Splicing and inserting mounting assembly and mounting system for inorganic mineral plate
The combination of the fixed unit, dry hanging unit, bottom support unit and edge finishing unit of the inorganic mineral board splicing installation component solves the problems of high flatness and quality requirements during the installation of traditional surface panels, achieves rapid installation and material savings, and improves construction efficiency and quality.
Patent Information
- Application Number
- CN202422869889.9
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-11-25
- Publication Date
- 2025-09-26
- Estimated Expiration
- 2034-11-25
AI Technical Summary
Traditional surface panels have high requirements for flatness and quality during installation, which leads to material waste and long construction period.
The inorganic mineral board is installed with an insert assembly, including a fixing unit, a dry hanging unit, a bottom support unit and a trimming unit. The fixing unit is used to directly install the board on the fixing surface, and the bottom support unit and the trimming unit are used to quickly install the inorganic mineral board to ensure the flatness of the installation.
It improves installation efficiency, saves base materials, reduces construction difficulty, and improves installation quality.
Smart Images

Figure CN223386905U_ABST
Abstract
Description
Technical Field
[0001] The utility model belongs to the technical field of building decoration engineering, specifically relates to a supporting structure, in particular to an inserting and installing component and an installing system for an inorganic mineral plate. Background Art
[0002] The conventional practice for traditional surface materials such as wood veneers is to first lay out the lines for positioning, make the base keel, seal the base, install wooden hanging strips, and install the wood veneer. The construction method is relatively complicated and has high requirements for the flatness and quality of the wooden base.
[0003] Moreover, the production process is complicated and the price is high. Any carelessness in on-site processing and cutting will cause waste. If the project schedule is short, traditional materials are restricted by the performance of the materials themselves and cannot effectively avoid or reduce wet construction. A large amount of on-site pouring and fusion work will seriously delay the construction period, and to a certain extent, the process quality will not meet the standards due to the rush to meet the schedule.
[0004] Therefore, there is an urgent need to develop a new inorganic mineral panel installation assembly and installation system to solve the technical problems of how to overcome the material waste and long installation cycle caused by the high flatness and quality requirements of traditional surface panels.
[0005] It should be noted that the above information disclosed in this background technology section is only used to understand the background technology of the present application concept, and therefore, the above description is not considered to constitute information of the prior art. Utility Model Content
[0006] The embodiments of the present disclosure at least provide a splicing installation component and installation system for inorganic mineral panels.
[0007] In the first aspect, an embodiment of the present disclosure provides a splicing and installation assembly for inorganic mineral panels, comprising: a fixing unit, a dry hanging unit, a bottom support unit and a trimming unit; wherein the dry hanging unit is hung on the fixing unit, the bottom support unit is located below the dry hanging unit, and the trimming unit is located around the dry hanging unit; the fixing unit is suitable for installing the dry hanging unit on a fixed surface, and the dry hanging unit is suitable for arranging a plurality of inorganic mineral panels in sequence; and the bottom support unit is suitable for supporting each inorganic mineral panel, and the trimming unit is suitable for limiting each inorganic mineral panel.
[0008] In an optional embodiment, the fixing unit includes: a plurality of fixing clips; the fixing clips are arranged in sequence to hang the dry hanging unit.
[0009] In an alternative embodiment, the fixing clip includes: a fixing block; a protruding portion is provided on the fixing block, and the protruding portion is provided in a screw shape; a screwing portion is further provided on the surface of the fixing block, and the screwing portion is provided in a nut shape; an inner concave portion is further formed on the fixing block, and the inner side wall of the inner concave portion is provided in a threaded shape.
[0010] In an alternative embodiment, the dry-hanging unit includes: a plurality of dry-hanging keels and a plurality of fasteners; a plurality of adjusting holes are sequentially formed on the dry-hanging keels, and each fastener passes through the corresponding adjusting hole and is in threaded cooperation with the inner concave portion, so that the dry-hanging keels are arranged in sequence.
[0011] In an alternative embodiment, the dry-hanging keel is arranged in a U shape, and the waist and abdomen of the dry-hanging keel are concave; each adjusting hole is sequentially arranged on the waist and abdomen of the dry-hanging keel, and the adjusting hole is arranged in an oblong shape.
