Maintenance well structure for rapid maintenance of municipal road

By combining the use of structures such as inspection well sections, regular hexagonal bosses, replacement grooves, precast concrete well rings and outer bases, the problem of easy damage to inspection wells on heavy-loaded road sections is solved, rapid maintenance and efficient installation are achieved, and the service life and traffic capacity of the road are improved.

CN223386681UActive Publication Date: 2025-09-26武安市城市综合服务中心
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202520049614.2
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2025-01-09
Publication Date
2025-09-26
Estimated Expiration
2035-01-09

AI Technical Summary

Technical Problem

The existing inspection well structure has a short service life in heavy-load sections, is easily damaged, and has low maintenance efficiency, which affects road traffic.

Method used

It adopts a combined structure including an inspection well section, a regular hexagonal boss, a replacement trough, a precast concrete well ring, an outer base and a precast asphalt surface layer, and utilizes an overall prefabrication and hoisting design to achieve rapid replacement and installation.

Benefits of technology

It realizes the rapid maintenance of the inspection well, ensures the flatness and bearing capacity of the road surface, improves the maintenance efficiency and shortens the maintenance time.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN223386681U_ABST
    Figure CN223386681U_ABST
Patent Text Reader

Abstract

The utility model discloses an overhaul well structure for quickly maintaining a municipal road, which comprises an overhaul well section arranged below the road, a replacement groove arranged on the outer side of the upper part of the overhaul well section, and a replacement cylinder seat embedded in the replacement groove; the prefabricated concrete well ring is arranged above the inspection well section; the outer base is arranged below the outer side surface of the prefabricated concrete well ring and is filled with an inorganic binding material; and the prefabricated asphalt surface layer is arranged above the outer base and the prefabricated concrete walling crib. The maintenance well structure has the advantages that the maintenance well structure can be quickly embedded into the replacement groove through integral prefabrication, so that the maintenance well can be quickly maintained and replaced, the smoothness of a road surface is guaranteed, the maintenance time is effectively shortened, and the maintenance efficiency is improved; through the arrangement of the prefabricated asphalt surface layer, the smoothness of the pavement after maintenance of the overhaul well can be guaranteed, meanwhile, the outer base and the inorganic binding material filled in the outer base can serve as a pavement base layer, and the bearing capacity of the prefabricated asphalt surface layer is guaranteed.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field related to municipal administration, in particular to a maintenance well structure used for rapid maintenance of municipal roads. Background Art

[0002] Inspection wells are designed for easy maintenance of urban underground infrastructure such as power supply, water supply, drainage, sewage, communications, cable TV, gas pipes, and streetlight lines. They are generally located at pipeline intersections, bends, changes in pipe diameter or slope, and at regular intervals along straight pipe sections.

[0003] The inspection well structure in the existing technology can meet daily needs on roads with low traffic volume and for small vehicles. However, its service life is short in heavy-load sections such as important port sections, logistics distribution centers, and freight centers. It is very easy to have problems such as asphalt damage and damage around the well. Once damaged, the maintenance efficiency is low and the maintenance time is long, which has a great impact on the normal traffic on the road. Utility Model Content

[0004] In order to solve the problems raised in the above background technology, the utility model provides a maintenance well structure for rapid maintenance of municipal roads.

[0005] To achieve the above-mentioned purpose, the technical solution of the present utility model is a maintenance well structure for rapid maintenance of municipal roads, comprising:

[0006] The maintenance well section is set below the road and at a certain height from the road surface, with a regular hexagonal boss set on its upper end:

[0007] The replacement slot is opened on the outside of the upper part of the maintenance well section, and the replacement cylinder seat is embedded in the interior of the slot, and the lower end of the replacement cylinder seat is sleeved on the maintenance well section;

[0008] A precast concrete well ring is arranged above the inspection well section, with a regular hexagonal groove at its lower end, which is fitted over the upper end of the inspection well section, and an inspection well cover is installed at its upper end. Hoisting grooves are evenly distributed on the inner wall surface, and U-shaped reinforcement ribs are installed in the hoisting grooves, which extend out of the precast concrete well ring;

[0009] The outer base is arranged below the outer surface of the precast concrete well ring and embedded in the precast concrete well ring. It is connected to the U-shaped reinforcement ribs and has short reinforcement ribs arranged inside. The short reinforcement ribs are evenly distributed vertically and connected to the outer base and the U-shaped reinforcement ribs. The interior of the outer base is filled with inorganic binder.

