High-strength environment-friendly suspended ceiling decorative plate structure
By installing combined structures such as pipe fittings, installation rods, and movable blocks, the rapid positioning and installation of decorative panels is achieved, which solves the problems of low installation efficiency of decorative panels and the danger of high-level operations of workers, improves installation efficiency and reduces safety risks.
Patent Information
- Application Number
- CN202421346759.0
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-06-13
- Publication Date
- 2025-07-18
- Estimated Expiration
- 2034-06-13
AI Technical Summary
The installation efficiency of existing decorative panels is relatively slow, and there is danger that installation workers are at high places for a long time.
The combination structure of installation pipe fittings, installation rods, movable blocks, extrusion springs, rotating parts, pulleys, and engaging mechanisms is adopted to achieve rapid positioning and installation of the decorative panel.
It improves the installation efficiency of decorative panels, reduces the time for installers to be at high altitudes, and reduces the risk.
Smart Images

Figure CN223119336U_ABST
Abstract
Description
Technical Field
[0001] The utility model belongs to the technical field of building decoration, and particularly relates to a high-strength and environment-friendly ceiling decoration board structure. Background Technique
[0002] A ceiling refers to a kind of decoration for the top decoration of a house living environment. Simply put, it refers to the decoration of the ceiling, which is an important part of interior decoration. The ceiling has the functions of heat preservation, heat insulation, sound insulation, and sound absorption, and is also a concealed layer for electrical, ventilation and air conditioning, communication, fire prevention, alarm pipeline equipment, etc. Aluminum gusset plate is a special material, which is light in texture and durable, and is widely used in home decoration ceilings. It has good moisture-proof, oil-proof, and flame-retardant characteristics, and is convenient for transportation and use. It has a variety of excellent characteristics, which can not only achieve good decorative effects, but also have multiple functions.
[0003] At present, during the installation process of existing decorative boards, most of them use bolts to connect the installation beam with them by bolts. However, this installation efficiency is not only relatively slow, but also the installation workers are long-term on the surface of ladders or installation frames, resulting in a certain degree of danger.
[0004] Therefore, a high-strength and environment-friendly ceiling decoration board structure is needed to solve the problem of relatively slow installation efficiency of decorative boards in the existing technology. Content of the Utility Model
[0005] The purpose of the utility model is to provide a high-strength and environment-friendly ceiling decoration board structure to solve the problems raised in the above background technique.
[0006] To achieve the above purpose, the utility model provides the following technical solution: A high-strength and environment-friendly ceiling decoration board structure, including a decorative board and a keel. Both ends of the top of the decorative board are fixedly provided with installation pipe fittings. The top of the decorative board is fixedly provided with positioning blocks in a rectangular distribution. A clamping groove is opened on the inner wall of the positioning block. Both ends of the bottom of the keel are fixedly installed with installation beams. An activity mechanism is arranged at the bottom end of the installation beam;
[0007] Sliding grooves are opened on both sides of the bottom of the two installation beams. Installation parts are slidably installed on the inner walls of the sliding grooves. Pulleys are rotatably installed on both sides of the installation parts. A connecting part is fixedly installed at the bottom end of the installation part. An installation sleeve is fixedly installed on the outer wall of the bottom of the connecting part. A clamping mechanism is arranged on the inner wall of the installation sleeve.
[0008] It should be noted in the solution that the activity mechanism includes an installation rod. The installation rod is fixedly installed at the center of the bottom end of the installation beam. An extrusion spring is fixedly installed on the outer wall of the installation rod. A movable block is fixedly installed at the bottom end of the extrusion spring. Rotating parts are rotatably installed at both ends of the movable block.
[0009] Further, it is worth noting that the movable block is slidably mounted on the outer wall of the mounting rod, and the other end of the rotating member is rotatably mounted on the middle of the bottom end of the mounting member.
[0010] Furthermore, it should be noted that the engaging mechanism includes a mounting groove, which is formed on the inner wall of the mounting sleeve. A stress spring is fixed to the bottom end of the inner wall of the mounting sleeve, the top end of the stress spring is fixed with a limiting block, and the top end of the limiting block is fixed with an engaging block.
[0011] As a preferred embodiment, the engaging block is engaged with the top end of the engaging groove, and the top end of the engaging block is arc-shaped.
[0012] As a preferred embodiment, the mounting rod is slidably mounted on the inner wall of the mounting pipe fitting, and the top end of the mounting pipe fitting is in contact with the bottom end of the movable block.
[0013] As a preferred embodiment, keel hangers are fixedly installed on both sides of the top end of the keel, and a hanger rod is fixed to the top end of the keel hanger.
[0014] Compared with the prior art, a high-strength environmental protection ceiling decorative board structure provided by the present utility model has at least the following beneficial effects:
[0015] (1) Through the mutual cooperation of the mounting pipe fitting, the mounting rod, the movable block, the compression spring, the rotating member, the pulley, the engaging mechanism, the compression spring, the engaging block, and the engaging groove, the decorative board can be quickly positioned and installed, thereby improving the installation efficiency, avoiding the installation workers from being in a high-altitude installation state for a long time, and reducing the risk. BRIEF DESCRIPTION OF THE DRAWINGS
[0016] Figure 1 is a side perspective view of the present utility model;
[0017] Figure 2 is a partial sectional view of the present utility model;
[0018] Figure 3 is an exploded view of the present utility model;
[0019] Figure 4 is an installation structure diagram of the present utility model.
