Underground pipe network well grate facility renovation matching toolkit
By providing manhole cover and rainwater grate maintenance tool kits, the problems of black mixed cement dispersion and pollution in manhole cover and rainwater grate maintenance are solved, and the maintenance effect is achieved with higher quality and efficiency.
Patent Information
- Application Number
- CN202422166111.1
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-09-04
- Publication Date
- 2025-07-15
- Estimated Expiration
- 2034-09-04
AI Technical Summary
The prior art has problems of black mixed cement sprinkling and secondary cleaning in the maintenance of manhole covers and rainwater grates, which affects the quality and efficiency of maintenance.
Provide a supporting tool kit for the renovation of underground pipe network well grate facilities, including manhole cover repair tools and grate repair tools. Components such as molds and support poles are used to ensure the correct position and fixation of black mixed cement, and avoid sprinkling and contamination.
The installation quality and appearance of manhole covers and rainwater grates are improved, the secondary cleaning work is reduced, and the on-site operation efficiency is improved.
Smart Images

Figure CN223103710U_ABST
Abstract
Description
Technical Field
[0001] The utility model belongs to the field of maintenance tools for underground pipe network facilities, and more specifically, relates to a complete set of tools for renovating underground pipe network manhole cover facilities. Background Art
[0002] There are a large number of manhole covers and rainwater grates on the road. To ensure safe driving on the road, the annual maintenance volume of the facilities is also large. At the same time, it also involves project works of major, medium and minor repairs, and there are certain differences in the maintenance standards. Due to different standards and processes in the maintenance, to varying degrees, it will affect the pipe network facilities and the maintenance quality. Summary of the Utility Model
[0003] The purpose of the utility model is to provide a complete set of tools for renovating underground pipe network manhole cover facilities in view of the deficiencies of the existing technology. This set of tools can solve the problems of black mixed cement spillage and avoid secondary cleaning operations during the maintenance of manhole covers and rainwater grates, improve the appearance and installation quality of manhole covers and rainwater grates, and improve the efficiency of on-site operations.
[0004] To achieve the above purpose, the utility model provides a complete set of tools for renovating underground pipe network manhole cover facilities, including:
[0005] Manhole cover maintenance tools, including a manhole cover edge protection mold, a manhole cover anti-side leakage mold and an anti-pollution mold. The inner diameter of the manhole cover edge protection mold matches the outer diameter of the hole formed by the manhole cover cutting machine. The top surface of the manhole cover anti-side leakage mold supports on the lower side of the manhole cover assembly. The area of the anti-pollution mold is the same as that of the manhole cover of the manhole cover assembly.
[0006] Grate maintenance tools, including a grate edge protection mold, a mold inner lining protection plate and an adjustable support rod. The inner diameter of the grate edge protection mold matches the outer contour of the rainwater grate assembly. The outer side of the mold inner lining protection plate fits and supports against the well wall of the rainwater well. The inner side of the mold inner lining protection plate fits and supports against the end of the adjustable support rod.
[0007] Optionally, the manhole cover edge protection mold includes a plurality of arc-shaped molds. Jacks and inserts are respectively arranged at both ends of the arc-shaped mold, and a first handle is arranged in the middle of the arc-shaped mold.
[0008] Optionally, the bottom of the manhole cover edge protection mold fits against the road surface.
[0009] Optionally, the manhole cover anti-side leakage mold includes an annular airbag and an anti-leakage cloth. The outer circumference of the anti-leakage cloth is connected to one side of the annular airbag, and the other side of the annular airbag fits against the manhole cover assembly.
[0010] Optionally, an air extraction pipe is arranged on the inner circumference of the annular airbag.
[0011] Optionally, the anti-pollution mold includes a waterproof cloth, and a magnetic attraction block is arranged on one side of the waterproof cloth close to the manhole cover.
[0012] Optionally, the grid edge protection mold includes a plurality of long strip plates. The long strip plates are made of stainless steel, and a second handle is arranged on one side of the long strip plates.
[0013] Optionally, the mold inner lining protection plate includes four inner lining plates. One end of the inner side of the inner lining plate is provided with a flanging, and the flanging is attached to the edge of the rainwater grid base.
[0014] Optionally, the adjustable support rod includes a first group of support rods and a second group of support rods. The first group of support rods is arranged along the length direction of the rainwater inlet grid assembly, and the second group of support rods is arranged along the width direction of the rainwater inlet grid assembly. The first group of support rods and the second group of support rods each include two support rods.
