By installing a cylinder-driven suspension bracket and a reduction motor to control the rotating tube on the tower crane, the lateral and circumferential adjustment of the sprinkler head can be achieved, which solves the dust treatment limitations caused by the fixed tower crane sprinkler device and improves the flexibility and coverage of dust reduction.

CN223342273UActive Publication Date: 2025-09-16HANGZHOU LINGYUE CONSTRUCTION CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202422901520.1
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-11-27
Publication Date
2025-09-16
Estimated Expiration
2034-11-27

AI Technical Summary

Technical Problem

The spraying device of the existing tower crane is fixed, and it is difficult to flexibly adjust the spraying range, resulting in significant limitations in dust treatment.

Method used

A rotating tube system with a cylinder-driven hanger and a reduction motor-controlled system was designed. Combined with the sprinkler head and water storage tank, the sprinkler head can be adjusted laterally and circumferentially to expand the spraying range.

Benefits of technology

By adjusting the sprinkler head laterally and circumferentially, it can flexibly respond to dust in different locations, improving the flexibility and coverage of the dust reduction effect.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN223342273U_ABST
    Figure CN223342273U_ABST
Patent Text Reader

Abstract

The utility model discloses a building construction tower crane which comprises a tower crane body, an air cylinder is arranged on the tower crane body, a suspension frame is arranged at the bottom of one end of the tower crane body in a sliding mode, an output shaft of the air cylinder is connected with the suspension frame, an installation box is arranged at the bottom of the suspension frame, and a rotating pipe is rotatably installed in the installation box through a bearing. A gear motor is arranged on one side of the mounting box and is in transmission connection with a rotating pipe, the bottom of the rotating pipe communicates with a spraying head, a water storage tank is arranged on one side of the tower crane body, a water pump is arranged on the top of the water storage tank, the input end of the water pump communicates with the water storage tank, and the output end of the water pump is sequentially connected with a hose and a butt joint pipe. The butt joint pipe fixedly penetrates through the suspension frame, and one end of the butt joint pipe extends into the rotating pipe. Through the arrangement, the range of spraying and dust falling of the tower crane is expanded, so that dust falling can be effectively carried out aiming at different positions, and the flexibility of the tower crane is improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to a building construction tower crane. Background Art

[0002] A tower crane, also known as a tower crane or tower crane, originated in Western Europe. It is a rotating crane with a boom mounted on top of a tall tower. It has a large operating area and is primarily used for vertical and horizontal material transportation and the installation of building components in housing construction.

[0003] Construction sites usually generate a large amount of dust. To prevent the dust from spreading, some existing tower cranes are equipped with spray devices to spray and reduce the dust on the construction site. However, the spray devices on the tower cranes are mostly fixed, and it is inconvenient to adjust the spray range of the spray devices. Therefore, the dust can only be processed within a specific range, which makes it difficult to improve its flexibility and has certain limitations.

[0004] Therefore, it is necessary to provide a construction tower crane to solve the above problems. Utility Model Content

[0005] The technical problem to be solved by the utility model is to provide a building construction tower crane to solve the problems raised in the above background technology.

[0006] In order to solve the above problems, the present invention adopts the following technical solutions:

[0007] A construction tower crane comprises a tower crane body, a cylinder is provided on the tower crane body, a suspension bracket is slidably provided at the bottom of one end of the tower crane body, the cylinder output shaft is connected to the suspension bracket, a mounting box is provided at the bottom of the suspension bracket, a rotating tube is rotatably installed in the mounting box through a bearing, a reduction motor is provided on one side of the mounting box, the reduction motor is transmission-connected to the rotating tube, a sprinkler head is connected to the bottom of the rotating tube, a water tank is provided on one side of the tower crane body, a water pump is provided on the top of the water tank, an input end of the water pump is connected to the water tank, an output end of the water pump is connected in sequence with a hose and a docking pipe, the docking pipe is fixedly penetrated through the suspension bracket and one end extends into the interior of the rotating tube.

[0008] Preferably, the output shaft of the reduction motor passes through the mounting box and is connected to a worm, and a worm wheel is fixedly sleeved on the outer wall of the rotating tube, and the worm wheel is meshedly connected to the worm.

[0009] Preferably, two fixed blocks are provided at the bottom of one side of the tower crane body, a cross bar is fixedly provided between the two fixed blocks, a sliding sleeve is provided at the top of the suspension frame, and the sliding sleeve is slidably connected to the cross bar.

[0010] Preferably, a rubber sealing ring is provided inside the rotating tube, and the inner surface of the rubber sealing ring contacts the outer surface of the butt-joint tube.

[0011] The beneficial effects of the present invention are as follows: water is added to the water tank and the water pump is started. The water in the water tank passes through the hose, the docking tube, and the rotating tube in sequence, and is finally sprayed downward from the sprinkler head, thereby reducing dust. The cylinder output shaft is extended and retracted to drive the suspension frame to move laterally, thereby driving the sprinkler head below it to move laterally to adjust the lateral position of the spray. The reduction motor is started to drive the rotating tube to rotate, thereby allowing the sprinkler head to be rotated and adjusted to reduce dust at different circumferential positions. Through the above arrangement, the range of the tower crane spray dust reduction can be expanded, thereby effectively reducing dust at different locations and improving its flexibility. BRIEF DESCRIPTION OF THE DRAWINGS

[0012] In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the following briefly introduces the drawings required for use in the embodiments or the description of the prior art, but this does not limit the scope of protection of the present invention.

