Heating and ventilation pipeline heat preservation fixing structure
By pasting the combined design of adjustable fixing clips and snap ring metal fixing sheets, the problems of inconvenient operation and unreliable pasting in the insulation fixing structure of HVAC pipes are solved, automatic glue brushing and precise cutting are achieved, and construction efficiency and adhesion quality are improved.
Patent Information
- Application Number
- CN202422393966.8
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-09-30
- Publication Date
- 2025-08-05
- Estimated Expiration
- 2034-09-30
AI Technical Summary
The existing HVAC thermal insulation fixed structure is inconvenient to operate in a limited space, the insulation material is not firmly pasted, and it is prone to deformation and untightening problems.
The combination design of adhesive adjustable fixing clips and snap ring metal fixing sheets is adopted to achieve automatic glue brushing and precise cutting, ensuring uniform distribution of glue, and using scaled prestressed metal components to adapt to pipes of different sizes to avoid material waste.
Improve construction efficiency and adhesion quality, ensure that the insulation material is firmly fixed, reduce manual operation steps, and improve the convenience and efficiency of construction.
Smart Images

Figure CN223191326U_ABST
Abstract
Description
Technical Field
[0001] The utility model belongs to the technical field of HVAC pipelines, in particular to a HVAC pipeline heat preservation fixing structure. Background Art
[0002] "HVAC" is the name of a classification of work types in construction equipment. HVAC includes three aspects: heating, ventilation, and air conditioning. During the installation of the HVAC system, a fixing device is required to fix the HVAC pipes. With the continuous development of modern construction technology, HVAC systems have been widely used in various types of buildings. In the HVAC system, the insulation and fixation of the pipes are very important.
[0003] However, in the use of the existing HVAC pipe insulation fixing structure, most of the HVAC pipes are located at the bottom of the board, so the workers have limited operating space when cutting and installing, which is inconvenient. The insulation material is elastic, and the material and the pipe need to fit tightly, which makes it inconvenient to apply glue. When the opening point at one end is pasted, the opening point at the other end cannot be fixed, which may cause the paste to be unstable. When the opening point at one end is pasted, the other end droops, which may cause the insulation to be loose and deformed, affecting the appearance. Utility Model Content
[0004] The purpose of the utility model is to provide a HVAC pipe insulation fixing structure. The hollow structure inside the clamping component of the HVAC pipe insulation fixing pasting tool can realize automatic glue application and solve the problem of uneven glue application. The connection between the clamping component and the glue bottle can solve the problem of repeated glue addition. The combination of the prestressed metal component with scale and the clamping component realizes efficient pasting of insulation materials in a limited space, which can solve the problems of large cutting errors of pipe insulation materials, inconvenient installation, loose pasting, uneven installation, and unsightly appearance in the existing insulation installation process.
[0005] In order to solve the above technical problems, the present invention is achieved through the following technical solutions:
[0006] The utility model is a wastewater treatment device for a guide belt type CNC printing machine, comprising two adhesive adjustable fixing clamps, wherein the adhesive adjustable fixing clamps are groove-shaped plastic components with holes, the lower side of which clamps the thermal insulation material, and the upper side can be sleeved on the snap ring type metal fixing plate and can slide freely on the snap ring type metal fixing plate. Since the component itself has holes, its interior is a hollow structure, and the rounded corner design in the clamping groove will not make the thermal insulation material fit the groove edge. When glue is placed therein, it can flow out at the holes due to gravity factors. When operation starts, air flows in the gap between the thermal insulation material and the clamping groove edge, and according to Bernoulli's principle, the glue in the glue tank will be automatically replenished, thereby realizing automatic glue brushing. The two adhesive adjustable fixing clamps are provided with a clamping component and a prestressed metal component with a scale.
[0007] The clamping component comprises a thermal insulation material clamping groove respectively provided on two adhesively adjustable fixing clamps, and the inner walls of the two thermal insulation material clamping grooves are slidably connected with thermal insulation materials.
[0008] Furthermore, the thermal insulation material includes fixed sheet sliding grooves respectively opened on two adhesive adjustable fixing clips, and the inner walls of the two fixed sheet sliding grooves are slidably connected with snap ring type metal fixing sheets, and the snap ring type metal fixing sheets are prestressed metal sheets engraved with lengths. When used, after being bent with force, the snap ring type metal fixing sheets automatically shrink and tighten due to the characteristics of the snap ring type metal fixing sheets, thereby achieving the purpose of fixing the thermal insulation material, and the snap ring type metal fixing sheets can be cut according to their scale lines, and several scale lines are set on the top of the snap ring type metal fixing sheet.
