Aerial work anchoring device for air conditioner installation

By designing a high-altitude operation anchoring device for air conditioning installation, the coordination of rotary locking blocks and clamping blocks is used to solve the problem of cumbersome hole opening in the prior art, efficient safety rope installation is achieved, construction efficiency is improved and hole residue is reduced.

CN223256512UActive Publication Date: 2025-08-22万庆恩
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202422542593.6
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-10-22
Publication Date
2025-08-22
Estimated Expiration
2034-10-22

AI Technical Summary

Technical Problem

The existing operation method of wire ropes surrounding the shear wall is complicated during installation and disassembly, and large holes are required to be opened on the surface of the shear wall, which affects construction efficiency and leaves holes that need to be filled.

Method used

A high-altitude work anchoring device including connecting sleeves, clamping parts and adjusting parts is designed. By rotating the locking block, it slides and rotates in the shear wall hole, and cooperates with the clamping block to complete the anchoring, avoiding drilling of large holes, and directly installing safety ropes in the reserved holes.

Benefits of technology

The construction process is simplified, construction efficiency is improved, anchor point installation is reduced, and residual problems in holes are reduced.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN223256512U_ABST
    Figure CN223256512U_ABST
Patent Text Reader

Abstract

The utility model discloses a high-altitude operation anchoring device for air conditioner installation, which comprises a connecting sleeve, a clamping part and an adjusting part, the clamping part is arranged at one end of the connecting sleeve, the clamping part comprises a clamping frame arranged at one end of the connecting sleeve, a rotating shaft arranged in the clamping frame and a rotating locking block arranged in the clamping frame, and the rotating locking block is arranged in the connecting sleeve. The rotating locking block is in sliding connection with the rotating shaft, the adjusting part is arranged at the other end of the connecting sleeve, and the adjusting part comprises a second threaded rod arranged at the other end of the connecting sleeve, a clamping block arranged on the second threaded rod and a connecting lantern ring arranged on the second threaded rod. The anchoring device has the advantages that the clamping part and the adjusting part are arranged, the locking block can be rotated along the rotating shaft in a sliding mode after penetrating through a hole formed in a shear wall, and therefore the anchoring device can be installed in cooperation with the clamping block, drilling is not needed, and the anchoring device can be installed conveniently. The installation operation of the safety rope can be directly completed on the original reserved air conditioner hole, and the construction efficiency is improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of high-altitude construction safety equipment, in particular to a high-altitude operation anchoring device for air-conditioning installation. Background Art

[0002] Currently, most high-rise buildings are frame structures. When installing air conditioning units outside a building, workers working at the edge of the exterior wall are required to wear safety harnesses according to safety construction regulations. Safety harnesses are typically secured by encircling a shear wall with a steel wire rope, then connecting the worker's safety harness to the encircling steel wire rope to ensure safety at the exterior wall edge.

[0003] The existing operation method of the wire rope encircling shear wall is cumbersome during installation and disassembly, and requires drilling a large hole on the surface of the shear wall to install the encircling wire rope, so that a large hole remains after the construction is completed and needs to be filled, affecting the construction efficiency.

[0004] Therefore, in view of the above technical problems, it is necessary to propose a high-altitude work anchoring device for air conditioning installation. Utility Model Content

[0005] The purpose of the present utility model is to provide an aerial work anchoring device for air-conditioning installation, so as to solve the problem that the existing operation method of the steel wire rope encircling the shear wall proposed in the above-mentioned background technology is cumbersome during installation and disassembly, and a large hole needs to be opened on the surface of the shear wall for installing the encircling steel wire rope, so that a large hole will remain after the construction is completed and needs to be filled, which affects the construction efficiency.

[0006] To achieve the above objectives, the present invention provides the following technical solutions:

[0007] An aerial work anchoring device for air conditioning installation, comprising a connecting sleeve, a clamping portion, and an adjusting portion:

[0008] The clamping part is arranged at one end of the connecting sleeve, and the clamping part includes a clamping frame arranged at one end of the connecting sleeve, a rotating shaft arranged inside the clamping frame, and a rotating locking block arranged inside the clamping frame. The rotating locking block and the rotating shaft are slidingly connected. The adjusting part is arranged at the other end of the connecting sleeve, and the adjusting part includes a second threaded rod arranged at the other end of the connecting sleeve, a clamping block arranged on the second threaded rod, and a connecting ring arranged on the second threaded rod. The clamping block and the second threaded rod are threadedly connected.

