Assembly type raw bamboo structural member connecting joint
By using steel casing and fixtures in the original bamboo structure combined with grouting connection, the problem of insufficient tensile and seismic performance of the original bamboo structure is solved, and a stable and reliable connection node is achieved, which is suitable for the standardized and modular construction of modern bamboo structures.
Patent Information
- Application Number
- CN202421608535.2
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-07-09
- Publication Date
- 2025-07-11
- Estimated Expiration
- 2034-07-09
AI Technical Summary
Most of the connections of existing original bamboo structures rely on traditional mortise and tenon structures, resulting in weak overall tensile resistance and insufficient seismic resistance.
The original bamboo structural components are connected by steel sleeves and fixtures, and materials such as phosphogypsum are poured through grouting holes to form a stable connection node. The combination of steel sleeves and long bolts is used to enhance the connection strength and seismic resistance.
It effectively avoids cracks caused by hole punching of original bamboo, improves the stability and seismic resistance of the connecting nodes, meets the standardization and modular needs of modern bamboo structures, and reduces the skill requirements of workers.
Smart Images

Figure CN223088675U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the field of building construction, and particularly relates to a connecting node of an assembled original bamboo structure member. Background Art
[0002] China is the country with the richest bamboo resources in the world, ranking first in the world in terms of bamboo forest area, bamboo stock volume and bamboo production. Bamboo has excellent mechanical properties, and its tensile strength along the grain, compressive strength along the grain and elastic modulus are all superior to those of wood. The specific strength of bamboo is about 3-4 times that of steel. The energy consumption per unit area of the bamboo structure is relatively low, and its energy consumption per unit area is 1 / 3, 1 / 8 and 1 / 50 of that of the wood structure, concrete structure and steel structure respectively. In addition, the bamboo structure also has excellent seismic performance. Since the overall connection of the building with the original bamboo as the main body mostly relies on the traditional mortise and tenon structure for fixation during actual use, the overall tensile resistance is weak, directly resulting in weak overall seismic performance. Summary of the Invention
[0003] In view of this, the utility model provides a connecting node of an assembled original bamboo structure member.
[0004] The connecting node of the assembled original bamboo structure member provided by the utility model adopts the following technical solutions:
[0005] A connecting node of an assembled original bamboo structure member includes a connecting node of an original bamboo structure column and an original bamboo structure beam. A plurality of steel sleeves I are arranged on the original bamboo structure column. Both ends of the steel sleeves I pass through the original bamboo of the original bamboo structure column and are inserted into the original bamboo of the original bamboo structure beam. A plurality of fixing pieces I for fixing the original bamboo structure beam are arranged on the steel sleeves I. A plurality of grouting holes are reserved on the original bamboo of the original bamboo structure column and the original bamboo structure beam.
[0006] Further, a plurality of connecting holes through which the fixing pieces I pass are reserved on the original bamboo of the original bamboo structure column and the original bamboo structure beam.
[0007] Further, a plurality of air outlet holes are reserved on the original bamboo of the original bamboo structure column and the original bamboo structure beam.
[0008] Further, the original bamboo on the outer circle of the original bamboo structure column is not disconnected, and the original bamboo on the inner circle of the original bamboo structure column is disconnected.
[0009] Further, it also includes a connecting node of an original bamboo wall and an original bamboo floor I. A plurality of steel sleeves II are arranged on the original bamboo floor I. Both ends of the steel sleeves II pass through the original bamboo of the original bamboo floor I and are inserted into the original bamboo of the original bamboo wall. A plurality of fixing pieces II for fixing the original bamboo wall on the original bamboo floor I are arranged on the steel sleeves II. A plurality of grouting holes are reserved on the original bamboo of the original bamboo wall and the original bamboo floor I.
[0010] Furthermore, connection holes for the fixing member II to pass through are reserved on the raw bamboo of the raw bamboo wall and the raw bamboo floor I.
[0011] Furthermore, a plurality of air vents are reserved on the raw bamboo of the raw bamboo wall and the raw bamboo floor I.
