Signboard foundation structure

The steel frame and concrete U-shaped trough structure solves the installation problem of signboards under limited space and interference from underground pipelines, and ensures the stable installation and safety of signboards.

CN223358305UActive Publication Date: 2025-09-19CHANGJIANG SURVEY PLANNING DESIGN & RES CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202422771844.8
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-11-14
Publication Date
2025-09-19
Estimated Expiration
2034-11-14

AI Technical Summary

Technical Problem

When space is limited and there is interference from underground pipelines, the installation and construction of signboards is difficult to carry out, and existing technologies cannot effectively guarantee the safe, stable and normal installation of signboards.

Method used

It adopts a steel frame and concrete U-shaped trough structure. A U-shaped notch is set in the concrete U-shaped trough to accommodate underground pipelines. Pre-buried anchor bolts enhance the connection strength. Combined with the sand cushion layer, it provides a fixed foundation to ensure the stable installation of the signboard.

Benefits of technology

It provides sufficient strength and anti-overturning ability to avoid interference with underground pipelines, ensuring the normal installation of the signboard and the safety and stability of the overall structure.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN223358305U_ABST
    Figure CN223358305U_ABST
Patent Text Reader

Abstract

The utility model provides a signboard foundation structure and belongs to the technical field of road engineering and traffic engineering. The concrete U-shaped groove is poured in the steel bar frame; the concrete U-shaped groove is provided with a U-shaped notch with a downward opening; the U-shaped notch is used for accommodating an underground pipeline; the mounting base is connected to the upper side surface of the concrete U-shaped groove; the lower end of the vertical rod is connected to the mounting base; and the sign board surface is connected to the upper end of the vertical rod. The concrete U-shaped groove has enough strength, anti-overturning capacity and anti-sliding capacity, provides a fixed installation foundation for the vertical rod and the sign board face, and guarantees safety and stability of the whole structure of the sign board. The U-shaped notch formed in the lower side of the concrete U-shaped groove provides an embedded space for the underground pipeline, interference of the underground pipeline is avoided, and normal installation and construction of the signboard are guaranteed.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model belongs to the technical field of road engineering and traffic engineering, and more specifically relates to a signboard infrastructure structure. Background Art

[0002] Road signs are important symbols for road driving. They have prominent guiding, restrictive and identifying functions, and can provide drivers and passengers with brief and important information notifications.

[0003] Signs consist of the signboard, columns, foundation, and corresponding connecting components. The foundation must withstand vertical and horizontal loads and bending moments from the superstructure. Therefore, it must possess sufficient strength, anti-overturning, and anti-slip capabilities to ensure the safety and stability of the structure. Large sign foundations are typically large, making installation difficult when pipelines interfere with the sign's installation location or when space is limited. Utility Model Content

[0004] The purpose of the utility model is to provide a signboard infrastructure structure, which can ensure normal installation and construction of the signboard under conditions of limited space and interference from underground pipelines.

[0005] To achieve the above objectives, the present invention provides a signboard infrastructure, comprising:

[0006] steel frame;

[0007] A concrete U-shaped trough is cast in the steel frame; the concrete U-shaped trough is provided with a U-shaped notch opening downward; the U-shaped notch is used to accommodate underground pipelines;

[0008] An installation base connected to the upper side of the concrete U-shaped groove;

[0009] a vertical pole, the lower end of which is connected to the mounting base; and

[0010] The sign board is connected to the upper end of the vertical pole.

[0011] Furthermore, a plurality of anchor bolts are pre-embedded in the concrete U-shaped groove, and the upper ends of the anchor bolts are bolted to the mounting base.

[0012] Furthermore, the anchor bolt includes a first bent bolt and a second bent bolt, the first bent bolt includes a first vertical section, a bent section, a second vertical section and a first horizontal section connected to each other; the second bent bolt includes a third vertical section, a second horizontal section, a fourth vertical section and a third horizontal section connected to each other.

[0013] Furthermore, a plurality of the anchor bolts are symmetrically embedded in the concrete U-shaped groove.

[0014] Furthermore, it also includes a sand cushion layer, which is arranged on the lower side of the concrete U-shaped groove and the underground pipeline.

[0015] Compared with the prior art, the present invention has the following technical effects:

[0016] The concrete U-shaped groove of the signboard foundation structure of the utility model has sufficient strength, anti-overturning and anti-slip capabilities, which provides a fixed installation foundation for the upright pole and the signboard surface, ensuring the safety and stability of the overall structure of the signboard; the U-shaped notch provided on the lower side of the concrete U-shaped groove provides a pre-buried space for underground pipelines, which can solve the problem of signboard installation and construction under limited space and interference from underground pipelines, avoid interference from underground pipelines, and ensure the normal installation and construction of the signboard. BRIEF DESCRIPTION OF THE DRAWINGS

[0017] In order to more clearly illustrate the technical solutions in the embodiments of the present invention, the following briefly introduces the drawings required for use in the embodiments or descriptions of the prior art. Obviously, the drawings described below are only some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying any creative labor.