[0009] By adopting the above technical solution, the rotating locking block can slide and rotate along the rotating axis after passing through the hole opened in the shear wall, thereby cooperating with the clamping block to complete the installation of the anchoring device, so that only a smaller hole needs to be drilled on the shear wall to complete the installation operation of the safety rope, thereby improving construction efficiency.

[0010] Preferably, the connecting sleeve includes a first connector provided at one end of the connecting sleeve, and one end of the clamping frame is provided with a first threaded rod, and the first threaded rod is threadedly connected to the first connector.

[0011] By adopting the above technical solution, the first threaded rod can be connected to the first connector, thereby fixing the clamping portion to one end of the connecting sleeve.

[0012] Preferably, the connecting sleeve includes a second connecting head provided at the other end of the connecting sleeve, the second connecting head is threadedly connected to the second threaded rod, and the interior of the connecting sleeve is a hollow structure.

[0013] By adopting the above technical solution, the second threaded rod can be received into the interior of the connecting sleeve by rotating the second threaded rod.

[0014] Preferably, the clamping portion further comprises a guide groove provided on the surface of the rotation locking block, and the rotation shaft passes through the guide groove and is slidably connected thereto.

[0015] By adopting the above technical solution, the rotating shaft can slide along the guide groove, so that the rotating locking block can change its own angle.

[0016] Preferably, the rotation locking block is an asymmetric structure, and the center of gravity of the rotation locking block is biased towards the side where the guide groove is provided.

[0017] By adopting the above technical solution, the rotating locking block can change its angle by naturally falling due to gravity after passing through the hole opened in the shear wall.

[0018] Preferably, the adjusting portion further comprises a handle provided at one end of the second threaded rod, and the handle is vertically provided at one end of the second threaded rod.

[0019] By adopting the above technical solution, the user can hold the handle when rotating the second threaded rod, which is convenient for the user to operate.

[0020] Preferably, the adjusting portion further comprises an adjusting button arranged on a side of the clamping block, and the second threaded rod passes through the adjusting button and is threadedly connected thereto.

[0021] By adopting the above technical solution, the position of the clamping block on the second threaded rod can be adjusted by rotating the adjusting knob, thereby cooperating with the rotated rotating locking block to clamp and fix the device on the shear wall.

[0022] Compared with the prior art, the beneficial effects of the present invention are as follows: by providing a clamping part and an adjusting part, the locking block can be rotated along the rotating axis after passing through the hole opened in the shear wall, thereby cooperating with the clamping block to complete the installation of the anchoring device. No drilling is required, and the installation operation of the safety rope can be completed directly on the original reserved air-conditioning hole, which reduces the difficulty of anchor point installation and improves construction efficiency. BRIEF DESCRIPTION OF THE DRAWINGS

[0023] Figure 1 This is a schematic diagram of the overall structure of the utility model;

[0024] Figure 2 This is a schematic diagram of the overall cross-sectional structure of the utility model;

[0025] Figure 3 This is a schematic diagram of the cross-sectional structure of the utility model as a whole connected to the wall;

[0026] Figure 4 This is a schematic diagram of the cross-sectional structure of the clamping part of the utility model passing through the wall;

[0027] Figure 5 This is a schematic diagram of the rotating cross-sectional structure of the rotary locking block of the utility model;

[0028] Figure 6 This is a schematic diagram of the structure of the clamping part of the utility model;

[0029] Figure 7 This is a structural diagram of the adjustment part of the utility model.

[0030] Reference numerals in the figure: 1. connecting sleeve; 101. first connecting head; 102. second connecting head; 2. clamping part; 201. clamping frame; 202. first threaded rod; 203. rotating shaft; 204. rotating locking block; 205. guide groove; 3. adjusting part; 301. second threaded rod; 302. handle; 303. clamping block; 304. adjusting button; 305. connecting collar. DETAILED DESCRIPTION

[0031] It should be noted that, in the absence of conflict, the embodiments of the present invention and the features therein can be combined with each other.

[0032] In the description of the present invention, it should be understood that the terms "center", "longitudinal", "lateral", "up", "down", "front", "back", "left", "right", "vertical", "horizontal", "top", "bottom", "inside", "outside" and the like indicate orientations or positional relationships based on the orientations or positional relationships shown in the accompanying drawings, and are only for the convenience of describing the present invention and simplifying the description, and do not indicate or imply that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood as limiting the present invention. In addition, the terms "first", "second", etc. are only used for descriptive purposes and cannot be understood as indicating or implying relative importance or implicitly indicating the number of the indicated technical features. Therefore, features defined as "first", "second", etc. may explicitly or implicitly include one or more of the features. In the description of the present invention, unless otherwise specified, "multiple" means two or more.

