Movable construction site sewage treatment device

By designing a mobile sewage treatment device and using an activated carbon purification system to absorb irritating gases, the problem of inability to move the sewage treatment device on the construction site and gas pollution is solved, and the mobility and purification effect of sewage treatment are achieved.

CN223239914UActive Publication Date: 2025-08-19JIUJIANG RUNDA ENVIRONMENTAL PROTECTION CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202422362384.3
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-09-27
Publication Date
2025-08-19
Estimated Expiration
2034-09-27

AI Technical Summary

Technical Problem

The sewage treatment device on the construction site cannot be moved and lacks the gas purification function. The irritating gas generated by aeration directly emits polluted air, endangering residents' health.

Method used

A mobile sewage treatment device is designed, including a treatment box, partition, aeration pipe, air pump and activated carbon purification system. It absorbs irritating gas through activated carbon to achieve purification and can be detached and transferred.

Benefits of technology

The mobility and gas purification functions of the sewage treatment device are realized, which avoids polluted air emissions, protects the environment and residents' health, and simplifies the sewage treatment process at the construction site.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN223239914U_ABST
    Figure CN223239914U_ABST
Patent Text Reader

Abstract

A movable construction site sewage treatment device comprises a treatment box body, a mounting base is arranged on the treatment box body, a partition plate is arranged in the treatment box body and can divide the inner space of the treatment box body into a large cavity and a small cavity, a water inlet valve is arranged on the treatment box body, and a water outlet valve is arranged on the water inlet valve. An air pump is arranged on the treatment box body through a fixing frame, an aeration pipe is arranged in the large cavity of the treatment box body, the aeration pipe is connected with the air pump, a valve body is arranged on the partition plate, and vent holes are formed in the treatment box body. Through the arrangement of activated carbon, toxic and harmful substances in stimulated gas can be absorbed, purification is achieved, air pollution caused by direct emission is avoided, in addition, the whole device is detachably arranged, and transfer according to a construction site is facilitated.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of sewage treatment, in particular to a mobile construction site sewage treatment device. Background Art

[0002] With the continuous advancement of urban construction, construction site sewage treatment has become an important environmental issue. The living areas of construction sites will produce a large amount of sewage containing particulate impurities, food residues, oil pollution, and phosphorus-containing waste. In order to reduce the pollution of the surrounding environment caused by direct discharge of sewage from living areas, a series of sewage treatment is required.

[0003] Currently, sewage from living areas is sent to treatment pools for purification. However, the treatment pools need to be fixed in place and cannot be moved. When they are moved at the construction site, supporting facilities need to be re-excavated and rebuilt, which is time-consuming and labor-intensive. In addition, there is a lack of gas purification facilities in the treatment pools. When the sewage in the treatment pools is aerated, the irritating gases generated are directly discharged to pollute the surrounding air. The polluted air can be easily inhaled by surrounding residents, causing harm to their health.

[0004] Therefore, there is an urgent need to provide a mobile construction site sewage treatment device with a gas purification function. Utility Model Content

[0005] In order to overcome the shortcomings of the current treatment pool that needs to be fixed and cannot be moved according to the construction site, the lack of gas purification treatment facilities in the treatment pool, and the irritating gas generated by aeration is directly discharged to pollute the surrounding air, the utility model provides a mobile construction site sewage treatment device with gas purification function.

[0006] To solve the above problems, the utility model adopts the following technical solutions: a mobile construction site sewage treatment device, including a treatment box, the treatment box is provided with a mounting seat, the treatment box is provided with a partition, the partition can divide the internal space of the treatment box into two cavities, a large cavity and a small cavity, the treatment box is provided with a water inlet valve, the treatment box is provided with an air pump through a fixed frame, an aeration pipe is provided in the large cavity of the treatment box, the aeration pipe is connected to the air pump, a valve body is provided on the partition, the treatment box is provided with a vent, and the irritating gas generated by aeration is discharged from the vent, the treatment box is provided with a limiting frame, the limiting frame is slidably provided with a first baffle, the first baffle is sleeved with a first elastic member, the treatment box is provided with a fixed sleeve, the fixed sleeve is provided with a plurality of ventilation plates, activated carbon is provided between the plurality of ventilation plates, and the activated carbon is located above the vent for purifying the irritating gas.