[0012] In an alternative embodiment, the bottom support unit includes: a support block and a skirting board; the support block is located below the dry-hanging unit, and the skirting board is connected to the support block; the skirting board is adapted to support each inorganic mineral board.
[0013] In an alternative embodiment, an outer edge portion is provided on the skirting board, so that the outer edge portion limits each inorganic mineral board.
[0014] In an alternative embodiment, the edge finishing unit includes: a top edge finishing strip and at least one side edge finishing strip; the top edge finishing strip is located above the dry-hanging unit, and the side edge finishing strip is located on the side of the dry-hanging unit; corresponding edge finishing portions are provided on both the top edge finishing strip and the side edge finishing strip to limit each inorganic mineral board.
[0015] In an alternative embodiment, the plug-in installation assembly for inorganic mineral boards further includes: a plurality of middle seam lines; the middle seam lines are located between two inorganic mineral boards, and the middle seam lines are respectively clamped with the corresponding inorganic mineral boards.
[0016] In a second aspect, an embodiment of the present disclosure further provides an installation system, which includes: the plug-in installation assembly for inorganic mineral boards as described above and a plurality of inorganic mineral boards; wherein each inorganic mineral board is adapted to be sequentially plugged on the plug-in installation assembly for inorganic mineral boards.
[0017] The beneficial effect of the present utility model is that the present utility model directly installs the dry-hanging unit on the fixing surface through the fixing unit, and the bottom support unit and the edge finishing unit can quickly install each inorganic mineral board, while ensuring the flatness of the installation. Compared with the traditional surface layer board installation structure, the installation efficiency can be improved, the base materials can be saved, the construction difficulty can be reduced, and the installation quality can be improved.
[0018] Other features and advantages of the present invention will be described in the following description, and in part will become apparent from the description, or understood by practicing the present invention. The objectives and other advantages of the present invention are realized and obtained by the structures particularly pointed out in the description, claims and drawings.
[0019] In order to make the above-mentioned objects, features and advantages of the present invention more obvious and easy to understand, preferred embodiments are specifically cited herein and described in detail with reference to the accompanying drawings. BRIEF DESCRIPTION OF THE DRAWINGS
[0020] In order to more clearly illustrate the specific implementation methods of the utility model or the technical solutions in the prior art, the drawings required for use in the specific implementation methods or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are some implementation methods of the utility model. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying any creative work.
[0021] Figure 1 A structural diagram of an inorganic mineral panel plug-in installation assembly provided in an embodiment of the present disclosure;
[0022] Figure 2 A structural diagram of a fixing unit provided in an embodiment of the present disclosure;
[0023] Figure 3 A front view of a fixing clamp provided in an embodiment of the present disclosure;
[0024] Figure 4 A top view of a fixing clamp provided in an embodiment of the present disclosure;
[0025] Figure 5 A structural diagram of a dry hanging unit provided in an embodiment of the present disclosure;
[0026] Figure 6 A structural diagram of a dry-hanging keel provided in an embodiment of the present disclosure;
[0027] Figure 7 A structural diagram of a bottom support unit provided in an embodiment of the present disclosure;
[0028] Figure 8 A structural diagram of a top edge strip provided in an embodiment of the present disclosure;
[0029] Figure 9 A structural diagram of an inorganic mineral plate provided in an embodiment of the present disclosure;
[0030] Figure 10 A structural diagram of a center seam line provided in an embodiment of the present disclosure.
[0031] In the picture:
[0032] 1. Fixing unit; 11. Fixing block; 111. Raised portion; 112. Twisting portion; 113. Concave portion;
[0033] 2. Dry hanging unit; 21. Dry hanging keel; 22. Fasteners; 211. Waist and abdomen; 212. Adjustment hole;
[0034] 3. Bottom support unit; 31. Support block; 32. Skirting line; 33. Outer edge;
[0035] 4. Edge trimming unit; 41. Top edge trimming strip; 411. Edge trimming portion;
[0036] 5. Fixed surface;
[0037] 6. Inorganic mineral board; 61. Grooving;
[0038] 7. Center seam line. DETAILED DESCRIPTION
[0039] To make the purpose, technical solutions, and advantages of the embodiments of the present invention more clear, the technical solutions of the present invention will be clearly and completely described below with reference to the accompanying drawings. Obviously, the embodiments described are only part of the embodiments of the present invention, not all of them. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without making creative efforts shall fall within the scope of protection of the present invention.