[0013] Figure 1 A schematic diagram of the overall structure provided by the utility model;

[0014] Figure 2 The utility model provides Figure 1 Schematic diagram of part of the structure;

[0015] Figure 3 A front sectional view of the installation box provided by the utility model;

[0016] Figure 4 This is a top sectional view of the installation box provided by the utility model.

[0017] Among them, 1. Tower crane body; 2. Cylinder; 3. Suspension bracket; 4. Installation box; 5. Rotating tube; 6. Reducer motor; 7. Sprinkler head; 8. Water tank; 9. Water pump; 10. Hose; 11. Butt joint; 12. Worm; 13. Worm gear; 14. Fixed block; 15. Cross bar; 16. Sleeve; 17. Rubber sealing ring. DETAILED DESCRIPTION

[0018] See Figures 1 to 4The construction tower crane shown includes a tower crane body 1, a cylinder 2 is provided on the tower crane body 1, a suspension bracket 3 is slidingly provided at the bottom of one end of the tower crane body 1, the output shaft of the cylinder 2 is connected to the suspension bracket 3, and an installation box 4 is provided at the bottom of the suspension bracket 3. A rotating tube 5 is rotatably installed in the installation box 4 through a bearing, and a reduction motor 6 is provided on one side of the installation box 4. The reduction motor 6 is transmission-connected to the rotating tube 5, and a sprinkler head 7 is connected to the bottom of the rotating tube 5. A water tank 8 is provided on one side of the tower crane body 1, and a water pump 9 is provided on the top of the water tank 8. The input end of the water pump 9 is connected to the water tank 8, and the output end of the water pump 9 is sequentially connected to a hose 10 and a docking pipe 11, and the docking pipe 11 is fixedly penetrated through the suspension bracket 3 and one end extends into the interior of the rotating tube 5.

[0019] Furthermore, the output shaft of the reduction motor 6 passes through the mounting box 4 and is connected to a worm 12 . A worm wheel 13 is fixedly sleeved on the outer wall of the rotating tube 5 . The worm wheel 13 is meshed and connected to the worm 12 .

[0020] The worm 12 and the worm wheel 13 are arranged to achieve transmission connection between the output shaft of the reduction motor 6 and the rotating tube 5 .

[0021] Furthermore, two fixing blocks 14 are provided at the bottom of one side of the tower crane body 1 , a cross bar 15 is fixedly provided between the two fixing blocks 14 , and a sliding sleeve 16 is provided at the top of the suspension frame 3 , and the sliding sleeve 16 is slidably connected to the cross bar 15 .

[0022] The fixing block 14 , the crossbar 15 and the sliding sleeve 16 are arranged to achieve the sliding installation of the suspension bracket 3 .

[0023] Furthermore, a rubber sealing ring 17 is provided inside the rotating tube 5 , and the inner surface of the rubber sealing ring 17 contacts the outer surface of the butt-joint tube 11 .

[0024] The rubber sealing ring 17 is provided to improve the sealing performance of the connection between the butt joint 11 and the rotary tube 5 .

[0025] When the utility model is used, water is added into the water tank 8, and the water pump 9 is started. The water in the water tank 8 passes through the hose 10, the docking tube 11 and the rotating tube 5 in sequence, and is finally sprayed downward from the sprinkler head 7, so as to reduce the dust. The output shaft of the cylinder 2 is extended and retracted to drive the suspension frame 3 to move horizontally, and then drive the sprinkler head 7 below it to move horizontally, so as to adjust the horizontal position of the spray. The reduction motor 6 is started to drive the rotating tube 5 to rotate, so that the sprinkler head 7 can be rotated and adjusted to reduce the dust at different circumferential positions.

[0026] The above are only specific embodiments of the present invention, but the scope of protection of the present invention is not limited to them. Any changes or substitutions that do not require creative work should be included in the scope of protection of the present invention. Therefore, the scope of protection of the present invention should be based on the scope of protection defined in the claims.

Claims

1. A construction tower crane, characterized by: It includes a tower crane body, a cylinder is provided on the tower crane body, a suspension bracket is slidingly provided at the bottom of one end of the tower crane body, the cylinder output shaft is connected to the suspension bracket, a mounting box is provided at the bottom of the suspension bracket, a rotating tube is rotatably installed in the mounting box through a bearing, a reduction motor is provided on one side of the mounting box, the reduction motor is transmission-connected to the rotating tube, a sprinkler head is connected to the bottom of the rotating tube, a water tank is provided on one side of the tower crane body, a water pump is provided on the top of the water tank, an input end of the water pump is connected to the water tank, an output end of the water pump is sequentially connected to a hose and a docking pipe, the docking pipe is fixedly penetrated through the suspension bracket and one end extends into the interior of the rotating tube.

2. A construction tower crane according to claim 1, characterized in that: The output shaft of the reduction motor passes through the mounting box and is connected to a worm, and a worm wheel is fixedly sleeved on the outer wall of the rotating tube, and the worm wheel is meshed with the worm.

3. A construction tower crane according to claim 1, characterized in that: Two fixed blocks are provided at the bottom of one side of the tower crane body, a cross bar is fixedly provided between the two fixed blocks, a sliding sleeve is provided on the top of the suspension frame, and the sliding sleeve is slidably sleeved on the cross bar.

4. A construction tower crane according to claim 1, characterized in that: A rubber sealing ring is provided inside the rotating tube, and the inner surface of the rubber sealing ring contacts the outer surface of the butt-joint tube.