Building curtain wall construction hoisting equipment

By introducing positioning components and limiting components into the building curtain wall construction hoisting equipment, the vertical and longitudinal limitations of the curtain wall are achieved, which solves the risk of the operator's arm being hit in the existing equipment and improves safety and usage effect.

CN223385711UActive Publication Date: 2025-09-26HUBEI LIANNUO CONSTR CO LTD
View PDF 1 Cites 0 Cited by

Patent Information

Application Number
CN202422650866.9
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-10-31
Publication Date
2025-09-26
Estimated Expiration
2034-10-31

AI Technical Summary

Technical Problem

During the operation of existing building curtain wall construction hoisting equipment, there is a risk of the operator's arm being hit when the curtain wall presses down the connecting block to drive the blocking door to flip, which reduces safety.

Method used

Positioning components and limiting components placed inside the shell, including moving strips, sealing strips, locking rods and telescopic springs, are used. The vertical and longitudinal limiting of the curtain wall is achieved through sliding fit and the combination of the locking rods and screw holes. Hoisting is carried out in conjunction with lifting rings to ensure the stability and safety of the curtain wall position.

Benefits of technology

It improves the safety of the combination of curtain wall and placement shell, ensures the stability of curtain wall position, reduces the risk of operator injury, and improves the use effect of construction hoisting equipment.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN223385711U_ABST
    Figure CN223385711U_ABST
Patent Text Reader

Abstract

The utility model discloses building curtain wall construction hoisting equipment which comprises a placing shell and two groups of sealing strips, and the top of the placing shell is fixedly connected with a hoisting ring. The curtain wall is placed in the containing shell, the moving strip is moved downwards, the outer frame on the outer side of the moving strip is in sliding fit with the bevel edges of the two sets of sealing strips, the two sets of sealing strips are firstly placed on the front side of the curtain wall, then the moving strip continues to be moved downwards to continue to slide along the inner surface wall of the containing shell, and the outer frame is kept in sliding fit with the two sets of sealing strips; the locking rods are rotated to be combined with the screw holes in the corresponding positions, vertical limiting of the moving strips and the positioning assemblies is achieved, then vertical limiting of the curtain wall is achieved, finally, hooks of an external crane are combined with the hanging rings, hoisting of the curtain wall is achieved, and vertical and longitudinal limiting of the curtain wall is completed. And the position stability of the curtain wall is guaranteed, and meanwhile the combining safety of the curtain wall and the containing shell is improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of glass curtain wall hoisting, in particular to a building curtain wall construction hoisting device. Background Art

[0002] Building curtain wall construction hoisting equipment refers to the mechanical equipment used to lift the glass curtain wall during the installation of the glass curtain wall on the exterior wall of the building.

[0003] Chinese patent publication number CN221543877U, publication date 20240816, discloses a building curtain wall hoisting device including a placement shell for placing the curtain wall, two blocking doors for blocking the curtain wall are provided on one side of the placement shell, two fixed blocks are provided on one side of the placement shell, the bottom and top of the blocking door are movably connected to the opposite sides of the two fixed blocks respectively, the two blocking doors are symmetrically arranged, and two driving mechanisms are provided at the bottom of the inner wall of the placement shell for respectively driving the two blocking doors to rotate.

[0004] The existing building curtain wall construction hoisting equipment mentioned above is a device that places the curtain wall on a placement shell, presses down a connecting block on the curtain wall, and drives the blocking door to flip and close. During the specific implementation process, the curtain wall drives the blocking door to flip through the connecting block very quickly, so the operator needs to quickly pull his hand out of the placement shell, and the risk of the blocking door hitting the operator's arm is relatively high. Therefore, it is urgent to propose corresponding building curtain wall construction hoisting equipment to solve the above problems. Utility Model Content

[0005] The purpose of the utility model is to solve the above problems and to provide a building curtain wall construction hoisting device.

