Adjustable pier column mold

By designing adjustable pier molds and using adjustment plates and hydraulic strut systems, the problems of poor versatility of the formwork and construction safety hazards are solved, and multi-special applicability, low-cost and efficient installation and high-quality production are achieved.

CN223115492UActive Publication Date: 2025-07-18CHINA CONSTR TECH (FUZHOU) CO LTD
View PDF 1 Cites 0 Cited by

Patent Information

Application Number
CN202422264829.4
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-09-14
Publication Date
2025-07-18
Estimated Expiration
2034-09-14

AI Technical Summary

Technical Problem

The existing prefabricated pier column formwork has a large weight and poor versatility, resulting in high costs, many joints, serious slurry leakage, poor component appearance and large construction safety risks. Moreover, traditional templates cannot be adjusted according to pier columns of different specifications.

Method used

An adjustable pier mold is designed to achieve flexible adjustment of the template through adjustment plates and hydraulic struts, combine guide rails and pulley systems to improve installation efficiency, and set up a port between the edge mold and the adjustment plate to reduce the splicing leakage and enhance the splicing strength.

Benefits of technology

It realizes the multi-spec applicability of the template, reduces labor and machinery costs, improves installation and disassembly efficiency, reduces slurry leakage and deformation dislocation, and improves production quality and safety.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN223115492U_ABST
    Figure CN223115492U_ABST
Patent Text Reader

Abstract

The utility model relates to the technical field of pier column molds, in particular to an adjustable pier column mold which comprises side molds and a construction platform, the construction platform is fixed to the tops of the side molds, an adjusting plate is clamped between the two side molds, the surface of the adjusting plate is fixed to a second rotating shaft, and the surface of one side mold is fixed to a first rotating shaft. One end of the hydraulic supporting rod is rotationally connected with the second rotating shaft, the other end of the hydraulic supporting rod is detachably matched with the first rotating shaft, a transverse rib plate and a longitudinal rib plate are fixed to the surface of the side formwork, pulleys are arranged at the bottoms of the side formwork and the adjusting plates, and guide rails matched with the pulleys are fixed to the ground. The side dies of the same model can be suitable for pier columns of various different specifications, and the usable range of the device is widened.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of pier column molds, and specifically relates to an adjustable pier column mold. Background Technique

[0002] In the construction of precast bridges, due to the characteristics of large height, heavy weight, and diverse cross-section changes of precast pier columns, various types of templates are required during the production process to meet the construction needs. This not only results in large template weight, poor versatility, and high costs, but also causes quality problems such as many joints, serious slurry leakage problems, and poor appearance of components when using small pieces of templates for splicing, thus posing potential safety hazards. In addition, the installation and disassembly of templates mainly rely on manual operation of hoisting equipment, which is time-consuming, inefficient, and has high labor costs. In traditional production processes, workers need to use equipment such as aerial work platforms for high-altitude pouring operations, which require multi-party coordination and cooperation, posing great safety hazards.

[0003] The Chinese utility model patent with the patent publication number CN220362744U, which was publicly disclosed on January 19, 2024, discloses a mold assembly for precast pier columns. Its height and diameter are both built according to the diameter and height of the to-be-built precast pier column, and it has the advantages of improving construction efficiency, less construction floor area, less concrete work, and one-time forming of precast pier columns. However, it cannot be adjusted according to different specifications of pier columns, and the usage scenario is single. Content of the Utility Model

[0004] In view of the above problems, the utility model provides an adjustable pier column mold, which can select adjusting plates with different widths according to different specifications of pier columns, so that the same type of side mold can be applicable to a variety of different specifications of pier columns, increasing the applicable range of the device.

[0005] To achieve the above object, the utility model provides the following technical solutions:

[0006] An adjustable pier column mold includes side molds and a construction platform. The construction platform is fixed on the top of the side molds. An adjusting plate is clamped between the two side molds. The surface of the adjusting plate is fixed to the second rotating shaft, and the surface of one side mold is fixed to the first rotating shaft. One end of the hydraulic strut is rotatably connected to the second rotating shaft, and the other end of the hydraulic strut is detachably matched with the first rotating shaft.

[0007] Further, transverse ribs and longitudinal ribs are fixed on the surface of the side mold.

[0008] Further, pulleys are provided at the bottom of the side mold and the adjusting plate, and guide rails matching the pulleys are fixed on the ground.

[0009] Further, a supporting plate is fixed on the top of the side mold, and the top of the supporting plate is fixed to the construction platform.

