Highway high fill roadbed settlement observation device
The problem of loose settlement pipe is solved by using a locking mechanism in the high-fill subgrade settlement observation device of the high-fill subgrade settlement observation device, and the accuracy and stability of observation are achieved, ensuring the fixation of the settlement pipe and the reliability of observation data during construction.
Patent Information
- Application Number
- CN202422629536.1
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-10-30
- Publication Date
- 2025-08-26
- Estimated Expiration
- 2034-10-30
AI Technical Summary
In the prior art, during the construction of high-fill subgrades on highways, settlement pipes are prone to loosening due to vibration and other reasons, which affects the observation accuracy.
A high-fill subgrade settlement observation device is designed, and a locking mechanism is used to lock the adjacent settlement tube sections to avoid loosening. The locking mechanism consists of a first clamp, a second clamp, a screw and a hand-tightened nut, and the settlement tube is fixed by the combination of the screw and a hand-tightened nut.
During the construction process, the settlement pipe can rise with the increase of the fill height and is fixed by a locking mechanism to ensure the accuracy and stability of the observation and avoid loosening affecting the observation results.
Smart Images

Figure CN223271886U_ABST
Abstract
Description
Technical Field
[0001] The utility model belongs to the technical field of high fill roadbed construction, and in particular relates to a high fill roadbed settlement observation device for a highway. Background Art
[0002] During the construction of high-fill roadbed, settlement observation can be used to timely understand the deformation of the roadbed and predict future development trends, so as to take necessary measures to ensure construction safety and roadbed stability.
[0003] In order to facilitate the observation of the settlement of the roadbed, it is usually necessary to set up an observation device on the top of the roadbed to assist the observation. In the prior art, the Chinese utility model patent document with the authorization announcement number CN214333757U discloses a new type of highway roadbed settlement observation device. When observing, first select a monitoring point to set up the device, connect the cap of the reflective rope to the top of the settlement pipe thread and tighten it, stretch the settlement pipe to a certain height through the reflective rope, carry out the first layer of filling, read the scale on the outer wall of the settlement pipe and measure the elevation with a level, compress the top of the settlement pipe to the filling point, and then the settlement pipe is tightened. After the soil height is reached, the roller performs normal rolling construction. After the rolling is completed, the cap is found through the reflective rope, and the settlement tube is stretched to a certain height again through the reflective rope. The elevation of the settlement tube is measured, and the second layer of backfill is carried out. The settlement tube is compressed to the same level as the backfill, and the roller performs the second layer of rolling. The above steps are repeated for multiple layers of backfill; as the backfill height increases, the settlement tube can be stretched upward, and adjacent settlement tubes are fixed by friction. During the construction process, due to vibration and other reasons, the settlement tubes are prone to loosening and shrinking, thereby affecting the accuracy of observation.
[0004] Therefore, it is necessary to design a highway high fill roadbed settlement observation device that can lock the settlement tubes, is not easy to loosen, and ensures the accuracy of observation to solve the current technical problems. Summary of the Invention
[0005] In view of the deficiencies in the prior art, the utility model provides a highway high fill roadbed settlement observation device in which settlement tubes can be locked, are not prone to loosening, and ensure the accuracy of observation.
[0006] The technical solution of the utility model is: a highway high embankment roadbed settlement observation device, comprising a base plate, the top of the base plate is provided with at least two settlement pipe sections that are slid together in sequence from the inside to the outside; the bottom end of the settlement pipe section located on the outermost side is vertically fixedly connected to the top of the base plate; the top end of the settlement pipe section located on the innermost side is provided with an observation plate; between two adjacent settlement pipe sections, the top end of the settlement pipe section located on the outer side is provided with a locking mechanism for locking or releasing it with the settlement pipe section located on the inner side.
[0007] The locking mechanism includes a first clamping plate and a second clamping plate symmetrically arranged at the upper end of the settlement pipe section located on the outside. The first clamping plate and the second clamping plate are both slidably connected to the top of the settlement pipe section located on the outside along the radial direction of the settlement pipe section. A slot is opened along the axial direction of the settlement pipe section located on the inside, and a screw is provided inside the slot. One end of the screw is fixedly connected to the inner side of the second clamping plate, and the other end of the screw passes through the first clamping plate. The outer side of the end of the screw is equipped with a hand-tightened nut corresponding to the outer side of the first clamping plate.
[0008] Two support blocks are symmetrically arranged on the upper end of the settlement pipe section located on the outside, and guide rods are vertically fixed on both sides of the support blocks. Limiting plates are provided at the ends of the guide rods, and the ends of the first clamping plate and the second clamping plate are slidably mounted on the outside of the corresponding guide rods.
[0009] The end of the screw rod is provided with a limiting disk for limiting the position of the hand-tightening nut.
[0010] Anti-slip pads are fixedly provided on the inner sides of the first clamping plate and the second clamping plate.
[0011] A protective cover is detachably provided on the top end of the innermost settling pipe section, and the protective cover is sleeved on the outer side of the observation plate.
