Super-long lock wall pier body steel bar clamping and fixing device for efficient construction
By designing an extra-long gate wall pier steel bar fixing device, the problem of insufficient steel cage installation accuracy is solved, efficient construction and quality improvement are achieved, and it is suitable for fixing scenarios of various metal materials.
Patent Information
- Application Number
- CN202422699547.7
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-11-06
- Publication Date
- 2025-09-26
- Estimated Expiration
- 2034-11-06
AI Technical Summary
In the hub renovation and expansion project, existing technology cannot effectively improve the installation accuracy of the steel cage, resulting in difficulty in ensuring the construction quality of the main structure.
A steel bar fixing device for an ultra-long gate wall pier for efficient construction is designed. The device includes a steel plate, steel bar slots, longitudinal ribs, and transverse ribs. The steel bars are accurately positioned and fixed through connecting components and can be decomposed into multiple assembly units for easy construction.
It improves the steel bar installation accuracy and construction efficiency, reduces rework and material waste, improves project quality and safety, and has wide applicability and market prospects.
Smart Images

Figure CN223386866U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of gate wall and pier body reinforcement binding; specifically, the utility model relates to an ultra-long gate wall pier body reinforcement clamping device for efficient construction. Background Art
[0002] In the important control engineering of water discharge involved in the hub expansion and renovation project, it is necessary to involve buildings such as sluice gates, ship locks, and overflow weirs to ensure flood control safety while the hub is expanded and renovated. At the same time, the hub can adjust the water level of the upstream reservoir area to meet the requirements of ecological water storage. The main functions of the hub project are flood control, water storage, and navigation, while taking into account irrigation and ecological water discharge. Among them, the bottom plate size of the main flood discharge gate and regulating gate structure is large. This application is aimed at the hub expansion and renovation project. In order to improve the installation accuracy of the steel cage and then improve the construction quality of the main structure, and contribute to the high-standard construction of water conservancy projects, an efficient construction super-long gate wall pier steel bar clamping device is proposed. Utility Model Content
[0003] In view of this, the utility model provides a super-long gate wall pier body steel bar fixing device for efficient construction, thereby solving or at least alleviating the above-mentioned problems existing in the prior art.
[0004] In order to achieve the aforementioned objectives, the utility model provides a super-long gate wall pier body steel bar fixing device for efficient construction, including a steel plate, a steel bar slot, longitudinal ribs and transverse ribs. The steel plate is configured to adapt to the cross-sectional shape of the gate wall pier body, and the steel bar slot is arranged on the inner side surface of the steel plate. There are two steel plates, and the two steel plates are distributed up and down. The two steel plates are connected by longitudinal ribs. There are multiple transverse ribs, and the two ends of the transverse ribs are connected to two of the longitudinal ribs in the width direction.
[0005] In the aforementioned super-long gate wall pier body steel bar fixing device for efficient construction, optionally, the steel plate is divided into multiple plate units with transverse ribs as dividing lines, and two plate units distributed up and down and their internal longitudinal ribs and transverse ribs form an assembly unit, and two adjacent assembly units are connected by a connecting component.
[0006] In the aforementioned super-long gate wall pier body steel bar fixing device for efficient construction, optionally, the connecting assembly includes a threaded rod, a fastening nut, a pad and a threaded column, the threaded rod is slidably installed in the end portion of the transverse rib located on the inner side of the plate unit, the end of the plate unit away from the transverse rib and the end of the pad away from the transverse rib are respectively provided with a first through hole and a second through hole for the threaded rod to pass through, the fastening nut is threadedly connected to the outer end of the threaded rod, the end of the pad away from the second through hole is provided with a third through hole, the threaded column passes through the third through hole and is threadedly installed on the end of the transverse rib.
[0007] In the aforementioned super-long gate wall pier body steel bar fixing device for efficient construction, optionally, the end of the transverse rib is provided with a slot for inserting the threaded column, and a threaded connection block that cooperates with the threaded column thread is provided in the slot.
[0008] In the aforementioned super-long gate wall pier body steel bar fixing device for efficient construction, optionally, one end of the threaded rod is fixedly mounted with a collar that is slidably sleeved on the outside of the transverse rib through a support plate, and a through groove is provided on the wall surface of the slot, and the outer end of the threaded connection block passes through the through groove and is fixed to the inner surface of the collar.
[0009] In the aforementioned super-long gate wall pier body steel bar fixing device for efficient construction, optionally, an annular groove is provided on the outside of the transverse rib, the sleeve is slidably sleeved in the annular groove, and the through groove is opened on the inner wall surface of the annular groove.
[0010] In the aforementioned super-long gate wall pier body steel bar fixing device for efficient construction, optionally, the contact surface between the top of the pad and the plate unit is a plane, and the threaded rod is provided with two outer side surfaces of the support plate, and the contact surface between the outer side surface of the support plate and the inner surface of the plate unit is a plane.