[0012] Furthermore, it also includes the connection node between the raw bamboo structural beam and the raw bamboo floor II. A plurality of fixing members III for fixing are arranged on the raw bamboo structural beam and the raw bamboo floor II, and a plurality of grouting holes are reserved on the raw bamboo of the raw bamboo structural beam and the raw bamboo floor II.
[0013] Furthermore, connection holes for the fixing member III to pass through are reserved on the raw bamboo of the raw bamboo structural beam and the raw bamboo floor II.
[0014] Furthermore, a plurality of air vents are reserved on the raw bamboo of the raw bamboo structural beam and the raw bamboo floor II.
[0015] In summary, the present utility model includes at least one of the following beneficial effects:
[0016] 1. First, special steel sleeves and fixing members are used to connect the main components, and then through grouting, the phenomenon that the raw bamboo is weakened by drilling and cracks are prone to appear after drilling at the joints can be effectively avoided, and the connection joints are stable and reliable;
[0017] 2. The process is simple and has strong applicability, meeting the development needs of modern bamboo structures for standardization and modularization, and at the same time reducing the requirements for workers' capabilities;
[0018] 3. The beam-column connection joints have good seismic performance. The outer bamboo tubes at the joints are not disconnected, and can effectively withstand the eccentric tension generated by seismic action. BRIEF DESCRIPTION OF THE DRAWINGS
[0019] In order to more clearly illustrate the specific embodiments of the present application or the technical solutions in the prior art, the following will briefly introduce the drawings required for use in the description of the specific embodiments or the prior art. Obviously, the drawings in the following description are some embodiments of the present application. For those of ordinary skill in the art, without creative efforts, other drawings can also be obtained based on these drawings.
[0020] Figure 1 It is a schematic structural diagram of the connection node between the raw bamboo structural column and the raw bamboo structural beam in the embodiment of the present utility model;
[0021] Figure 2 It is a cross-sectional view of the connection node between the raw bamboo structural column and the raw bamboo structural beam in the embodiment of the present utility model;
[0022] Figure 3 It is a schematic structural diagram of the connection node between the raw bamboo wall and the raw bamboo floor in the embodiment of the present utility model;
[0023] Figure 4 This is a cross-sectional view of the connection node between the original bamboo wall and the original bamboo floor slab in the embodiment of the present utility model;
[0024] Figure 5 This is a schematic structural diagram of the connection node between the original bamboo structural beam and the original bamboo floor slab in the embodiment of the present utility model;
[0025] Figure 6 This is a cross-sectional view of the connection node between the original bamboo structural beam and the original bamboo floor slab in the embodiment of the present utility model.
[0026] Explanation of reference numerals:
[0027] 1. Original bamboo structural column; 2. Original bamboo structural beam; 3a. Steel casing I; 3b. Steel casing II; 4a. Fastening piece I; 4b. Fastening piece II; 4c. Fastening piece III; 5. Original bamboo wall; 6. Original bamboo floor slab I; 7. Original bamboo floor slab II. Specific implementation manners
[0028] The following uses specific specific examples to illustrate the implementation manners of the present utility model. Those skilled in the art can easily understand other advantages and effects of the present utility model from the content disclosed in this specification. The present utility model can also be implemented or applied through other different specific implementation manners. Various details in this specification can also be modified or changed based on different viewpoints and applications without departing from the spirit of the present utility model.
[0029] The following combines the attached Figure 1-6 to further elaborate on the present utility model in detail.
