Maintenance platform structure for power transformer

The integration of a self-contained maintenance platform within electric power transformers addresses safety and cost issues by connecting a cooling and auxiliary platform with a transition ladder, enhancing safety and reducing costs.

CN223109527UActive Publication Date: 2025-07-15BAODING BAOLING TRANSFORMER
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202422576471.9
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-10-24
Publication Date
2025-07-15
Estimated Expiration
2034-10-24

AI Technical Summary

Technical Problem

The existing power transformers lack a built-in maintenance platform during maintenance, resulting in insufficient safety and temporary measures are required to meet customer needs.

Method used

A cooling platform and auxiliary equipment platform are installed between the cooler bracket of the transformer and the box to form an overall structure and equipped with a transition ladder, combining the guardrail design of I-shaped steel and steel plate mesh to improve safety.

Benefits of technology

The transformer has been equipped with maintenance platform, which improves the safety of staff, reduces the number of walking routes and ladders, and reduces manufacturing and maintenance costs.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN223109527U_ABST
    Figure CN223109527U_ABST
Patent Text Reader

Abstract

The utility model relates to a maintenance platform structure for a power transformer, and belongs to the technical field of transformer manufacturing. According to the technical scheme, a cooling platform (2) is arranged between a cooler (13) of the transformer and a box body (12) of the transformer, and the cooling platform is fixed on a cooler support (11) of the transformer and the box body of the transformer; a cantilever beam (14) is arranged on a box body of the transformer, an auxiliary equipment platform (3) is arranged on the cantilever beam, and the auxiliary equipment platform is located below an auxiliary device of the transformer. The cooling platform and the auxiliary equipment platform are connected into a whole and form a whole with a box body of the transformer, and a transition ladder (1) is arranged between the box body of the transformer and the cooling platform. The transformer maintenance platform has the advantages that the transformer is provided with the maintenance platform, safety of workers in the maintenance process is improved, requirements of clients are met, walking routes of the workers are reduced, and the number of ladders is reduced; not only is the manufacturing cost of the transformer reduced, but also the maintenance cost of the transformer is reduced.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to a maintenance platform structure for a power transformer, belonging to the technical field of transformers. Background Art

[0002] With the development of power technology and the continuous improvement of power quality, the safety of transformers during maintenance has received more and more attention. A cooler bracket is provided on one side of the transformer box, and the cooler of the transformer is installed on the cooler bracket. The auxiliary device of the transformer (including oil pump, fan, motor and pipeline, etc., for heat dissipation and cooling medium delivery) is installed on the box next to the cooler. At present, some regions have required the installation of an inspection platform on the side of the auxiliary device of the transformer. The inspection platform and the transformer itself are an integral whole and can be used for a long time. The purpose is to prevent the staff from falling, thereby improving the safety of the staff. The power transformer of the prior art itself is not equipped with an inspection platform. The inspection platforms designed by people are temporary safety measures adopted when the transformer needs to be inspected after it is put into use. For example: Chinese patent CN202022778692.6 is named "a foldable inspection platform for transformers", CN202311625798.4 is named "a maintenance platform for inspecting high-altitude transformers" and CN201721468616.7 is named "a maintenance platform for large transformers". How to meet customer needs and provide transformer products with built-in maintenance platforms to improve safety performance is a technical problem that needs to be urgently solved in this field. Utility Model Content

[0003] The utility model aims to provide a maintenance platform structure for a power transformer. The transformer has a maintenance platform. A cooling platform and an auxiliary equipment platform are arranged between a cooler bracket and a box body of the transformer. The cooling platform and the auxiliary equipment platform are connected as a whole and form a whole with the box body of the transformer. A transition ladder is arranged between the box body of the transformer and the cooling platform, so as to improve the safety of the staff during the maintenance process, meet the needs of customers, and solve the above-mentioned technical problems existing in the prior art.

[0004] The technical solution of the utility model is:

[0005] An overhaul platform structure for a power transformer. A cooler support is provided on one side of the transformer box body. The cooler of the transformer is installed on the cooler support, and auxiliary devices of the transformer are installed on the box body beside the cooler. The special feature is that a cooling platform is arranged between the cooler of the transformer and the box body of the transformer. The cooling platform is fixed on the cooler support of the transformer and the box body of the transformer, and the cooler support serves as the support point of the cooling platform. A cantilever beam is arranged on the box body of the transformer, and an auxiliary equipment platform is arranged on the cantilever beam. The auxiliary equipment platform is located below the auxiliary device of the transformer, and the cantilever beam serves as the support point of the auxiliary equipment platform. The cooling platform and the auxiliary equipment platform are integrated and form a whole with the box body of the transformer. A transition ladder is arranged between the box body of the transformer and the cooling platform.