[0018] Figure 1 A schematic diagram of the overall structure of a signboard infrastructure provided by an embodiment of the present utility model;

[0019] Figure 2 for Figure 1 Schematic diagram of some structures in .

[0020] Among them, the reference numerals in the figures are:

[0021] 1. Steel frame, 2. Concrete U-shaped groove, 3. Mounting base, 4. Vertical pole, 5. Marking board, 6. U-shaped notch, 7. Anchor bolt, 8. Underground pipeline, 9. Sand cushion, 71. First bending bolt, 72. Second bending bolt. DETAILED DESCRIPTION

[0022] In order to make the technical problems, technical solutions and beneficial effects to be solved by the present invention more clearly understood, the present invention is further described in detail below with reference to the accompanying drawings and embodiments. It should be understood that the specific embodiments described herein are only used to explain the present invention and are not intended to limit the present invention.

[0023] It should be noted that when an element is referred to as being “fixed on” or “disposed on” another element, it may be directly on the other element or indirectly on the other element. When an element is referred to as being “connected to” another element, it may be directly connected to the other element or indirectly connected to the other element.

[0024] It should be understood that the terms "length", "up", "down", "vertical", "horizontal", "top", "bottom", "inside", "outside", etc., indicating the orientation or position relationship, are based on the orientation or position relationship shown in the accompanying drawings, and are only for the convenience of describing the present invention and simplifying the description, and do not indicate or imply that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood as a limitation on the present invention.

[0025] The terms used in the embodiments of the present invention are only for the purpose of describing specific embodiments and are not intended to limit the present invention. The singular forms "a", "the" and "the" used in the embodiments of the present invention and the appended claims are also intended to include plural forms, unless the context clearly indicates otherwise.

[0026] The terms "first" and "second" are used solely for descriptive purposes, to distinguish objects, such as substances, from one another, and should not be construed as indicating or implying relative importance or implicitly specifying the quantity of the technical features being referred to. For example, a first XX could also be referred to as a second XX, and similarly, a second XX could also be referred to as a first XX, without departing from the scope of the embodiments of the present invention. Thus, features defined as "first" or "second" may explicitly or implicitly include one or more of such features.

[0027] See also Figure 1 、 Figure 2 Now, a signboard infrastructure structure provided by an embodiment of the present utility model is described.

[0028] In one embodiment of the present invention, a signboard infrastructure structure includes a steel frame 1, a concrete U-shaped channel 2, a mounting base 3, a vertical pole 4, and a signboard 5. The concrete U-shaped channel 2 is cast within the steel frame 1; the mounting base 3 is connected to the upper side of the concrete U-shaped channel 2; the lower end of the vertical pole 4 is connected to the mounting base 3; the signboard 5 is connected to the upper end of the vertical pole 4; the concrete U-shaped channel 2 is provided with a downwardly opening U-shaped notch 6; the U-shaped notch 6 is used to accommodate underground pipelines 8.

[0029] The reinforcement frame 1 of this embodiment is constructed from multiple steel bars assembled, tied, or welded together. The layout, material, and dimensions of the reinforcement frame are determined based on reinforcement calculations. The concrete U-shaped trough 2 can be cylindrical or rectangular. In the rectangular form, its width is a, its length is b, and its height is h. The U-shaped notch 6 on its lower side has a depth of h2 and a width of a2. Its material and dimensions must meet strength, anti-overturning, anti-sliding, and base stress requirements.

[0030] The concrete U-shaped groove 2 of the foundation structure of a signboard in the embodiment of the present utility model has sufficient strength, anti-overturning and anti-slip capabilities, which provides a fixed installation foundation for the upright pole 4 and the sign board 5, ensuring the safety and stability of the overall structure of the signboard; the U-shaped notch 6 provided on the lower side of the concrete U-shaped groove 2 provides a pre-buried space for the underground pipeline 8, which can solve the problem of signboard installation and construction under limited space and interference from the underground pipeline 8, avoid interference from the underground pipeline 8, and ensure the normal installation and construction of the signboard.

[0031] Furthermore, a plurality of anchor bolts 7 are pre-embedded in the concrete U-shaped trough 2 of this embodiment, and the upper ends of the anchor bolts 7 are bolted to the mounting base 3. The anchor bolts 7 not only connect the mounting base 3 and the concrete U-shaped trough 2 together, but also enhance the structural strength of the concrete U-shaped trough 2.

[0032] Furthermore, the anchor bolt 7 of this embodiment includes a first bent bolt 71 and a second bent bolt 72. The first bent bolt 71 includes a first vertical section, a bent section, a second vertical section, and a first horizontal section that are interconnected; the second bent bolt 72 includes a third vertical section, a second horizontal section, a fourth vertical section, and a third horizontal section that are interconnected. The first and second bent bolts 71 and 72 can strengthen the integrity of the connections between the upper and lower sections and the left and right sections within the concrete U-shaped channel 2, thereby increasing the structural strength of the concrete U-shaped channel 2.