[0030] The embodiment of the present utility model discloses a connection node for assembled original bamboo structural components. Refer to Figure 1 - Figure 6, the connection node of the prefabricated bamboo structure members includes the connection node of the bamboo structure column 1 and the bamboo structure beam 2. Multiple steel sleeves I 3a are arranged on the bamboo structure column 1. The two ends of the steel sleeve I 3a pass through the bamboo of the bamboo structure column 1 and are inserted into the bamboo of the bamboo structure beam 2. Multiple fixing parts I 4a for fixing the bamboo structure beam 2 are arranged on the steel sleeve I 3a. The fixing part I 4a is a long bolt. The long bolt penetrates from the topmost one to the bottommost one of the steel sleeve I 3a. The long bolt is arranged on the steel sleeve I 3a in a horizontal and vertical state. Multiple grouting holes are reserved on the bamboo of the bamboo structure column 1 and the bamboo structure beam 2. It is connected by a special steel sleeve and a long bolt and is poured through the grouting holes. Phosphogypsum can be used as the grouting material. The treated phosphogypsum has high strength and short setting time. It can set in a few minutes and has a slight expansion property, avoiding detaching from the bamboo due to shrinkage caused by temperature changes in the later stage. There are natural diaphragms in the bamboo at certain intervals. The diaphragms can prevent the expansion of the grouting range inside the bamboo, realizing strong node connection. At the node, the phenomenon that the bamboo is weakened by drilling and cracks are prone to appear after drilling can be effectively avoided. The connection node is stable and reliable. The long bolt can also act as a shear connection shear to strengthen the connection between the grouting material and the bamboo.
[0031] In this embodiment, multiple connection holes through which the fixing part I 4a passes are reserved on the bamboo of the bamboo structure column 1 and the bamboo structure beam 2. Utilizing the fact that the inside of the bamboo is hollow, the bamboo is pre-drilled at a certain interval, and then fixed together by a special steel sleeve I 3a and a long bolt.
[0032] In this embodiment, multiple air vents are reserved on the bamboo of the bamboo structure column 1 and the bamboo structure beam 2. The air vents are reserved on the bamboo according to the required grouting length.
[0033] In this embodiment, the bamboo on the outer circle of the bamboo structure column 1 is not disconnected, and the bamboo on the inner circle of the bamboo structure column 1 is disconnected. The steel sleeve I 3a passes through the bamboo on the outer circle, and the disconnected bamboo on the inner circle is connected and fixed by a long bolt. The beam-column connection node has good seismic performance. At the node, the outer bamboo tube is not disconnected, which can effectively bear the eccentric tension generated by the earthquake action.
[0034] In this embodiment, it also includes the connection node of the bamboo wall 5 and the bamboo floor I 6. Multiple steel sleeves II 3b are arranged on the bamboo floor I 6. The two ends of the steel sleeve II 3b pass through the bamboo of the bamboo floor I 6 and are inserted into the bamboo of the bamboo wall 5. Multiple fixing parts II 4b for fixing the bamboo wall 5 on the bamboo floor I 6 are arranged on the steel sleeve II 3b. The fixing part II 4b is a long bolt, and the setting method is the same as the setting direction of the long bolt on the steel sleeve I 3a. Multiple grouting holes are reserved on the bamboo wall 5 and the bamboo floor I 6.
[0035] In this embodiment, connection holes for the fixing member II 4b to pass through are reserved on the raw bamboo of the raw bamboo wall 5 and the raw bamboo floor I 6. By taking advantage of the fact that the interior of the raw bamboo is hollow, the raw bamboo is pre-drilled at a certain interval, and then fixed together with a long bolt through a special steel sleeve II 3b.
[0036] In this embodiment, a plurality of air vents are reserved on the raw bamboo of the raw bamboo wall 5 and the raw bamboo floor I 6.
[0037] In this embodiment, it further includes the connection node of the raw bamboo structural beam 2 and the raw bamboo floor II 7. A plurality of fixing members III 4c for fixing are provided on the raw bamboo structural beam 2 and the raw bamboo floor II 7.
[0038] In this embodiment, connection holes for the fixing member III 4c to pass through are reserved on the raw bamboo of the raw bamboo structural beam 2 and the raw bamboo floor II 7. By taking advantage of the fact that the interior of the raw bamboo is hollow, the raw bamboo is pre-drilled at a certain interval, and then fixed together with a long bolt through a special steel sleeve III 3c.
[0039] In this embodiment, a plurality of grouting holes and air vents are reserved on the raw bamboo of the raw bamboo structural beam 2 and the raw bamboo floor II 7.