[0020] In the figure: 1, decorative board; 2, mounting pipe fitting; 3, positioning block; 4, engaging groove; 5, keel; 6, keel hanger; 7, hanger rod; 8, movable mechanism; 81, mounting rod; 82, compression spring; 83, movable block; 84, rotating member; 9, sliding groove; 10, mounting member; 11, pulley; 12, connecting member; 13, mounting sleeve; 14, engaging mechanism; 141, mounting groove; 142, stress spring; 143, limiting block; 144, engaging block; 15, mounting beam. Detailed implementation mode
[0021] The following further describes the present utility model in conjunction with embodiments.
[0022] Please refer to Figures 1-4 , the present utility model provides a high-strength environmental protection ceiling decorative board structure, including a decorative board 1 and a keel 5. Both ends of the top of the decorative board 1 are fixedly provided with installation pipe fittings 2. Positioning blocks 3 are fixedly arranged in a rectangular distribution on the top of the decorative board 1. A clamping groove 4 is opened in the inner wall of the positioning block 3. Both ends of the bottom of the keel 5 are fixedly installed with installation beams 15. An activity mechanism 8 is arranged at the bottom end of the installation beam 15;
[0023] Sliding grooves 9 are opened on both sides of the bottom of the two installation beams 15. Installation parts 10 are slidably installed on the inner walls of the sliding grooves 9. Pulleys 11 are rotatably installed on both sides of the installation parts 10. A connecting part 12 is fixedly installed at the bottom end of the installation part 10. An installation sleeve 13 is fixedly installed on the outer wall of the bottom of the connecting part 12. A clamping mechanism 14 is arranged inside the installation sleeve 13.
[0024] Through the activity mechanism 8, mainly when installing the decorative board 1, it can be realized that the installation pipe fitting 2 is attached to the movable block 83, so as to drive the rotation of the movable block 83 for limiting movement. Thus, it can drive the rotation of the rotating part 84, and further drive the pulley 11 to move. Therefore, it can drive the connecting part 12 to be stressed, and then drive the installation sleeve 13 to slide.
[0025] Through the clamping mechanism 14, when the installation sleeve 13 slides to the inner wall of the clamping groove 4, since the top end of the clamping block 144 is arc-shaped, it can be realized that it is stressed with the clamping groove 4. Then, the clamping block 144 is driven to reset by the stress spring 142, and thus it can be realized that it is clamped with the clamping groove 4.
[0026] Furthermore, as Figure 2 and Figure 4 shown, specifically, the activity mechanism 8 includes an installation rod 81. The installation rod 81 is fixedly installed at the center of the bottom end of the installation beam 15. An extrusion spring 82 is fixedly installed on the outer wall of the installation rod 81. The bottom end of the extrusion spring 82 is fixedly installed with a movable block 83. Rotating parts 84 are rotatably installed at both ends of the movable block 83.
[0027] When the movable block 83 is stressed, it can drive the extrusion spring 82 to be extruded, so as to drive the rotating part 84 to rotate. Thus, it can drive the pulley 11 to be stressed and slide. Further, it can drive the connecting part 12 to be stressed and slide.
[0028] Furthermore, as Figure 2As shown, it is worth specifically stating that the movable block 83 is slidably installed on the outer wall of the installation rod 81, and the other end of the rotating member 84 is rotatably installed in the middle of the bottom end of the installation member 10.
[0029] The working process of this solution is as follows: When quickly installing the decorative board 1, first lift the decorative board 1 so that the installation rod 81 slides into the inner wall of the installation pipe fitting 2. At the same time, the installation pipe fitting 2 can be in contact with the bottom end of the movable block 83, and then the movable block 83 can be driven by the installation pipe fitting 2 to be stressed. Further, the rotating member 84 can be driven to rotate, and further, the pulley 11 can be driven to slide and be stressed, and further, the connecting member 12 can be driven to slide. Thus, the installation sleeve 13 can be driven to slide into the inner wall of the engaging groove 4. At the same time, since the top end of the engaging block 144 is arc-shaped, it can be stressed with the engaging groove 4. Then, the engaging block 144 is driven to reset by the stress spring 142, and thus it can be engaged with the engaging groove 4, and the decorative board 1 can be fixedly installed.
[0030] According to the above working process, it can be known that when installing the decorative board 1, first align the installation pipe fitting 2 with the installation rod 81, so that the movable block 83 can be driven to slide in a limited way, and further, the movable block 83 can be driven to slide, so that the movable mechanism 8 and the engaging mechanism 14 can be driven to slide in a limited way, and the decorative board 1 can be quickly and fixedly installed.
[0031] Further, as Figure 3 shown, it is worth specifically stating that the engaging mechanism 14 includes an installation groove 141, the installation groove 141 is opened on the inner wall of the installation sleeve 13, a stress spring 142 is fixed at the bottom end of the inner wall of the installation sleeve 13, a limiting block 143 is fixed at the top end of the stress spring 142, and an engaging block 144 is fixed at the top end of the limiting block 143.
