Drilling device for emergency flood prevention timber pile in hydraulic engineering of Yellow River

Through the cooperation of the adjusting plate and the sleeve, the vibration and terrain adaptability problems of the wood pile drilling device during the drilling process are solved, the stability and drilling quality of the device are improved, and the service life is extended.

CN223326588UActive Publication Date: 2025-09-12HEZE YELLOW RIVER RIVER AFFAIRS BUREAU YUNCHENG YELLOW RIVER RIVER AFFAIRS BUREAU
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202422078882.5
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-08-27
Publication Date
2025-09-12
Estimated Expiration
2034-08-27

AI Technical Summary

Technical Problem

Existing wood pile drilling devices vibrate greatly during the drilling process, causing wear on parts and making it difficult to adapt to complex terrain, affecting stability and drilling quality.

Method used

A device including an adjustment plate, a sleeve and a drill bit is designed. The height is adjusted by the adjustment plate, and the sleeve provides stable support and reduces vibration. The base and the support legs cooperate to adapt to uneven ground and improve stability.

Benefits of technology

The device's stability and drilling quality during the drilling process are enhanced, part wear is reduced, and its service life and ability to adapt to complex terrain are increased.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN223326588U_ABST
    Figure CN223326588U_ABST
Patent Text Reader

Abstract

The utility model relates to the technical field of hydraulic engineering emergency rescue equipment, and discloses a Yellow River hydraulic engineering emergency rescue flood prevention timber pile drilling device which comprises a base, supporting legs are arranged at the bottom of the base, a supporting frame used for stabilizing is fixedly installed at the top of the base, and an adjusting plate used for adjusting the height is connected to the outer surface of the supporting frame in a clamped mode. A sleeve is fixedly installed at the top of the adjusting plate, and a drill bit used for drilling is arranged at the bottom of the adjusting plate. According to the Yellow River water conservancy project emergency flood prevention timber pile drilling device, through cooperative arrangement of an adjusting plate, a sleeve and a drill bit, the device can be more stable during drilling, the adjusting plate can conveniently adjust the height of the drill bit, meanwhile, the sleeve can be stably supported, the sleeve can reduce vibration generated by the device in the working process, and the drilling efficiency is improved. And therefore, impact and abrasion borne by the motor due to vibration are reduced, the drill bit can drill needed holes in the ground, and the timber pile can be fixed conveniently.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of emergency equipment for water conservancy projects, in particular to a wooden pile drilling device for emergency flood control in the Yellow River water conservancy project. Background Art

[0002] During the rescue and flood prevention process of the Yellow River water conservancy project, it is often necessary to quickly fix wooden piles in an emergency to reinforce the embankment or build temporary protective structures. However, traditional wooden pile drilling equipment often has problems such as poor stability, inconvenient adjustment, and difficulty in adapting to complex terrain, which affects the efficiency and quality of rescue. Therefore, it is necessary to design a new type of wooden pile drilling device to solve the above problems.

[0003] However, the existing technology has the following problems when it is actually used:

[0004] 1. The existing technology is not convenient for reducing the vibration generated by the device during the drilling process, which may cause the parts on the device to be impacted and worn, thereby reducing the service life of the device;

[0005] 2. The existing technology is not easy to adjust according to the actual ground conditions when in use, which may cause the device to shake during use, thereby affecting the drilling quality of the device and reducing the stability of the device. Utility Model Content

[0006] (1) Technical problems solved

[0007] In order to overcome the above-mentioned defects of the prior art, the utility model provides a wooden pile drilling device for emergency flood prevention in the Yellow River water conservancy project, which solves the following problems in the prior art:

[0008] 1. The existing technology is not convenient for reducing the vibration generated by the device during the drilling process, which may cause the parts on the device to be impacted and worn, thereby reducing the service life of the device;

[0009] 2. The existing technology is not easy to adjust according to the actual ground conditions when in use, which may cause the device to shake during use, thereby affecting the drilling quality of the device and reducing the stability of the device.