[0007] Optionally, a water outlet plate is provided on one side of the processing box body close to the small cavity, a barrier frame is slidingly provided on the water outlet plate, the upper part of the barrier frame penetrates into the processing box body and is located in the small cavity, a support frame is fixedly connected to the processing box body, the support frame is used to support the upper part of the barrier frame, and a second elastic member is sleeved on the barrier frame.

[0008] Optionally, a processing frame is fixedly connected to the processing box body, a water outlet is provided on the side of the processing box body close to the processing frame, a second baffle is slidably provided on the processing frame, a fixed plate is fixedly connected to the processing box body, a knob is threadedly provided on the fixed plate, and the second baffle can be fixed by rotating the knob in the forward direction, a slide rail is fixedly connected to the processing frame, a third baffle is slidably provided on the slide rail, a screen is provided in the processing frame, and the screen is used to separate water and debris.

[0009] Optionally, symmetrically distributed fixing rings are fixed in the aeration pipe, and a baffle is slidably provided in the fixing ring. Initially, the baffle frame is in a closed state, and a third elastic member is sleeved on the baffle.

[0010] Optionally, a filter is provided in the water inlet valve.

[0011] Optionally, a transparent plate is embedded in the processing frame.

[0012] Compared with the existing technology, the utility model has the following technical effects: 1. Through the setting of activated carbon, it can absorb toxic and harmful substances in irritating gases, achieve purification, and avoid direct emission of polluted air. In addition, the device as a whole is detachable and can be easily transferred according to the construction site.

[0013] 2. Through the design of the water outlet, during aeration, the floating debris in the sewage can flow out of the treatment frame from the water outlet, achieving rapid removal of debris.

[0014] 3. The barrier frame and fixed ring can block the aeration pipe to prevent sewage in the large cavity from entering the air pump. BRIEF DESCRIPTION OF THE DRAWINGS

[0015] Figure 1 It is a schematic diagram of the three-dimensional structure of the utility model.

[0016] Figure 2 It is a schematic diagram of the three-dimensional cross-sectional structure of the fixed sleeve, ventilation plate and activated carbon of the utility model.

[0017] Figure 3 It is a schematic three-dimensional cross-sectional structure diagram of the limiting frame, the first baffle and the first elastic member of the utility model.

[0018] Figure 4 It is a schematic three-dimensional cross-sectional structure diagram of the water outlet plate, barrier frame and support frame of the utility model.

[0019] Figure 5 It is a schematic diagram of the three-dimensional cross-sectional structure of the screen, filter and processing frame of the utility model.

[0020] Figure 6 It is a schematic three-dimensional cross-sectional structure diagram of the second baffle, the fixing plate and the knob of the present invention.

[0021] Figure 7 It is a schematic diagram of the three-dimensional cross-sectional structure of the aeration pipe, fixed ring and baffle of the utility model.

[0022] Figure 8 It is a schematic diagram of the three-dimensional structure of the fixing ring, the spoiler and the third elastic member of the utility model.

[0023] The parts in the accompanying drawings are marked as follows: 1-mounting seat, 2-processing box, 201-water inlet valve, 3-fixing frame, 4-air pump, 5-aeration pipe, 6-partition, 7-valve body, 8-limiting frame, 9-first baffle, 10-first elastic member, 11-fixing sleeve, 12-vent plate, 13-activated carbon, 14-water outlet plate, 15-blocking frame, 16-support frame, 17-second elastic member, 18-processing frame, 19-second baffle, 20-fixing plate, 21-knob, 22-slide rail, 23-third baffle, 24-screen, 25-fixing ring, 26-baffle, 27-third elastic member, 28-filter, 29-transparent plate. DETAILED DESCRIPTION

[0024] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the embodiments described are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without making creative efforts are within the scope of protection of the present invention.

