utility model is defined by the appended claims rather than the above description. Therefore, all changes falling within the meaning and scope of the equivalent elements of the claims are intended to be encompassed within the present utility model, and any reference signs in the claims should not be regarded as limiting the claims involved.

[0040] Although the embodiments of the present utility model have been shown and described, for those of ordinary skill in the art, it can be understood that various changes, modifications, substitutions and variations can be made to these embodiments without departing from the principle and spirit of the present utility model. The scope of the present utility model is defined by the appended claims and their equivalents.

Claims

1. A novel telescopic construction platform for tunnel construction, comprising support columns (1), a first tabletop (5) and an upper tabletop (18), characterized in that: A support column (1) is bolted to the outer edge of the upper tabletop (18). The first tabletops (5) are bolted to the support columns (1) on both the left and right sides. A first support rod (6) is bolted between the first tabletop (5) and the support column (1). A second support rod (3) is bolted between the upper tabletop (18) and the support column (1). A telescopic wheel assembly (2) is fixedly connected to the bottom of the support column (1). The telescopic wheel assembly (2) includes a storage seat (13), a hydraulic cylinder (15), and a moving wheel (16). A sliding plate (14) is slidably connected to the inner cavity of the storage seat (13). The hydraulic cylinder (15) is bolted to the upper side of the storage seat (13). The lower side of the telescopic end of the hydraulic cylinder (15) is connected to the sliding plate (14). The moving wheel (16) is installed on the lower side of the sliding plate (14). An extension plate (7) is slidably connected to the first tabletop (5). A retractable guardrail (9) is installed on the upper tabletop (18).

2. The novel telescopic construction scaffold for tunnel construction according to claim 1, wherein: A limiting block (17) is provided at the bottom of the inner cavity of the storage seat (13).

3. The novel telescopic construction gantry for tunnel construction according to claim 1, characterized in that: A protective plate (10) is bolted between the second support rods (3).

4. A novel telescopic construction scaffolding for tunnel construction according to claim 3, characterized in that: A wire storage box (11) is bolted to the protective plate (10).

5. A novel telescopic construction scaffold for tunnel construction according to claim 1, characterized in that: A storage plate (8) is bolted to the outside of the upper tabletop (18). The retractable guardrail (9) is installed in the storage plate (8).