[0011] In the aforementioned super-long gate wall pier body steel bar fixing device for efficient construction, optionally, when the collar is located at the inner end of the annular groove, the threaded rod is entirely located on the inner side of the plate unit.
[0012] The utility model has at least the following beneficial effects:
[0013] 1. This set of steel bar clamps enables workers to quickly and accurately locate and fix multiple steel bars, greatly simplifying the traditional construction process, effectively shortening construction time, and thus significantly improving project progress.
[0014] 2. The unique structural design makes the steel bars more stable after being fixed, improving the overall quality and safety of the project. At the same time, the multi-directional spacing control function ensures high precision during the construction process, further improving the quality of the project.
[0015] 3. The design of this set of steel bar clamps focuses more on workers' operation and use. Workers can easily get started, which reduces the difficulty of operation and improves construction efficiency and work satisfaction.
[0016] 4. Precise positioning and secure fixation reduce rework and material waste, lowering construction costs. Although there is an initial cost investment, the long-term efficiency gains and cost savings are significant, resulting in outstanding overall economic benefits.
[0017] 5. This equipment represents a groundbreaking innovation in traditional construction methods. Through its unique design concept, it successfully addresses the practical operational challenges encountered in traditional construction methods. Furthermore, its design offers broad applicability, perfectly meeting the requirements for securing rebar in construction projects. Its flexibility and functionality also allow for easy expansion into other metal material securing scenarios. Its ability to solve practical problems, improve construction efficiency, and reduce costs promises broad market prospects and promotional value. BRIEF DESCRIPTION OF THE DRAWINGS
[0018] The disclosure of the present invention will become more apparent with reference to the accompanying drawings. It should be understood that these drawings are for illustrative purposes only and are not intended to limit the scope of protection of the present invention. In the drawings:
[0019] Figure 1 This is a structural schematic diagram of the utility model for the efficient construction of an ultra-long gate wall pier steel bar fixing device.
[0020] Figure 2 For this utility model Figure 1 Enlarged view of point A in the middle.
[0021] Figure 3 For this utility model Figure 2 Enlarged view of point B in the middle.
[0022] Figure 4 This is a schematic diagram of the two splicing units of the utility model after being disassembled.
[0023] Figure 5 For this utility model Figure 4 Enlarged view of point C in the middle.
[0024] Figure markings: 1-steel plate; 1.1-plate unit; 2-rebar slot; 3-longitudinal rib; 4-transverse rib; 5-threaded rod; 6-fastening nut; 7-pad; 8-threaded column; 9-first through hole; 10-second through hole; 11-third through hole; 12-slot; 13-threaded connection block; 14-support plate; 15-ring; 16-through groove; 17-annular groove. DETAILED DESCRIPTION
[0025] With reference to the accompanying drawings and specific embodiments, the structure, composition, characteristics and advantages of the present invention will be described below in an exemplary manner. However, all descriptions should not be used to form any limitation on the present invention.
[0026] In addition, for any single technical feature described or implied in the embodiments mentioned in this document, or any single technical feature shown or implied in the accompanying drawings, the present invention still allows for continued arbitrary combination or deletion between these technical features (or their equivalents) without any technical obstacles, and thus it should be considered that these more embodiments according to the present invention are also within the scope of the description in this document.
[0027] It should also be noted that the terms "inside" and "outside" and the like indicate orientations or positional relationships based on the orientations or positional relationships shown in the accompanying drawings, i.e., ..., and are only for the convenience of describing the present disclosure and simplifying the description, and do not indicate or imply that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore should not be understood as a limitation on the present disclosure.
[0028] Furthermore, the terms "first," "second," "third," and "fourth" are used for descriptive purposes only and should not be understood to indicate or imply relative importance or implicitly specify the quantity of the technical features indicated. Thus, a feature specified as "first," "second," "third," or "fourth" may explicitly or implicitly include at least one of these features.
[0029] like Figures 1 to 5 As shown, a typical embodiment of the present invention provides a super-long gate wall pier body steel bar fixing device for efficient construction, including a steel plate 1, a steel bar slot 2, a longitudinal rib 3 and a transverse rib 4. The steel plate 1 is configured to adapt to the cross-sectional shape of the gate wall pier body, and the steel bar slot 2 is arranged on the inner side of the steel plate 1. There are two steel plates 1, and the two steel plates 1 are distributed up and down. The two steel plates 1 are connected by the longitudinal rib 3. There are multiple transverse ribs 4, and the two ends of the transverse rib 4 are connected to two of the longitudinal ribs 3 in the width direction.