[0006] In order to achieve the above purpose, the present invention adopts the following technical solutions:

[0007] A building curtain wall construction hoisting device includes a placement shell and two sets of seals, the top of the placement shell is fixedly connected to a lifting ring, and a horizontal telescopic component is arranged between the two sets of seals and the front end surface of the placement shell. The inner surface wall of the placement shell is integrated with a positioning component for vertical positioning of the curtain wall and a moving bar for pushing the positioning component. The outer surface wall of the moving bar is in transmission cooperation with the two sets of seals, and a limiting component for vertically limiting the moving bar is arranged between the middle part of the moving bar and the placement shell.

[0008] Preferably, the positioning assembly includes a pressure strip slidably connected to the inner surface wall of the placement shell, and a telescopic spring is fixedly connected between the pressure strip and the movable strip.

[0009] Preferably, the horizontal telescopic assembly includes a protrusion integrally formed with the seal, and a reset spring is fixedly connected between the outer wall of the protrusion and the front end surface of the placement shell.

[0010] Preferably, the outer wall of the movable strip is fixedly connected to an outer frame, the outer frame is U-shaped, a bevel is provided on the top of the seal, and the bevel and the outer wall of the horizontal end of the seal are both slidably connected to the inner wall of the outer frame.

[0011] Preferably, the limiting assembly includes a locking rod screwed together with the inner surface wall of the middle portion of the movable bar, and the locking rod is screwed together with the inner surface wall of the placement shell through a screw hole. There are multiple groups of screw holes, and the multiple groups of screw holes are vertically linearly distributed.

[0012] Preferably, the inner surface walls on both sides of the horizontal end of the placement shell are provided with side hollowing.

[0013] In summary, due to the adoption of the above technical solution, the beneficial effects of the present invention are:

[0014] 1. In the present application, after the curtain wall is placed inside the placement shell, the movable bar is moved downward, and the outer frame outside the movable bar slides with the oblique sides of the two sets of seals. The two sets of seals are first placed on the front side of the curtain wall, and then the movable bar is continued to be moved downward so that it continues to slide along the inner surface wall of the placement shell, and the outer frame keeps sliding with the two sets of seals until the positioning assembly contacts the top of the curtain wall, and then the locking rod is rotated to engage with the screw holes in the corresponding position to realize the vertical limitation of the movable bar and the positioning assembly, and then realize the vertical limitation of the curtain wall, and finally the hook of the external crane is combined with the lifting ring to realize the lifting of the curtain wall, thereby completing the vertical and longitudinal limitation of the curtain wall, ensuring the stability of the position of the curtain wall while improving the safety of the combination of the curtain wall and the placement shell.

[0015] 2. In this application, the positioning assembly comprises a combination of a telescopic spring and a pressure strip, which, on the one hand, ensures the stability of the vertical limit of the curtain wall, and on the other hand, can provide a supplementary margin for the combination of the locking rod and the screw hole through the telescopic characteristics of the telescopic spring, so that the locking rod can always find the corresponding screw hole to realize the positioning of the movable strip, thereby improving the use effect of the building curtain wall construction hoisting equipment. BRIEF DESCRIPTION OF THE DRAWINGS

[0016] Figure 1 Shows a schematic diagram of the overall structure provided according to an embodiment of the utility model;

[0017] Figure 2 A schematic diagram of a side hollow structure provided according to an embodiment of the present utility model is shown;

[0018] Figure 3 A schematic diagram of the locking rod structure provided according to an embodiment of the present utility model is shown;

[0019] Figure 4 A schematic diagram of the layering structure provided according to an embodiment of the present utility model is shown.

[0020] Legend:

[0021] 1. Placement shell; 2. Lifting ring; 3. Seal; 4. Bevel; 5. Bump; 6. External frame; 7. Moving bar; 8. Locking rod; 9. Screw hole; 10. Side hollowing; 11. Reset spring; 12. Pressure strip; 13. Telescopic spring. DETAILED DESCRIPTION

[0022] The following will be combined with the accompanying drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the embodiments described are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without making creative efforts are within the scope of protection of the present invention.