[0025] Example 1

[0026] See also Figure 1-Figure 3, a mobile construction site sewage treatment device, including a treatment box 2, a mounting base 1 is provided at the bottom of the treatment box 2, and the mounting base 1 is used to realize the detachable setting of the device as a whole, so that the device can be conveniently transferred according to the construction site. A partition 6 is provided in the treatment box 2, and the partition 6 can separate the internal space of the treatment box 2 into two cavities, a large cavity and a small cavity. The large cavity and the small cavity are respectively used to treat sewage and store treated sewage. Two water inlet valves 201 are provided on the left side of the treatment box 2, which are symmetrically distributed front and back. A filter 28 is provided in the water inlet valve 201. The filter 28 can be used to remove most of the debris when the sewage enters the treatment box 2. An air pump 4 is provided on the front side of the treatment box 2 through a fixing frame 3, and an aeration pipe 5 is provided in the large cavity of the treatment box 2. The aeration pipe 5 is connected to the air pump 4, and two valve bodies 7 are symmetrically distributed in the front and back at the lower part of the partition 6. A vent is provided on the top of the treatment box 2, and the irritating gas generated by aeration is discharged from the vent. A limiting frame 8 is provided on the top of the treatment box 2, and a first baffle 9 is slidably provided on the limiting frame 8. The first baffle 9 is used to seal the vent. The left and right parts of the first baffle 9 are both sleeved with a first elastic member 10, and the two ends of the first elastic member 10 are respectively connected to the first baffle 9 and the treatment box 2. A fixing sleeve 11 is provided on the top of the treatment box 2 by screw connection, and the fixing sleeve 11 is provided with two ventilation plates 12 symmetrically distributed in the upper and lower parts. Activated carbon 13 is provided between the two ventilation plates 12. The activated carbon 13 is located above the vent to purify the irritating gas.

[0027] After pretreatment, the sewage from the living area enters the large cavity through the water inlet valve 201. Then the air pump 4 is started, and air is input into the large cavity through the aeration pipe 5, so that the sewage in the large cavity contacts with the air and is oxygenated, and the sewage is stirred, thereby strengthening the contact between the internal organic matter and the microorganisms and dissolved oxygen. As a result, the debris in the water floats up. During this period, the irritating gas in the large cavity continues to increase. When a certain pressure value is reached, the limit frame 8 is pushed open by the irritating gas, and the irritating gas is discharged from the vent and the toxic and harmful substances are absorbed by the activated carbon 13 before being discharged, thereby achieving purification. The aerated water enters the small cavity from the valve body 7 for storage and discharge.

[0028] Example 2

[0029] Based on Example 1, please refer to Figure 4A water outlet plate 14 is provided on the side of the treatment box 2 close to the small cavity, and a barrier frame 15 is slidingly provided on the water outlet plate 14. The upper part of the barrier frame 15 penetrates into the treatment box 2 and is located in the small cavity. A support frame 16 is fixedly connected to the treatment box 2, and the support frame 16 is used to support the upper part of the barrier frame 15. A second elastic member 17 is sleeved on the upper part of the barrier frame 15, and the two ends of the second elastic member 17 are respectively connected to the barrier frame 15 and the support frame 16.

[0030] As the water inside the small cavity increases and reaches a certain water level, the water flow pushes the barrier frame 15 upward, the second elastic member 17 is compressed, and the treated water is discharged from the water outlet plate 14, realizing automatic drainage and convenient use.

[0031] See also Figure 5 and Figure 6 , the rear side of the processing box 2 is fixed with a processing frame 18, and a water outlet is provided on the side of the processing box 2 close to the processing frame 18. A second baffle 19 is slidingly provided on the upper part of the processing frame 18. By adjusting the second baffle 19 to a suitable height, the water outlet height can be changed. The top rear side of the processing box 2 is fixed with two fixed plates 20 that are symmetrically distributed on the left and right by welding. A knob 21 is threadedly provided on the fixing plate 20. Turning the knob 21 forward can fix the second baffle 19. A slide rail 22 is fixedly connected to the processing frame 18, and a third baffle 23 is slidably provided on the slide rail 22. A screen 24 is provided in the processing frame 18, and the screen 24 is used to separate water and debris. A transparent plate 29 is embedded in the processing frame 18, through which the impurity processing status inside the processing frame 18 can be observed; during aeration, the debris floating in the sewage flows out of the processing frame 18 from the water outlet, realizing rapid impurity removal, and then the debris and the residual sewage are separated by the screen 24, which is convenient for the subsequent distribution and processing of the debris and sewage.