[0015] Optionally, the support rod includes a metal pipe and a bolt. A nut is arranged at one end of the metal pipe, the bolt is screwed with the nut, and the threaded part of the bolt is inserted into the metal pipe.
[0016] The utility model provides a renovation supporting tool kit for underground pipe network well grids. The beneficial effects are as follows: The two replacement devices included in the tool kit innovate the governance model of pipe network ancillary facilities, form a standard manhole cover governance process standard, form a set of standardized operation appliances, improve the quality standard of disease treatment, reduce the public safety risk. At the same time, the manhole cover equipment has reference value for industries such as "water, electricity, gas, heat", etc., filling the industry gap in the treatment of ancillary facility diseases.
[0017] Other features and advantages of the utility model will be described in detail in the following specific implementation manners. Brief Description of the Drawings
[0018] By describing the exemplary embodiments of the utility model in more detail in conjunction with the drawings, the above and other objects, features and advantages of the utility model will become more obvious. Among them, in the exemplary embodiments of the utility model, the same reference numerals generally represent the same components.
[0019] Figure 1 The schematic diagram of the installation position shows a renovation supporting tool kit for underground pipe network well grids when repairing a manhole cover according to an embodiment of the utility model.
[0020] Figure 2 The schematic diagram of the structure shows a grid edge protection mold for a manhole cover according to an embodiment of the utility model.
[0021] Figure 3 Shows a schematic structural diagram of an arc-shaped mold according to an embodiment of the present invention.
[0022] Figure 4 Shows a schematic structural diagram of an anti-side leakage mold for a manhole cover according to an embodiment of the present invention.
[0023] Figure 5 Shows a schematic structural diagram of a rim protection mold for a grating according to an embodiment of the present invention.
[0024] Figure 6 Shows a schematic diagram of the relative positions of a mold inner lining plate and an adjustable support rod when a renovation supporting tool kit for an underground pipe network manhole facility repairs a rainwater inlet grating.
[0025] Figure 7 Shows Figure 6 partial enlarged view of
[0026] Explanation of reference numerals:
[0027] 1. Manhole cover rim protection mold; 2. Manhole cover anti-side leakage mold; 3. Anti-pollution mold; 4. Manhole cover assembly; 5. Manhole cover; 6. Grating rim protection mold; 7. Mold inner lining plate; 8. Adjustable support rod; 9. Arc-shaped mold; 10. Jack hole; 11. Insert piece; 12. First handle; 13. Annular airbag; 14. Anti-leakage cloth; 15. Air extraction pipe; 16. Long strip plate; 17. Second handle; 18. Inner lining plate; 19. Flange; 20. First group of support rods; 21. Second group of support rods; 22. Metal pipe; 23. Bolt; 24. Nut. Detailed implementation manners
[0028] The preferred embodiments of the present invention will be described in more detail below. Although the preferred embodiments of the present invention are described below, it should be understood that the present invention can be implemented in various forms and should not be limited by the embodiments set forth herein. On the contrary, these embodiments are provided to make the present invention more thorough and complete, and to convey the scope of the present invention fully to those skilled in the art.
[0029] The present invention provides a renovation supporting tool kit for an underground pipe network manhole facility, including:
[0030] A manhole cover repair tool, including a manhole cover rim protection mold, a manhole cover anti-side leakage mold, and an anti-pollution mold. The inner diameter of the inner circle of the manhole cover rim protection mold matches the outer diameter of the hole formed by the manhole cover cutting machine. The top surface of the manhole cover anti-side leakage mold supports on the lower side of the manhole cover assembly, and the area of the anti-pollution mold is the same as that of the manhole cover of the manhole cover assembly;
[0031] The grate repair tool includes a grate edge protection mold, a mold inner lining protection plate, and an adjustable support rod. The inner diameter of the grate edge protection mold matches the outer contour of the rainwater inlet grate assembly. The outer side of the mold inner lining protection plate fits and supports against the well wall of the rainwater well, and the inner side of the mold inner lining protection plate fits and supports against the end of the adjustable support rod.