[0006] Both the cooling platform and the auxiliary equipment platform are provided with guardrails.

[0007] Both the cooling platform and the auxiliary equipment platform are composed of I-beams to form a planar frame. A steel strip is laid on the upper surface of the planar frame, and a steel mesh is arranged above the steel strip.

[0008] The guardrail is installed on the I-beam through fixing parts to play a role in protecting the safety of workers.

[0009] The steel mesh is pressed tightly around the planar frame through fixing plates, and the fixing plates are installed on the guardrail.

[0010] Workers reach the cooling platform from the box body through the transition ladder, and then reach the auxiliary equipment platform from the cooling platform for overhaul and maintenance; it reduces the walking route of workers and the number of ladders; it not only reduces the manufacturing cost of the transformer but also reduces the maintenance cost of the transformer.

[0011] A support frame is arranged below the auxiliary equipment platform, and the support frame is arranged on the installation base plate of the transformer. The cantilever beam and the support frame together support the auxiliary equipment platform to meet the strength requirements.

[0012] The steel strip is welded to the I-beam, and the steel mesh is laid above the steel strip.

[0013] The positive effects of the present utility model: The transformer is equipped with an overhaul platform by itself. A cooling platform and an auxiliary equipment platform are arranged between the cooler support of the transformer and the box body. The cooling platform and the auxiliary equipment platform are integrated and form a whole with the box body of the transformer. A transition ladder is arranged between the box body of the transformer and the cooling platform, which improves the safety of workers during the overhaul process, meets the needs of customers, reduces the walking route of workers and the number of ladders; it not only reduces the manufacturing cost of the transformer but also reduces the maintenance cost of the transformer. Description of the Drawings

[0014] Figure 1This is the front view of the transformer cooling platform in the embodiment of the present utility model;

[0015] Figure 2 This is the left view of the present utility model;

[0016] Figure 3 This is the top view of the present utility model;

[0017] Figure 4 This is the front view of the transformer auxiliary equipment platform in the embodiment of the present utility model;

[0018] Figure 5 This is the top view of the transformer expanded metal in the embodiment of the present utility model;

[0019] In the figure: transition ladder 1, cooling platform 2, auxiliary equipment platform 3, guardrail 4, fixing plate 5, support frame 6, fixing part 7, I-beam 8, steel strip 9, expanded metal 10, cooler support 11, box body 12, cooler 13, cantilever beam 14. Specific embodiments

[0020] The following further describes the present utility model through embodiments in conjunction with the attached drawings.

[0021] A maintenance platform structure for a power transformer. A cooler support 11 is provided on one side of the transformer box body 12, and the cooler 13 of the transformer is installed on the cooler support 11. An auxiliary device of the transformer is installed on the box body 12 beside the cooler; the special feature is that: a cooling platform 2 is arranged between the cooler 13 of the transformer and the box body 12 of the transformer, and the cooling platform 2 is fixed on the cooler support 11 of the transformer and the box body 12 of the transformer, and the cooler support 11 serves as the support point of the cooling platform 2; a cantilever beam 14 is arranged on the box body 12 of the transformer, and an auxiliary equipment platform 3 is arranged on the cantilever beam 14. The auxiliary equipment platform 3 is located below the auxiliary device of the transformer, and the cantilever beam 14 serves as the support point of the auxiliary equipment platform 3; the cooling platform 2 and the auxiliary equipment platform 3 are integrated and form a whole with the box body 12 of the transformer, and a transition ladder 1 is arranged between the box body 12 of the transformer and the cooling platform 2.

[0022] Guardrails 4 are provided on both the cooling platform 2 and the auxiliary equipment platform 3.

[0023] Both the cooling platform 2 and the auxiliary equipment platform 3 are composed of I-beams 8 to form a planar frame, a steel strip 9 is laid on the upper surface of the planar frame, and an expanded metal 10 is arranged on the steel strip 9.

[0024] The guardrail 4 is installed on the I-beam 8 through the fixing part 7 to play a role in protecting the safety of workers.

[0025] The expanded metal 10 is pressed by fixing plates 5 around the planar frame, and the fixing plates 5 are installed on the guardrail 4.