[0009] Furthermore, both of the two adjustable adhesive fixing clips are provided with glue guide grooves, both of the two adjustable adhesive fixing clips are provided with glue loading grooves, the two glue guide grooves are respectively connected to the two glue loading grooves, and the inner walls of the two adjustable adhesive fixing clips are provided with several glue outlet holes, and the several glue outlet holes are respectively connected to the two glue loading grooves.
[0010] Furthermore, the tops of the two adjustable adhesive fixing clamps are each provided with a glue bottle connecting port, and the two glue bottle connecting ports are respectively connected to the two glue guide grooves.
[0011] Furthermore, glue bottles are provided on the inner walls of the two glue bottle connecting ports, and the glue bottles are filled with glue. The glue bottles are soft bottles with rubber rings at the bottle mouths. The rubber rings at the bottle mouths can be connected to the glue bottle connecting ports on the adjustable fixing clips, so as to facilitate the injection of glue and avoid the disadvantages of repeated glue injection.
[0012] Furthermore, two rubber rings are sleeved on the outer walls of the two glue bottles, and the outer walls of several of the rubber rings are in contact with the inner walls of the connecting ports of the two glue bottles respectively.
[0013] The utility model has the following beneficial effects:
[0014] 1. By setting up a snap ring type metal fixing sheet, since it is engraved with length and is a prestressed metal sheet, it can be accurately cut according to the scale line during use to ensure that the size of the fixing sheet perfectly matches the insulation material and the pipeline, avoiding material waste and improving construction efficiency. After being bent with force, it automatically shrinks and tightens by utilizing its characteristics, which can firmly fix the insulation material and prevent the insulation material from loosening or falling off during use, thereby ensuring the stability of the insulation effect.
[0015] 2. By setting up an adjustable pasting clamp, the lower side clamps the insulation material, and the upper side can be put on the snap ring metal fixing plate and slide freely. This design enables the fixing clamp to adapt to insulation materials and pipes of different sizes, improving the versatility of the device. The interior is hollow and has holes. The rounded corners in the clamping groove prevent the insulation material from fitting against the groove edge. When glue is placed in it, it can flow out from the holes due to gravity. During operation, air flows in the gap between the insulation material and the clamping groove edge. According to Bernoulli's principle, the glue in the glue tank will be automatically replenished to realize the automatic glue brushing function, reducing the tedious steps of manual glue brushing, improving the convenience and efficiency of construction, and at the same time ensuring that the glue is evenly distributed and improving the quality of pasting.
[0016] 3. By setting up the glue bottle, the soft bottle design with a rubber ring on the bottle mouth can be connected to the glue bottle connection port on the adjustable fixing clip, which makes it easy to inject glue, avoids the disadvantages of repeated glue injection, saves construction time and improves work efficiency.
[0017] Of course, any product implementing the present invention does not necessarily need to achieve all of the advantages described above at the same time. BRIEF DESCRIPTION OF THE DRAWINGS
[0018] In order to more clearly illustrate the technical solutions of the embodiments of the present invention, the following briefly introduces the drawings required for describing the embodiments. Obviously, the drawings described below are only some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without creative work.
[0019] Figure 1 It is a schematic diagram of the overall structure of the utility model;
[0020] Figure 2 This is a schematic diagram of the front side cross-sectional structure of the present invention;
[0021] Figure 3 It is a schematic diagram of the right side cross-sectional structure of the present utility model;
[0022] Figure 4 For this utility model Figure 3 Schematic diagram of the enlarged structure of A in the middle;
[0023] Figure 5 For this utility model Figure 2 Schematic diagram of the enlarged structure of B.
[0024] In the accompanying drawings, the components represented by the reference numerals are as follows:
[0025] 1. Adjustable fixing clip; 2. Insulation material holding groove; 3. Insulation material; 4. Fixing plate sliding groove; 5. Snap ring type metal fixing plate; 51. Scale line; 6. Glue guide groove; 7. Glue loading groove; 8. Glue outlet hole; 9. Glue bottle connection port; 10. Glue bottle; 11. Rubber ring. DETAILED DESCRIPTION
[0026] The following will be combined with the accompanying drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the embodiments described are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without making creative efforts are within the scope of protection of the present invention.
[0027] See also Figure 1-5 The cam is provided with a plurality of holes, and the holes are connected to the two fixing holes 1, and the fixing holes 1 are connected to the fixing holes 1.