[0032] Specifically, the tool kit includes a manhole cover repair tool and a grate repair tool, which can meet the repair requirements of underground pipe network manhole facilities at the same time. When repairing the manhole cover, after the construction of the circle cutting machine is completed, select a manhole cover edge protection mold of the corresponding size to cover the ground. The part exposed in the middle of the manhole cover edge protection mold needs to place the manhole cover assembly and black mixed cement. Before placing the manhole cover assembly, place the manhole cover anti-side leakage mold below to support the manhole cover assembly and prevent the black mixed cement from falling into the sewer. Finally, after the installation of the manhole cover assembly is completed, cover the anti-pollution mold on the manhole cover to avoid polluting the manhole cover during the cement plastering; when repairing the rainwater inlet grate, use the grate edge protection mold to limit the construction area of the black mixed cement, and then use the mold inner lining protection plate and the adjustable support rod to support and limit the well wall profile. When the strength of the black mixed cement meets the requirements, the mold inner lining protection plate and the adjustable support rod can be removed.
[0033] Optionally, the manhole cover edge protection mold includes a plurality of arc-shaped molds. Jacks and inserts are respectively arranged at both ends of the arc-shaped mold, and a first handle is arranged in the middle of the arc-shaped mold.
[0034] Specifically, in order to reduce the labor intensity of workers, the manhole cover edge protection mold is split into a plurality of arc-shaped molds. After the construction of the circle cutting machine is completed, the plurality of arc-shaped molds can be spliced into a circle and fixed by inserting the jacks and inserts, so as to form the construction area of the manhole cover assembly on the ground. After pouring the black mixed cement, it can be supported by the manhole cover edge protection mold. After the strength of the black mixed cement reaches the process requirements, the manhole cover edge protection mold can be removed.
[0035] Optionally, the bottom of the manhole cover edge protection mold fits against the road surface.
[0036] Specifically, the manhole cover edge protection mold is placed on the ground outside the circumference of the manhole cover assembly, and it is ensured that the upper surface of the manhole cover edge protection mold is flat. After the manhole cover edge protection mold is ensured to be stably installed, the black mixed cement can be poured, and the external quality of the black mixed cement after forming can be guaranteed.
[0037] Optionally, the manhole cover anti-side leakage mold includes an annular airbag and an anti-leakage cloth. The outer circumference of the anti-leakage cloth is connected to one side of the annular airbag, and the other side of the annular airbag fits against the manhole cover assembly.
[0038] Optionally, an air extraction pipe is arranged on the inner circumference of the annular airbag.
[0039] Specifically, after the manhole cover anti-leakage mold is placed in the manhole, the side with the anti-leakage cloth is placed below, and then the annular airbag is inflated to lift the manhole cover assembly to the same height as the ground. Then, black mixed cement is poured to prevent the manhole cover assembly from settling before the black mixed cement generates sufficient support strength. Additionally, the anti-leakage cloth can intercept the poured black mixed cement to prevent the spilled black mixed cement from falling into the sewer. When the strength of the black mixed cement reaches the process requirements and can support the manhole cover assembly, the annular airbag can be deflated, and then the manhole cover anti-leakage mold can be removed from the manhole cover assembly.
[0040] Optionally, the anti-pollution mold includes a waterproof cloth, and magnetic blocks are arranged on the side of the waterproof cloth close to the manhole cover.
[0041] Specifically, before pouring the black mixed cement on the outer peripheral surface of the manhole cover, the waterproof cloth is covered on the manhole cover and fixed to the manhole cover by magnetic attraction to prevent the waterproof cloth from being blown away. In this way, the black mixed cement will not be poured onto the manhole cover, causing adhesion between the manhole cover and the manhole ring or blockage of the manhole cover holes.
[0042] Optionally, the grate edge protection mold includes multiple long strips, the long strips are made of stainless steel, and a second handle is arranged on one side of the long strips.
[0043] Specifically, the use method of the grate edge protection mold is the same as that of the manhole cover edge protection mold, except that a rectangular area is formed inside after the grate edge protection mold is surrounded, and this rectangular area is used to place the rainwater inlet grate assembly; the poured black mixed cement is supported and limited by the inner side of the long strips to ensure that the shape of the black mixed cement does not change before the strength reaches the process requirements; the second handle is beneficial for adjusting the position of the long strips so that the grate edge protection mold can be applicable to rainwater inlet grate assemblies of multiple sizes.
[0044] Optionally, the mold inner lining protection plate includes four inner lining plates, and a flanging is arranged at one end of the inner side of the inner lining plates, and the flanging fits with the edge of the rainwater grate base.
[0045] Specifically, the four inner lining plates are selected and installed according to the internal size requirements of the rainwater inlet, and then the gap between the inner lining plates in the opposite direction is adjusted by the adjustable support rods to ensure the support strength of the inner lining plates, so that the black mixed cement will not flow randomly after pouring.