[0012] A support seat is fixedly provided on the top of the innermost sedimentation pipe section, a support rod is fixedly provided on the top of the support seat, the observation plate is fixedly provided on the top of the support rod, and a magnet ring is fixedly provided on the bottom end of the protective cover, and the magnet ring is detachably fixed to the top of the support seat by magnetic attraction.
[0013] Insertion rods are evenly arranged on the bottom of the bottom plate, and the bottom ends of the insertion rods have cone heads.
[0014] The beneficial effects of the present invention are as follows: during the construction process, as the fill height increases, the settlement pipe section can be moved upward to adjust, thereby raising the height of the observation plate, and after raising, the adjacent settlement pipe sections can be locked and fixed by a locking mechanism to avoid loosening during the construction process, which affects the accuracy of observation. BRIEF DESCRIPTION OF THE DRAWINGS
[0015] Figure 1 The utility model is a structural schematic diagram of an implementation method of a high-fill roadbed settlement observation device for a medium-sized highway.
[0016] Figure 2 for Figure 1 A partial enlarged view of point A in the middle.
[0017] Figure 3This is a structural schematic diagram of another embodiment of the high fill roadbed settlement observation device for a highway in the present utility model.
[0018] Figure 4 It is a structural schematic diagram of the protective cover in the utility model. DETAILED DESCRIPTION
[0019] Various exemplary embodiments of the present invention will now be described in detail with reference to the accompanying drawings. The description of the exemplary embodiments is merely illustrative and does not constitute any limitation on the present invention and its application or use. The present invention can be implemented in many different forms and is not limited to the embodiments described herein. These embodiments are provided to make the present invention thorough and complete and to fully convey the scope of the present invention to those skilled in the art. It should be noted that unless otherwise specifically stated, the relative arrangement of the components and steps, the composition of the materials, the numerical expressions and the numerical values set forth in these embodiments should be interpreted as being merely exemplary and not as limiting.
[0020] The terms "first," "second," and similar terms used in this disclosure do not indicate any order, quantity, or importance, but are simply used to distinguish different parts. Terms such as "include" or "comprising" mean that the elements preceding the term include the elements listed after the term, and do not exclude the possibility of also including other elements. Terms such as "upper," "lower," "left," and "right" are used only to indicate relative positional relationships. When the absolute position of the object being described changes, the relative positional relationship may also change accordingly.
[0021] like Figure 1 and 2As shown, the highway high embankment roadbed settlement observation device includes a base plate 1, and the top of the base plate 1 is provided with at least two settlement pipe sections 2 that are slid together from the inside to the outside in sequence; the bottom end of the outermost settlement pipe section 2 is vertically fixedly connected to the top of the base plate 1; the top of the innermost settlement pipe section 2 is provided with an observation plate 7; between two adjacent settlement pipe sections 2, the top of the outer settlement pipe section 2 is provided with a locking mechanism 3 for locking or releasing it with the inner settlement pipe section 2; in this embodiment, when observing, a monitoring point is first selected to set the highway high embankment roadbed settlement observation device, and the observation plate 7 can be raised and lowered by adjusting the inner settlement pipe section 2 upwards. When the height of the soil filling increases, the settlement pipe sections 2 can be moved upward to adjust the height of the observation plate 7, and after the height is increased, the adjacent settlement pipe sections 2 can be locked and fixed by the locking mechanism 3 to avoid loosening during construction and affecting the accuracy of observation.
[0022] In some embodiments, the locking mechanism 3 has a first clamping plate 32 and a second clamping plate 33 symmetrically arranged on the upper end of the settlement pipe segment 2 located on the outside. The first clamping plate 32 and the second clamping plate 33 are both slidably connected to the top of the settlement pipe segment 2 located on the outside along the radial direction of the settlement pipe segment 2. A slot 39 is opened on the settlement pipe segment 2 located on the inside along its axial direction. A screw 36 is provided inside the slot 39. One end of the screw 36 is fixedly connected to the inner side of the second clamping plate 33, and the other end of the screw 36 is fixedly connected to the inner side of the second clamping plate 33. One end passes through the first clamping plate 32, and the outer side of the end of the screw rod 36 is equipped with a hand nut 38 corresponding to the outer side of the first clamping plate 32. By tightening the hand nut 38, the hand nut 38 cooperates with the screw rod 36, so that the first clamping plate 32 and the second clamping plate 33 are brought close to each other to clamp and fix the settlement pipe section 2 located on the inner side to prevent loosening; when adjusting, loosen the hand nut 38, and the first clamping plate 32 and the second clamping plate 33 will release the settlement pipe section 2 located on the inner side.
[0023] In some embodiments, two support blocks 31 are symmetrically provided at the upper end of the outer settling pipe section 2, and guide rods 34 are vertically fixed on both sides of the support block 31. A limiting plate 35 is provided at the end of the guide rod 34, and the ends of the first clamping plate 32 and the second clamping plate 31 are slidably mounted on the outer side of the corresponding guide rod 34. The limiting plate 35 can prevent the first clamping plate 32 and the second clamping plate 33 from slipping off the guide rod 34.