[0010] The precast asphalt surface layer is set above the outer base and the precast concrete well ring and wraps the inspection manhole cover. Its thickness is the same as the asphalt surface layer of the road.

[0011] Preferably, the outer base is embedded in the replacement cartridge seat in the replacement slot.

[0012] Preferably, the upper end of the outer base is flush with the upper surface of the road base.

[0013] Preferably, there is a certain gap between the outer side of the prefabricated asphalt surface layer and the inner wall of the replacement groove, the gap width is the same as the wall thickness of the replacement cylinder seat, and modified asphalt is filled in the gap.

[0014] Preferably, the same short reinforcement ribs are installed between the U-shaped reinforcement ribs, and the positions of the short reinforcement ribs correspond to those between the outer base and the U-shaped reinforcement ribs.

[0015] Preferably, the upper surface of the prefabricated asphalt surface layer is on the same horizontal plane as the upper surface of the inspection manhole cover.

[0016] Compared with the prior art, the beneficial effects of the present invention are:

[0017] 1. This inspection well structure can be quickly embedded into the replacement groove by utilizing overall prefabrication, so that the inspection well can be quickly repaired and replaced, and the flatness of the road surface can be ensured, which effectively shortens the maintenance time and improves the maintenance efficiency.

[0018] 2. The use of prefabricated asphalt surface layer can ensure the flatness of the road surface after the inspection well is repaired. At the same time, the outer base and the inorganic binder filled inside it can serve as the road base layer to ensure the bearing capacity of the prefabricated asphalt surface layer.

[0019] 3. By using the setting of replacement groove and replacement cylinder seat, the outer base and prefabricated concrete well ring can be installed quickly, and the flatness of the road surface after installation is guaranteed to facilitate the rapid maintenance of the inspection well.

[0020] 4. The U-shaped reinforcement ribs can be used to firmly fix the precast concrete well ring and the outer base. The hoisting grooves can be used to facilitate the hoisting and replacement of the entire device, making the maintenance and replacement of the inspection well more convenient. BRIEF DESCRIPTION OF THE DRAWINGS

[0021] Figure 1 This is a structural schematic diagram of a maintenance well structure for rapid maintenance of municipal roads described in the utility model;

[0022] Figure 2 It is a cross-sectional view of the replacement slot of the utility model;

[0023] Figure 3 It is a cross-sectional view of the precast concrete well ring and outer base of the utility model;

[0024] In the picture:

[0025] 1. Inspection well section; 11. Regular hexagonal boss; 2. Replacement groove; 21. Replacement cylinder seat; 3. Precast concrete well ring; 31. Regular hexagonal groove; 32. Inspection well cover; 33. Lifting groove; 34. U-shaped reinforcement; 4. Outer base; 41. Short reinforcement bar; 42. Inorganic binder; 5. Precast asphalt surface layer; 6. Modified asphalt. DETAILED DESCRIPTION

[0026] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the embodiments described are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without making creative efforts are within the scope of protection of the present invention.

[0027] The utility model provides a technical solution, such as Figure 1-Figure 3 As shown; a maintenance well structure for rapid maintenance of municipal roads, comprising: an inspection well section 1, arranged below the road and spaced a certain height from the road surface, with a regular hexagonal boss 11 provided at its upper end: a replacement groove 2, opened on the upper outer side of the inspection well section 1, with a replacement cylinder seat 21 embedded inside, and the lower end of the replacement cylinder seat 21 is sleeved on the inspection well section 1.

[0028] In the embodiment of the utility model, the setting of the regular hexagonal boss 11 at the upper end of the inspection well section 1 can enable the precast concrete well ring 3 to be quickly inserted into the inspection well section 1 and prevent it from rotating, so that the precast concrete well ring 3 can utilize its own gravity to be stably placed in the replacement groove 2, making the inspection well maintenance more convenient and faster.

[0029] In the embodiment of the present invention, the setting of the replacement groove 2 is utilized so that when the inspection manhole cover 32 is damaged or the asphalt pavement around it is damaged and needs to be replaced, the staff can directly lift out the precast concrete well ring 3, the inspection manhole cover 32, the outer base 4, and the precast asphalt surface layer 5 as a whole, thereby facilitating the replacement of the new inspection manhole structure.