[0040] In this document, when it is mentioned that a first component is located on a second component, this may mean that the first component may be directly formed on the second component, or that a third component may be interposed between the first component and the second component. In addition, in the drawings, the thickness of components may be exaggerated or reduced in order to effectively describe technical content.
[0041] As used herein, when an element or layer is referred to as being "located on," "engaged to," "connected to," "attached to," or "coupled to" another element or layer, it may be directly located on, engaged, connected, attached to, or coupled to the other element or layer, or there may be intervening elements or layers. Conversely, when an element is referred to as being "directly on," "directly engaged to," "directly connected to," "directly attached to," or "directly coupled to" another element or layer, there may be no intervening elements or layers. Other words used to describe the relationship between elements should be interpreted in a similar manner (e.g., "between" versus "directly between," "adjacent" versus "directly adjacent," etc.). As used herein, the term "and / or" includes any and all combinations of one or more of the associated listed items.
[0042] As used herein, the phrases "in one embodiment," "according to one embodiment," "in some embodiments," and the like generally refer to the fact that the particular feature, structure, or characteristic following the phrase may be included in at least one embodiment of the present disclosure. Thus, a particular feature, structure, or characteristic may be included in more than one embodiment of the present disclosure, such that these phrases do not necessarily refer to the same embodiment. As used herein, the terms "example," "exemplary," and the like are used to "serve as an example, instance, or illustration." Any implementation, aspect, or design described herein as "example" or "exemplary" is not necessarily to be construed as preferred or advantageous over other implementations, aspects, or designs. Instead, the use of the terms "example," "exemplary," and the like is intended to present concepts in a concrete manner.
[0043] It should be noted that similar reference numerals and letters denote similar items in the following drawings, and therefore, once an item is defined in one drawing, it does not need to be further defined or explained in subsequent drawings.
[0044] The following embodiments of the present invention are described in detail with reference to the accompanying drawings. In the absence of conflict, the following embodiments and features in the embodiments may be combined with each other.
[0045] like Figures 1 to 10 At least one embodiment provides a splicing and installation assembly for inorganic mineral panels, which includes: a fixing unit 1, a dry hanging unit 2, a bottom support unit 3 and a trimming unit 4; wherein the dry hanging unit 2 is hung on the fixing unit 1, the bottom support unit 3 is located below the dry hanging unit 2, and the trimming unit 4 is located around the dry hanging unit 2; the fixing unit 1 is suitable for installing the dry hanging unit 2 on a fixing surface 5, and the dry hanging unit 2 is suitable for arranging a plurality of inorganic mineral panels 6 in sequence; and the bottom support unit 3 is suitable for supporting each inorganic mineral panel 6, and the trimming unit 4 is suitable for limiting each inorganic mineral panel 6.
[0046] In at least one embodiment, the dry hanging unit 2 is directly installed on the fixing surface 5 through the fixing unit 1, and the bottom support unit 3 cooperates with the edge trimming unit 4 to quickly install each inorganic mineral board 6 while ensuring the flatness of the installation. Compared with the traditional surface board installation structure, it can improve the installation efficiency, save base materials, reduce the construction difficulty and improve the installation quality.
[0047] In at least one embodiment, see Figure 2 The fixing unit 1 includes: a plurality of fixing clips; each of the fixing clips is arranged in sequence to hang the dry hanging unit 2.
[0048] Specifically, the function of the fixing clamp is to install the dry hanging unit 2 .