[0040] Specific examples are used in this article to elaborate on the principles and implementation manners of the present application. The descriptions of the above embodiments are only used to help understand the method and its core idea of the present application. The above are only the preferred implementation manners of the present application. It should be noted that due to the limited nature of literal expression and objectively infinite specific structures, for those of ordinary skill in the art in this technical field, without departing from the principle of the present application, several improvements, refinements or changes can be made, or the above technical features can be combined in an appropriate manner; these improvements, refinements, changes or combinations, or directly applying the concept and technical solution of the utility model to other occasions without improvement, shall all be regarded as the protection scope of the present application.
Claims
1. An assembled connection node for a raw bamboo structure member, characterized in that: The connection node includes a raw bamboo structural column (1) and a raw bamboo structural beam (2). A plurality of steel sleeves I (3a) are arranged on the raw bamboo structural column (1). The two ends of the steel sleeve I (3a) pass through the raw bamboo of the raw bamboo structural column (1) and are inserted into the raw bamboo of the raw bamboo structural beam (2). A plurality of fixing members I (4a) for fixing the raw bamboo structural beam (2) are arranged on the steel sleeve I (3a). A plurality of grouting holes are reserved on the raw bamboo of the raw bamboo structural column (1) and the raw bamboo structural beam (2).
2. The connecting node of the prefabricated original bamboo structure member according to claim 1, characterized in that: A plurality of connection holes through which the fixing members I (4a) pass are reserved on the raw bamboo of the raw bamboo structural column (1) and the raw bamboo structural beam (2).
3. The connecting node of the assembled original bamboo structure member according to claim 2, wherein: A plurality of air vents are reserved on the raw bamboo of the raw bamboo structural column (1) and the raw bamboo structural beam (2).
4. The connecting joint of the prefabricated round bamboo structure member according to claim 3, characterized in that: The raw bamboo on the outer circle of the raw bamboo structural column (1) is continuously arranged, and the raw bamboo on the inner circle of the raw bamboo structural column (1) is discontinuously arranged.
5. The connecting joint of the prefabricated original bamboo structure member according to claim 1, characterized in that: It also includes the joint connection point of a raw bamboo wall (5) and a raw bamboo floor I (6). A plurality of steel sleeves II (3b) are arranged on the raw bamboo floor I (6). The two ends of the steel sleeve II (3b) pass through the raw bamboo of the raw bamboo floor I (6) and are inserted into the raw bamboo of the raw bamboo wall (5). A plurality of fixing members II (4b) for fixing the raw bamboo wall (5) on the raw bamboo floor I (6) are arranged on the steel sleeve II (3b). A plurality of grouting holes are reserved on the raw bamboo of the raw bamboo wall (5) and the raw bamboo floor I (6).
6. The connecting joint of the prefabricated original bamboo structure member according to claim 5, wherein: A plurality of connection holes for the fixing members II (4b) to pass through are reserved on the raw bamboo of the raw bamboo wall (5) and the raw bamboo floor I (6).
7. The connecting joint of the prefabricated original bamboo structure member according to claim 6, characterized in that: A plurality of air vents are reserved on the raw bamboo of the raw bamboo wall (5) and the raw bamboo floor I (6).
8. The connecting joint of the assembled original bamboo structure member according to claim 1, wherein: It also includes the connection node of the raw bamboo structural beam (2) and the raw bamboo floor II (7). A plurality of fixing members III (4c) for fixing are arranged on the raw bamboo structural beam (2) and the raw bamboo floor II (7). A plurality of grouting holes are reserved on the raw bamboo of the raw bamboo structural beam (2) and the raw bamboo floor II (7).
9. The connecting node of the assembled original bamboo structure member according to claim 8, characterized in that: A plurality of connection holes for the fixing members III (4c) to pass through are reserved on the raw bamboo of the raw bamboo structural beam (2) and the raw bamboo floor II (7).
10. The connection node of the prefabricated original bamboo structure member according to claim 9, characterized in that: A plurality of air vents are reserved on the raw bamboo of the raw bamboo structural beam (2) and the raw bamboo floor II (7).