Movable gypsum manufacturing platform

By designing a mobile gypsum production platform, environmental pollution and sewer blockage caused by wastewater discharge during gypsum bandage production are solved, and wastewater precipitation and resource recycling are achieved.

CN223186722UActive Publication Date: 2025-08-05张小林
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202422939829.X
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-11-29
Publication Date
2025-08-05
Estimated Expiration
2034-11-29

AI Technical Summary

Technical Problem

The direct discharge of wastewater and cleaning liquid generated during the production of existing gypsum bandages leads to environmental pollution and sewer blockage.

Method used

A mobile gypsum production platform is designed, including a workbench, a sedimentation tank and a mobile bracket. The wastewater is collected into the sedimentation tank through a turbid water outlet pipe. The sedimentation inclined plate of the sedimentation tank is used for sedimentation treatment, clean water is discharged into the sedimentation channel, and the sediment is centrally treated.

Benefits of technology

It effectively avoids sewer blockage, reduces environmental pollution, and realizes centralized treatment of wastewater and resource recycling during gypsum production.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN223186722U_ABST
    Figure CN223186722U_ABST
Patent Text Reader

Abstract

The utility model provides a movable gypsum manufacturing platform which comprises a working table, a precipitation tank and a movable support, the working table is fixedly arranged above the movable support, a gypsum manufacturing tank is arranged on the upper side of the working table, an angle valve is arranged on the working table, the bottom face of the gypsum manufacturing tank is of a funnel-shaped structure, and a water outlet is formed in the funnel-shaped bottom. The lower portion of the water outlet is connected with a precipitation tank through a muddy water outlet pipeline, the precipitation tank is located below the workbench and fixed to the movable support, a precipitation inclined plate is arranged at the bottom of the precipitation tank, a clear water outlet pipeline is connected to the side wall of the precipitation tank, and the position of the clear water outlet pipeline is higher than the top end of the precipitation inclined plate. The muddy water generated in the gypsum cleaning process and the workbench cleaning process is collected through the muddy water outlet pipeline, the water outlet end of the muddy water outlet pipeline is led into the precipitation tank, clear water is discharged into a sewer after precipitation, sediment is subjected to next-step centralized treatment, and the situation that the sewer is blocked, and inconvenience is caused is avoided.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field related to gypsum production, in particular to a mobile gypsum production platform. Background Art

[0002] Plaster bandage immobilization is a traditional orthopedic fixation method. It's widely used in hospital orthopedic emergency rooms, wards, and operating rooms. Plaster bandage immobilization precisely shapes the fracture based on the patient's condition, the location of the fracture, and the intended purpose, and is suitable for fractures throughout the body.

[0003] In clinical practice, plaster bandages are often made by simply covering a table with plastic sheeting. This makes cleanup difficult and wastes plaster powder. Furthermore, the soaking of the plaster during the bandage making process can pollute the work environment. Furthermore, wastewater generated during the making process and the cleaning fluid used to clean the bandage table contain plaster powder. Direct discharge of this wastewater can cause environmental pollution or clog pipes. Utility Model Content

[0004] The utility model aims to provide a mobile gypsum production platform, which can centrally process turbid water generated during the gypsum cleaning process and the equipment cleaning process, thereby avoiding blockage of sewers and causing inconvenience.

[0005] To this end, the technical solution adopted by the utility model is: a mobile gypsum production platform, including a workbench, a sedimentation tank and a movable bracket, the workbench is fixedly arranged above the movable bracket, a gypsum production tank is arranged on the upper side of the workbench, an angle valve is arranged on the workbench, and the bottom surface of the gypsum production tank is a funnel-shaped structure gradually inclined downward from the four sides to the middle, and a water outlet is arranged at the funnel-shaped bottom of the gypsum production tank, and the bottom of the water outlet is connected to the sedimentation tank through a turbid water outlet pipe, the sedimentation tank is located below the workbench and fixed on the movable bracket, a sedimentation inclined plate is arranged at the bottom of the sedimentation tank, and a clean water outlet pipe is connected to the side wall of the sedimentation tank, the position of the clean water outlet pipe is higher than the top of the sedimentation inclined plate, and the turbid water outlet pipe extends to the bottom of the sedimentation tank.