[0030] The precast concrete well ring 3 is arranged above the inspection well section 1, and a regular hexagonal groove 31 is opened at its lower end. The regular hexagonal groove 31 is mounted on the upper end of the inspection well section 1, and an inspection well cover 32 is installed at its upper end. The inner wall side surface is provided with lifting grooves 33, which are evenly distributed. U-shaped reinforcement ribs 34 are installed in the lifting grooves 33, and the U-shaped reinforcement ribs 34 extend out of the precast concrete well ring 3; the outer base 4 is arranged below the outer surface of the precast concrete well ring 3 and embedded in the precast concrete well ring 3, and is connected to the U-shaped reinforcement ribs 34. Short reinforcement ribs 41 are arranged inside it, and the short reinforcement ribs 41 are vertically evenly distributed and connected to the outer base 4 and the U-shaped reinforcement ribs 34. Inorganic binder 42 is filled inside it; the precast asphalt surface layer 5 is arranged above the outer base 4 and the precast concrete well ring 3, and wraps the inspection well cover 32. Its thickness is the same as that of the road asphalt surface layer.

[0031] In the embodiment of the present invention, the regular hexagonal groove 31 provided at the lower end of the precast concrete well ring 3 can be used to quickly connect the well ring with the inspection well section 1, and ensure the firmness of the connection to avoid shaking.

[0032] In the embodiment of the utility model, the lifting groove 33 and the U-shaped reinforcement rib 34 are arranged so that the lifting hook can be quickly mounted on the U-shaped reinforcement rib 34, thereby facilitating the lifting of the entire device, and the inspection well structure can be quickly disassembled and installed through lifting, making the operation more convenient and quick.

[0033] In the embodiment of the present invention, the provision of the U-shaped reinforcement ribs 34 can make the connection between the outer base 4 and the precast concrete well ring 3 more stable, ensure the safety of the device hoisting, avoid leakage of the inorganic binder 42, and by providing the reinforcement short ribs 41, the outer base 4 is fixed more firmly to avoid deformation.

[0034] In the embodiment of the present invention, the prefabricated asphalt surface layer 5 is directly prefabricated above the inorganic binder 42 and the prefabricated concrete well ring 3, so that the road surface can be directly passed after the inspection well is repaired, avoiding the collapse of the asphalt surface layer 5 due to vehicle rolling, and improving maintenance efficiency.

[0035] In the embodiment of the present invention, the thickness of the prefabricated asphalt surface layer 5 is the same as the thickness of the asphalt surface layer of the road surface. At the same time, the size of the prefabricated asphalt surface layer 5 is the same as the outer diameter of the outer base 4, so that the entire device can be embedded in the replacement groove 2, making the inspection well maintenance faster and more convenient.

[0036] In the present invention, the outer base 4 is embedded in the replacement cartridge seat 21 in the replacement slot 2, making the device replacement more efficient and stable.

[0037] In the present invention, the upper end of the outer base 4 is flush with the upper surface of the road base, thereby ensuring that the prefabricated asphalt surface layer 5 is aligned with the asphalt surface layer of the road.

[0038] In the present invention, there is a certain gap between the outer side of the prefabricated asphalt surface layer 5 and the inner wall of the replacement groove 2, the gap width is the same as the wall thickness of the replacement cylinder seat 21, and modified asphalt 6 is filled therein; by filling the modified asphalt 6, its fluidity can be utilized to fill the gap, thereby ensuring the flatness of the road surface, and at the same time, the prefabricated asphalt surface layer 5 can be quickly connected with the road asphalt surface layer.

[0039] In the present invention, the same short reinforcement ribs 41 are installed between the U-shaped reinforcement ribs 34 and correspond to the positions of the short reinforcement ribs 41 between the outer base 4 and the U-shaped reinforcement ribs 34 , thereby improving the connection strength of the outer base 4 .

[0040] In the present invention, the upper surface of the prefabricated asphalt surface layer 5 and the upper surface of the inspection well cover 32 are on the same horizontal plane, ensuring the flatness of the road surface after the inspection well is replaced.

[0041] When using the utility model, the staff opens the manhole cover and inserts the lifting hook into the manhole so that it is hung on the U-shaped reinforcement rib 34 in the lifting groove 33. Then, the staff uses the lifting equipment to drag the damaged manhole structure upward, thereby lifting it together with the outer base 4 and the broken prefabricated asphalt surface layer 5, and then lifts it out of the replacement tank 2 and hoisted it onto the transportation equipment.

[0042] Then the staff removes the hook, opens the manhole cover 32 of the new manhole structure, inserts the hook into it, and then hangs it on the U-shaped reinforcement rib 34 in the internal lifting groove 33. Then, the new manhole structure is hoisted into the replacement groove 2 by using the lifting equipment, and the outer base 4 is embedded in the replacement cylinder seat 21. At the same time, during the hoisting process, the new manhole structure is rotated so that the regular hexagonal groove 31 at the lower end of the precast concrete well ring 3 is aligned with the regular hexagonal boss 11 of the manhole section 1. Then, the new manhole structure is controlled to descend so that the precast concrete well ring 3 is fitted onto the manhole section 1.

