Hanging basket bearing frame above building safety channel

By setting up scaffoldings and setting up protective railings on both sides of the safety passage, the problem of hanging basket shelving above the safety passage is solved, and the stable support of the hanging basket and the safety of the construction site are achieved, avoiding structural damage and personnel inconvenience.

CN223151593UActive Publication Date: 2025-07-25SHANGHAI CONSTRUCTION NO 7 (GROUP) CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202421971576.8
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-08-14
Publication Date
2025-07-25
Estimated Expiration
2034-08-14

AI Technical Summary

Technical Problem

In the prior art, the hanging basket cannot be effectively shelved above the safety channel, resulting in the safety channel structure being unable to withstand the load of the hanging basket and affecting the inconvenience of personnel up and down.

Method used

Scaffolding is set up on both sides of the safety passage, the height is 20 cm higher than the highest point of the passage, at least two spans are set up, and a clamped rod and a climbing staircase are set up, and protective railings are set up on the uprights to form a stable support structure.

Benefits of technology

The stable shelving of the hanging basket above the safety passage is achieved, ensuring the safety of the passage and hanging basket. At the same time, the structure is simple and reliable, and is suitable for materials collection on construction sites without customization.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN223151593U_ABST
    Figure CN223151593U_ABST
Patent Text Reader

Abstract

The utility model relates to a hanging basket bearing frame above a building safety channel, which is characterized in that scaffolds are respectively erected on two sides of the safety channel in the length direction, and a placing surface at the top end of each scaffold is at least 20cm higher than the highest point of the safety channel. According to the hanging basket bearing frame above the building safety channel, the scaffolds are arranged on the two sides of the safety channel to support the hanging basket, the hanging basket can be placed above the safety channel, and the safety of the building safety channel and the hanging basket is guaranteed. Meanwhile, the structure is simple and reliable, materials can be obtained on the construction site, and independent customization is not needed.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of building safety construction, in particular to a hanging basket bearing frame above a building safety passage. Background Technique

[0002] In construction projects, in order to ensure the safety of entering the building, a safety passage is generally set on the outside of the building. However, as the progress advances, when constructing the exterior wall, hanging baskets need to be installed. According to the specification requirements, the hanging baskets need to land when not in use or when people get on. And some hanging baskets are just above the safety passage, which leads to them having to be placed above the safety passage. The structure of the safety passage is not sufficient to bear the load of the hanging basket for a long time, and it is not convenient for people to go up and down. Content of the Utility Model

[0003] Aiming at the problem that the hanging basket cannot be placed above the existing safety passage, the technical solution specifically adopted by the utility model is: a hanging basket bearing frame above a building safety passage, including: scaffolding is erected on both sides in the longitudinal direction of the safety passage, and the placing surface at the top of the scaffolding is at least 20 cm higher than the highest point of the safety passage.

[0004] Further improved, the scaffolding is erected at least two spans outward along both sides of the safety passage.

[0005] Further improved, inclined tie rods are provided on the scaffolding on each side of the safety passage.

[0006] Further improved, the inclined tie rods are arranged on the scaffolding on each side at an interval of every two spans.

[0007] Further improved, adjustable bases are arranged at the bottom of the scaffolding.

[0008] Further improved, a climbing staircase is provided on the scaffolding.

[0009] Further improved, a first protective railing is provided on the outside of the climbing staircase.

[0010] Further improved, the vertical poles of the scaffolding extend upward along the placing surface for at least 1.5 meters.

[0011] Further improved, a second protective railing is provided between the vertical poles above the placing surface.

[0012] The beneficial effects of the utility model are as follows:

[0013] The hanging basket bearing frame above the building safety passage provided by the utility model supports the hanging basket by setting up scaffolding on both sides of the safety passage, not only realizes placing the hanging basket above the safety passage, but also ensures the safety of the building safety passage and the hanging basket. At the same time, the structure is simple and reliable, and materials can be obtained on the construction site without separate customization. Brief Description of the Drawings

[0014] The present utility model will be further described below in conjunction with the drawings and embodiments.

[0015] Figure 1 is a front structural schematic diagram of the hanging basket bearing frame above the building safety passage of the present utility model;

[0016] Figure 2 is a side structural schematic diagram of the hanging basket bearing frame above the building safety passage of the present utility model. Detailed Description of the Preferred Embodiment

[0017] The present utility model will now be described in further detail with reference to the drawings. These drawings are all simplified schematic diagrams, only illustrating the basic structure of the present utility model in a schematic manner, so they only show the components related to the present utility model.

[0018] In the description of the present utility model, it should be understood that the terms "center", "longitudinal", "transverse", "length", "width", "thickness", "upper", "lower", "front", "rear", "left", "right", "vertical", "horizontal", "top", "bottom", "inner", "outer", "clockwise", "counterclockwise", etc. indicate the orientation or positional relationship based on the orientation or positional relationship shown in the drawings. It is only for the convenience of describing the present utility model and simplifying the description, rather than indicating or implying that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, so it should not be construed as a limitation of the present utility model.