[0024] In some embodiments, a limiting plate 37 is provided at the end of the screw rod 36 to limit the hand-tightening nut 38 . The limiting plate 37 can prevent the hand-tightening nut 38 from slipping off the screw rod 36 .
[0025] In some embodiments, anti-slip pads 321 are fixedly provided on the inner sides of the first clamping plate 32 and the second clamping plate 33. The anti-slip pads 321 can increase the friction between the first clamping plate 32, the second clamping plate 33 and the settlement pipe section 2 located on the inner side, thereby avoiding slippage after locking and improving the stability of the fixation.
[0026] In some embodiments, as Figure 3 and 4 As shown, a protective cover 4 is detachably provided on the top of the innermost settling tube section 2. The protective cover 4 is mounted on the outside of the observation plate 7. The protective cover 4 protects the observation plate 7. When no observation is being performed, the cover is mounted on the outside of the observation plate 7 to protect it. When observation is required, the protective cover 4 can be removed.
[0027] In some embodiments, a support seat 5 is fixedly provided on the top of the innermost sedimentation pipe section 2, a support rod 6 is fixedly provided on the top of the support seat 5, an observation plate 7 is fixedly provided on the top of the support rod 6, and a magnet ring 41 is fixedly provided on the bottom end of the protective cover 4. The magnet ring 41 is detachably fixed to the top of the support seat 5 by magnetic attraction.
[0028] In some embodiments, the bottom of the base plate 1 is evenly provided with insertion rods 11, and the bottom ends of the insertion rods 11 have cone heads.
[0029] Thus far, various embodiments of the present invention have been described in detail. To avoid obscuring the concept of the present invention, some details well known in the art have not been described. Based on the above description, those skilled in the art will fully understand how to implement the technical solutions disclosed herein.
[0030] The above-described embodiments represent only some of the embodiments of the present invention. While the descriptions are relatively specific and detailed, they should not be construed as limiting the scope of the utility model patent. It should be noted that a person skilled in the art would be able to make various modifications and improvements without departing from the concept of the present utility model, and these modifications and improvements fall within the scope of protection of the present utility model. Therefore, the scope of protection of the present utility model patent shall be based on the appended claims.
Claims
1. A highway high fill roadbed settlement observation device, characterized by: It comprises a bottom plate, on the top of which at least two sedimentation pipe sections are provided, which are slidably sleeved together from the inside to the outside; The bottom end of the outermost settling pipe segment is vertically fixedly connected to the top of the bottom plate; An observation plate is provided at the top of the innermost settling tube segment; Between two adjacent sedimentation pipe sections, a locking mechanism for locking or releasing the top end of the sedimentation pipe section located on the outside and the sedimentation pipe section located on the inside is provided.
2. The highway high fill roadbed settlement observation device according to claim 1, characterized in that: The locking mechanism includes a first clamping plate and a second clamping plate symmetrically arranged at the upper end of the settlement pipe section located on the outside. The first clamping plate and the second clamping plate are both slidably connected to the top of the settlement pipe section located on the outside along the radial direction of the settlement pipe section. A slot is opened along the axial direction of the settlement pipe section located on the inside, and a screw is provided inside the slot. One end of the screw is fixedly connected to the inner side of the second clamping plate, and the other end of the screw passes through the first clamping plate. The outer side of the end of the screw is equipped with a hand-tightened nut corresponding to the outer side of the first clamping plate.
3. The highway high fill roadbed settlement observation device according to claim 2, characterized in that: Two support blocks are symmetrically arranged on the upper end of the settlement pipe section located on the outside, and guide rods are vertically fixed on both sides of the support blocks. Limiting plates are provided at the ends of the guide rods, and the ends of the first clamping plate and the second clamping plate are slidably mounted on the outside of the corresponding guide rods.
4. The highway high fill roadbed settlement observation device according to claim 2, characterized in that: The end of the screw rod is provided with a limiting disk for limiting the position of the hand-tightening nut.
5. The highway high fill roadbed settlement observation device according to claim 2, characterized in that: Anti-slip pads are fixedly provided on the inner sides of the first clamping plate and the second clamping plate.
6. The highway high fill roadbed settlement observation device according to claim 1, characterized in that: A protective cover is detachably provided on the top end of the innermost settling pipe section, and the protective cover is sleeved on the outer side of the observation plate.
7. The highway high fill roadbed settlement observation device according to claim 6, characterized in that: A support seat is fixedly provided on the top of the innermost sedimentation pipe section, a support rod is fixedly provided on the top of the support seat, the observation plate is fixedly provided on the top of the support rod, and a magnet ring is fixedly provided on the bottom end of the protective cover, and the magnet ring is detachably fixed to the top of the support seat by magnetic attraction.
8. The highway high fill roadbed settlement observation device according to claim 1, characterized in that: Insertion rods are evenly arranged on the bottom of the bottom plate, and the bottom ends of the insertion rods have cone heads.