[0049] In at least one embodiment, see Figure 3 , Figure 4 , the fixing clip includes: a fixing block 11; a convex portion 111 is provided on the fixing block 11, and the convex portion 111 is arranged in a screw shape; a screwing portion 112 is further provided on the surface of the fixing block 11, and the screwing portion 112 is arranged in a nut shape; an inner concave portion 113 is further formed on the fixing block 11, and the inner side wall of the inner concave portion 113 is arranged in a threaded shape.
[0050] Specifically, by turning the screwing portion 112 with a wrench, the convex portion 111 can be screwed into the fixing surface 5, and at the same time, the inner concave portion 113 can be used in cooperation with the dry hanging unit 2.
[0051] As another optional implementation manner of the fixing block 11, the fixing block 11 can be a 40MM * 40MM * 10MM square polyethylene plastic block, with a central hole opened, the hole diameter is 10MM, the edge distance is 20MM, the screw-shaped diameter extending outside the hole is 10MM, the outermost octagonal screw cap adjusts the distance into the wall, and the inner concave is 5MM outward, and the inner concave distance is 10MM from each of the four sides.
[0052] In at least one embodiment, please refer to Figure 5 , the dry hanging unit 2 includes: a plurality of dry hanging keels 21 and a plurality of fasteners 22; a plurality of adjustment holes 212 are sequentially formed on the dry hanging keel 21, and each of the fasteners 22 passes through the corresponding adjustment hole 212 and is in threaded cooperation with the inner concave portion 113, so that each of the dry hanging keels 21 is arranged in a row.
[0053] Specifically, the fastener 22 can be a screw, a galvanized cross round head screw, with a diameter of 10MM and a length of 40MM.
[0054] In at least one embodiment, please refer to Figure 6 , the dry hanging keel 21 is arranged in a U shape, and the waist and abdomen 211 of the dry hanging keel 21 is concave; each of the adjustment holes 212 is sequentially arranged on the waist and abdomen 211 of the dry hanging keel 21, and the adjustment hole 212 is arranged in an oblong shape.
[0055] Specifically, a long oblong-shaped opening is opened every 200MM in the waist and abdomen 211, the opening diameter is 15MM, the hole length is 30MM, and each adjustment hole 212 contains a matching finished polyethylene expansion screw.
[0056] In at least one embodiment, please refer to Figure 7 , the bottom support unit 3 includes: a support block 31 and a skirting board 32; the support block 31 is located below the dry hanging unit 2, and the skirting board 32 is connected to the support block 31; the skirting board 32 is adapted to support each inorganic mineral board 6.
[0057] Specifically, the support block 31 is made of a 40MM * 70MM through-length wooden square, and is painted with anti-corrosion, fire-proof, and insect-proof coatings three times.
[0058] In at least one embodiment, an outer edge portion 33 is provided on the skirting board 32 to limit each inorganic mineral board 6 by the outer edge portion 33.
[0059] Specifically, the skirting board 32 is a "卜"-shaped stainless steel skirting board 32 with a length of 70MM, a thickness of 1.5MM stainless steel titanium plating, extending outward horizontally at a 90-degree angle for 12MM at a position of 19MM downward from the upper part in the vertical direction, and then extending upward by 4MM at the outermost end to form a wrapped shape.
[0060] In at least one embodiment, please refer to Figure 8 , the edge closing unit 4 includes: a top edge closing strip 41 and at least one side edge closing strip; the top edge closing strip 41 is located above the dry hanging unit 2, and the side edge closing strip is located on the side of the dry hanging unit 2; corresponding edge closing portions 411 are provided on both the top edge closing strip 41 and the side edge closing strip to limit each inorganic mineral board 6.
[0061] Specifically, the top edge closing strip 41 and the side edge closing strip are stainless steel start-stop edge closing lines, in an L shape, with a long side length of 50MM and a short side length of 20MM, and a wrapped edge closing of 4MM upward is formed at the outer end of the short side, and the thickness is 1.5MM titanium-plated stainless steel.
[0062] In at least one embodiment, please refer to Figure 9 , Figure 10 , the plug-in installation component for the inorganic mineral board further includes: a plurality of middle seam lines 7; the middle seam lines 7 are located between two inorganic mineral boards 6, and the middle seam lines 7 are respectively clamped with the corresponding inorganic mineral boards 6.