[0046] Optionally, the adjustable support rods include a first group of support rods and a second group of support rods. The first group of support rods is arranged along the length direction of the rainwater inlet grate assembly, and the second group of support rods is arranged along the width direction of the rainwater inlet grate assembly. The first group of support rods and the second group of support rods each include two support rods.
[0047] Optionally, the support rod includes a metal pipe and a bolt. One end of the metal pipe is provided with a nut, the bolt is screwed with the nut, and the threaded portion of the bolt is inserted into the metal pipe.
[0048] Specifically, after placing the four inner lining plates inside the rainwater inlet, then place the support rods in sequence. Then, according to the required inner size of the rainwater inlet, adjust the length of the bolt extending out to make the inner lining plates supported in place. Then, pour black mixed cement on the outer side of the inner lining plates, place the rainwater grate base on the inner side of the inner lining plates, and support the rainwater grate base through the flanging to ensure the correct position of the rainwater grate in the vertical direction. After the strength of the black mixed cement reaches the process requirements, remove the support rods and inner lining plates in sequence.
[0049] Embodiment
[0050] As Figures 1 to 7 shown, the present utility model provides a renovation supporting tool kit for underground pipe network well grates, including:
[0051] Manhole cover repair tools, including a manhole cover edge protection mold 1, a manhole cover anti-side leakage mold 2, and an anti-pollution mold 3. The inner ring size of the manhole cover edge protection mold 1 matches the outer diameter of the hole formed by the manhole cover cutting machine. The top surface of the manhole cover anti-side leakage mold 2 supports on the lower side of the manhole cover assembly 4, and the area of the anti-pollution mold 3 is the same as that of the manhole cover 5 of the manhole cover assembly 4;
[0052] Grate repair tools, including a grate edge protection mold 6, a mold inner lining plate 7, and an adjustable support rod 8. The inner ring size of the grate edge protection mold 6 matches the outer contour of the rainwater inlet grate assembly. The outer side of the mold inner lining plate 7 is attached and supported to the well wall of the rainwater well, and the inner side of the mold inner lining plate 7 is attached and supported to the end of the adjustable support rod 8.
[0053] In this embodiment, the manhole cover edge protection mold 1 includes a plurality of arc-shaped molds 9. Insertion holes 10 and insertion pieces 11 are respectively arranged at both ends of the arc-shaped mold 9, and a first handle 12 is arranged in the middle of the arc-shaped mold 9.
[0054] In this embodiment, the bottom of the manhole cover edge protection mold 1 is attached to the road surface.
[0055] In this embodiment, the manhole cover anti-side leakage mold 2 includes an annular airbag 13 and an anti-leakage cloth 14. The outer periphery of the anti-leakage cloth 14 is connected to one side of the annular airbag 13, and the other side of the annular airbag 13 is attached to the manhole cover assembly 4.
[0056] In this embodiment, an air extraction pipe 15 is arranged on the inner periphery of the annular airbag 13.
[0057] In this embodiment, the anti-pollution mold 3 includes a waterproof cloth, and a magnetic attraction block is arranged on the side of the waterproof cloth close to the manhole cover.
[0058] In this embodiment, the grating edge protection mold 6 includes a plurality of long strips 16 made of stainless steel, and a second handle 17 is provided on one side of the long strip 16.
[0059] In this embodiment, the inner lining protection plate 7 of the mold includes four inner lining plates 18. A flanging 19 is provided at one end of the inner side of the inner lining plate 18, and the flanging 19 fits against the edge of the rainwater grating base.
[0060] In this embodiment, the adjustable support rod 8 includes a first group of support rods 20 and a second group of support rods 21. The first group of support rods 20 is arranged along the length direction of the rainwater inlet grating assembly, and the second group of support rods 21 is arranged along the width direction of the rainwater inlet grating assembly. The first group of support rods 20 and the second group of support rods 21 each include two support rods.
[0061] In this embodiment, the support rod includes a metal tube 22 and a bolt 23. A nut 24 is provided at one end of the metal tube 22. The bolt 23 is screwed with the nut 24, and the threaded part of the bolt 23 is inserted into the metal tube 22.