[0010] Furthermore, a guardrail is provided at the top of the construction platform.

[0011] Furthermore, a matching rabbet is provided between the side form and the adjusting plate.

[0012] The utility model has the following beneficial effects:

[0013] 1. The utility model can select adjusting plates with different widths according to pier columns of different specifications, so that side forms of the same model can be applied to a variety of pier columns with different specifications, increasing the applicable range of the device.

[0014] 2. Through the configuration of guide rails and pulleys at the bottom of the utility model and the control of the driving mechanism, the input of manpower and machinery is significantly reduced. At the same time, the installation and disassembly efficiency of the mold is improved, and the labor and machinery costs are reduced.

[0015] 3. A rabbet is provided between the side form and the adjusting plate of the utility model. The rabbet not only reduces the influence of joint leakage on the appearance of the precast pier column, but also solves the problem of easy deformation and dislocation of the parallel joints of the mold, and enhances the strength of the splicing area through the interaction force, further ensuring the production quality.

[0016] 4. The utility model integrates the construction platform and the mold, improving the safety of the production process, reducing the use of construction machinery, and avoiding information chaos and potential safety hazards that may occur during the collaborative operation of production personnel with boom truck drivers, signal workers, slinging workers, etc. BRIEF DESCRIPTION OF THE DRAWINGS

[0017] Figure 1 is a schematic structural diagram of the utility model;

[0018] Figure 2 is Figure 1 the schematic structural diagram of area A in

[0019] Figure 3 is a schematic installation state diagram of the utility model;

[0020] Figure 4 is Figure 3 the schematic structural diagram of area B in

[0021] The labels in the drawings are:

[0022] 1. Side form; 2. Transverse rib; 3. Longitudinal rib; 4. First rotating shaft; 5. Hydraulic strut; 6. Second rotating shaft; 7. Adjusting plate; 8. Pulley; 9. Guide rail; 10. Construction platform; 11. Guardrail; 12. Support plate. DETAILED DESCRIPTION OF THE EMBODIMENTS

[0023] The technical solutions in the embodiments of the present utility model will be clearly and completely described below with reference to the accompanying drawings in the embodiments of the present utility model.

[0024] As Figures 1 - 4 shown, the adjustable pier formwork of this embodiment includes side forms 1 and a construction platform 10. The construction platform 10 is fixed to the top of the side forms 1. An adjusting plate 7 is clamped between the two side forms 1. The surface of the adjusting plate 7 is fixed to the second rotating shaft 6, and the surface of one side form 1 is fixed to the first rotating shaft 4. One end of the hydraulic strut 5 is rotatably connected to the second rotating shaft 6, and the other end of the hydraulic strut 5 is detachably matched with the first rotating shaft 4.

[0025] The present utility model adopts the flexible stretching combination technology of the side forms 1 and the precise control of the adjusting plate 7 to realize the production of precast piers of various cross-section types, significantly improving the applicable range of the formwork; integrating the construction platform 10 with the formwork improves the safety of the production process, reduces the use of construction machinery, and avoids the information chaos and potential safety hazards that may occur during the multi-party collaborative operation of production personnel, boom lift drivers, signal workers, slingers, etc.

[0026] The side forms 1 are bent, cut and stamped from Q235B steel and used as concrete forming templates; the hydraulic strut 5 is an automatic telescopic rod member with a hydraulic system inside; the adjusting plate 7 is used to change the size when the side forms 1 are adjusted in size and is processed from Q235B steel; the construction platform 10 is cut and processed from checkered plate, and production personnel can walk on this platform.

[0027] Further, transverse rib plates 2 and longitudinal rib plates 3 are fixed to the surface of the side forms 1.

[0028] The transverse rib plates 2 and the longitudinal rib plates 3 are cut from square steel and are used to ensure that the side forms do not deform during production.

[0029] Further, pulleys 8 are provided at the bottoms of the side forms 1 and the adjusting plate 7, and guide rails 9 matching the pulleys 8 are fixed to the ground.

[0030] With the configuration of the guide rails 9 and the pulleys 8 at the bottom of the present utility model and the control of the driving mechanism, the input of manpower and machinery is significantly reduced. At the same time, the installation and disassembly efficiency of the formwork is improved, and the labor and machinery costs are reduced. The pulleys 8 are located at the bottoms of the adjusting plate 7 and the side forms 1, enabling the adjusting plate 7 to slide freely when the size changes; the guide rails 9 are located below the pulleys 8 and are processed from Q235B steel, aiming to provide a sliding track for the pulleys 8.