[0019] In addition, the terms "first" and "second" are only used for descriptive purposes and cannot be construed as indicating or implying relative importance or implicitly indicating the quantity of the indicated technical features. Thus, the features defined with "first" and "second" may explicitly or implicitly include one or more of such features. In the description of the present utility model, "a plurality" means two or more unless otherwise specifically defined.

[0020] In the present utility model, unless otherwise clearly defined and limited, the terms "installed", "connected", "connected", "fixed", etc. should be understood in a broad sense. For example, it may be a fixed connection, a detachable connection, or an integral connection; it may be a mechanical connection or an electrical connection; it may be directly connected or indirectly connected through an intermediate medium, and it may be the communication inside two elements. For those of ordinary skill in the art, the specific meanings of the above terms in the present utility model can be understood according to specific circumstances.

[0021] Such as Figure 1 and Figure 2As shown in the figure, in order to provide a support platform above the safety passage, the present utility model provides a hanging basket bearing frame above the building safety passage, which includes: A scaffold 1 is erected on each side in the longitudinal direction of the safety passage 100. The hanging basket 200 can be placed on the placing surface 2 at the top of the scaffold 1 (that is, the two scaffolds 1 are respectively used to support one end of the hanging basket 200), and the placing surface 2 at the top of the scaffold 1 is at least 20 cm higher than the highest point of the safety passage 100 to avoid the top of the safety passage being compressed. Among them, the placing surface 2 is fully covered with scaffold boards, so that the gravity of the hanging basket is distributed to the entire placing surface through the scaffold boards, rather than being supported only by the scaffold crossbars in contact with the hanging basket, to avoid bending deformation.

[0022] The hanging basket bearing frame above the building safety passage provided by the present utility model supports the hanging basket by setting scaffolds on both sides of the safety passage, which not only realizes placing the hanging basket above the safety passage, but also ensures the safety of the building safety passage and the hanging basket. At the same time, this structure is simple and reliable, and materials can be obtained on the construction site without separate customization.

[0023] In order to provide a more stable support for the hanging basket, a further improvement of this technical solution is that the scaffold 1 is built at least two spans outward along both sides of the safety passage 100.

[0024] In order to improve the stability of the scaffold, a further improvement of this technical solution is that a diagonal bracing 3 is provided on each scaffold 1 on each side of the safety passage 100.

[0025] In order to improve the scaffolding efficiency, a further improvement of this technical solution is that the diagonal bracing 3 is arranged at every two spans on each scaffold 1 on each side.

[0026] A further improvement is that an adjustable base 4 is provided at the bottom of the scaffold 1 to adapt to uneven ground and keep the scaffold vertical.

[0027] In order to facilitate the staff to go up and down, a further improvement of this technical solution is that a climbing ladder 5 is erected on the scaffold 1.

[0028] In order to improve the safety of using the climbing ladder, a further improvement of this technical solution is that a first guardrail 6 is provided between the upper and lower scaffold crossbars on the outside of the climbing ladder 5, and the distance between two adjacent upper and lower first guardrails 6 is 0.5 m.

[0029] In order to provide lateral protection for the hanging basket and prevent overturning, a further improvement of this technical solution is that the vertical pole 11 of the scaffold 1 extends at least 1.5 meters upward along the placing surface 2, and the protruding vertical pole 11 functions as a guardrail.

[0030] Further improved, a second safety railing 7 is provided between the vertical rods 11 above the placement surface 2, preventing the staff from falling between the vertical rods 11 after getting off the hanging basket to the placement surface, thus improving the safety in use of this loading rack.

[0031] Enlightened by the above ideal embodiments of the present invention, through the above description, relevant staff can, without departing from the technical idea of this invention, make various changes and modifications. The technical scope of this invention is not limited to the content in the specification, and its technical scope must be determined according to the scope of the claims.

Claims

1. A hanging basket carrier above the safety passage of a building, characterized in that, Including: Scaffolds are erected on both sides in the longitudinal direction of the safety passage, and the resting surfaces at the top of the scaffolds are at least 20 cm higher than the highest point of the safety passage.

2. The hanging basket bearing frame above the building safety passage according to claim 1, characterized in that, The scaffolds are built at least two spans outward along both sides of the safety passage.

3. The hanging basket bearing frame above the building safety passage according to claim 1, characterized in that, Diagonal braces are provided on the scaffolds on each side of the safety passage.

4. The hanging basket bearing frame above the building safety passage according to claim 3, characterized in that, The diagonal braces are arranged on the scaffolds on each side at an interval of every two spans.

5. The hanging basket bearing frame above the building safety passage according to claim 1, characterized in that Adjustable bases are provided at the bottom of the scaffolds.

6. The hanging basket bearing frame above the building safety passage according to claim 1, characterized in that, Climbing stairs are provided on the scaffolds.

7. The hanging basket bearing frame above the building safety passage according to claim 6, characterized in that, First protective railings are provided on the outer sides of the climbing stairs.

8. The hanging basket bearing frame above the building safety passage according to claim 1, characterized in that, The scaffold uprights extend upward along the resting surface for at least 1.5 m.

9. The hanging basket bearing frame above the building safety passage according to claim 8, characterized in that, Second protective railings are provided between the uprights above the resting surface.