[0028] A plurality of glue outlet holes 8 are provided on the inner walls of the two adhesive adjustable fixing clips 1, and the plurality of glue outlet holes 8 are respectively connected to the two glue filling grooves 7. A glue bottle connecting port 9 is provided on the top of the two adhesive adjustable fixing clips 1, and the two glue bottle connecting ports 9 are respectively connected to the two glue guide grooves 6. A glue bottle 10 is provided on the inner wall of the two glue bottle connecting ports 9, and the glue bottle 10 is filled with glue. Two rubber rings 11 are sleeved on the outer walls of the two glue bottles 10, and the outer walls of the plurality of rubber rings 11 are respectively in contact with the inner walls of the two glue bottle connecting ports 9. The soft bottle design with a rubber ring 11 on the bottle mouth can be connected to the glue bottle 10 connecting port on the adhesive adjustable fixing clip 1, which is convenient for injecting glue, avoids the disadvantages of repeated glue injection, saves construction time, and improves work efficiency.
[0029] A specific application of this embodiment is: first, roll the snap-ring type metal fixing sheet 5 on the pipe to be pasted with the thermal insulation material 3 and record the scale, remove the snap-ring type metal fixing sheet 5 and lay it flat on the thermal insulation material 3, cut the thermal insulation material 3 of corresponding size according to the recorded scale, and then insert the adjustable pasting fixing clamp 1 from both sides of the snap-ring type metal fixing sheet 5, and at the same time clamp the two sides of the thermal insulation material 3 on the snap-ring type metal fixing sheet 5 on both sides respectively, and finally install the glue bottle 10 filled with glue on the adjustable pasting fixing clamp 1, after the glue has penetrated into the fixing clamp for a period of time, bend the snap-ring type metal fixing sheet 5 with force, and after it automatically tightens, pull the entire device along the direction of the pipe to start the pasting work.
[0030] Throughout this specification, references to terms such as "one embodiment," "example," or "specific example" indicate that a specific feature, structure, material, or characteristic described in conjunction with that embodiment or example is included in at least one embodiment or example of the present invention. In this specification, schematic representations of these terms do not necessarily refer to the same embodiment or example. Furthermore, the specific features, structures, materials, or characteristics described may be combined in any suitable manner in any one or more embodiments or examples.
[0031] The preferred embodiments of the present invention disclosed above are intended only to help illustrate the present invention. The preferred embodiments do not describe all details in detail, nor do they limit the present invention to the specific embodiments described. Obviously, many modifications and variations are possible based on the contents of this specification. These embodiments are selected and described in detail in this specification to better explain the principles and practical applications of the present invention, thereby enabling those skilled in the art to better understand and utilize the present invention. The present invention is limited only by the claims and their full scope and equivalents.
Claims
1. A heat preservation fixing structure for a heating and ventilation pipe, comprising two adhesive adjustable fixing clamps (1), wherein the two adhesive adjustable fixing clamps (1) are provided with a clamping member and a prestressed metal member with a scale, characterized in that ; The clamping member comprises a thermal insulation material clamping groove (2) respectively provided on two adhesively adjustable fixing clamps (1), and thermal insulation materials (3) are slidably connected to the inner walls of the two thermal insulation material clamping grooves (2); The thermal insulation material (3) comprises fixed sheet sliding grooves (4) respectively provided on two adhesively adjustable fixing clamps (1), and the inner walls of the two fixed sheet sliding grooves (4) are slidably connected with snap ring type metal fixed sheets (5), and the top of the snap ring type metal fixed sheet (5) is provided with a plurality of scale lines (51).
2. A HVAC pipe insulation fixing structure according to claim 1, characterized in that: The two adhesive adjustable fixing clamps (1) are each provided with a glue guide groove (6), and the two adhesive adjustable fixing clamps (1) are each provided with a glue loading groove (7), and the two glue guide grooves (6) are respectively connected to the two glue loading grooves (7).
3. The HVAC pipe insulation fixing structure according to claim 2, characterized in that: A plurality of glue outlet holes (8) are provided on the inner walls of the two adhesive adjustable fixing clamps (1), and the plurality of glue outlet holes (8) are respectively connected to the two glue loading grooves (7).
4. The HVAC pipe insulation fixing structure according to claim 3, characterized in that: The tops of the two adhesive adjustable fixing clamps (1) are each provided with a glue bottle connection port (9), and the two glue bottle connection ports (9) are respectively connected to the two glue guide grooves (6).
5. The HVAC pipe insulation fixing structure according to claim 4, characterized in that: Glue bottles (10) are provided on the inner walls of the two glue bottle connecting ports (9), and the glue bottles (10) are filled with glue.
6. The HVAC pipe insulation fixing structure according to claim 5, characterized in that: Two rubber rings (11) are sleeved on the outer walls of the two glue bottles (10), and the outer walls of a plurality of the rubber rings (11) are in contact with the inner walls of the two glue bottle connection ports (9) respectively.