[0032] See also Figure 7 and Figure 8 Two fixed rings 25 symmetrically distributed on the left and right are fixed to the aeration tube 5, and a baffle 26 is slidably arranged in the fixed ring 25. Initially, the barrier frame 15 is in a closed state to prevent sewage in the large cavity from entering the air pump 4 through the aeration tube 5. When the air pump 4 is started and aeration begins, the gas can flush the baffle frame 15 open, and a third elastic member 27 is sleeved on the baffle 26. The two ends of the third elastic member 27 are respectively connected to the baffle 26 and the fixed ring 25. Under the elastic force of the third elastic member 27, the barrier frame 15 can be in close contact with the fixed ring 25 to ensure sealing. At the same time, it can also be used to drive the barrier frame 15 to reset.

[0033] The above embodiments are intended only to illustrate the technical concepts and features of the present invention. Their purpose is to enable those familiar with the art to understand the contents of the present invention and implement them accordingly. They are not intended to limit the scope of protection of the present invention. Any equivalent changes or modifications based on the spirit of the present invention are intended to be included in the scope of protection of the present invention.

Claims

1. A mobile construction site sewage treatment device, comprising a treatment box (2), a mounting seat (1) provided on the treatment box (2), a partition (6) provided in the treatment box (2), the partition (6) being capable of separating the internal space of the treatment box (2) into two cavities, a large cavity and a small cavity, a water inlet valve (201) provided on the treatment box (2), an air pump (4) provided on the treatment box (2) via a fixing frame (3), an aeration pipe (5) provided in the large cavity of the treatment box (2), the aeration pipe (5) being connected to the air pump (4), a valve body (7) provided on the partition (6), and characterized in that: The treatment box (2) is provided with a vent hole, and the irritating gas generated by aeration is discharged from the vent hole. The treatment box (2) is provided with a limit frame (8), and a first baffle (9) is slidably provided on the limit frame (8). A first elastic member (10) is sleeved on the first baffle (9). The treatment box (2) is provided with a fixed sleeve (11), and the fixed sleeve (11) is provided with a plurality of vent plates (12). Activated carbon (13) is provided between the plurality of vent plates (12). The activated carbon (13) is located above the vent hole and is used to purify the irritating gas.

2. A mobile construction site sewage treatment device according to claim 1, characterized in that: A water outlet plate (14) is provided on one side of the treatment box (2) close to the small cavity, and a barrier frame (15) is slidably provided on the water outlet plate (14). The upper portion of the barrier frame (15) penetrates into the treatment box (2) and is located in the small cavity. A support frame (16) is fixedly connected to the treatment box (2), and the support frame (16) is used to support the upper portion of the barrier frame (15). A second elastic member (17) is sleeved on the barrier frame (15).

3. A mobile construction site sewage treatment device according to claim 1, characterized in that: A processing frame (18) is fixedly connected to the processing box (2), a water outlet is provided on a side of the processing box (2) close to the processing frame (18), a second baffle (19) is slidably provided on the processing frame (18), a fixing plate (20) is fixedly connected to the processing box (2), a knob (21) is threadedly provided on the fixing plate (20), and the second baffle (19) can be fixed by rotating the knob (21) in a forward direction, a slide rail (22) is fixedly connected to the processing frame (18), a third baffle (23) is slidably provided on the slide rail (22), a screen (24) is provided in the processing frame (18), and the screen (24) is used to separate water and debris.

4. A mobile construction site sewage treatment device according to claim 1, characterized in that: A symmetrically distributed fixing ring (25) is fixedly connected to the aeration tube (5), and a baffle (26) is slidably arranged in the fixing ring (25). Initially, the baffle frame (15) is in a closed state, and a third elastic member (27) is sleeved on the baffle (26).

5. A mobile construction site sewage treatment device according to claim 1, characterized in that: A filter screen (28) is provided inside the water inlet valve (201).

6. A mobile construction site sewage treatment device according to claim 3, characterized in that: A transparent plate (29) is embedded in the processing frame (18).