[0010] (2) Technical solution

[0011] To achieve the above purpose, the utility model is implemented through the following technical solutions: a wooden pile drilling device for emergency rescue and flood prevention in the Yellow River water conservancy project, including a base, the bottom of the base is provided with a supporting foot, the top of the base is fixedly installed with a support frame for stability, the outer surface of the support frame is clamped with an adjustment plate for adjusting the height, the top of the adjustment plate is fixedly installed with a sleeve, and the bottom of the adjustment plate is provided with a drill bit for drilling.

[0012] Optionally, a connecting rod is fixedly connected to one side of the base, and a bearing is clamped on the inner wall of the connecting rod.

[0013] Optionally, an adjusting rod is fixedly connected to the top of the support leg, an outer surface of the adjusting rod is threadedly connected to the inner wall of the base, and a knob is fixedly connected to the top of the adjusting rod.

[0014] Optionally, a screw is clamped on the bottom of the support frame, the outer surface of the screw is clamped on the inner wall of the bearing, and a rotating disk is fixedly installed on the top of the screw.

[0015] Optionally, an assembly plate is fixedly mounted on one side of the adjustment plate, a load-bearing plate is fixedly connected to the bottom of the assembly plate, and the top of the load-bearing plate is fixedly mounted to the bottom of the adjustment plate.

[0016] Optionally, a telescopic rod is clamped inside the sleeve, and a limit cover is threadedly connected to the top of the sleeve.

[0017] Optionally, a spring is clamped inside the telescopic rod, and a fastening rod is fixedly connected to the top of the telescopic rod.

[0018] Optionally, a transmission column is fixedly mounted on the top of the drill bit, a motor is clamped on the top of the transmission column, and the bottom of the motor is fixedly mounted to the outer surface of the fastening rod.

[0019] (3) Beneficial effects

[0020] The utility model provides a wooden pile drilling device for emergency flood prevention in the Yellow River water conservancy project, which has the following features:

[0021] Beneficial effects:

[0022] 1. The Yellow River Water Conservancy Project emergency flood prevention wooden pile drilling device can make the device more stable during drilling through the coordinated arrangement of the adjustment plate, sleeve and drill bit. The adjustment plate can facilitate the adjustment of the drill bit height and provide stable support for the sleeve. The sleeve can reduce the vibration generated by the device during operation, thereby reducing the impact and wear of the motor due to vibration. The drill bit can drill the required holes in the ground, making it convenient to fix the wooden piles and increasing the practicality of the device.

[0023] 2. The Yellow River Water Conservancy Project emergency flood prevention wooden pile drilling device can maintain stability on uneven ground through the coordinated setting of the base and the support legs, thereby improving the quality of the device's drilling. The base can limit the support legs so that the support legs maintain a certain verticality after adjustment. The support legs can be adjusted by rotating the length of each support leg from the ground, thereby reducing the shaking of the device during use and increasing the stability of the device. BRIEF DESCRIPTION OF THE DRAWINGS

[0024] Figure 1 This is a schematic diagram of the structure of the utility model;

[0025] Figure 2 This is a schematic diagram of the base structure of the utility model;

[0026] Figure 3 This is a schematic diagram of the support structure of the utility model;

[0027] Figure 4 This is a schematic diagram of the structure of the adjustment plate of the utility model;

[0028] Figure 5 This is a schematic diagram of the sleeve structure of the utility model;

[0029] Figure 6 This is a schematic diagram of the drill bit structure of the utility model.

[0030] In the figure: 1. Base; 2. Support leg; 3. Support frame; 4. Adjustment plate; 5. Sleeve; 6. Drill bit; 7. Connecting rod; 8. Bearing; 9. Adjustment rod; 10. Knob; 11. Screw; 12. Rotating disk; 13. Assembly plate; 14. Load-bearing plate; 15. Telescopic rod; 16. Limit cover; 17. Spring; 18. Fastening rod; 19. Transmission column; 20. Motor. DETAILED DESCRIPTION

[0031] The following is a clear and complete description of the technical solutions in the embodiments of the present invention in conjunction with the accompanying drawings. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without making creative work are within the scope of protection of the present invention.