[0031] Further, a support plate 12 is fixed to the top of the side forms 1, and the top of the support plate 12 is fixed to the construction platform 10.

[0032] The support plate 12 is used to carry the construction platform 10.

[0033] Further, a guardrail 11 is provided on the top of the construction platform 10.

[0034] The guardrail 11 is made of galvanized square steel and is placed around the construction platform 10 to play a role in safety enclosure.

[0035] Furthermore, a rabbet that matches each other is provided between the side form 1 and the adjusting plate 7.

[0036] A rabbet is provided between the side form 1 and the adjusting plate 7. The rabbet not only reduces the influence of mortar leakage at the joint on the appearance of the precast pier column, but also solves the problem that the parallel joints of the mold are prone to deformation and dislocation, and enhances the strength of the splicing area through the interaction force, further ensuring the production quality.

[0037] The usage method of the utility model is as follows:

[0038] 1. Place the guide rail 9 on a flat mold table or the ground;

[0039] 2. Since there are pulleys 8 at the bottom of the side form 1 and the adjusting plate 7, place them on the guide rail 9;

[0040] 3. Fasten the two side forms 1 with tie bolts;

[0041] 4. When the size is not adjusted, the adjusting plate 7 is located at the panel part of the side form 1;

[0042] 5. Assemble the combined guardrail 11 and the construction platform 10 on the ground;

[0043] 6. Fix the support plate 12 on the side form 1 to ensure tight connection;

[0044] 7. After the combined guardrail 11 and the construction platform 10 are assembled, use a lifting device to lift them to the top of the mold and place them on the support plate 12, and connect and fix them with bolts;

[0045] 8. Paste a rubber strip at the rabbet position and polish it flat;

[0046] 9. Pour concrete from the middle vacancy of the construction platform 10;

[0047] 10. After pouring, wait for the concrete to reach the required strength, lift off the construction platform 10, loosen the tie bolts of the side form 1, and slide the two side forms 1 apart to complete the demolding of the precast pier column;

[0048] 11. When the size needs to be changed, first pull the two side forms 1 to the designed position;

[0049] 12. Then push the hydraulic strut 5. The side form 1 remains stationary under the action of the first rotating shaft 4, and the adjusting plate 7 moves to the other side under the drive of the second rotating shaft 6;

[0050] 13. After the adjusting plate 7 is pushed by the hydraulic strut 5 and moves to the corresponding position, the rabbet joints of the adjusting plate 7 and the side form 1 can be aligned and spliced. This staggered rabbet joint structure can prevent the concrete slurry from overflowing, and at the same time, interact at the joint position to ensure that the weak joint position does not deform.

[0051] 14. Then, repeating the above steps 5 to 10 can complete the production of precast pier columns.

[0052] Although the embodiments of the present invention have been shown and described, for those of ordinary skill in the art, it can be understood that various changes, modifications, substitutions, and variations can be made to these embodiments without departing from the principle and spirit of the present invention. The scope of the present invention is defined by the appended claims and their equivalents.

Claims

1. An adjustable pier formwork, comprising side forms (1) and a construction platform (10), the construction platform (10) being fixed to the top of the side forms (1), characterized in that, An adjusting plate (7) is clamped between the two side forms (1). The surface of the adjusting plate (7) is fixed to the second rotating shaft (6), and the surface of one side form (1) is fixed to the first rotating shaft (4). One end of the hydraulic strut (5) is rotatably connected to the second rotating shaft (6), and the other end of the hydraulic strut (5) is detachably fitted with the first rotating shaft (4).

2. The adjustable pier mold according to claim 1, wherein, Transverse rib plates (2) and longitudinal rib plates (3) are fixed to the surface of the side form (1).

3. The adjustable pier mold according to claim 1, characterized in that, Pulleys (8) are arranged at the bottoms of the side form (1) and the adjusting plate (7), and guide rails (9) matching the pulleys (8) are fixed to the ground.

4. The adjustable pier mold according to claim 1, characterized in that, A supporting plate (12) is fixed to the top of the side form (1), and the top of the supporting plate (12) is fixed to the construction platform (10).

5. An adjustable pier mold according to claim 1, wherein, A guardrail (11) is arranged at the top of the construction platform (10).

6. The adjustable pier mold according to claim 1, characterized in that, A tenon and mortise matching each other is arranged between the side form (1) and the adjusting plate (7).

Citation Information

Patent Citations

  • Die assembly of prefabricated pier column

    CN220362744U