[0033] In the description of this utility model, it should be noted that, unless otherwise expressly specified or limited, the terms "installed," "connected," and "connected" should be understood in a broad sense. For example, they can refer to fixed connections, detachable connections, or integral connections; mechanical connections, electrical connections; direct connections, indirect connections through an intermediate medium, and internal communication between two components. Those skilled in the art will understand the specific meanings of the above terms in this utility model based on specific circumstances.

[0034] The following describes the embodiments of the present invention in detail with reference to the accompanying drawings. However, the present invention can be implemented in many different ways as defined and covered by the claims.

[0035] like Figures 1 to 7As shown, this embodiment provides a technical solution: an aerial work anchoring device for air conditioning installation, comprising a connecting sleeve 1, a clamping portion 2 and an adjusting portion 3: the connecting sleeve 1 is a hollow steel pipe, and nuts for connection are provided at both ends of the steel pipe. The clamping portion 2 is provided at one end of the connecting sleeve 1, and the clamping portion 2 includes a clamping frame 201 provided at one end of the connecting sleeve 1, a rotating shaft 203 is provided inside the clamping frame 201, and a rotating locking block 204 is provided inside the clamping frame 201. The rotating locking block 204 is in sliding connection with the rotating shaft 203. The adjusting portion 3 is provided at the connecting sleeve. At the other end of the tube 1, the adjusting part 3 includes a second threaded rod 301 arranged at the other end of the connecting sleeve 1, a clamping block 303 is provided on the second threaded rod 301, and a connecting ring 305 is provided on the second threaded rod 301. The clamping block 303 and the second threaded rod 301 are threadedly connected. The locking block 204 can be rotated and slid along the rotating axis 203 after passing through the hole opened in the shear wall, thereby cooperating with the clamping block 303 to complete the installation of the anchoring device. There is no need to drill a hole, and the safety rope can be installed directly on the original reserved air-conditioning hole, which improves the construction efficiency.

[0036] The high-altitude anchoring device for air conditioning installation includes a clamping part 2, a clamping frame 201 and a rotation locking block 204: a first connecting head 101 is provided at one end of the connecting sleeve 1, and a first threaded rod 202 is provided at one end of the clamping frame 201. The first threaded rod 202 is threadedly connected to the first connecting head 101 and can be connected to the first connecting head 101 through the first threaded rod 202, so that the clamping part 2 is fixed to one end of the connecting sleeve 1, and a guide groove 205 is provided on the surface of the rotation locking block 204, and the rotating shaft 203 passes through the guide groove 205 and is slidably connected to it, so that the rotating shaft 203 can slide along the guide groove 205, so that the rotation locking block 204 can change its own angle. The rotation locking block 204 is an asymmetric structure, and the center of gravity of the rotation locking block 204 is biased toward the side where the guide groove 205 is provided, so that the rotation locking block 204 can change its own angle by naturally falling due to gravity after passing through the hole opened in the shear wall.

[0037] The high-altitude anchoring device for air conditioning installation includes an adjusting part 3, a second threaded rod 301 and a clamping block 303: a second connecting head 102 is provided at the other end of the connecting sleeve 1, and the second connecting head 102 is threadedly connected to the second threaded rod 301. The interior of the connecting sleeve 1 is a hollow structure, and the second threaded rod 301 can be received into the interior of the connecting sleeve 1 by rotating the second threaded rod 301. The adjusting part 3 also includes a handle 302 provided at one end of the second threaded rod 301. The handle 302 is vertically provided at one end of the second threaded rod 301, so that the user can hold the handle 302 when rotating the second threaded rod 301, which is convenient for the user to operate. An adjusting button 304 is provided on the side of the clamping block 303, and the second threaded rod 301 passes through the adjusting button 304 and is threadedly connected to it. The position of the clamping block 303 on the second threaded rod 301 can be adjusted by rotating the adjusting button 304, thereby cooperating with the rotated rotating locking block 204 to clamp the device on the shear wall.