[0032] See also Figures 1 to 6 The utility model provides a technical solution: a wooden pile drilling device for emergency flood prevention in the Yellow River water conservancy project. The wooden pile drilling device for emergency flood prevention in the Yellow River water conservancy project is mainly used in the scene of piling for flood prevention in the Yellow River water conservancy project.

[0033] Example 1:

[0034] See also Figure 1 、 Figure 4 、 Figure 5 and Figure 6 In order to make the device more stable when drilling, an adjustment plate 4, a sleeve 5 and a drill bit 6 are provided;

[0035] The outer surface of the support frame 3 is clamped with an adjusting plate 4 for adjusting the height, and a sleeve 5 is fixedly installed on the top of the adjusting plate 4. A drill bit 6 for drilling is provided at the bottom of the adjusting plate 4. An assembling plate 13 is fixedly installed on one side of the adjusting plate 4, and the bottom of the assembling plate 13 is fixedly connected to a load-bearing plate 14. The top of the load-bearing plate 14 is fixedly installed to the bottom of the adjusting plate 4. The inside of the sleeve 5 is clamped with a telescopic rod 15, and the top of the sleeve 5 is threadedly connected to a limiting cover 16. The inside of the telescopic rod 15 is clamped with a spring 17, and the top of the telescopic rod 15 is fixedly connected to a fastening rod 18. A transmission column 19 is fixedly installed on the top of the drill bit 6, and a motor 20 is clamped on the top of the transmission column 19. The bottom of the motor 20 is fixedly installed to the outer surface of the fastening rod 18. By setting the assembling plate 13, the adjusting rod 9 can be made firmer when in use. The setting of the load-bearing plate 14 can support the sleeve 5 to prevent the sleeve 5 from shaking during use. The setting of the telescopic rod 15 can be extended and retracted according to the vibration conditions when the device is in use. The setting of the limit cover 16 can limit the position of the telescopic rod 15 to prevent the telescopic rod 15 from separating from the sleeve 5. The setting of the spring 17 can reduce the up and down movement of the telescopic rod 15, thereby reducing the impact and wear on the motor 20, and the elastic coefficient of the spring 17 can fully achieve the above-mentioned effect. The setting of the fastening rod 18 can make the connection between the motor 20 and the telescopic rod 15 more firmly. The setting of the transmission column 19 can transmit the kinetic energy generated by the motor 20 to the drill bit 6 to drill holes in the ground. The setting of the motor 20 can convert electricity into rotational force, thereby improving the practicality of the device.

[0036] Example 2:

[0037] See also Figure 1 and Figure 2 In order to reduce the shaking of the device during use, a base 1 and a support leg 2 are provided;

[0038] The bottom of the base 1 is provided with a support foot 2, and a connecting rod 7 is fixedly connected to one side of the base 1. The inner wall of the connecting rod 7 is clamped with a bearing 8. The top of the support foot 2 is fixedly connected to an adjusting rod 9. The outer surface of the adjusting rod 9 is threadedly connected to the inner wall of the base 1, and the top of the adjusting rod 9 is fixedly connected to a knob 10. Through the setting of the connecting rod 7, the base 1 can be made more firm during use and not prone to deformation. The setting of the bearing 8 can make the device more stable when adjusting the height. The setting of the adjusting rod 9 can adjust the distance between the support foot 2 and the ground by rotation, so that the device can adapt to a variety of complex terrains. The setting of the knob 10 can facilitate the user to rotate the adjusting rod 9, thereby increasing the convenience of the device.

[0039] Example 3:

[0040] See also Figure 1 and Figure 3In order to make the device more convenient to move at a high level when in use, a support frame 3 is provided;

[0041] A support frame 3 for stability is fixedly installed on the top of the base 1. A screw 11 is clamped on the bottom of the support frame 3. The outer surface of the screw 11 is clamped on the inner wall of the bearing 8. A rotating disk 12 is fixedly installed on the top of the screw 11. Through the setting of the screw 11, the depth of the drilling hole of the device can be conveniently adjusted. The setting of the rotating disk 12 can facilitate the user to rotate the screw 11 when using the device.