[0006] As a preferred embodiment of the above solution, the clean water outlet pipe is a stretchable corrugated pipe.

[0007] Further preferably, a first mounting platform is provided at the lower portion of the movable bracket, and a mounting groove for mounting a sedimentation tank is provided on the first mounting platform, and the sedimentation tank is embedded in the mounting groove.

[0008] Further preferably, a second mounting platform is provided on the upper portion of the movable bracket, at least one storage drawer is provided on the second mounting platform, and each of the storage drawers is provided with a handle.

[0009] Further preferably, a fixing cylinder for fixing the turbid water outlet pipe is provided on the second installation platform, and the turbid water outlet pipe passes through the fixing cylinder and extends into the sedimentation tank.

[0010] Further preferably, universal wheels are provided below the movable bracket.

[0011] More preferably, the workbench is welded to the movable bracket.

[0012] The beneficial effects of the utility model are as follows: the turbid water generated during the gypsum cleaning process and the workbench cleaning process is collected through the turbid water outlet pipe, the outlet end of the turbid water outlet pipe is passed into the sedimentation tank, and the clean water is discharged into the sewer after sedimentation. The sediment is centrally processed in the next step to avoid sewer blockage and inconvenience. BRIEF DESCRIPTION OF THE DRAWINGS

[0013] Figure 1 It is a structural diagram of the present utility model. DETAILED DESCRIPTION

[0014] The present invention will be further described below with reference to the accompanying drawings and embodiments.

[0015] like Figure 1 As shown, a mobile gypsum production platform includes a workbench 1, a settling tank 2, and a mobile support 3, which are welded to each other. Welding reduces the weight of the structure, simplifies operation, provides excellent mechanical properties and sealing, ensures the overall strength of the workbench 1 and mobile support 3, improves the stability of the connection, and is more environmentally friendly.

[0016] The workbench 1 is fixedly arranged above the mobile bracket 3, and a gypsum making tank is arranged on the upper side of the workbench 1. The gypsum making tank is used to complete the gypsum making and soaking. An angle valve 9 is provided on the workbench 1. The angle valve 9 is convenient for taking water during the production process. The water can be directly connected to the other fixed water outlet valves or water taps near the production point through a water pipe to take water. The bottom surface of the gypsum making tank is a funnel-shaped structure that gradually tilts downward from the four sides to the middle. The bottom surface is set to a funnel shape for easy drainage. A water outlet is provided at the funnel-shaped bottom of the gypsum making tank. The bottom of the mouth is connected to the sedimentation tank 2 through the turbid water outlet pipe 4. The sedimentation tank 2 is located below the workbench 1 and fixed on the movable bracket 3. A sedimentation inclined plate 201 is provided at the bottom of the sedimentation tank 2. The sedimentation inclined plate 201 is provided, which is similar to the sedimentation tank 2 in the sewage treatment pool. It can play the role of precipitating gypsum powder. The supernatant is discharged from the clean water outlet pipe 5. The side wall of the sedimentation tank 2 is connected to the clean water outlet pipe 5. The position of the clean water outlet pipe 5 is higher than the top of the sedimentation inclined plate 201, and the turbid water outlet pipe 4 extends to the bottom of the sedimentation tank 2.

[0017] The gypsum on the workbench 1 is rinsed by connecting the outlet valve or faucet through the angle valve 9. The wastewater generated during the production process and the cleaning liquid used to clean the production table, which contains gypsum powder, enter the sedimentation tank 2 through the turbid water outlet pipe 4. The turbid water is then settled by the sedimentation inclined plate 201 provided at the bottom of the sedimentation tank 2, and the upper clear liquid is discharged from the clean water outlet pipe 5. The remaining gypsum powder accumulates at the bottom of the sedimentation tank 2. The sedimentation tank 2 is removed from the installation tank and the gypsum powder in the sedimentation tank 2 is cleaned. The clean water outlet pipe can be directly connected to the sewer to discharge the upper clear liquid.