[0023] See also Figure 1-4 , the utility model provides a technical solution:

[0024] A building curtain wall construction hoisting device includes a placement shell 1 and two sets of seals 3. The top of the placement shell 1 is fixedly connected to a lifting ring 2. A horizontal telescopic component is provided between the two sets of seals 3 and the front end surface of the placement shell 1. The inner surface wall of the placement shell 1 is integrated with a positioning component for vertical positioning of the curtain wall and a moving bar 7 for pushing the positioning component. The outer surface wall of the moving bar 7 is in transmission cooperation with the two sets of seals 3, and a limiting component for vertically limiting the moving bar 7 is provided between the middle part of the moving bar 7 and the placement shell 1.

[0025] After placing the curtain wall inside the placement shell 1, move the moving bar 7 downward, and the outer frame 6 on the outside of the moving bar 7 slides with the oblique edges 4 of the two sets of seals 3. The two sets of seals 3 are first placed on the front side of the curtain wall, and then continue to move the moving bar 7 downward so that it continues to slide along the inner wall of the placement shell 1, and the outer frame 6 keeps sliding with the two sets of seals 3 until the positioning assembly contacts the top of the curtain wall, and then rotate the locking rod 8 to engage with the screw hole 9 in the corresponding position to realize the vertical limit of the moving bar 7 and the positioning assembly, and then realize the vertical limit of the curtain wall, and finally combine the hook of the external crane with the lifting ring 2 to realize the lifting of the curtain wall, thereby completing the vertical and longitudinal limit of the curtain wall, ensuring the stable position of the curtain wall while improving the safety of the combination of the curtain wall and the placement shell 1.

[0026] Specifically, such as Figure 2 and Figure 4As shown, the positioning assembly includes a pressure strip 12 that is slidably connected to the inner wall of the placement shell 1, and a telescopic spring 13 is fixedly connected between the pressure strip 12 and the movable bar 7. The positioning assembly is composed of the telescopic spring 13 and the pressure strip 12. On the one hand, it ensures the stability of the vertical limit of the curtain wall. On the other hand, the telescopic characteristics of the telescopic spring 13 can be used to provide a supplementary margin for the combination of the locking rod 8 and the screw hole 9, so that the locking rod 8 can always find the corresponding screw hole 9 to realize the positioning of the movable bar 7, thereby improving the use effect of the building curtain wall construction hoisting equipment.

[0027] Specifically, such as Figure 2 and Figure 3 As shown, the horizontal telescopic component includes a protrusion 5 integrally formed with the seal 3, and a return spring 11 is fixedly connected between the outer wall of the protrusion 5 and the front end surface of the placement shell 1, thereby maintaining the horizontal position of the seal 3 while giving the seal 3 a horizontal telescopic characteristic. The outer wall of the moving bar 7 is fixedly connected to the outer frame 6, and the outer frame 6 is a U-shaped structure. A bevel 4 is provided on the top of the seal 3, and the bevel 4 and the outer wall of the horizontal end of the seal 3 are slidably connected to the inner wall of the outer frame 6, thereby realizing the linkage between the moving bar 7 and the two groups of seals 3. The limiting component includes 7 is screwed together with a locking rod 8 on the inner wall in the middle of the housing 1, and the locking rod 8 is screwed together with the inner wall of the housing 1 through a screw hole 9. There are multiple groups of screw holes 9, and the multiple groups of screw holes 9 are distributed vertically. After the positioning assembly contacts the top of the curtain wall, the locking rod 8 is rotated to engage with the screw hole 9 at the corresponding position to achieve vertical limiting of the movable bar 7 and the positioning assembly. The inner walls on both sides of the horizontal end of the housing 1 are provided with side hollows 10 to provide space for the operator's hands to move, thereby facilitating the combination or separation of the housing 1 with the curtain wall.