[0063] Specifically, a groove 61 with an inner concave depth of 7MM and a thickness of 3MM is pre-processed and cut around the inorganic mineral board 6.
[0064] Specifically, the middle seam line 7 is in the shape of the character "干", the length of the first horizontal "-" is 20MM, and the length inclines to one side, and the remaining "十" is in an orthogonal shape of 10MM * 10MM.
[0065] Specifically, on the 240mm thick reinforced concrete partition wall, after laying out the lines according to the design standards, fix the fixing clips; secondly, after completing the point fixation, cover the fixing clips with 50MM dry hanging keels 21, adjust the position through the adjustment holes 212, and use fasteners 22 to fix the two. Under the 240mm thick reinforced concrete partition wall, according to the design dimensions, use fasteners 22 to fix the 40MM*70MM support block 31, and finally use fasteners 22 to fix the skirting board 32 on the 40MM*70MM support block 31; again, according to the design dimensions, at the starting point of the dry hanging, On the far left and top, fasteners 22 are used to fix the top edge strip 41 and the side edge strip to the dry-hanging keel 21 respectively, and the bottom needs to be adjusted to the position with the skirting 32; then, the inorganic mineral board 6 is placed and adjusted to the position, and the snap-fit of the side edge strip and the opening of the inorganic mineral board 6 are used to engage with each other to complete the dry hanging. After completing the first piece of engagement, the center seam line 7 is installed and placed, and the inorganic mineral board 6 is continued to be installed until the last board; finally, on the reserved far right, according to the design size, the top edge strip 41 is fixed to the dry-hanging keel 21 with fasteners 22, and then the last inorganic mineral board 6 is installed and adjusted.
[0066] Based on the same concept, at least one embodiment further provides an installation system, which includes: the above-mentioned inorganic mineral panel installation assembly and a plurality of inorganic mineral panels 6; wherein each of the inorganic mineral panels 6 is suitable for being sequentially inserted into the inorganic mineral panel installation assembly.
[0067] To sum up, the utility model directly installs the dry hanging unit on the fixed surface through the fixing unit, and the bottom support unit cooperates with the edge trimming unit to quickly install various inorganic mineral panels while ensuring the flatness of the installation. Compared with the traditional surface panel installation structure, it can improve installation efficiency, save base materials, reduce construction difficulty and improve installation quality.
[0068] In the description of the embodiments of the present invention, unless otherwise specified or limited, the terms "mounted," "connected," and "connected" should be understood in a broad sense. For example, they can refer to fixed connections, detachable connections, or integral connections; mechanical connections or electrical connections; direct connections or indirect connections through an intermediate medium; and internal communication between two components. Those skilled in the art will understand the specific meanings of the above terms in the present invention based on the specific circumstances.
[0069] In the description of the present invention, it should be noted that the terms "center", "upper", "lower", "left", "right", "vertical", "horizontal", "inside", "outside" and the like indicate positions or positional relationships based on the positions or positional relationships shown in the accompanying drawings, and are only for the convenience of describing the present invention and simplifying the description, rather than indicating or implying that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood as limiting the present invention. In addition, terms such as "first", "second" and other numerical terms do not imply an order or sequence when used herein unless expressly indicated above. Therefore, without departing from the teachings of the example embodiments, the first element, component, region, layer or section discussed above may be referred to as a second element, component, region, layer or section.
[0070] Spatially relative terms, such as "inside," "outside," "below," "beneath," "down," "above," "on," etc., may be used herein to describe the relationship of one element or feature to another element or feature as illustrated in the figures. In addition to the orientations depicted in the figures, spatially relative terms may be intended to encompass different orientations of the device in use or operation. For example, if the device in the figures is flipped, an element described as being "below" or "below" other elements or features will be oriented to be "above" the other elements or features. Thus, the example term "below" may encompass both above and below orientations. The device may be oriented otherwise (rotated 90 degrees or in other orientations), and the spatially relative descriptors used herein are interpreted accordingly.
[0071] In the above discussion, unless otherwise indicated, the terms "about," "approximately," "substantially," etc., when used to describe a numerical value, mean a variation of + / - 10% of the value.