[0043] At this time, the upper surface of the prefabricated asphalt surface layer 5 is aligned with the upper end of the asphalt surface layer of the road surface. The staff takes out the modified asphalt, fills it into the gap between the prefabricated asphalt surface layer 5 and the asphalt surface layer of the road surface, and smoothes it.

[0044] When the inspection well structure is manufactured, the outer base 4 and the U-shaped reinforcement ribs 34 are cast inside the precast concrete well ring 3 when the precast concrete well ring 3 is cast in the mold, so that the outer base 4 and the U-shaped reinforcement ribs 34 are fixed together with the precast concrete well ring 3. Subsequently, the short reinforcement ribs 41 are welded and welded between the U-shaped reinforcement ribs 34 and between the U-shaped reinforcement ribs 34 and the outer base 4.

[0045] Then, it is hoisted into a prefabricated trough set on the ground, and the inorganic binder 42 is filled into the outer base 4 and compacted, and then a prefabricated asphalt surface layer 5 is laid on it and wrapped around the inspection well cover 32.

[0046] It should be noted that, in this document, relational terms such as first and second, etc., are used only to distinguish one entity or operation from another entity or operation, and do not necessarily require or imply any actual relationship or order between these entities or operations. Moreover, the terms "include," "comprise," or any other variations thereof are intended to cover non-exclusive inclusion, so that a process, method, article, or device that includes a series of elements includes not only those elements, but also other elements not explicitly listed, or elements inherent to such process, method, article, or device. In the absence of further limitations. The phrase "includes an element defined by..." does not exclude the presence of other identical elements in the process, method, article, or device that includes the element.

[0047] Although the embodiments of the present invention have been shown and described, it will be understood by those skilled in the art that various changes, modifications, substitutions and variations may be made to these embodiments without departing from the principles and spirit of the present invention, and the scope of the present invention is defined by the appended claims and their equivalents.

Claims

1. A maintenance well structure for rapid maintenance of municipal roads, characterized in that: include: The maintenance well section is set below the road and at a certain height from the road surface, with a regular hexagonal boss set on its upper end: The replacement slot is opened on the outside of the upper part of the maintenance well section, and the replacement cylinder seat is embedded in the interior of the slot, and the lower end of the replacement cylinder seat is sleeved on the maintenance well section; A precast concrete well ring is arranged above the inspection well section, with a regular hexagonal groove at its lower end, which is fitted over the upper end of the inspection well section, and an inspection well cover is installed at its upper end. Hoisting grooves are evenly distributed on the inner wall surface, and U-shaped reinforcement ribs are installed in the hoisting grooves, which extend out of the precast concrete well ring; The outer base is arranged below the outer surface of the precast concrete well ring and embedded in the precast concrete well ring. It is connected to the U-shaped reinforcement ribs and has short reinforcement ribs arranged inside. The short reinforcement ribs are evenly distributed vertically and connected to the outer base and the U-shaped reinforcement ribs. The interior of the outer base is filled with inorganic binder. The precast asphalt surface layer is set above the outer base and the precast concrete well ring and wraps the inspection manhole cover. Its thickness is the same as the asphalt surface layer of the road.

2. A maintenance well structure for rapid maintenance of municipal roads according to claim 1, characterized in that: The outer base is embedded in the replacement cartridge seat in the replacement slot.

3. The inspection well structure for rapid maintenance of municipal roads according to claim 2, characterized in that: The upper end of the outer base is flush with the upper surface of the road base.

4. The inspection well structure for rapid maintenance of municipal roads according to claim 1, characterized in that: There is a certain gap between the outer side of the prefabricated asphalt surface layer and the inner wall of the replacement groove, the width of the gap is the same as the wall thickness of the replacement cylinder seat, and modified asphalt is filled in the gap.

5. The inspection well structure for rapid maintenance of municipal roads according to claim 1 is characterized in that: The same short reinforcement ribs are installed between the U-shaped reinforcement ribs and correspond to the positions of the short reinforcement ribs between the outer base and the U-shaped reinforcement ribs.

6. The inspection well structure for rapid maintenance of municipal roads according to claim 1, characterized in that: The upper surface of the prefabricated asphalt surface layer is on the same horizontal plane as the upper surface of the inspection well cover.