[0032] Further, as Figure 3 shown, it is worth specifically stating that the engaging block 144 is engaged with the top end of the engaging groove 4, and the top end of the engaging block 144 is arc-shaped.
[0033] Since the engaging block 144 is arc-shaped, the engaging block 144 can be stressed with the outer wall of the engaging groove 4, and then the engaging block 144 can be driven to slide and stress into the inner wall of the installation groove 141, so that the installation sleeve 13 is completely in contact with the inner wall of the engaging groove 4. Then, the stress spring 142 can drive the engaging block 144 to reset, and thus the decorative board 1 can be fixedly installed. And the decorative board material is high-strength environmental protection materials such as bamboo fiber board and calcium silicate board, which has the characteristics of fire prevention, moisture resistance, antibacterial, etc., so as to improve the environmental protection of the decorative board 1 and the practicality of high-strength decoration.
[0034] Further, as shown in Figure 1 , Figure 2 , Figure 4 , it is specifically worth noting that the mounting rod 81 is slidably mounted on the inner wall of the mounting pipe fitting 2, and the top end of the mounting pipe fitting 2 is in contact with the bottom end of the movable block 83.
[0035] Further, as shown in Figure 1 , Figure 2 and Figure 4 , it is specifically worth noting that keel hangers 6 are fixedly mounted on both sides of the top end of the keel 5, and a hanger rod 7 is fixed to the top end of the keel hanger 6.
[0036] In summary: Through the movable mechanism 8, when installing the decorative panel 1, the mounting pipe fitting 2 can be brought into contact with the movable block 83, so as to drive the movable block 83 to perform a limiting movement, thereby driving the rotating member 84 to rotate, further driving the pulley 11 to move, then driving the connecting member 12 to be stressed, and then driving the mounting sleeve 13 to slide. Then, through the engaging mechanism 14, when the mounting sleeve 13 slides to the inner wall of the engaging groove 4, since the top end of the engaging block 144 is arc-shaped, it can be brought into contact with the engaging groove 4, and then the engaging block 144 is driven to reset by the stress spring 142, so as to engage with the engaging groove 4.
Claims
1. A high-strength environmental protection ceiling decorative board structure, comprising a decorative board (1) and a keel (5), characterized in that, Installation pipe fittings (2) are fixed at both ends of the top of the decorative panel (1). Positioning blocks (3) are fixedly arranged on the top of the decorative panel (1) in a rectangular distribution. A clamping groove (4) is formed in the inner wall of the positioning block (3). Installation beams (15) are fixedly installed at both ends of the bottom of the keel (5). An active mechanism (8) is arranged at the bottom end of the installation beam (15). Sliding grooves (9) are formed on both sides of the bottom of the two installation beams (15). Installation parts (10) are slidably installed on the inner walls of the sliding grooves (9). Pulleys (11) are rotatably installed on both sides of the installation part (10). A connecting part (12) is fixed to the bottom end of the installation part (10). An installation sleeve (13) is fixed to the outer wall of the bottom of the connecting part (12). A clamping mechanism (14) is arranged on the inner wall of the installation sleeve (13).
2. The structure of a high-strength environmental protection ceiling decorative board according to claim 1, characterized in that: The active mechanism (8) includes an installation rod (81). The installation rod (81) is fixedly installed at the center of the bottom end of the installation beam (15). An extrusion spring (82) is fixed to the outer wall of the installation rod (81). A movable block (83) is fixed to the bottom end of the extrusion spring (82). Rotating parts (84) are rotatably installed at both ends of the movable block (83).
3. The structure of a high-strength environmental protection ceiling decorative board according to claim 2, characterized in that: The movable block (83) is slidably installed on the outer wall of the installation rod (81). The other end of the rotating part (84) is rotatably installed at the middle of the bottom end of the installation part (10).
4. A high-strength and environmentally friendly ceiling decorative panel structure according to claim 1, characterized in that: The clamping mechanism (14) includes an installation groove (141). The installation groove (141) is formed in the inner wall of the installation sleeve (13). A stress spring (142) is fixed to the bottom end of the inner wall of the installation sleeve (13). A limiting block (143) is fixed to the top end of the stress spring (142). A clamping block (144) is fixed to the top end of the limiting block (143).
5. The structure of a high-strength environmental protection ceiling decorative board according to claim 4, wherein: The clamping block (144) is clamped with the top end of the clamping groove (4). The top end of the clamping block (144) is arc-shaped.
6. The structure of a high-strength environmental protection ceiling decorative board according to claim 2, characterized in that: The installation rod (81) is slidably installed in the inner wall of the installation pipe fitting (2). The top end of the installation pipe fitting (2) is in contact with the bottom end of the movable block (83).
7. The structure of a high-strength environmental protection ceiling decorative board according to claim 1, characterized in that: Keel hanging parts (6) are fixedly installed on both sides of the top end of the keel (5). A hanger bar (7) is fixed to the top end of the keel hanging part (6).