[0038] Working principle: drill a hole at the location where the air conditioner needs to be installed to install the device, a first connector 101 is provided at one end of the connecting sleeve 1, and a first threaded rod 202 is provided at one end of the clamping frame 201, first the clamping part 2 is connected to one end of the connecting sleeve 1 through a thread, and a second connector 102 is provided at the other end of the connecting sleeve 1, the second connector 102 is threadedly connected to the second threaded rod 301, and the adjusting part 3 is connected to one end of the connecting sleeve 1 through a thread, and a guide groove 205 is provided on the surface of the rotary locking block 204, and the rotating shaft 203 passes through the guide groove 205 and is slidably connected to it, and then the rotary locking block 204 is slid and rotated so that the rotary locking block 204 is parallel to the entire connecting sleeve 1, and then the front end of the rotary locking block 204 is extended into the hole drilled in the shear wall, and the connecting sleeve 1 is pushed into the hole until the rotary locking block 204 is completely out of the hole. The other end of the hole is exposed. Since the rotation locking block 204 is an asymmetric structure, the center of gravity of the rotation locking block 204 is biased to the side with the guide groove 205. The rotation locking block 204 will rotate under the influence of gravity, so that the rotation locking block 204 is perpendicular to the connecting sleeve 1. Then the entire device is pulled to one end of the adjustment part 3, and the Shudie rotation locking block 204 abuts against the shear wall. Then an adjusting button 304 is provided on the side of the clamping block 303, and the second threaded rod 301 passes through the adjusting button 304 and is threadedly connected to it. The position of the clamping block 303 on the second threaded rod 301 can be adjusted by rotating the adjusting button 304, so that the device can be clamped and fixed on the shear wall in cooperation with the rotated rotation locking block 204, and then the safety rope can be installed on the connecting ring 305, so that only a smaller hole needs to be drilled in the shear wall to complete the installation operation of the safety rope, thereby improving the efficiency of construction.

[0039] Although the embodiments of the present invention have been shown and described, it will be understood by those skilled in the art that various changes, modifications, substitutions and variations may be made to these embodiments without departing from the principles and spirit of the present invention, and the scope of the present invention is defined by the appended claims and their equivalents.

Claims

1. An aerial work anchoring device for air conditioning installation, characterized in that: The invention comprises a connecting sleeve (1); a clamping portion (2), wherein the clamping portion (2) is arranged at one end of the connecting sleeve (1); the clamping portion (2) comprises a clamping frame (201) arranged at one end of the connecting sleeve (1), a rotating shaft (203) arranged inside the clamping frame (201), and a rotating locking block (204) arranged inside the clamping frame (201); the rotating locking block (204) and the rotating shaft (203) are in sliding connection; An adjusting portion (3) is provided at the other end of the connecting sleeve (1), and the adjusting portion (3) comprises a second threaded rod (301) provided at the other end of the connecting sleeve (1), a clamping block (303) provided on the second threaded rod (301), and a connecting collar (305) provided on the second threaded rod (301), wherein the clamping block (303) and the second threaded rod (301) are threadedly connected.

2. The high-altitude anchoring device for air conditioning installation according to claim 1, characterized in that: The connecting sleeve (1) comprises a first connector (101) provided at one end of the connecting sleeve (1); a first threaded rod (202) is provided at one end of the clamping frame (201); and the first threaded rod (202) is threadedly connected to the first connector (101).

3. The high-altitude anchoring device for air conditioning installation according to claim 1, characterized in that: The connecting sleeve (1) comprises a second connecting head (102) arranged at the other end of the connecting sleeve (1), the second connecting head (102) being threadedly connected to the second threaded rod (301), and the interior of the connecting sleeve (1) is a hollow structure.

4. The high-altitude anchoring device for air conditioning installation according to claim 1, characterized in that: The clamping portion (2) further comprises a guide groove (205) formed on the surface of the rotating locking block (204), and the rotating shaft (203) passes through the guide groove (205) and is slidably connected thereto.

5. The high-altitude anchoring device for air-conditioning installation according to claim 4, characterized in that: The rotation locking block (204) has an asymmetric structure, and the center of gravity of the rotation locking block (204) is biased toward the side where the guide groove (205) is provided.

6. The high-altitude anchoring device for air conditioning installation according to claim 1, characterized in that: The adjusting portion (3) further comprises a handle (302) arranged at one end of the second threaded rod (301), wherein the handle (302) is arranged vertically at one end of the second threaded rod (301).

7. The high-altitude anchoring device for air conditioning installation according to claim 1, characterized in that: The adjusting portion (3) further comprises an adjusting button (304) arranged on the side of the clamping block (303), and the second threaded rod (301) passes through the adjusting button (304) and is threadedly connected thereto.