[0026] The staff pass from the box body 12 to the cooling platform 2 via the transition ladder 1, and then reach the auxiliary equipment platform 3 from the cooling platform 2 for maintenance; the walking route of the staff is reduced and the number of ladders is decreased; this not only reduces the manufacturing cost of the transformer but also reduces the maintenance cost of the transformer.

[0027] A support frame 6 is arranged below the auxiliary equipment platform 3, and the support frame 6 is arranged on the installation base plate of the transformer. The cantilever beam 14 and the support frame 6 together support the auxiliary equipment platform 3, thus meeting the strength requirements. The box body 12, the cooling platform 2 and the auxiliary equipment platform are connected as a whole through the transition ladder 1.

[0028] The steel strip 9 is welded to the I-beam 8, and the expanded metal mesh 10 is laid above the steel strip 9.

[0029] As Figure 1 Shown in the front view of the cooling platform, in this embodiment, the I-beam 8, the steel strip 9 and the fixing part 7 are welded together to form a base. The guardrail 4 is fixed to the fixing part 7 through fasteners, and the guardrails are connected by fasteners. The expanded metal mesh 10 is laid on the steel strip 9 and fixed by the fixing plate 5, forming an integral body with the cooler support 11 and the box body 12.

[0030] As Figure 2 Shown in the left view, in this embodiment, one end of the transition ladder 1 is fixed to the box body 12, and the other end is fixed to the cooling platform 2. The periphery is strengthened by the guardrail 4, the fixing plate 5 is fixed to the guardrail 4, and the I-beam 8 and the steel strip 9 are placed on the cooler support 11.

[0031] As Figure 3 Shown in the top view, in this embodiment, the transition ladder 1, the cooling platform 2, the auxiliary equipment platform 3, the cooler support 11 and the box body 12 are connected through the fixing part 7 and fasteners to form an integral maintenance passage, ensuring the safety of the staff.

[0032] As Figure 4 Shown in the front view of the auxiliary equipment platform, in this embodiment, the auxiliary equipment platform 3 is jointly composed of the guardrail 4, the fixing plate 5, the support frame 6, the I-beam 8, the steel strip 9 and the box body 12. Among them, the auxiliary equipment platform 3 is supported by the cantilever beam of the box body 12 and the support frame 6 together, thus meeting the strength requirements.

[0033] As Figure 5 Shown as above, the expanded metal mesh 10 is laid above the steel strip 9 and fixed by fixing parts and the fixing plate, facilitating the staff to work on it and preventing larger objects from falling. The fixing plate 5 can prevent feet from stretching out of the platform.

Claims

1. A maintenance platform structure for a power transformer. A cooler support (11) is provided on one side of the transformer box body (12). The cooler (13) of the transformer is installed on the cooler support (11). An auxiliary device of the transformer is installed on the box body (12) beside the cooler. It is characterized in that: A cooling platform (2) is arranged between the cooler (13) of the transformer and the box body (12) of the transformer. The cooling platform (2) is fixed on the cooler support (11) of the transformer and the box body (12) of the transformer, and the cooler support (11) serves as the support point of the cooling platform (2); a cantilever beam (14) is arranged on the box body (12) of the transformer, and an auxiliary equipment platform (3) is arranged on the cantilever beam (14). The auxiliary equipment platform (3) is located below the auxiliary device of the transformer, and the cantilever beam (14) serves as the support point of the auxiliary equipment platform (3); the cooling platform (2) and the auxiliary equipment platform (3) are integrated and form an integral body with the box body (12) of the transformer. A transition ladder (1) is arranged between the box body (12) of the transformer and the cooling platform (2).

2. The structure of the maintenance platform for a power transformer according to claim 1, wherein: Guardrails (4) are provided on both the cooling platform (2) and the auxiliary equipment platform (3).

3. The structure of an overhaul platform for a power transformer according to claim 2, characterized in that: Both the cooling platform (2) and the auxiliary equipment platform (3) are composed of I-beams (8) to form a planar frame. A steel strip (9) is laid on the upper surface of the planar frame, and a steel mesh (10) is arranged on the steel strip (9).

4. The structure of the maintenance platform for a power transformer according to claim 3, wherein: The guardrail (4) is installed on the I-beam (8) through a fixing member (7).

5. The structure of the maintenance platform for a power transformer according to claim 4, characterized in that: The steel mesh (10) is pressed by fixing plates (5) around the planar frame, and the fixing plates (5) are installed on the guardrail (4).