[0072] Based on the above-mentioned ideal embodiment of the present invention, and in accordance with the above description, relevant personnel can make various changes and modifications without departing from the technical scope of the present invention. The technical scope of the present invention is not limited to the content of the specification, but must be determined according to the scope of the claims.
Claims
1. A splicing and installation assembly for an inorganic mineral board, characterized in that: Comprising: a fixing unit (1), a dry-hanging unit (2), a bottom support unit (3) and a trimming unit (4); wherein the dry-hanging unit (2) is hung on the fixing unit (1), the bottom support unit (3) is located below the dry-hanging unit (2), and the trimming unit (4) is located around the dry-hanging unit (2); the fixing unit (1) is adapted to install the dry-hanging unit (2) on a fixing surface (5), and a number of inorganic mineral boards (6) are adapted to be arranged in sequence on the dry-hanging unit (2); and the bottom support unit (3) is adapted to support each inorganic mineral board (6), and the trimming unit (4) is adapted to limit each inorganic mineral board (6).
2. The plug-in installation assembly for inorganic mineral boards according to claim 1, wherein the fixing unit (1) comprises: a number of fixing fasteners; each of the fixing fasteners is arranged in sequence to hang the dry-hanging unit (2).
3. The plug-in installation assembly for inorganic mineral boards according to claim 2, wherein the fixing fastener comprises: a fixing block (11); a protrusion (111) is provided on the fixing block (11), and the protrusion (111) is arranged in a screw shape; a screwing part (112) is further provided on the surface of the fixing block (11), and the screwing part (112) is arranged in a nut shape; a concave part (113) is further formed on the fixing block (11), and the inner side wall of the concave part (113) is arranged in a threaded shape.
4. The plug-in installation assembly for inorganic mineral boards according to claim 3, wherein the dry-hanging unit (2) comprises: a number of dry-hanging keels (21) and a number of fasteners (22); a number of adjustment holes (212) are sequentially formed on the dry-hanging keel (21), and each of the fasteners (22) passes through the corresponding adjustment hole (212) and is in threaded cooperation with the concave part (113) so that the dry-hanging keels (21) are arranged in sequence.
5. The plug-in installation assembly for inorganic mineral boards according to claim 4, wherein the dry-hanging keel (21) is arranged in a U shape, and the waist and abdomen part (211) of the dry-hanging keel (21) is concave; each of the adjustment holes (212) is sequentially arranged on the waist and abdomen part (211) of the dry-hanging keel (21), and the adjustment hole (212) is arranged in an oblong shape.
6. The plug-in installation assembly for inorganic mineral boards according to claim 1, wherein the bottom support unit (3) comprises: a support block (31) and a skirting board (32); the support block (31) is located below the dry-hanging unit (2), and the skirting board (32) is connected to the support block (31); the skirting board (32) is adapted to support each inorganic mineral board (6).
7. The plug-in installation assembly for inorganic mineral boards according to claim 6, wherein an outer edge part (33) is provided on the skirting board (32) so that the outer edge part (33) limits each inorganic mineral board (6).
8. The plug-in installation assembly for inorganic mineral boards according to claim 1, wherein the trimming unit (4) comprises: a top trimming strip (41) and at least one side trimming strip; The top edge strip (41) is located above the dry hanging unit (2), and the side edge strips are located on the sides of the dry hanging unit (2); The top edge strip (41) and the side edge strips are both provided with corresponding edge portions (411) to limit the position of each inorganic mineral plate (6).
9. The inorganic mineral board splicing and installation assembly according to claim 1, wherein: Also includes: Several raphe lines (7); The center seam line (7) is located between the two inorganic mineral plates (6), and the center seam line (7) is respectively engaged with the corresponding inorganic mineral plates (6).
10. A mounting system, characterized in that: include: An inorganic mineral panel assembly as claimed in any one of claims 1 to 9 and a plurality of inorganic mineral panels (6); in Each of the inorganic mineral panels (6) is suitable for being sequentially inserted into the inorganic mineral panel inserting and mounting assembly.