[0030] After applying the solution of the above embodiment, the steel bars are positioned by using the corresponding steel bar slots 2 on the two steel plates 1, which can improve the accuracy of steel bar installation and arrange the steel bars according to a preset layout, thereby improving the efficiency of steel bar installation. The longitudinal ribs 3 are used to connect the upper and lower steel plates 1, and the transverse ribs 4 improve the stability of the device by connecting the two corresponding longitudinal ribs 3 in the transverse direction.
[0031] The steel plate 1 is divided into a plurality of plate units 1.1 with the transverse ribs 4 as dividing lines, and two plate units 1.1 distributed up and down and their internal longitudinal ribs 3 and transverse ribs 4 form an assembly unit, and two adjacent assembly units are connected by connecting components.
[0032] In this embodiment, the device is divided into multiple units for assembly. Each unit is smaller and lighter, making it easier to transport and install. During installation, two corresponding units are simply connected using a connecting assembly. In a more specific embodiment, the device is divided into multiple units based on the longer side of the gate wall pier.
[0033] In one relatively specific embodiment, the connecting assembly includes a threaded rod 5, a fastening nut 6, a pad 7 and a threaded column 8. The threaded rod 5 is slidably installed at the end of the transverse rib 4 located on the inner side of the plate unit 1.1. The end of the plate unit 1.1 away from the transverse rib 4 and the end of the pad 7 away from the transverse rib 4 are respectively provided with a first through hole 9 and a second through hole 10 for the threaded rod 5 to pass through. The fastening nut 6 is threadedly connected to the outer end of the threaded rod 5. The end of the pad 7 away from the second through hole 10 is provided with a third through hole 11. The threaded column 8 passes through the third through hole 11 and is threadedly installed at the end of the transverse rib 4.
[0034] A transverse rib 4 is provided at one end of each assembly unit corresponding to the upper and lower ends of the longitudinal rib 3, and the transverse rib 4 connects the longitudinal rib 3 and the plate unit 1.1 at the same time.
[0035] When assembling the units, align the end of one unit corresponding to the transverse rib 4 with the end of the other unit away from the transverse rib 4, so that the ends of the plate unit 1.1 are aligned. Slide the threaded rod 5 outward on the transverse rib 4, allowing it to pass through the first through-hole 9 of the plate unit 1.1 in the other unit. Then, the threaded column 8 is threadedly connected to the end of the transverse rib 4 to install the backing plate 7. At the same time, the second through-hole 10 is fitted with the outer end of the threaded rod 5. Finally, install the fastening nut 6 on the threaded rod 5.
[0036] By making the above arrangement, the pad 7 cooperates with the screw rod to clamp and fix the opposite ends of the spliced plate unit 1.1 from both the inside and outside sides, so as to connect and fix the two assembled units in the width direction, and connect the pad 7 to the transverse rib 4 through the threaded rod 5 and the transverse rib 4 and the threaded column 8 to connect the pad 7 to the transverse rib 4, so as to connect and fix the two spliced units in the length direction.
[0037] A slot 12 for inserting the threaded column 8 is formed at the end of the transverse rib 4 , and a threaded connection block 13 threadably matched with the threaded column 8 is provided in the slot 12 .
[0038] After the threaded column 8 is inserted into the slot 12 , the threaded column 8 is rotated so as to be threadedly connected to the threaded connection block 13 , thereby stably mounting the backing plate 7 on the transverse rib 4 .
[0039] At the same time, the threaded rod 5 cooperates with the fastening nut 6 to fix the end of the pad 7 away from the transverse rib 4, thereby fixing both ends of the pad 7 at the same time, thereby improving stability.
[0040] One end of the threaded rod 5 is fixedly mounted with a collar 15 slidably sleeved on the outside of the transverse rib 4 through a support plate 14 . A through groove 16 is provided on the wall of the slot 12 . The outer end of the threaded connection block 13 passes through the through groove 16 and is fixed to the inner surface of the collar 15 .
[0041] Specifically, the inner end of the threaded rod 5 is fixedly connected to the support plate 14, and the support plate 14 and the ring 15 form a whole, which is used to carry the displacement of the threaded rod 5 in the length direction of the transverse rib 4, and is used for inserting or withdrawing the threaded rod 5 from the first through hole 9. The cooperation between the threaded connecting block 13 and the through groove 16 can prevent the support plate 14 from swinging, and then keep the threaded rod 5 in a state of alignment with the first through hole 9, making it more convenient for the threaded rod 5 to be inserted into the first through hole 9 quickly and accurately.
[0042] An annular groove 17 is provided on the outside of the transverse rib 4, and the collar 15 is slidably sleeved in the annular groove 17, and the through groove 16 is opened on the inner wall surface of the annular groove 17. In this way, the annular groove 17 can limit the farthest position of the collar 15 sliding inward on the transverse rib 4, thereby limiting the threaded rod 5.