[0018] The clean water outlet pipe 5 is a stretchable bellows. If there is a sewer pipe near the production platform, the bellows can be directly pulled into the sewer pipe to drain the clear liquid from the top of the sedimentation tank 2. If there is no sewer pipe nearby, the other end of the bellows can be placed in the sedimentation tank 2, which then serves as a temporary storage for wastewater. After production is completed, the sedimentation tank 2 can be removed, the supernatant liquid can be poured out, and the gypsum powder settled at the bottom can be recovered.

[0019] A first mounting platform 301 is provided at the lower portion of the movable bracket 3 . A mounting groove for mounting the sedimentation tank 2 is provided on the first mounting platform 301 . The sedimentation tank 2 is embedded in the mounting groove.

[0020] The upper portion of the mobile bracket 3 is provided with a second mounting platform 302, on which at least one storage drawer 6 is provided. Each storage drawer 6 is provided with a handle 601. Plaster material, hand soap, etc. can be placed.

[0021] A fixing cylinder 7 for fixing the turbid water outlet pipe 4 is provided on the second mounting platform 302 , and the turbid water outlet pipe 4 passes through the fixing cylinder 7 and extends into the sedimentation tank 2 , so as to facilitate the fixing of the turbid water outlet pipe 4 .

[0022] Universal wheels 8 are provided below the mobile bracket 3. This makes it easy to transport the mobile bracket 3 and allows it to be moved directly to a corner when placed, saving space and being more convenient.

[0023] By setting a turbid water outlet pipe 4 under the workbench 1, the turbid water generated during the gypsum cleaning process and the workbench 1 cleaning process is collected, and the outlet end of the turbid water outlet pipe 4 is passed into the sedimentation tank 2. After sedimentation, the clean water is discharged into the sewer, and the sediment is centrally processed in the next step to avoid sewer blockage and inconvenience.

[0024] Although the embodiments of the present invention have been shown and described, those skilled in the art will appreciate that various changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and purpose of the present invention, and that the scope of the present invention is defined by the claims and their equivalents.

Claims

1. A mobile gypsum production platform, characterized by: The invention comprises a workbench (1), a sedimentation tank (2) and a movable support (3); the workbench (1) is fixedly arranged above the movable support (3); a gypsum production tank is arranged on the upper side of the workbench (1); an angle valve (9) is arranged on the workbench (1); the bottom surface of the gypsum production tank is a funnel-shaped structure that gradually slopes downward from the periphery to the middle; a water outlet is arranged at the funnel-shaped bottom of the gypsum production tank; the bottom of the water outlet is connected to the sedimentation tank (2) through a turbid water outlet pipe (4); the sedimentation tank (2) is located below the workbench (1) and is fixed on the movable support (3); a sedimentation inclined plate (201) is arranged at the bottom of the sedimentation tank (2); a clean water outlet pipe (5) is connected to the side wall of the sedimentation tank (2); the clean water outlet pipe (5) is located higher than the top of the sedimentation inclined plate (201); and the turbid water outlet pipe (4) extends to the bottom of the sedimentation tank (2).

2. The mobile plaster production platform according to claim 1, characterized in that: The clean water outlet pipe (5) is a stretchable corrugated pipe.

3. The mobile plaster production platform according to claim 1, characterized in that: A first mounting platform (301) is provided at the lower portion of the movable bracket (3), and a mounting groove for mounting the sedimentation tank (2) is provided on the first mounting platform (301), and the sedimentation tank (2) is embedded in the mounting groove.

4. The mobile plaster production platform according to claim 1, characterized in that: A second mounting platform (302) is provided on the upper portion of the mobile bracket (3), at least one storage drawer (6) is provided on the second mounting platform (302), and each of the storage drawers (6) is provided with a handle (601).

5. The mobile plaster production platform according to claim 4, characterized in that: A fixing cylinder (7) for fixing the turbid water outlet pipe (4) is provided on the second installation platform (302), and the turbid water outlet pipe (4) passes through the fixing cylinder (7) and extends into the sedimentation tank (2).

6. The mobile plaster production platform according to claim 1, characterized in that: Universal wheels (8) are provided below the movable bracket (3).

7. The mobile plaster production platform according to claim 1, characterized in that: The workbench (1) is welded to the movable bracket (3).