[0062] In summary, when the tool kit is used for repairing the manhole cover, first, according to the width and depth to be repaired, use a trimming machine to cut the road surface structure; second step, install the manhole cover anti-side leakage mold 2; third step, break the road surface structure and clean the soil around the well; fourth step, place the manhole cover edge protection mold 1 and cover the anti-pollution mold 3 on the manhole cover 5; fifth step, lay the steel bar ring; sixth step, pour black mixed cement to pour and repair the road surface; seventh step, wait until the black mixed cement reaches the quality hardness, and remove all the molds; eighth step, restore the road surface.
[0063] When the tool kit is used for repairing the rainwater grating, first, according to the width and depth to be repaired, use a trimming machine to cut the road surface structure around the grating to be repaired; second step, break the road surface structure and clean the soil around the well; third step, support the inner lining protection plate 7 inside the rainwater inlet; fourth step, use the adjustable support rod 8 to fix the mold, and adjust the extended length of the bolt 23 according to the internal size of the rainwater inlet; fifth step, place the grating edge protection mold 6; sixth step, pour black mixed cement outside the mold to repair the road surface; seventh step, wait until the material reaches the quality hardness, and remove all the molds; eighth step, restore the road surface.
[0064] The above has described the embodiments of the present invention. The above description is exemplary and not exhaustive, and is not limited to the disclosed embodiments. Many modifications and variations are obvious to those of ordinary skill in the art in the technical field without departing from the scope and spirit of the described embodiments.
Claims
1. An underground pipe network manhole cover facility renovation supporting tool kit, characterized in that, Including: A manhole cover repair tool, including a manhole cover edge protection mold, a manhole cover anti-side leakage mold and an anti-pollution mold. The inner diameter of the manhole cover edge protection mold matches the outer diameter of the hole formed by the manhole cover cutting machine. The top surface of the manhole cover anti-side leakage mold supports on the lower side of the manhole cover assembly. The area of the anti-pollution mold is the same as that of the manhole cover of the manhole cover assembly. A grate repair tool, including a grate edge protection mold, a mold inner lining protection plate and an adjustable support rod. The inner diameter of the grate edge protection mold matches the outer contour of the rainwater inlet grate assembly. The outer side of the mold inner lining protection plate fits and supports against the well wall of the rainwater well. The inner side of the mold inner lining protection plate fits and supports against the end of the adjustable support rod.
2. The underground pipe network manhole cover facility renovation supporting tool kit according to claim 1, characterized in that, The manhole cover edge protection mold includes a plurality of arc-shaped molds. Plug holes and inserts are respectively arranged at both ends of the arc-shaped mold. A first handle is arranged in the middle of the arc-shaped mold.
3. The underground pipe network manhole cover facility renovation supporting tool kit according to claim 1, characterized in that, The bottom of the manhole cover edge protection mold fits against the road surface.
4. The underground pipe network manhole cover facility renovation supporting tool kit according to claim 1, characterized in that, The manhole cover anti-side leakage mold includes an annular airbag and an anti-leakage cloth. The outer circumference of the anti-leakage cloth is connected to one side of the annular airbag. The other side of the annular airbag fits against the manhole cover assembly.
5. The underground pipe network manhole cover facility renovation supporting tool kit according to claim 4, characterized in that, An air extraction pipe is arranged on the inner circumference of the annular airbag.
6. The renovation supporting tool kit for the underground pipe network manhole cover facility according to claim 1, wherein, The anti-pollution mold includes a waterproof cloth. Magnetic blocks are arranged on one side of the waterproof cloth close to the manhole cover.
7. The underground pipe network manhole cover facility renovation supporting tool kit according to claim 1, characterized in that, The grate edge protection mold includes a plurality of long strips. The long strips are made of stainless steel. A second handle is arranged on one side of the long strips.
8. The renovation supporting tool kit for the underground pipe network well grate facility according to claim 1, characterized in that, The mold inner lining protection plate includes four lining plates. A flanging is arranged at one end of the inner side of the lining plate. The flanging fits against the edge of the rainwater grate base.
9. The underground pipe network manhole cover facility renovation supporting tool kit according to claim 8, characterized in that, The adjustable support rod includes a first group of support rods and a second group of support rods. The first group of support rods is arranged along the length direction of the rainwater inlet grate assembly. The second group of support rods is arranged along the width direction of the rainwater inlet grate assembly. The first group of support rods and the second group of support rods each include two support rods.
10. The underground pipe network manhole cover facility renovation supporting toolkit according to claim 9, characterized in that, The support rod includes a metal pipe and a bolt. A nut is arranged at one end of the metal pipe. The bolt is screwed with the nut, and the threaded part of the bolt is inserted into the metal pipe.