[0028] Working principle: After placing the curtain wall inside the placement shell 1, move the moving bar 7 downwards, and the outer frame 6 on the outside of the moving bar 7 slides with the bevel 4 of the two sets of seals 3. The two sets of seals 3 are placed on the front side of the curtain wall first, and then continue to move the moving bar 7 downwards to make it continue to slide along the inner wall of the placement shell 1, and the outer frame 6 keeps sliding with the two sets of seals 3 until the positioning assembly contacts the top of the curtain wall, and then rotate the locking rod 8 to make it engage with the screw hole 9 at the corresponding position to realize the vertical limit of the moving bar 7 and the positioning assembly, thereby realizing the vertical limit of the curtain wall, and finally connect the hook of the external crane with The lifting ring 2 is combined to realize the lifting of the curtain wall, thereby completing the vertical and longitudinal limitation of the curtain wall, ensuring the stability of the position of the curtain wall while improving the safety of the combination of the curtain wall and the placement shell 1. The positioning component is composed of a telescopic spring 13 and a pressure strip 12. On the one hand, it ensures the stability of the vertical limitation of the curtain wall. On the other hand, the telescopic characteristics of the telescopic spring 13 can be used to provide a supplementary margin for the combination of the locking rod 8 and the screw hole 9, so that the locking rod 8 can always find the corresponding screw hole 9 to realize the positioning of the movable bar 7, thereby improving the use effect of the building curtain wall construction lifting equipment.

[0029] The above description of the embodiments is intended to enable those skilled in the art to implement or use the present invention. Various modifications to these embodiments will be readily apparent to those skilled in the art, and the general principles defined herein may be implemented in other embodiments without departing from the spirit or scope of the present invention. Therefore, the present invention is not limited to the embodiments shown herein but is intended to conform to the widest scope consistent with the principles and novel features disclosed herein.

Claims

1. A building curtain wall construction hoisting device, comprising a placement shell (1) and two sets of seals (3), wherein a lifting ring (2) is fixedly connected to the top of the placement shell (1), characterized in that: A horizontal telescopic assembly is provided between the two groups of seals (3) and the front end surface of the placement shell (1); the inner surface wall of the placement shell (1) is integrated with a positioning assembly for vertical positioning of the curtain wall and a moving bar (7) for pushing the positioning assembly; the outer surface wall of the moving bar (7) is in transmission cooperation with the two groups of seals (3), and a limiting assembly for vertically limiting the moving bar (7) is provided between the middle part of the moving bar (7) and the placement shell (1).

2. A building curtain wall construction hoisting equipment according to claim 1, characterized in that: The positioning assembly comprises a pressure strip (12) slidably connected to the inner surface wall of the placement shell (1), and a telescopic spring (13) is fixedly connected between the pressure strip (12) and the moving strip (7).

3. A building curtain wall construction hoisting equipment according to claim 2, characterized in that: The horizontal telescopic assembly comprises a protrusion (5) integrally formed with the seal (3), and a return spring (11) is fixedly connected between the outer wall of the protrusion (5) and the front end surface of the placement shell (1).

4. The building curtain wall construction hoisting equipment according to claim 3, characterized in that: The outer wall of the movable strip (7) is fixedly connected to an outer frame (6), and the outer frame (6) is in a U-shaped structure. A bevel (4) is provided on the top of the seal (3), and the bevel (4) and the outer wall of the horizontal end of the seal (3) are both slidably connected to the inner wall of the outer frame (6).

5. The building curtain wall construction hoisting equipment according to claim 4, characterized in that: The limiting assembly includes a locking rod (8) screwed together with the inner surface wall of the middle portion of the moving bar (7), and the locking rod (8) is screwed together with the inner surface wall of the placement shell (1) through a screw hole (9). The screw holes (9) are provided in multiple groups, and the multiple groups of screw holes (9) are vertically linearly distributed.

6. The building curtain wall construction hoisting equipment according to claim 5, characterized in that: The inner surface walls on both sides of the horizontal end of the placement shell (1) are provided with side hollowing (10).