[0043] Furthermore, the contact surface between the top of the pad 7 and the plate unit 1.1 is a plane, and two threaded rods 5 are provided on the outer side surfaces of the support plate 14, and the contact surface between the outer side surface of the support plate 14 and the inner surface of the plate unit 1.1 is a plane.
[0044] Specifically, the outer ends of the pad 7 and the threaded column 8 are both located within the width direction of the plate unit 1.1. The pad 7 includes a transverse section extending from the inside to the outside and a long section extending from the outer end of the transverse section toward the splicing direction. The second through hole 10 is opened on the long section.
[0045] In this embodiment, the top of the transverse section is supported on one side of the plate unit 1.1 connected to the longitudinal rib 3, the inner side of the long section contacts the outer side of the plate unit 1.1, and the long section contacts the outer side of the two spliced plate units 1.1.
[0046] When the collar 15 is located at the inner end of the annular groove 17 , the threaded rod 5 is entirely located inside the plate unit 1 . 1 .
[0047] The technical scope of the present invention is not limited to the contents of the above description. Those skilled in the art can make various deformations and modifications to the above implementation without departing from the technical concept of the present invention, and these deformations and modifications should all fall within the scope of the present invention.
Claims
1. A super-long gate wall pier steel bar fixing device for efficient construction, characterized in that: The invention comprises a steel plate (1), a steel bar groove (2), a longitudinal rib (3) and a transverse rib (4); the steel plate (1) is configured to match the cross-sectional shape of the gate wall pier body; the steel bar groove (2) is arranged on the inner side surface of the steel plate (1); two steel plates (1) are provided, and the two steel plates (1) are distributed up and down; the two steel plates (1) are connected by the longitudinal rib (3); a plurality of transverse ribs (4) are provided, and the two ends of the transverse rib (4) are connected to two longitudinal ribs (3) in the width direction.
2. The high-efficiency construction super-long gate wall pier steel bar fixing device according to claim 1, characterized in that: The steel plate (1) is divided into a plurality of plate units (1.1) with the transverse ribs (4) as dividing lines, and two plate units (1.1) distributed up and down and the longitudinal ribs (3) and transverse ribs (4) therein form an assembly unit, and two adjacent assembly units are connected via a connecting component.
3. The high-efficiency construction super-long gate wall pier steel bar fixing device according to claim 2, characterized in that: The connecting assembly comprises a threaded rod (5), a fastening nut (6), a pad (7) and a threaded column (8); the threaded rod (5) is slidably mounted on the end of the transverse rib (4) at a position located inside the plate unit (1.1); the end of the plate unit (1.1) away from the transverse rib (4) and the end of the pad (7) away from the transverse rib (4) are respectively provided with a first through hole (9) and a second through hole (10) for the threaded rod (5) to pass through; the fastening nut (6) is threadedly connected to the outer end of the threaded rod (5); the end of the pad (7) away from the second through hole (10) is provided with a third through hole (11); the threaded column (8) passes through the third through hole (11) and is threadedly mounted on the end of the transverse rib (4).
4. The high-efficiency construction super-long gate wall pier steel bar fixing device according to claim 3, characterized in that: The end of the transverse rib (4) is provided with a slot (12) for inserting the threaded column (8), and a threaded connection block (13) threadably matched with the threaded column (8) is provided in the slot (12).
5. The high-efficiency construction super-long gate wall pier steel bar fixing device according to claim 4, characterized in that: One end of the threaded rod (5) is fixedly mounted with a collar (15) which is slidably sleeved on the outside of the transverse rib (4) via a support plate (14); a through groove (16) is provided on the wall surface of the slot (12); the outer end of the threaded connection block (13) passes through the through groove (16) and is fixedly connected to the inner surface of the collar (15).
6. The high-efficiency construction super-long gate wall pier steel bar fixing device according to claim 5, characterized in that: An annular groove (17) is provided on the outside of the transverse rib (4), the collar (15) is slidably sleeved in the annular groove (17), and the through groove (16) is opened on the inner wall surface of the annular groove (17).
7. The high-efficiency construction super-long gate wall pier steel bar fixing device according to claim 5, characterized in that: The contact surface between the top of the pad (7) and the plate unit (1.1) is a plane, and the outer side surfaces of the threaded rod (5) against the plate (14) are provided with two, and the contact surface between the outer side surface of the against the plate (14) and the inner surface of the plate unit (1.1) is a plane.
8. The high-efficiency construction super-long gate wall pier steel bar fixing device according to claim 6, characterized in that: When the collar (15) is located at the inner end of the annular groove (17), the threaded rod (5) is entirely located on the inner side of the plate unit (1.1).