[0042] The electrical components mentioned in this article are all connected to an external main controller and 220V AC power, and the main controller can be a conventional known device that performs control such as a computer.

[0043] In the present invention, the working steps of the device are as follows:

[0044] First, place the device at the location to be drilled, and adjust the length of each leg 2 by rotating the knob 10 to keep the device horizontal and stable. Secondly, change the position of the adjustment plate by the position of the screw 11 on the support frame 3, thereby adjusting the initial height of the drill bit 6. Then, start the motor 20, which drives the drill bit 6 to rotate through the transmission column 19. At the same time, the rotation of the rotating disk 12 applies downward pressure to perform the drilling operation. During the drilling process, the spring 17 in the telescopic rod 15 acts as a buffer to reduce the impact and wear of vibration on the motor 20. Finally, after the drilling is completed, turn off the motor 20, lift the drill bit 6 to a safe position, and prepare for the next round of drilling operation or move the device to a new position.

[0045] Although embodiments of the present invention have been shown and described, it will be understood by those skilled in the art that various changes, modifications, substitutions and variations may be made to these embodiments without departing from the principles and spirit of the present invention, and the scope of the present invention is defined by the appended claims and their equivalents.

Claims

1. A wooden pile drilling device for emergency flood prevention in Yellow River water conservancy projects, comprising a base (1), characterized in that: The bottom of the base (1) is provided with a support foot (2), the top of the base (1) is fixedly mounted with a support frame (3) for stabilization, the outer surface of the support frame (3) is clamped with an adjustment plate (4) for adjusting the height, the top of the adjustment plate (4) is fixedly mounted with a sleeve (5), and the bottom of the adjustment plate (4) is provided with a drill bit (6) for drilling holes.

2. The Yellow River water conservancy project emergency flood prevention wooden pile drilling device according to claim 1, characterized in that: A connecting rod (7) is fixedly connected to one side of the base (1), and a bearing (8) is clamped on the inner wall of the connecting rod (7).

3. The Yellow River water conservancy project emergency flood prevention wooden pile drilling device according to claim 1, characterized in that: The top of the support leg (2) is fixedly connected to an adjusting rod (9), the outer surface of the adjusting rod (9) is threadedly connected to the inner wall of the base (1), and the top of the adjusting rod (9) is fixedly connected to a knob (10).

4. The Yellow River water conservancy project emergency flood prevention wooden pile drilling device according to claim 2, characterized in that: A screw rod (11) is clamped on the bottom of the support frame (3), the outer surface of the screw rod (11) is clamped on the inner wall of the bearing (8), and a rotating disk (12) is fixedly installed on the top of the screw rod (11).

5. The Yellow River water conservancy project emergency flood prevention wooden pile drilling device according to claim 1, characterized in that: An assembly plate (13) is fixedly mounted on one side of the adjustment plate (4), a load-bearing plate (14) is fixedly connected to the bottom of the assembly plate (13), and the top of the load-bearing plate (14) is fixedly mounted to the bottom of the adjustment plate (4).

6. The Yellow River water conservancy project emergency flood prevention wooden pile drilling device according to claim 1, characterized in that: A telescopic rod (15) is clamped inside the sleeve (5), and a limit cover (16) is threadedly connected to the top of the sleeve (5).

7. The Yellow River water conservancy project emergency flood prevention wooden pile drilling device according to claim 6, characterized in that: A spring (17) is clamped inside the telescopic rod (15), and a fastening rod (18) is fixedly connected to the top of the telescopic rod (15).

8. The Yellow River water conservancy project emergency flood prevention wooden pile drilling device according to claim 7, characterized in that: A transmission column (19) is fixedly mounted on the top of the drill bit (6), a motor (20) is clamped on the top of the transmission column (19), and the bottom of the motor (20) is fixedly mounted on the outer surface of the fastening rod (18).