[0033] Furthermore, in this embodiment, multiple anchor bolts 7 are symmetrically embedded in the concrete U-shaped groove 2, that is, multiple first bent bolts 71 are symmetrically embedded in the concrete U-shaped groove 2, and multiple second bent bolts 72 are also symmetrically embedded in the concrete U-shaped groove 2. In this embodiment, eight anchor bolts 7 are provided, and the shapes of the first bent bolts 71 and the second bent bolts 72 are bent according to the shape of the cast U-shaped concrete U-shaped groove 2. The material and size of the anchor bolts 7 must meet the requirements of shear resistance and pull-out resistance.

[0034] Furthermore, the signboard foundation structure of this embodiment includes a sand cushion layer 9, which is placed below the concrete U-shaped groove 2 and the underground pipeline 8. This layer serves as a leveling agent during construction and also acts as a water and moisture barrier. Furthermore, it protects the underground pipeline 8 and reduces the impact of construction vibrations on it. Specifically, the thickness of the sand cushion layer 9 is 10 cm.

[0035] The signboard foundation structure of this embodiment is embedded in a roadside slope, earthen shoulder, or green belt, and the foundation must meet bearing capacity requirements. If underground pipelines 8 are located below the signboard and space is limited, the pipelines 8 pass through the U-shaped notch 6. The signboard foundation must meet the requirements of the "Code for Design of Urban Road Traffic Facilities" (GB 50688-2011) and the "Code for Design of Highway Bridge and Culvert Foundations" (JTG 3363-2019).

[0036] The design steps of the signboard infrastructure of this embodiment are as follows:

[0037] S1. Determine the bending moment M of the lower structure in the X and Y directions based on the weight of the sign board 5, the weight of the pole 4, and the wind load. x 、M y and vertical load F h .

[0038] S2, according to the bending moment M x 、M y and vertical load F h , carry out strength, anti-overturning, anti-sliding, and base stress verification design, determine the material strength grade of the cement concrete U-shaped groove 2 and its width a, length b, height h, as well as the groove depth h2 and groove width a2 of the U-shaped notch 6, where the groove width a2 needs to be greater than the diameter of the underground pipeline 8.

[0039] S3, according to the bending moment M x 、M y and vertical load F h , perform reinforcement calculations and determine the material strength grade, layout spacing, and steel bar size of the steel frame 1.

[0040] S4, according to the bending moment M x 、M y and vertical load F h , perform shear and pull-out calculations to determine the material strength and size of the anchor bolt 7.

[0041] The specific calculations should comply with the relevant provisions of the "Code for Design of Highway Bridge and Culvert Foundations" (JTG 3363-2019).

[0042] The construction and installation steps of the signboard infrastructure of this embodiment are as follows:

[0043] S1. Collect geological survey data, find out the distribution of underground pipelines 8, determine the installation location of the signboard, and ensure that the bearing capacity of the foundation meets the requirements. If it does not meet the requirements, the foundation needs to be reinforced.

[0044] S2. Excavate a foundation pit and lay a 10 cm sand cushion layer 9 below the underground pipeline 8.

[0045] S3. Mechanically process the steel bars, assemble and tie or weld them into a steel bar frame 1, and place them into the foundation pit together with the anchor bolts 7.

[0046] S4. Install the formwork, pour concrete U-shaped groove 2, and cure for 7 days.

[0047] S5. Install the upper structure: connect the installation base 3, the vertical pole 4 and the sign board surface 5 in sequence on the poured concrete U-shaped groove 2.

[0048] S6. Carry out structural acceptance after construction is completed.

[0049] The above embodiments merely illustrate several implementations of the present invention. While the descriptions are relatively specific and detailed, they should not be construed as limiting the scope of the present invention. It should be noted that a person skilled in the art would be able to make numerous variations and improvements without departing from the concept of the present invention, all of which fall within the scope of protection of the present invention. Therefore, the scope of protection of the present invention shall be determined by the appended claims.

Claims

1. A signboard infrastructure, characterized in that: include: steel frame; A concrete U-shaped trough is cast in the steel frame; the concrete U-shaped trough is provided with a U-shaped notch opening downward; the U-shaped notch is used to accommodate underground pipelines; An installation base connected to the upper side of the concrete U-shaped groove; a vertical pole, the lower end of which is connected to the mounting base; and The sign board is connected to the upper end of the vertical pole.

2. A signboard base structure according to claim 1, characterized in that: A plurality of anchor bolts are pre-buried in the concrete U-shaped groove, and the upper ends of the anchor bolts are bolted to the mounting base.

3. A signboard base structure according to claim 2, characterized in that: The anchor bolt includes a first bent bolt and a second bent bolt, the first bent bolt includes a first vertical section, a bent section, a second vertical section and a first horizontal section connected to each other; the second bent bolt includes a third vertical section, a second horizontal section, a fourth vertical section and a third horizontal section connected to each other.

4. A signboard base structure according to claim 2, characterized in that: A plurality of anchor bolts are symmetrically embedded in the concrete U-shaped groove.

5. A signboard base structure according to any one of claims 1 to 4, characterized in that: It also includes a sand cushion layer, which is arranged on the lower side of the concrete U-shaped groove and the underground pipeline.